Loading...
HomeMy WebLinkAboutNC0024236_Pretreatment Compliance Inspection_20230510 (2)NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l 1. Control Authority (POTW) Name: City of Kinston 2. Control Authority Representative(s): _Benjamin Overton 3. Title(s): Environmental Compliance SuRervisor 4. Last Inspection Date: 5/3/2022 Inspection Type (Check One): ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ® NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ❑ NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO PCS CODING Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type �I I N I C 1 0 1 0 1 2 14 12 1 3 1 6 1 1 5 19 1 2023 1 l-P� I S (DTIA) (TYPI) INSP 7. Current Number Of Significant Industrial Users (SIUs)? 7 I 11 1 (FACC SILTS 8. Current Number Of Categorical Industrial Users CIUs ? 3 CIUS 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10 0 NOIN 12. Number of SIUs With No IUP, or With an Expired IUP 0 NOCM 13. Number of SILTS in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods Total Number of SIUs in SNC 0 PSNC 14. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 MSNC 15. Number of SILTS In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 SNPS 16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? The facility was issued a Civil Penalty Assessment for Total Suspended Solids violations that occurred in February 2023. 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Put 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ® YES ❑ NO ❑ YES ® NO Limits: N/A Reporting: N/A ,lished: N/A N/A F YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? EYES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 10-22 DMR spot checked 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW — Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 3/22/2018 ® Yes ❑ No 5/30/2018 ® Yes ❑ No 4/1/2023 Industrial Waste Survey IWS 8/18/2021 ® Yes ❑ No 6/2/2022 ® Yes ❑ No 5/31/2027 Sewer Use Ordinance SUO 8/22/2012 ® Yes ❑ No 9/21/2012 ® Yes ❑ No Enforcement Response Plan RP 2/13/2020 ® Yes ❑ No 2/14/2020 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 1 9/26/2018 ® Yes ❑ No 12/3/2018 ® Yes ❑ No INDUSTRIAL USER PERMIT IUP FILE REVIEW 3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION 29. User Name 1. William Barnet & Son 2. Smithfield Packaged 3. Electrolux Meats 30. IUP Number WRO09 WRO07 WRO03 31. Does File Contain Current Permit? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 32. Permit Expiration Date 12-31-2024 12-31-2024 12-31-2024 33. Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A N/A N/A 433 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? I ® Yes ❑ N=ol ® Yes ❑ No ® Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes [:]No a. ®Yes ❑No a. ®Yes ❑No b. If No, is One Needed? See Inspection Form from POTW b. []Yes []No b. ❑Yes ❑No b. []Yes []No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑NoEN/A ❑Yes❑NoEN/A ®Yes❑No❑N/A Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ®Yes []No a. ®Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ®Yes ❑ No ® Yes ElNo ®Yes ❑ No its Sampling as Required b IUP, includingflow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? I ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Sampling as Required b IUP, includingflow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A 11 ®Yes❑No❑N/A ®Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A file include process/dilution flows as Required b IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify es ElNo FN/A ❑ Yes ❑ No ❑ Yes ❑ No All Limits Non-Com liance from Both POTW and SIU Sam lin ? N/A N/A 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A All Re ortin Non-Com liance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑NoEN/A a.❑Yes❑NoEN/A a.❑Yes❑NoEN/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days9 b.❑Yes❑No®N/A b.❑Yes❑NoEN/A b.❑Yes❑NoEN/A c. If applicable, Did POTW resample within 30 days of becoming aware c.❑Yes❑NoEN/A of SIU limit violations in the POTW's sampling of the SIU? c.❑Yes❑No®N/A c.❑Yes❑No®N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No ❑ Yes ® No I ❑ Yes ® No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑NoEN/A ❑Yes❑NoEN/A 11 ❑Yes❑NoEN/A as Specified in the POTW's ERP OVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ®No ElYes ®No ElYes ® No Requested Information For You? 11 NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 FILE REVIEW COMMENTS: Headworks Analysis was submitted to Raleigh on March 30, 2023 Files were well organized and readily available. INDUSTRY INSPECTION PCS CODING: Trans.Code Main Program Permit Number MM/DD/YY I- N-j I I I I I I I l I I 1 (DTIA) 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: Inspec.Type Inspector Fac. Type LJLJ L S I 1 2 1 (TYPI) (INSP) (FACC) 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES ❑ NO NOV: ❑ YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory X Marginal Unsatisfactory PCI COMPLETED BY: DATE: NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3