Loading...
HomeMy WebLinkAboutSW6110103_Stormwater Report_20230503CUI JSOC - Microgrid Project number: 60652522 Attachment D — Hydrology Report AECOM Cul cul JSOC - Microgrid Project number: 60652522 REVISED (05/03/2023) ATTACHMENT D — Table of Contents 1. Stormwater Worksheets....................................................................................... 3 2. NCDEQ - BUA Figures and Worksheets............................................................... 7 3. EISA Section 438 Army LID Planning and Cost Tool Report ............................... 14 4. Hydraflow Hydrographs Output - Summary Reports .......................................... 16 5. Hydraflow Hydrographs Output - 10-Year Hydrograph and Routing Reports ..... 26 6. NOAAAtlas-14 Rainfall Data.............................................................................. 46 7. Bioretention Underdrain Calculations................................................................. 49 8. Erosion & Sediment Control - Outlet Protection Calculations ............................ 53 AECOM cul PN97470 - Page 2 of 62 (Revised, 05/03/2023) CUI Stormwater Worksheets CUI PN97470 - Page 3 of 62 (Revised, 05/03/2023) CUI JSOC Microgrid Installand and Integration Project: 60652522 Date: 26 JAN 2023 Design By: ACF Checked By: Pre -Development Drainage Areas A=COM READY -TO -ADVERTISE REVISED NRCS (HSG "A" SOILS) RATIONAL AREA A.0 Area, A (ac.) CN CN x A 55% 14% 0% 30.3% Imp. CNw = 52 C C x A Cw = 0.32 Wooded 0.338 30 10.1 0.05 0.0169 Grassed 0.088 39 3.4 0.15 0.0132 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.186 98 18.2 0.90 0.1670 Subtotal 0.612 31.8 0.1971 AREA B.0 Area, A (ac.) CN CN x A 0% 13% 0% 86.9% Imp. CNw = 90 C C x A Cw = 0.80 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.040 39 1.6 0.15 0.0060 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.265 98 26.0 1 0.90 0.2389 Subtotal 0.305 27.6 0.2449 TOTAL PRE -DEVELOPED SITES 1 0.9171 1 59.34 1 CNw = 65 1 1 0.44 1 Cw = 0.48 MC_SWM_WORKSHEETS.xlsx, PreDev DAs- 1/26/202314:40 PM 1 of 3 CUI PN97470 - Page 4 of 62 (Revised, 05/03/2023) CUI JSOC Microgrid Installand and Integration Project: 60652522 Date: 26 JAN 2023 Design By: ACF Checked By: Post -Development Drainage Areas A=COM READY -TO -ADVERTISE REVISED NRCS (HSG "A" SOILS) RATIONAL AREA A.1 (to CONTAINMENT with overflow to SCM) Area, A (ac.) CN CN x A 0% 6% 1% 93.3% Imp. CNw = 94 C C x A Cw = 0.85 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.012 39 0.5 0.15 0.0018 #57 stone, 6 inches 0.002 46 0.1 0.20 0.0004 Impervious 0.195 98 19.1 0.90 0.1753 Subtotal 0.209 19.7 0.1775 AREA A.2 (to SCM - BIORETENTION) Area, A (ac.) CN CN x A 0% 30% 0% 61.7% Imp. 8.7% CNw = 81 C C x A Cw = 0.69 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.099 39 3.9 0.15 0.0148 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.206 98 20.2 0.90 0.1855 Bioretention SCM 0.029 100 2.9 1.00 1 0.0290 Subtotal 0.334 27.0 0.2293 AREA A.3 (bypass SCM, uncontrolled) Area, A (ac.) CN CN x A 0% 0% 0% 100.0% Imp. CNw = 98 C C x A Cw = 0.90 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.000 39 0.0 0.15 0.0000 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.069 98 6.8 0.90 0.0621 Subtotal 0.069 6.8 0.0621 AREA B.0 (bypass SCM, uncontrolled) Area, A (ac.) CN CN x A 0% 0% 42% 57.6% Imp. CNw = 76 C C x A Cw = 0.60 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.000 39 0.0 0.15 0.0000 #57 stone, 6 inches 0.117 46 5.4 0.20 0.0235 Impervious 0.160 98 15.6 0.90 0.1437 Subtotal 0.2771 1 21.1 0.1672 AREA B.1 (to "Drainage Area 1 ") Area, A (ac.) I CN I CN x A C C x A USE UNDERGROUND INFILTRATION TRENCH DISCHARGES FROM ROUTING CALCULATIONS IN EXISTING PERMIT SW6110103 u.u000 2-yr = 0.19 cfs, 10-yr = 3.16 cfs, 25-yr = 5.47, 100-yr = 9.18 cfs r. 0.0254 :Nw = 98 = TOTAL - AREA A.0 1 0.6121 1 53.37 1 CNw = 87 1 1 0.47 1 Cw = 0.77 TOTAL - AREA B.0 1 0.2771 1 21.05 1 CNw = 76 1 1 0.17 1 Cw = 0.60 TOTAL POST -DEVELOPED SITES 1 0.8891 1 74.42 1 CNw = 84 1 1 0.64 1 Cw = 0.72 JSOC_SWM_WORKS HEETS.xlsx, PostDev DAs- 1/26/202314:40 PM 2of3 CUI PN97470 - Page 5 of 62 (Revised, 05/03/2023) CUI JSOC Microgrid Installand and Integration Project: 60652522 Date: 03 MAY 2023 Design By: ACF Checked By: Peak Runoff Rate Comparison A B C D E F G H J K L M A=COM READY -TO -ADVERTISE REVISED (05/03/2023) SITE 1 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 100- ear Pre -Developed 0.00 0.02 0.18 1.02 2.91 Post -Developed 0.18 0.32 0.38 3.62 6.19 Runoff Difference (cfs) [B -A] 1 0.18 0.30 0.20 2.60 3.28 Runoff Difference (%) C / A -- 1500% 111% 255% 113% SITE 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.53 1.14 1.45 2.29 3.61 Post -Developed 0.14 0.55 0.79 1.50 2.69 Runoff Difference (cfs) [F - E] 1 -0.39 -0.59 -0.66 -0.79 -0.92 Runoff Difference % G / E -74% -52% -46% -34% -25% SITES 1 & 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.53 1.14 1.59 3.29 6.48 Post -Developed 0.32 0.86 1.17 4.91 8.87 Runoff Difference (cfs) [K - J] 1 -0.21 -0.28 -0.42 1.62 2.39 Runoff Difference % L / J -40% -25% -26% 49.2% 37% Drainage Area and 10-Year Runoff Comparison N P Q R Value Overall Drainage Areas (acres) 45.5 Site Development Drainage Areas acres 0.92 Site vs. Overall % of Area N / P 2.02% 7 Site vs. Overall (% of 10-year Runoff) [M10YR X QJ 1.00% (based on proportional area) approximate % change in 10-year peak rate, with respect to the overall drainage area JSOC_SWM_WORKS HEETS.xlsx, Peak Rate Comparisons - 5/3/2023; 2:09 PM 1of1 CUI PN97470 - Page 6 of 62 (Revised, 05/03/2023) CUI NCDEQ — BUA Figures and Worksheets CUI PN97470 - Page 7 of 62 (Revised, 05/03/2023) CUI Q Y U U S��E� 2 E OVERALL �� S�� EXISTING CULVERT DRAINAGE AREA f 30" RCP @ 2.2% ONL A = 45.5 ac. EXISTING DITCH m. ALONG RAILROAD L PROJECT AREA 'IJIL.57 ACRES JIM LIM OVERALL PROJECT AREA 1" = 1000' L Y 7 L L Z n IM to, N 0 O N NO N O N N O O o avU No mU) J U) FZU N U oW N O 0 n E L i• / _ A�. I A ddlk� l \ %\ CO BUILDING \ 3-1549 i FIGURE 2 "DRAINAGE AREA 1" PROJECT AREA = LIMIT OF WORK = 155,722 SF (3.58 ACRES) EXISTING UNDERGROUND _ SWM INFILTRATION TRENCH PERMIT #SW6110103 1 \ \ 0 \ \ a . � \ INV=24 J100\ y Pty.Pr ---- - \ 7L INV = 241.6' I FIGI EXISTING CULVEF 30" RCP @ 2.2% W W Q O F- a W to cn W N - 100' 50' 0 100' 200' DEVELOPMENT AREAS - SITE 1 & SITE 2 1"=100' 1000' 500' 0 1000, 2000' 1" = 100' 1"=1000' co 0 W z� as Lu tU z W 02 a 0 J J J W a> �W W o O co co 0 o U z z N O O H N N Z H N z � 0 2 LL Co z O H Q z U N z V N O `��° N QO 0 2 V J 0 ti � o L Z O W 40 O �aU)Q CUI PN97470 - Page 8 of 62 (Revised, 05/03/2023) 0 [FO 10-Y ESIGN] A.3 (BYPASSES SCM) fAW 006 SF (0.069 ac.) -� EXISTING BUA = 2,536 SF lle�\ NEW BUA = 470 SF i [FOR 10-YEAR DESIGN] AREA A.1 (TO CONTAINMENT) 9,097 SF (0.209 ac.) 8,486 SF IMPERVIOUS [FOR TREATMENT DESIGN] EXISTING BUA = 1,166 SF NEW BUA = 7,320 SF 0 m I----------` 1,191 SF NEW BUA (BYPASSES SCM) - 470 SF NEW IMPERVIOUS BYPASSING SCM [FOR 10-YEAR DESIGN] AREA A.2 (TO SCM) 14,550 SF (0.334 ac.) 8,980 SF IMPERVIOUS 1,262 SF BIORETENTION SCM [FOR TREATMENT DESIGN] EXISTING BUA = 3,410 SF NEW BUA = 5,570 SF REMOVED BUA = 1,023 SF [FOR 10-YEAR DESIGN] TOTAL AREA A.0 (TO BMP FOR 10-YEAR) ` 23,647 SF (0.543 ac.) 17,466 SF IMPERVIOUS TO NEW SCM DEVELOPMENT LEGEND FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON 12,890 SF DEVELOPMENT: NEW IMPERVIOUS ' (NEW BUA - SUBJECT TO PERMITTING) 1,023 SF EXISTING DEVELOPMENT: REMOVE IMPERVIOUS (REMOVED BUA) 4,576 SF � EXISTING DEVELOPMENT: ON EXISTING IMPERVI (EXISTING BUA) [FOR TREATMENT DESIGN] EXISTING BUA = 4,576 SF NEW BUA = 12,890 SF S\�E REMOVED BUA = 1,023 SF SIE \ "DRAINAGE AREA 1" PROJECT AREA = LIMIT OF WORK = 155,722 SF (3.58 ACRES) \ MATCHLINE - SEE FIGURE 3 FOR CONTINUATION DEVELOPMENT AREA - SITE 1 ill =50' N 0 i aLL REVISED w co co aw Lua az H O w� a_j 05 w 00 w 0 co 0 90 Z Z N O O N N Z en N m CU 6� � N Z 0 a? LL Z C H az0N Z V Q' CV O � U) N Q oo(p J V Z c Q LOL . . r r 0 z Z N 0 J_ O L Z moo/ �W� 16 ^ U O a D Q CUI PN97470 - Page 9 of 62 (Revised, 05/03/2023) CUI \ WS60 BUILDING3-1549 EE FIGURE 2 FOR AREA SF EXISTING BUA (BYPASSES SC ` 361 SF EXISTING BUA \ ("DRA AGE AREA 1 ") \�° MATCHLINE - SEE FIGURE 2 FOR CONTINUATION UG SFARMIWPiCF "DRAINAGE AREA 1" E \ = LIMI=2S ORK Q ° / � = 155 (3.8 Ao QD Il a \ ° 40 �� 83 SF N W BU��(B�YA ES SCM) _0 54 SF NEW BUA, ("DRAIN GE AR A l"); SEE FIGURE 2 F R LO ATION OF EXIS ` 5,623 S G BUA PASSES SC \ \ \ 5,117 SF REMOV BUA (BYPASSES SCM) _ r - / _ - �� V INV = 241.6' EXISTING CULVERT x' �_ V A� 30" RCP @ 2.2% Tl�rlv \ V = �43.�' �v [FOR 10-YEAR PN] _ ` AREA B.0 (BYP ES SC ! 12,072 SF (0.2\'77 ac ) 6,957 SF IMPERVI S [1,229 jo RENCH] EXISTING BUA = 5,683 SF [682 NEW BUA = 1,274 SF [5 7 SF to REMOVED BUA = 5,1 7 F a '\ -- \ \ \ DEVELOPMENT AREA - SITE 2 ill =50' T ENCH] 2 C ] �R�NcH�NG ONLY TO EXISTING BYPASSES TRENCH SCM 1,274 SF 547 SF 5,117 SF 0 SF 5,683 SF 682 SF DEVELOPMENT LEGEND FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON AREA" (BUA) DEVELOPMENT: NEW IMPERVIOUS (NEW BUA -SUBJECT TO PERMITTING) aEXISTING DEVELOPMENT: REMOVE IMPERVIOUS (REMOVED BUA) EXISTING DEVELOPMENT: ON EXISTING IMPERVIOUS (EXISTING BUA) 50' 25' 0 50' 100, 4D 1 "=50' W cn Lu 0 W N ca N N ZM 0 i r■ m REVISED N w co co aw Lua az za w� Fi O J J 5 w 00 w 0 Go r 0 o 0 Z LL Z N OC) N N C� Z erl N m a� N ?O °? LL Z O H az0N Z v N O `��° N QO 0 (o J V Z C) O ti O z Z N 0 J_ O L O W QO Q �aU)Q CUI PN97470 - Page 10 of 62 (Revised, 05/03/2023) CUI A=COM Civil Calculation Sheet JSOC - Microgrid 10 South Jefferson Street, Suite 1600 Fort Bragg, North Carolina Roanoke, Virginia 24011 Fs u PERCEDED (05/03/2023) ob No.: 60652522 Designed By: A. Freeland hecked By: Date: 26 JAN 2023 subject: Treatment Volume (Required) -- Stormwater Control Measure Volume (Provided) ob Title: JSOC Microgrid; Fort Bragg NC Rev. No.: 1 READY -TO -ADVERTISE TREATMENT VOLUME SITE #1 (Added to existing permit as "Drainage Area 2") Values: A (Impervious Area) = 12,890 sq. ft. = 0.30 acres reatment Depth = 1.00 inches (NCDEQ tre e (minimum) = cu. ft. Required ed = I 1,0921cu. ft. Notes: (1) The provided I square feet for a del contour elevation of (2) The containment tank proq drained later to the bioretention (3) The required treatment vol reduction to development (iQj taken at the finches). TA rrea of 1456 edia area at e, which is held and lopment at Site 1. Any care excluded. EATMENT VOLUM SITE tributing to "Drainage Area mit) Values: Irreatme ous Area) = 547 sq. ft. = 0.01 nt Depth = 100 inches (NCDEQ treainimum) = cu. ft. Required Treatment Volume, Provided = 2,092 cu. ft. Approximatelyl 45.5 times more volume than required Notes (1) The treatment volume is provided by the surplus treatment capacity of the existing underground infiltration SCM. The original design required 4,750 cf of treatment and provided 6,842 cf - resulting in a treatment volume surplus of 2,092 cf.. (Other documents state 6,991 cf is the provided volume) JSOC_NCDEQ Treatment Worksheet.xlsx Print Date: 1/26/2023 CUI PN97470 - Page 11 of 62 (Revised, 05/03/2023) cul A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina REVISED (05/03/2023) Job No.: 60652522 Designed By: A. Freeland Checked By: Date: 2 MAY 2023 Subject: Treatment Volume (Required) -- Stormwater Control Measure Volume (Provided) Job Title: JSOC Microgrid; Fort Bragg NC Rev. No.: 2 READY -TO -ADVERTISE SCM Sizing Requirement Simple Method for Runoff Volume Rv = 0.05 + 0.9 * IA Where: Rv = Runoff coefficient (unitless) IA = Impervious fraction (unidess) DV - 3630 * RD ` Rv *A Where- DV = Design volume (cu ft) Ro = Design storm depth (in) A = Drainage area (ac) Ro = 1.0 inch Existing Infiltration Trench SCM (Contributing to "Drainage Area 1" of existing permit) Total Area, A = 85,000 sf = Impervious Area = 58,947 sf = IA = 69.3% Rv = 0.674 Required DV = 4,776 cf Provided DV = 1 6,991 cf 1.95 acres 1.35 acres (New BUA = 547 sf) (using Simple Method) (from existing permit, Sheet C-506) Bioretention SCM (Modification to existing permit as "Drainage Area 2") Total Area, A = 23,647 sf = 0.54 acres Impervious Area = 17,466 sf = 0.40 acres IA = 73.9% Rv = 0.715 Required DV = 1,409 cf (using Simple Method) Provided DV = 1 1,419 cf (from stage -storage data in calculations) JSOC_NCDEQ Treatment -Sizing Worksheet.xlsx Print Date: 5/3/2023 cul PN97470 - Page 12 of 62 (Revised, 05/03/2023) cul A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina REVISED (05/03/2023) AECOM Job No.: 60652522 Designed By: A. Freeland Checked By: B. Fisher Date: 2 MAY 2023 Subject: Bioretention - Infiltration Drawdown Check Job Title: JSOC - Microgrid Installation and Integration Page No.: 1 Rev. No.: 2 INFILTRATION DRAWDOWN CALCULATION i, mimmum ourraca .wrea For an rnTurrarron SA = FS * DV *12 K * T where: SA = required minimum surface area of infiltraton system (fEZ) FS = factor of safety (minimum of 2 is recommended) ❑V = design volume (ft') K = hydraulic conductivity of soil (irVhr) T = maximum dewate€ing time (72 hours) Soil Infiltration (Ksat) Test Result ID in/hr ft/hr B-2 46.77 3.90 Elevation @Test Location SHWT = Seasonal High Water Table Bioretention Infiltration Maximum Ponded Depth 9.0 inches Time to Drain - Average Test Rate 0.19 hrs Maximum Allowed Drain Time 72 hrs Time to Drain < 72 hours --> okay Bottom Elevation 260.0 feet Ground Elevation SHWT Depth 268.2 feet 13.0 feet SHWT Elevation 255.2 feet Separation, Design (between Bottom and SHWT) Separation, Minimum Required 4.8 feet 2.0 feet Separation (design) > Separation (min) --> okay Using NCDEQ Equation 2 (above) ... FS = 2.0 DV = 1419 cu. ft. (treatment volume, provided) K = 0.5 in/hr (use conservative minimum rate) T = 72 hours SA (min) = 946 sq. ft. (minimum surface area, calculated) SA (design) = 1260 sq. ft. (minimum surface area, provided) SA (design) > SA (min) --> okay JSOC NCDEQ Drawdown Worksheet.xlsx Print Date: 5/2/2023 cul PN97470 - Page 13 of 62 (Revised, 05/03/2023) CUI EISA Section 438 Army LID Planning and Cost Tool Report CUI PN97470 - Page 14 of 62 (Revised, 05/03/2023) CUI Army LID Planning and Cost Tool Report PROJECT INFO Date 8 / 30 / 2022 Army Command IMCOM Army Installation Fort Bragg Project name 60652522 - JSOC (SITE #1) Project description Site # 1 (0.61 acres) User Name Master Planner Structural BMP Bioretention: Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: IPC/ACF SITE INFO AND EISA VOLUME REQUIREMENT Project limit of disturbance (ac) 0.61 95% rainfall depth (in) 1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre -project curve number (CN) 52 Post -project curve number (CN) 87 Pre -project runoff volume (cf) 0 Post -project runoff volume (cf) 1666 EISA Section 438 retention volume 1666 requirement (cf) LID PLANNING SUMMARY Surface area Runoff volume Non-structural BMP Surface (sf) retained (cf) area (ac) 1260 1506 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 0 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00 0 Veg. Filter Strip (Slope G2%, Short Grass): 0.00 9097 1195 Veg. Filter Strip (Slope G2%, Tall Grass): 0.00 0 Reforestation (Trees - Short Grass): 0.00 0 Reforestation (Trees - Shrubs and Tall Grass): 0.00 Total retention volume provided by BMPs (cf): 2701 Project complies with EISA Section 438. LID COST SUMMARY CUI PN97470 - Page 15 of 62 (Revised, 05/03/2023) CUI Hydraflow Hydrographs Output Summary Reports I REVISED (05/03/2023) CUI PN97470 - Page 16 of 62 (Revised, 05/03/2023) CUI Hydraflow Table of Contents JSOC_SWM_Sites_RTA-Rev2.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 2 - Year SummaryReport......................................................................................................................... 4 3 - Year SummaryReport......................................................................................................................... 5 10 -Year SummaryReport......................................................................................................................... 6 100 - Year SummaryReport......................................................................................................................... 7 OFReport.................................................................................................................... 8 CUI PN97470 - Page 17 of 62 (Revised, 05/03/2023) CUI 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v202O.4 �RE A.0 (SITE 1) --��RE B.0 (SITE 2) OST A.1 3- PRE (COMBINE 8 - ROUTE TANK JW Legend Hid. Origin Description 1 SCS Runoff PRE A.0 (SITE 1) 2 SCS Runoff PRE B.0 (SITE 2) 3 Combine PRE (COMBINED) 4 SCS Runoff POST A.1 5 SCS Runoff POST A.2 6 SCS Runoff POST A.3 7 SCS Runoff POST B.0 (SITE 2) 8 Reservoir ROUTE TANK 9 Combine Inflow to SCM (BIOIRET) 10 Reservoir ROUTE SCM 11 Combine POST A.0 (SITE 1) 12 Combine POST (COMBINED) ..5 —POST A.2 —k—FOST A.3 �OST B.0 (SI 9 - Inflow to SCM (BIOI 10 - ROUTE SCM 11 - POST A.0 (SITE 1) 12 - POST (COMBINED) 2) Project: JSOC_SWM_Sites_RTA-Rev2.gpw Tuesday, 05 / 2 / 2023 cul Hydrograph Return Period RecP� y raflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr �1-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.024 0.184 0.000 ------- 1.022 ------- ------- 2.913 PRE A.0 (SITE 1) 2 SCS Runoff ------ 1.138 1.450 0.531 ------- 2.292 ------- ------- 3.606 PRE B.0 (SITE 2) 3 Combine 1,2 1.140 1.590 0.531 ------- 3.293 ------- ------- 6.477 PRE (COMBINED) 4 SCS Runoff ------ 0.872 1.081 0.455 ------- 1.640 ------- ------- 2.515 POST A.1 5 SCS Runoff ------ 0.841 1.149 0.288 ------- 2.024 ------- ------- 3.448 POST A.2 6 SCS Runoff ------ 0.315 0.382 0.181 ------- 0.564 ------- ------- 0.851 POST A.3 7 SCS Runoff ------ 0.552 0.793 0.143 ------- 1.503 ------- ------- 2.690 POST B.0 (SITE 2) 8 Reservoir 4 0.016 0.077 0.000 ------- 1.621 ------- ------- 2.497 ROUTE TANK 9 Combine 5,8 0.841 1.149 0.288 ------- 3.642 ------- ------- 5.928 Inflow to SCM (BIOIRET) 10 Reservoir 9 0.030 0.125 0.000 ------- 3.149 ------- ------- 5.392 ROUTE SCM 11 Combine 6,10 0.315 0.382 0.181 ------- 3.615 ------- ------- 6.189 POSTA.0 (SITE 1) 12 Combine 7,11 0.863 1.170 0.322 ------- 4.914 ------- ------- 8.871 POST (COMBINED) is 3-yr storm placeholder for 95th percentI le rainfall results Proj. file: JS0C_SWM_Sites_RTA-Rev2.gpw Tuesday, 05 / 2 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.024 1 723 327 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 1.138 1 717 2,377 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 1.140 1 717 2,704 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.872 1 717 1,901 ------ ------ ------ POST A.1 5 SCS Runoff 0.841 1 718 1,689 ------ ------ ------ POST A.2 6 SCS Runoff 0.315 1 717 744 ------ ------ ------ POST A.3 7 SCS Runoff 0.552 1 718 1,114 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.016 1 950 301 4 268.70 1,602 ROUTE TANK 9 Combine 0.841 1 718 1,990 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.030 1 1018 571 9 265.01 1,428 ROUTE SCM 11 Combine 0.315 1 717 1,315 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 0.863 1 718 2,428 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA-Rev2.gpw Return Period: 1 Year Tuesday, 05 / 2 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.184 1 720 715 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 1.450 1 717 3,070 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 1.590 1 718 3,784 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.081 1 717 2,390 ------ ------ ------ POST A.1 5 SCS Runoff 1.149 1 718 2,323 ------ ------ ------ POST A.2 6 SCS Runoff 0.382 1 717 911 ------ ------ ------ POST A.3 7 SCS Runoff 0.793 1 718 1,593 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.077 1 751 790 4 268.72 1,608 ROUTE TANK 9 Combine 1.149 1 718 3,113 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.125 1 773 1,694 9 265.02 1,460 ROUTE SCM 11 Combine 0.382 1 717 2,605 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 1.170 1 718 4,197 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA-Rev2.gpw Return Period: 2 Year Tuesday, 05 / 2 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.000 1 n/a 0 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 0.531 1 718 1,074 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 0.531 1 718 1,074 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.455 1 717 951 ------ ------ ------ POST A.1 5 SCS Runoff 0.288 1 718 595 ------ ------ ------ POST A.2 6 SCS Runoff 0.181 1 717 413 ------ ------ ------ POST A.3 7 SCS Runoff 0.143 1 719 331 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 0.000 1 n/a 0 4 267.08 951 ROUTE TANK 9 Combine 0.288 1 718 595 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.000 1 n/a 0 9 264.46 595 ROUTE SCM 11 Combine 0.181 1 717 413 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 0.322 1 718 744 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA-Rev2.gpw Return Period: 3 Year Tuesday, 05 / 2 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.022 1 718 2,311 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 2.292 1 717 5,003 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 3.293 1 718 7,314 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.640 1 717 3,736 ------ ------ ------ POST A.1 5 SCS Runoff 2.024 1 717 4,183 ------ ------ ------ POSTA.2 6 SCS Runoff 0.564 1 717 1,366 ------ ------ ------ POST A.3 7 SCS Runoff 1.503 1 718 3,051 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 1.621 1 718 2,136 4 268.91 1,685 ROUTE TANK 9 Combine 3.642 1 718 6,319 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 3.149 1 720 4,900 9 265.21 1,781 ROUTE SCM 11 Combine 3.615 1 720 6,266 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 4.914 1 720 9,317 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA-Rev2.gpw Return Period: 10 Year Tuesday, 05 / 2 / 2023 Hydrograph Summary Report CUI Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.913 1 718 5,915 ------ ------ ------ PRE A.0 (SITE 1) 2 SCS Runoff 3.606 1 717 8,126 ------ ------ ------ PRE B.0 (SITE 2) 3 Combine 6.477 1 718 14,041 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 2.515 1 717 5,881 ------ ------ ------ POST A.1 5 SCS Runoff 3.448 1 717 7,327 ------ ------ ------ POST A.2 6 SCS Runoff 0.851 1 717 2,086 ------ ------ ------ POST A.3 7 SCS Runoff 2.690 1 717 5,597 ------ ------ ------ POST B.0 (SITE 2) 8 Reservoir 2.497 1 718 4,281 4 268.98 1,713 ROUTE TANK 9 Combine 5.928 1 717 11,608 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 5.392 1 719 10,189 9 265.35 2,031 ROUTE SCM 11 Combine 6.189 1 718 12,275 6,10 ------ ------ POSTA.0 (SITE 1) 12 Combine 8.871 1 718 17,872 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA-Rev2.gpw Return Period: 100 Year Tuesday, 05 / 2 / 2023 CUI Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodeskg Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Tuesday, 05 / 2 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ge 25 of 62 (Revised, 05/03/2023) CUI 10-Year Hydrograph and Routing Reports I REVISED (05/03/2023) CUI PN97470 - Page 26 of 62 (Revised, 05/03/2023) CUI Hydraflow Table of Contents J SOC_SW M_Sites_RTA-Rev2.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Watershed Model Schematic...................................................................................... 1 10 -Year HydrographReports................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, PRE A.0 (SITE 1).................................................................. 2 Hydrograph No. 2, SCS Runoff, PRE B.0 (SITE 2).................................................................. 3 Hydrograph No. 3, Combine, PRE (COMBINED).................................................................... 4 Hydrograph No. 4, SCS Runoff, POST A.1.............................................................................. 5 Hydrograph No. 5, SCS Runoff, POST A.2.............................................................................. 6 Hydrograph No. 6, SCS Runoff, POST A.3.............................................................................. 7 Hydrograph No. 7, SCS Runoff, POST B.0 (SITE 2)............................................................... 8 Hydrograph No. 8, Reservoir, ROUTE TANK.......................................................................... 9 PondReport - TANK......................................................................................................... 10 Hydrograph No. 9, Combine, Inflow to SCM(BIOIRET)........................................................ 12 Hydrograph No. 10, Reservoir, ROUTE SCM........................................................................ 13 PondReport - SCM-Rev2.................................................................................................. 14 Hydrograph No. 11, Combine, POST A.0 (SITE 1)............................................................... 16 Hydrograph No. 12, Combine, POST (COMBINED).............................................................. 17 OFReport.................................................................................................................. 18 CUI PN97470 - Page 27 of 62 (Revised, 05/03/2023) CUI 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v202O.4 �RE A.0 (SITE 1) __Pti RE B.0 (SITE 2) 3 -PRE (COMBINE�OST A.1 �OST A.2 �OST A.3 ff ST B.0 8 - ROUTE TANK 9 - Inflow to SCM (BIOI 10 - ROUTE SCM Legend Hid. Origin Description 1 SCS Runoff PRE A.0 (SITE 1) 2 SCS Runoff PRE B.0 (SITE 2) 3 Combine PRE (COMBINED) 4 SCS Runoff POST A.1 5 SCS Runoff POST A.2 6 SCS Runoff POST A.3 7 SCS Runoff POST B.0 (SITE 2) 8 Reservoir ROUTE TANK 9 Combine Inflow to SCM (BIOIRET) 10 Reservoir ROUTE SCM 11 Combine POST A.0 (SITE 1) 12 Combine POST (COMBINED) 11 -POST A.0 (SITE 1) 12 - POST (COMBINED) 2) Project: JS0C_SWM_Sites_RTA-Rev2.gpw Tuesday, 05 / 2 / 2023 cul 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 1 PRE A.0 (SITE 1) Hydrograph type = SCS Runoff Peak discharge = 1.022 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,311 cuft Drainage area = 0.610 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 PRE A.0 (SITE 1) Hyd. No. 1 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) cul PN97470 - Page 29 of 62 (Revised, 05/03/2023) Hydrograph Report cul 3 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Hyd. No. 2 PRE B.0 (SITE 2) Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.310 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.45 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 05 / 2 / 2023 = 2.292 cfs = 11.95 hrs = 5,003 cuft = 90 = 0 ft = 6.00 min = Type II = 484 Q (cfs) 3.00 PRE B.0 (SITE 2) Hyd. No. 2 -- 10 Year Q (cfs) 3.00 2.00 2.00 1.00 1.00 0.00 0.0 2.0 Hyd No. 4.0 6.0 8.0 10.0 12.0 14.0 16.0 2 0.00 18.0 20.0 Time (hrs) cul PN97470 - Page 30 of 62 (Revised, 05/03/2023) cul 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 3 PRE (COMBINED) Hydrograph type = Combine Peak discharge = 3.293 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 7,314 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.920 ac PRE (COMBINED) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Hyd No. 1 Hyd No. 2 Time (hrs) cul PN97470 - Page 31 of 62 (Revised, 05/03/2023) cul 5 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 4 POST A.1 Hydrograph type = SCS Runoff Peak discharge = 1.640 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3,736 cuft Drainage area = 0.210 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 w POST A.1 Hyd. No. 4 -- 10 Year 2.0 4.0 6.0 8.0 Hyd No. 4 Q (cfs) 2.00 1.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) cul PN97470 - Page 32 of 62 (Revised, 05/03/2023) cul 6 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 5 POST A.2 Hydrograph type = SCS Runoff Peak discharge = 2.024 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 4,183 cuft Drainage area = 0.330 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 2.0 4.0 Hyd No. 5 6.0 8.0 POST A.2 Hyd. No. 5 -- 10 Year Q (cfs) 3.00 2.00 1.00 ..n•-- , ' I ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) cul PN97470 - Page 33 of 62 (Revised, 05/03/2023) cul 7 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 6 POST A.3 Hydrograph type = SCS Runoff Peak discharge = 0.564 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,366 cuft Drainage area = 0.070 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST A.3 Hyd. No. 6 -- 10 Year Q (cfs) ■I M1� 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 6 20.0 Time (hrs) cul PN97470 - Page 34 of 62 (Revised, 05/03/2023) cul 8 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 7 POST B.0 (SITE 2) Hydrograph type = SCS Runoff Peak discharge = 1.503 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,051 cuft Drainage area = 0.280 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 POST B.0 (SITE 2) Hyd. No. 7 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 7 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 Time (hrs) cul PN97470 - Page 35 of 62 (Revised, 05/03/2023) Hydrograph cul Report 9 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 8 ROUTE TANK Hydrograph type = Reservoir Peak discharge = 1.621 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,136 cuft Inflow hyd. No. = 4 - POST A.1 Max. Elevation = 268.91 ft Reservoir name = TANK Max. Storage = 1,685 cuft Storage Indication method used Q (cfs) 2.00 1.00 ROUTE TANK Hyd. No. 8 -- 10 Year 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 8 Hyd No. 4 ® Total storage used = 1,685 cuft Q (cfs) 2.00 1.00 0.00 20.0 Time (hrs) cul PN97470 - Page 36 of 62 (Revised, 05/03/2023) Pond Report CUI 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Pond No. 1 - TANK Pond Data Trapezoid -Bottom L x W = 25.0 x 16.0 ft, Side slope = 0.00: 1, Bottom elev. = 264.70 ft, Depth = 5.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 264.70 400 0 0 0.50 265.20 400 200 200 1.00 265.70 400 200 400 1.50 266.20 400 200 600 2.00 266.70 400 200 800 2.50 267.20 400 200 1,000 3.00 267.70 400 200 1,200 3.50 268.20 400 200 1,400 4.00 268.70 400 200 1,600 4.50 269.20 400 200 1,800 5.00 269.70 400 200 2,000 Tuesday, 05 / 2 / 2023 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 Inactive Inactive Inactive Crest Len (ft) = 4.97 Inactive Inactive Inactive Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 268.70 0.00 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 265.00 0.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 264.70 0.00 --- --- --- 0.00 0.05 20 264.75 0.00 --- --- --- 0.00 0.10 40 264.80 0.00 --- --- --- 0.00 0.15 60 264.85 0.00 --- --- --- 0.00 0.20 80 264.90 0.00 --- --- --- 0.00 0.25 100 264.95 0.00 --- --- --- 0.00 0.30 120 265.00 0.00 --- --- --- 0.00 0.35 140 265.05 0.00 --- --- --- 0.00 0.40 160 265.10 0.00 --- --- --- 0.00 0.45 180 265.15 0.00 --- --- --- 0.00 0.50 200 265.20 0.00 --- --- --- 0.00 0.55 220 265.25 0.00 --- --- --- 0.00 0.60 240 265.30 0.00 --- --- --- 0.00 0.65 260 265.35 0.00 --- --- --- 0.00 0.70 280 265.40 0.00 --- --- --- 0.00 0.75 300 265.45 0.00 --- --- --- 0.00 0.80 320 265.50 0.00 --- --- --- 0.00 0.85 340 265.55 0.00 --- --- --- 0.00 0.90 360 265.60 0.00 --- --- --- 0.00 0.95 380 265.65 0.00 --- --- --- 0.00 1.00 400 265.70 0.00 --- --- --- 0.00 1.05 420 265.75 0.00 --- --- --- 0.00 1.10 440 265.80 0.00 --- --- --- 0.00 1.15 460 265.85 0.00 --- --- --- 0.00 1.20 480 265.90 0.00 --- --- --- 0.00 1.25 500 265.95 0.00 --- --- --- 0.00 1.30 520 266.00 0.00 --- --- --- 0.00 1.35 540 266.05 0.00 --- --- --- 0.00 1.40 560 266.10 0.00 --- --- --- 0.00 1.45 580 266.15 0.00 --- --- --- 0.00 1.50 600 266.20 0.00 --- --- --- 0.00 1.55 620 266.25 0.00 --- --- --- 0.00 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 --- --- --- --- --- 0.000 Continues on next page... PN97470 - Page 37 of 62 (Revised, 05/03/2023) TANK Stage / Storage / Discharge Table Stage Storage Elevation o|vA n1vo o|vo Prfms, xx,A xx,o xx,o xx,o sxn| use, Total 1.00 640 266.30 000 - - - 000 - - - - - 0.000 1.85 000 20035 0.00 -- - -- 0.00 -- -- - -- -- 0.000 1.70 080 200.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 175 700 200.45 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 1.80 720 200.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 1.e5 740 266.55 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 1.90 700 200.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 1.95 780 200.05 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.00 800 200.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.05 820 20075 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.10 840 200.80 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.15 800 200.85 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.20 eeo 266.90 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.25 900 200.95 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.30 920 207.00 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.35 940 207.05 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.40 900 207.10 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.45 980 207.15 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.50 1.000 207.20 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.55 1.020 20725 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.60 1.040 207.30 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.85 1.000 20735 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.70 1.080 207.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.75 1.100 20745 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.80 1.120 207.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.e5 1.140 26755 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.90 1.160 267.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.95 1.180 20785 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.00 1.200 207.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.05 1.220 20775 0.00 -- - -- 0.00 -- -- - -- -- 0.000 310 1.240 207.80 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.15 1.200 20785 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.20 1.280 207.90 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.25 1.300 20795 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.30 1.320 208.00 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.35 1.340 20805 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.40 1.300 20810 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.45 1.380 20815 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.50 1.400 208.20 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.55 1.420 20825 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.60 1.440 208.30 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.85 1.400 20835 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.70 1.480 208.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.75 1.500 20845 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.80 1.520 208.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.85 1.540 20855 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.90 1.500 208.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.95 1.580 20885 0.00 -- - -- 0.00 -- -- - -- -- 0.000 4.00 1.000 208.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 4.05 1.020 20875 019io -- - -- 018 -- -- - -- -- 0185 410 1.040 208.80 0.54io '- - -' 0.52 -- '- - -- -- 0.523 4.15 1.000 20885 0.90io -- - -- 0.90 -- -- - -- -- 0.901 4.20 1.080 208.90 1.49io '- - -' 1.48 -- '- - -- -- 1.480 4.25 1.700 26895 2.07io -- - -- 2.07 -- -- - -- -- 2.068 4.30 1.720 269.00 2.72oo '- - -' 2.72 -- '- - -- -- 2.718 4.35 1.740 269.05 3.43oo -' '- -' 3.43 -' -' '- -' -' 3.426 4.40 1.700 20910 419oo '- - -' 419 -- '- - -- -- 4185 4.45 1.780 269.15 4.9eoo -- - -- 4.9e -- -- - -- -- 4.994 4.50 1.800 269.20 o.a000 '- - -' 5.85 -- '- - -- -- 5.851 4.55 1.820 269.25 6.73oo -- - -- 6.73o -- -- - -- -- 6.729 4.60 1.840 269.30 s.msoo '- - -' 6.95s -- '- - -- -- 6.945 4.05 1.800 209.35 7.0800 -' '- -' 7.08o -' -' '- -' -' 7.081 4.70 1.880 209.40 719oo '- - -' 7.19s -- '- - -- -- 7188 4.75 1.900 269.45 7.2800 -- - -- 7.28o -- -- - -- -- 7.279 4.80 1.920 269.50 7.3600 '- - -' 7.36o -- '- - -- -- 7.359 4.85 1.940 269o5 7.43oo -' '- -' 7.43o -' -' '- -' -' 7.431 4.90 1.900 209.60 7.50oo '- - -' 7.50o -- '- - -- -- 7.500 4.95 1.980 269.65 7.5600 -' '- -' 7.56o -' -' '- -' -' 7.562 5.00 2.000 269.70 7.62oo '- - -' 7.62o -- '- - -- -- 7.622 CU| PNQ747O'Page 3Oof82(Revised.O5/O3/2O23) cul 12 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 9 Inflow to SCM (BIORET) Hydrograph type = Combine Peak discharge = 3.642 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 6,319 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.330 ac Inflow to SCM (BIORET) Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 — Hyd No. 9 Hyd No. 5 Hyd No. 8 Time (hrs) cul PN97470 - Page 39 of 62 (Revised, 05/03/2023) cul 13 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 10 ROUTE SCM Hydrograph type = Reservoir Peak discharge = 3.149 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 4,900 cuft Inflow hyd. No. = 9 - Inflow to SCM (BIOIRET) Max. Elevation = 265.21 ft Reservoir name = SCM-Rev2 Max. Storage = 1,781 cuft Storage Indication method used. ROUTE SCM Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 10 — Hyd No. 9 ® Total storage used = 1,781 cult Time (hrs) cul PN97470 - Page 40 of 62 (Revised, 05/03/2023) Pond Report cul 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Pond No. 4 - SCM-Rev2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 264.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 264.00 1,260 0 0 0.25 264.25 1,269 316 316 0.50 264.50 1,397 333 649 0.75 264.75 1,530 366 1,015 1.00 265.00 1,701 404 1,419 1.25 265.25 1,792 437 1,855 1.50 265.50 1,810 450 2,305 2.00 266.00 1,810 905 3,210 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Crest Len (ft) = 10.00 10.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 265.00 265.50 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 262.40 0.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 264.00 0.00 --- --- --- 0.00 0.03 32 264.02 3.41 oc --- --- --- 0.00 0.05 63 264.05 3.41 oc --- --- --- 0.00 0.08 95 264.07 3.41 oc --- --- --- 0.00 0.10 126 264.10 3.41 oc --- --- --- 0.00 0.13 158 264.12 3.41 oc --- --- --- 0.00 0.15 190 264.15 3.41 oc --- --- --- 0.00 0.18 221 264.17 3.41 oc --- --- --- 0.00 0.20 253 264.20 3.41 oc --- --- --- 0.00 0.23 284 264.22 3.41 oc --- --- --- 0.00 0.25 316 264.25 3.41 oc --- --- --- 0.00 0.28 349 264.27 3.41 oc --- --- --- 0.00 0.30 383 264.30 3.41 oc --- --- --- 0.00 0.33 416 264.32 3.41 oc --- --- --- 0.00 0.35 449 264.35 3.41 oc --- --- --- 0.00 0.38 483 264.37 3.41 oc --- --- --- 0.00 0.40 516 264.40 3.41 oc --- --- --- 0.00 0.43 549 264.42 3.41 oc --- --- --- 0.00 0.45 583 264.45 3.41 oc --- --- --- 0.00 0.48 616 264.47 3.41 oc --- --- --- 0.00 0.50 649 264.50 3.41 oc --- --- --- 0.00 0.52 686 264.52 3.41 oc --- --- --- 0.00 0.55 722 264.55 3.41 oc --- --- --- 0.00 0.57 759 264.57 3.41 oc --- --- --- 0.00 0.60 795 264.60 3.41 oc --- --- --- 0.00 0.62 832 264.62 3.41 oc --- --- --- 0.00 0.65 869 264.65 3.41 oc --- --- --- 0.00 0.67 905 264.67 3.41 oc --- --- --- 0.00 0.70 942 264.70 3.41 oc --- --- --- 0.00 0.72 978 264.72 3.41 oc --- --- --- 0.00 0.75 1,015 264.75 3.41 oc --- --- --- 0.00 0.77 1,055 264.77 3.41 oc --- --- --- 0.00 0.80 1,096 264.80 3.41 oc --- --- --- 0.00 0.82 1,136 264.82 3.41 oc --- --- --- 0.00 0.85 1,176 264.85 3.41 oc --- --- --- 0.00 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 0.00 --- --- --- --- 0.000 Continues on next page... PN97470 - Page 41 of 62 (Revised, 05/03/2023) CUI 15 SCM-Rev2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 0.87 1,217 264.87 3.41 oc 0.90 1,257 264.90 3.41 oc 0.92 1,297 264.92 3.41 oc 0.95 1,338 264.95 3.41 oc 0.97 1,378 264.97 3.41 oc 1.00 1,419 265.00 3.41 oc 1.02 1,462 265.02 3.41 oc 1.05 1,506 265.05 3.41 oc 1.07 1,549 265.07 3.41 oc 1.10 1,593 265.10 3.41 oc 1.12 1,637 265.12 3.41 oc 1.15 1,680 265.15 3.41 oc 1.17 1,724 265.17 3.41 oc 1.20 1,768 265.20 3.41 oc 1.22 1,811 265.22 3.55oc 1.25 1,855 265.25 4.16oc 1.27 1,900 265.27 4.80oc 1.30 1,945 265.30 5.21 oc 1.32 1,990 265.32 5.32oc 1.35 2,035 265.35 5.40 oc 1.37 2,080 265.37 5.47 oc 1.40 2,125 265.40 5.52 oc 1.42 2,170 265.42 5.58 oc 1.45 2,215 265.45 5.62 oc 1.47 2,260 265.47 5.67 oc 1.50 2,305 265.50 5.71 oc 1.55 2,396 265.55 5.79 oc 1.60 2,486 265.60 5.86 oc 1.65 2,577 265.65 5.93 oc 1.70 2,667 265.70 5.99 oc 1.75 2,758 265.75 6.06 oc 1.80 2,848 265.80 6.12 oc 1.85 2,939 265.85 6.18 oc 1.90 3,029 265.90 6.24 oc 1.95 3,120 265.95 6.30 oc 2.00 3,210 266.00 6.36 oc ... End CIvB CIvC PrfRsr WrA WrB WrC Wrl) ExfiI User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.00 0.00 --- --- --- --- 0.000 --- --- --- 0.13 0.00 --- --- --- --- 0.132 --- --- --- 0.37 0.00 --- --- --- --- 0.372 --- --- --- 0.68 0.00 --- --- --- --- 0.684 --- --- --- 1.05 0.00 --- --- --- --- 1.053 --- --- --- 1.47 0.00 --- --- --- --- 1.471 --- --- --- 1.93 0.00 --- --- --- --- 1.934 --- --- --- 2.44 0.00 --- --- --- --- 2.437 --- --- --- 2.98 0.00 --- --- --- --- 2.977 --- --- --- 3.55 0.00 --- --- --- --- 3.553 --- --- --- 4.16 0.00 --- --- --- --- 4.162 --- --- --- 4.80 0.00 --- --- --- --- 4.802 --- --- --- 5.21 s 0.00 --- --- --- --- 5.211 --- --- --- 5.32 s 0.00 --- --- --- --- 5.320 --- --- --- 5.40 s 0.00 --- --- --- --- 5.399 --- --- --- 5.47 s 0.00 --- --- --- --- 5.466 --- --- --- 5.52 s 0.00 --- --- --- --- 5.524 --- --- --- 5.57 s 0.00 --- --- --- --- 5.574 --- --- --- 5.62 s 0.00 --- --- --- --- 5.623 --- --- --- 5.66 s 0.00 --- --- --- --- 5.665 --- --- --- 5.71 s 0.00 --- --- --- --- 5.707 --- --- --- 5.78 s 0.29 --- --- --- --- 6.075 --- --- --- 5.86 s 0.82 --- --- --- --- 6.678 --- --- --- 5.93 s 1.51 --- --- --- --- 7.436 --- --- --- 5.99 s 2.32 --- --- --- --- 8.311 --- --- --- 6.05 s 3.25 --- --- --- --- 9.298 --- --- --- 6.12 s 4.27 --- --- --- --- 10.39 --- --- --- 6.18 s 5.38 --- --- --- --- 11.56 --- --- --- 6.23 s 6.58 --- --- --- --- 12.80 --- --- --- 6.30 s 7.85 --- --- --- --- 14.14 --- --- --- 6.34 s 9.19 --- --- --- --- 15.53 CUI PN97470 - Page 42 of 62 (Revised, 05/03/2023) cul 16 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 11 POST A.0 (SITE 1) Hydrograph type = Combine Peak discharge = 3.615 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 6,266 cuft Inflow hyds. = 6, 10 Contrib. drain. area = 0.070 ac POST A.0 (SITE 1) Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 11 Hyd No. 6 Hyd No. 10 Time (hrs) cul PN97470 - Page 43 of 62 (Revised, 05/03/2023) cul 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Tuesday, 05 / 2 / 2023 Hyd. No. 12 POST (COMBINED) Hydrograph type = Combine Peak discharge = 4.914 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 9,317 cuft Inflow hyds. = 7, 11 Contrib. drain. area = 0.280 ac POST (COMBINED) Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 12 Hyd No. 7 Hyd No. 11 Time (hrs) cul PN97470 - Page 44 of 62 (Revised, 05/03/2023) CUI Hydraflow Rainfall Report 18 Hydraflow Hydrographs Extension for Autodeskg Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Tuesday, 05 / 2 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ge 45 of 62 (Revised, 05/03/2023) CUI NOAA Atlas-14 Rainfall Data CUI PN97470 - Page 46 of 62 (Revised, 05/03/2023) NOAA Atlas 14, Volume 2, Version 3 Location name: F� JJ ragg, North Carolina, USA* Latitude: 35.T18, Longitude:-79.3504° 1.%� 3 Elevation: 419.14 ft** *source: ESRI Maps 1. .,.k "'source: USGS M POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.439 0.519 0.604 0.667 0.740 0.793 0.843 0.869 0.944 0.987 5-min (0.399-0.485) (0.472-0.573) (0.549-0.667) (0.605-0.735) (D.669-0.815) (0.714-0.872) (0.755-0.926) (0.792-0.976) (0.834-1.04) (0.865-1.09) 0.701 0.829 0.967 1.07 1.18 1.26 1.34 1.41 1.49 1.55 10-min (0.638-0.775) (0.755-0.917) (0.878-1.07) (0.967-1.18) ( 1.07-1.3D) (1.14-1.39) (1.20-1.47) 11 1.26-1.55) (1.32-1.64) ( 1.36-1.71) 0.876 1.04 1.22 1.35 1.50 1.60 1.69 1.78 1.88 1.95 15-min (0.797-0.968) (0.949-1.15) 1 (1.11-1.35) 1 (1.22-1.49) 1 (1.35-1.65) 1 (1.44-1.76) 1 (1.52-1.86) 11 (1.58-1.95) (1.66-2.07) (1.71-2.15) 1.20 1.44 1.74 1.95 2.22 2.41 2.59 2.77 2.99 3.16 30-min 1 ( .09-1.33) (1.31-1.59) (1.58-1.92) (1.77-2.15) (2.00-2.44) (2.17-2.65) (2.32-2.85) (2.47-3.04) (2.64-3.29) (2.77-3.47) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.794.72) ( 4.D4-5.07) 1.76 2.13 2.66 3.07 3.61 4.03 4.46 4.89 5.47 5.92 2-hr 1 ( .59-1.96) (1.93-2.37) (2.40-2.97) (2.77-3.42) (3.23-4.02) (3.60-4.49) (3.95-4.96) (4.31-5.43) ( 4.77-6.08) (5.12-6.59) 3-hr 1.68-62608 2.04 2552 2.56-3316 2.96 3066 3.50135 3.93 4191 4. 65348 4.80 6008 5.40 6392 5.87-67459 6.63 6-hr 2.01 2.46 2.44-62097 3.06 3?73 3. 54 34 4.216.17 4.73 5185 5. 6 6555 5.81-7.29 6.56 8832 7. 4 9417 2. 4. 9. 12-hr 2.372�90 2.87 3051 3.62D .44 4. 26819 5.03 6321 5. 9-47 07 6.36 7496 7.06 8?92 8.02-310.3 8.78-141.4 3.07 3.71 4.68 5.45 6.50 7.34 8.20 9.10 10.3 11.3 24-hr (2.85-3.33) (3.444.03) (4.33-5.08) (5.03-5.90) (5.98-7.04) (6.73-7.94) (7.50-8.87) 11 (8.30-9.83) (9.38-11.2) (10.2-12.2) 3.58 4.31 5.40 6.26 7.43 8.37 9.33 10.3 11.7 12.8 2-day (3.32-3.86) (4.014.65) (5.01-5.82) (5.80-6.74) 1 (6.86-8.00) (7.70-9.01) (8.57-10.0) 11 (9.44-11.1) (10.6-12.6) (11.6-13.8) 3.79 4.57 5.68 6.57 7.78 8.75 9.74 10.8 12.2 13.3 3-day (3.54-4.07) (4.264.90) (5.29-6.10) (6.11-7.04) (7.21-8.34) (8.08-9.38) 1 (8.97-10.5) (9.88-11.6) (11.1-13.1) (12.1-14.3) 4.01 4.82 5.97 6.88 8.14 9.13 10.2 11.2 12.7 13.8 4-day (3.75-4.29) (4.51-5.16) (5.58-6.38) (6.42-7.34) (7.56-8.69) (8.46-9.75) 1 (9.38-10.9) 1 (10.3-12.0) (11.6-13.6) (12.6-14.8) 12 4.1 7-day 3 4 33 4496 5. 85493 6. 7025 7.23 8030 8.47-9.74 9.44-10.9 10.4- 2.1 11 5-13.3 12.18-15.0 13 9516.3 5.3064 619417 10-day 5. 5.9.12 7.88209 8.11.3 9.37o1D.6 10.4-11.8 113�13.0 1213-14.1 1317415.8 1417617.0 0. 17618.8 20-day 2.3 6.7.1457 7.98 8495 9.4 D.6 10.6 ,2.9 1212.1 7 131415.0 1415-16.4 155.5 1713 19.8 18 50 30-day 8 8 9738 9.88- 1.1 115�12.9 12.18-14.3 14.4-16.2 15.17---17.6 16.19-19.1 18.11 0.5 19.7 2.5 21 0-24.0 11.2 13.2 15.1 16.6 18.5 20.0 21.4 22.8 24.6 26.0 45-day (10.6-11.9) 11 (12.5-13.9) 11 (14.3-15.9) (15.7-17.5) (17.5-19.5) (18.8-21.1) (20.1-22.6) 1 (21.4-24.1) (23.1-26.1) (24.3-27.6) 13.4 15.7 17.9 19.5 21.6 23.2 24.7 26.2 28.1 29.6 60-day (12.8-14.2) (14.9-16.6) (16.9-18.8) (18.5-20.5) (20.4-22.7) (21.9-24.4) (23.3-26.0) (24.7-27.6) (26.4-29.7) (27.7-31.3) t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical CUI PN97470 - Page 47 of 62 (Revised, 05/03/2023) NOAA Atlas 14, Volume 2, Version 3 Location name: F� JJ ragg, North Carolina, USA* Latitude: 35.T18, Longitude:-79.3504° 1.%� 3 Elevation: 419.14 ft** * source: ESRI Maps 1. .,.k "source: USGS M POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in incheslhour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5.27 6.23 7.25 8.00 8.88 9.52 10.1 10.7 11.3 11.8 5-min (4.79-5.82) (5.66-6.88) (6.59-8.00) (7.26-8.82) (8.03-9.78) (8.57-10.5) (9.06-11.1) (9.50-11.7) ( 10.0-12.5) 10.4-13.0) 4.21 4.97 5.80 6.40 7.08 7.58 8.04 8.45 8.96 9.32 10-min (3.83-4.65) (4.53-5.50) (5.27-6.41) (5.80-7.05) (6.40-7.79) (6.83-8.33) (7.20-8.83) (7.54-9.29) ( 7.91-9.85) (8.17-10.3) 3.50 4.17 4.89 5.39 5.98 6.40 6.78 7.11 7.52 7.80 15-min (3.19-3.87) (3.80-4.61) (4.44-5.40) (4.89-5.94) (5.40-6.58) (5.76-7.04) (6.07-7.44) (6.34-7.81) (6.64-8.26) (6.84-8.58) 2.40 2.88 3.47 3.91 4.43 4.82 5.19 5.53 5.98 6.32 30-min (2.19-2.65) (2.62-3.18) (3.16-3.84) (3.55-4.31) (4.00-4.88) (4.34-5.30) (4.65-5.70) (4.93-6.08) (5.28-6.57) (5.54-6.95) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.79-4.72) 4.04-5.07) 0.878 1.06 1.33 1.53 1.81 2.02 2.23 2.44 2.73 2.96 2-hr (0.794-0.980) (0.962-1.19) 1 (1.20-1.48) 1 (1.38-1.71) 11 (1.62-2.01) 1 (1.80-2.24) (1.98-2.48) (2.15-2.72) (2.39-3.04) (2.56-3.29) 1.09 1.8 3-hr 0.560-0 691 0.6778--0 837 0.8594105 0.987---11.22 1.17-31.45 1.31-41764 1.45-61482 1.60--2?02 1. 00.30 1.95 2853 1g3953 6-hr 0.336-04 11 0.407---0 496 0.511-0 623 0.592--0..725 0.703-0 864 0.790-0 977 0.879--11.09 0.970-1.22 1.10-21.39 1 67 0.532 12-hr 0.197-0.241 0.238-0.292 0.300--0 368 0.350-0430 0.4D18-0516 0.4772-0586 0.5228-0 661 0.586-0. 40 0.666-0 854 .863 0.728-0 946 0.128 0.155 0.195 0.227 0.271 0.306 0.342 0.379 0.430 0.471 24-hr (0.119-0.139) (0.143-0.168) (0.181-0.212) (0.209-0.246) (0.249-0.293) (0.281-0.331) (0.313-0.370) (0.346-0.410) (0.391-0.465) (0.426-0.509) 0.074 0.090 0.112 0.130 0.155 0.174 0.194 0.215 0.243 0.266 2-day (0.069-0.080) (0.084-0.097) (0.104-0.121) (0.121-0.140) (0.143-0.167) (0.160-0.188) (0.178-0.209) (0.197-0.232) (0.222-0.263) (0.241-0.287) 0.053 0.063 0.079 0.091 0.108 D.122 0.135 D.150 0.169 0.184 3-day (0.049-0.057) (0.059-0.068) (0.074-0.085) (0.085-0.098) (0.100-0.116) (0.112-0.130) (0.125-0.145) (0.137-0.161) (0.154-0.182) (0.168-0.199) 0.042 0.050 0.062 0.072 0.085 1.095 0.106 0.117 0.132 0.144 4-day (0.039-0.045) (0.047-0.054) (0.058-0.066) (0.067-0.076) (0.079-0.090) (0.088-0.102) (0.098-0.113) (0.108-0.125) (0.121-0.141) (0.131-0.154) 0.021 7-day 0.026-0 030 0.031 0 035 0.038-0043 0. 4 -0 049 0.050-0 058 0.056-0065 006 -0 072 D. 68-D 079 0.076-0 089 0. 8 -0 097 10-day .142 0.021--0 024 0.02 -0 028 0.030-0034 0.03 -0 038 0.039-0 044 0.043-D 049 0047--0 054 0.051 D 059 0.057--0 066 0. 61--0 071 021 123 1.127 1.14 20-115 day 0.014-0 016 0.017--0 019 0.020-0022 0.02 -0 025 0. 0028 0.028-0031 0.03 0-0 034 0.033-D 037 0.036-0 041 0.039-0 044 0.112 30-day .121 0.01 -0 013 0.014-0 015 0.016-0018 0.018-002D 0.020-0 022 0.02 -0 024 0.023--0 026 0.025-D 028 0.027--0 031 0.029-0 033 0.01D 0.012 0.014 0.015 0.017 1.016 0.020 1.021 0.023 0.024 45-day (0.010-0.011) (0.012-0.013) (0.013-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.023-0.026) 0.009 O.D11 0.012 0.014 0.015 0.016 0.017 D.018 0.020 0.021 60-day (0.009-0.010) (0.010-D.D11) (0.012-0.013) (O.D13-D.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-D.D19) (0.018-0.021) (0.019-0.022) frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). rsinparenthesis are PF estimates at lower and upper hounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a EP,.�afn,121,on uration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not dagainst probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. fer to NOAA Atlas 14 document for more information. Back to Top PF graphical CUI PN97470 - Page 48 of 62 (Revised, 05/03/2023) CUI Bioretention SCM Underdrain Calculations CUI PN97470 - Page 49 of 62 (Revised, 05/03/2023) cul NCDEQ Stormwater Design Manual Environmental Quality When an impoundment is located in karst topography, gravelly sands, or fractured bedrock, a liner may be needed to sustain a permanent pool of water. If geotechnical tests confirm the need for a liner, acceptable options can include: 6 to 12 inches of clay soil (minimum 15 percent passing the #200 sieve and a maximum permeability of 1 x 10-5 cm/sec), a 30 mil poly -liner, or a bentonite liner. Underdrain Systems Underdrain systems are utilized in several SCM designs, and can have many different configurations. The underdrain system will either daylight, connect to another SCM, or connect to the conveyance system. All piping within the underdrain system should have a minimum slope of 0.5 percent and should be constructed of Schedule 40 or SDR 35 smooth wall PVC pipe. The underdrain pipes should be designed to carry 2-10 times the maximum flow exfiltrating from the SCM medium. Choose a value within this range to reflect the expected stability of the drainage area. This maximum flow is computed from Darcy's law and assuming maximum ponding and complete saturation along the depth of the medium. Manning's formula is then used to size the pipe. Due to the risk of underdrain clogging, designers are encouraged to install more than one underdrain of smaller diameter in order to facilitate drainage. The minimum size of pipe should be 4-inch diameter. The spacing of collection laterals should be no greater than 10 feet center to center, and a minimum of two pipes should be installed to allow for redundancy (Hunt and White, 2001). A minimum of 4 rows of perforations should be provided around the diameter of the pipe (more for pipes 10 inches in diameter and larger), and the perforations should be placed 6 inches on center within each row for the entire length of the drainage lateral. Perforations should be 3/8-inch in diameter. The underdrain pipes should have a minimum of 3 inches of washed #57 stone above and on each side of the pipe (stone is not required below the pipe). Above the stone, either filter fabric or two inches of choking stone is recommended to protect the underdrain from blockage. Avoid filter fabric if there is any question about the future stability of the drainage area. Above the filtering device, a minimum of 2 inches of washed sand should be installed. Choking stone (#8 or #89) in lieu of filter fabric is recommended if there is potential for higher sediment loads that would lead to clogging. Pipe socks are also not recommended. Typically, bioretention SCMs in the Piedmont region of North Carolina will require underdrains with an up -turned elbow. The number of pipes needed for the underdrain system can be determined using the following 3- step process: 1. Determine flow rate through the soil media and apply a safety factor of 10 (this is now the underdrain design flow, Q). 2. Use Equation 1 below FILTER MEDIA SURFACE AREA —1260 SF 6 i n/h r = 0.5 ft/h r ... 0.5* 1260 / 3600 = 0.175 cfs x 10 = 1.75 cfs 2 i n/h r = 0.16 ft/h r ... 0.16* 1260 / 3600 = 0.056 cfs x 10 = 0.56 cfs A-5. Common SCM Structures & Materials 12 Revised: 2-11-2018 cul PN97470 - Page 50 of 62 (Revised, 05/03/2023) NCDEQ Stormwater Design Manual cul Environmental Quality Equation 1: Underdrain Pipe Size (3) for 6 in/hr (MAX): Q = 1.75 cfs --> D = 9.82 inches Q n 8 for 4 in/hr: Q = 1.16 cfs --> D = 8.41 inches D = 16 So.s for 3 in/hr: Q = 0.88 cfs --> D = 7.57 inches for 2 in/hr (MIN): Q = 0.56 cfs --> D = 6.41 inches where: D = Diameter of single pipe (inches) n = Roughness factor (recommended to be 0.011) S = Internal slope (recommended to be 0.5%) Q = Underdrain design flow (cfs) 3. The only unknown is D. This is the diameter of a single pipe that could carry all the water were it to be the only underdrain. Underdrain pipe diameters are typically either 4 inches or 6 inches. Table 1 and 2 below convert D (in inches) to an equal number of 4 or 6 inch underdrains at 0.5% slope. Table 1: Number of 4" Pipes Required in the Underdrain 5.13 2 5.95 3 4 - 4" underdrains to 6.66 4 handle a media infiltration rate of up to 2 in/hr. 7.22 5 7.75 6 8.20 7 Table 2: Number of 6" Pipes Required in the Underdrain ff ' is Less Than No. of 6" Pipes 2 - 6" underdrains to 7.84 2 handle a media infiltration rate up to 3 in/hr. 9.11 3 4 - 6" underdrains to 10.13 4 handle a media infiltration rate of up to 6 in/hr. A-5. Common SCM Structures & Materials 13 Revised: 2-11-2018 SUMMARY: Selecting underdrains for 3 in/hr (nominal) target. USE two 6-inch underdrains connected to one 8-inch underdrain manifold. Turn up manifold with 90d elbows to set the internal water storage,�IWS) depth as shown on drawings. g (Revised, 05/03/2023 CUI NCDEQ Stormwater Design Manual Environmental Quality R i ill 4 C P_ I Outlets of SCMs are the devices that control the flow of stormwater out of the SCM to the conveyance system (stormwater pipe, natural drainageway, etc.). While most of the water quality treatment takes place within the SCM, the outlet design is often integral to treatment efficiency, as well as being a critical factor in stormwater volume control. Water quality is affected by how quickly the water is removed from the treatment unit, thereby affecting sedimentation time and possibly causing resuspension of particles. The depth from which the water is drawn also affects water quality, since the water is typically cleaner the higher it is in the water column. Finally, the design of the outlet is also the main means of controlling peak flow volumes and rates. Outlet designs are specific for each SCM depending on the goals to be achieved. The following sections will discuss many of the most common outlet designs. Hydraulic calculations for outlets types as well as storage and drawdowns are provided in Part B, Calculation Guidance. It should be noted that floatation issues should be considered with any structure (outlet box, riser, etc.) placed within a SCM. Designers should consider including provisions such as adjustable weirs to regulate and optimize water surface elevations and bottom drains and valves to allow the SCM to be drained for repairs and maintenance A drawdown orifice should have a turned -down elbow or other safeguard in order to prevent trash or other material floating on the surface from clogging the pipe. An example is shown in Figure 5. A-5. Common SCM Structures & Materials 14 Revised: 2-11-2018 CUI PN97470 - Page 52 of 62 (Revised, 05/03/2023) CUI Erosion & Sediment Control Outlet Protection CUI PN97470 - Page 53 of 62 (Revised, 05/03/2023) cul Channel Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Sep 6 2022 OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.58 Q (cfs) = 1.600 Area (sqft) = 0.47 Invert Elev (ft) = 264.00 Velocity (ft/s) = 3.38 Slope (%) = 0.50 Wetted Perim (ft) = 1.73 N-Value = 0.013 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 0.99 Calculations EGL (ft) = 0.76 Compute by: Known Q Known Q (cfs) = 1.60 Elev (ft) Section Depth (ft) 266.00 2.00 265.50 1.50 265.00 1.00 264.50 — 0.50 264.00 0.00 263.50 -0.50 0 1 2 3 cul Reach (ft)ON97470 - Page 54 of 62 (Revised, 05/03/2023) Depth Q Area Veloc wp (ft) (cfs) (sgft) (ft/s) (ft) 0.10 0.053 0.041 1.29 0.64 0.20 0.223 0.113 1.98 0.93 0.30 0.494 0.198 2.49 1.16 0.40 0.850 0.294 2.89 1.37 0.50 1.268 0.395 3.21 1.57 0.60 1.698 0.493 3.44 1.77 0.70 2.113 0.588 3.59 1.98 0.80 2.462 0.674 3.65 2.22 0.90 2.685 0.745 3.60 2.50 1.00 2.518 0.785 3.21 3.14 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 1 CUI PN97470 - Page 55 of 62 (Revised, 05/03/2023) Yc TopWidth Energy (ft) (ft) (ft) 0.10 0.60 0.13 0.20 0.80 0.26 0.30 0.92 0.40 0.39 0.98 0.53 0.48 1.00 0.66 0.56 0.98 0.78 0.63 0.92 0.90 0.68 0.80 1.01 0.71 0.60 1.10 0.68 0.00 1.16 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 2 CUI PN97470 - Page 56 of 62 (Revised, 05/03/2023) cul Channel Report Hydraflow Express Extension for AUtodeskS Civil 31DO by Autodesk, Inc. BIORETENTION OUTFALL (OP-2) Circular Diameter (ft) = 1.00 Invert Elev (ft) = 262.40 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 1.90 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Sep 6 2022 = 0.65 = 1.900 = 0.54 = 3.50 = 1.88 = 0.59 = 0.95 = 0.84 Elev (ft) Section Depth (ft) 264.00 1.60 263.50 1.10 263.00 0.60 262.50 0.10 262.00 -0.40 261.50 -0.90 0 1 2 3 cul Reach (4N97470 - Page 57 of 62 (Revised, 05/03/2023) Depth Q Area Veloc Wp (ft) (cfs) (sgft) (fUS) (ft) 0.10 0.053 0.041 1.29 0.64 0.20 0.223 0.113 1.98 0.93 0.30 0.494 0.198 2.49 1.16 0.40 0.850 0.294 2.89 1.37 0.50 1.268 0.395 3.21 1.57 0.60 1.698 0.493 3.44 1.77 0.70 2.113 0.588 3.59 1.98 0.80 2.462 0.674 3.65 2.22 0.90 2.685 0.745 3.60 2.50 1.00 2.518 0.785 3.21 3.14 Hydraflow Express - BIORETENTION OUTFALL (OP-2) - 09/6/22 1 CUI PN97470 - Page 58 of 62 (Revised, 05/03/2023) Yc Topwidth Energy (ft) (ft) (ft) 0.10 0.60 0.13 0.20 0.80 0.26 0.30 0.92 0.40 0.39 0.98 0.53 0.48 1.00 0.66 0.56 0.98 0.78 0.63 0.92 0.90 0.68 0.80 1.01 0.71 0.60 1.10 0.68 0.00 1.16 Hydraflow Express - BIORETENTION OUTFALL (OP-2) - 09/6/22 2 CUI PN97470 - Page 59 of 62 (Revised, 05/03/2023) cul Culvert Report Hydraflow Express Extension for AUtodeskS Civil 3D8 by Autodesk, Inc. Thursday, Jan 26 2023 BIORET OUTFALL TO OP-2 (10-YR) `REVISED Invert Elev Dn (ft) = 262.20 Calculations Pipe Length (ft) = 40.00 Qmin (cfs) = 1.00 Slope (%) = 0.50 Qmax (cfs) = 4.00 Invert Elev Up (ft) = 262.40 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 12.0 Shape = Circular Highlighted Span (in) = 12.0 Qtotal (cfs) = 3.30 No. Barrels = 1 Qpipe (cfs) = 3.30 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.47 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.20 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 263.09 HGL Up (ft) = 263.45 Embankment Hw Elev (ft) = 263.77 Top Elevation (ft) = 265.23 Hw/D (ft) = 1.37 Top Width (ft) = 5.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 Elev (ft) cNffine> 2 i9 2( 2( 2E 2f Hw Depth (R) 360 . it =-�OPP" �r 26' o IV is Circular Culvert HGL LV La Embank 2.60 1.a-1 -0 40 -1.40 60 Reach (R) cul PN97470 - Page 60 of 62 (Revised, 05/03/2023) CUI REVISED0 (OP-1) .. .. OALa = , E ' D- 6 (using 0 ' � - s �.USE NCDOT... a � r • • ��� �� II III 'a��� '�� fill, I ' lil''. � rtr • .�ii��i� � ,� �� �� �� , .� ■off®iI�I� iR'�i�; I� � • JI Q I .��wm.�erwrwrnrw�w����ftifti������� ���1111� rlr rrl 1 lie Curves may not be extrapolated. Figure 8.06b Design of outlet pr❑teation from a round pipe flowing full, maximum tailwater condition (Tw? 0.5 diameter). CONTAINMENT TANK TO 13IORETENTION BASIN (OP-1) 12" DUCTILE IRON PIPE @ 0.5% SLOPE Q10 = 1.6 cfs (from 10—yr reservoir V10 = 3.4 fps Qfull = 2.7 cfs (full discharge, gravity flow only) Vfull = 3.7 fps (full velocity, gravity flow only) 8.06.4 Rev. 12/93 CUI PN97470 - Page 61 of 62 (Revised, 05/03/2023) CUI REVISED (OP-2) Outlet W = Do + OALa pipe diameter (Ors) La Tai�wter 915DO 30 20 .i 10 USE minimum 0 3 5 50 100 Discharge (P/sec) Curves may not be extrapolated. Figure 8.06b Design of outlet pr❑teation from a round pipe flowing full, maximum tailwater condition (Tw? 0-5 diameter). 13IORETENTION BASIN OUTFALL (OP-2) 12" DIP @ 0.5% SLOPE Q10 = 3.3 cfs (from 10-yr reservoir routing output) V10 = 4.2 fps (from continuity) Qfull = 2.7 cfs (full discharge, gravity flow or. Vfull = 3.7 fps (full velocit° 8.06.4 Rev. 12/93 PN97470 - Page 62 of 62 (Revised, 05/03/2023) z N_ Q Q 1 � i o Lo0 USE 100pminimum CUI