Loading...
HomeMy WebLinkAboutNCC231234_ESC Approval Submitted_20230427 � 9 ROY COOPER Governor s =� ELIZABETH S.BISER �o* „a Secretary DOUGLAS R.ANSEL NORTH CAROLINA 3 Interim Director Environmental Quality February 14, 2023 LETTER OF APPROVAL I f Town of Fletcher ATTN: Mr. Mark Biberdorf 300 Old Cane Creek Rd Fletcher, NC 28732 i RE: Project Name: Multi-Use Courts at Bill Moore Community Park Acres Approved: 1.20 Project ID: HENDE-2023-017 County: Henderson City: Fletcher Address: 85 Howard Gap Rd River Basin: French Broad Stream Classification: C I Submitted By: McGill Associates - Nathan Sawyer Date Received by LQS:January 26, 2023 Plan Type: Recreation Dear Mr. Mark Biberdorf, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the , date of approval, if no land disturbing activity has been undertaken, as is required by Title 1SA NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. PIease direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources �o=�HCnaounw `vJjJ� Asheville Regional Office 1 2090 U.S.Highway 70 f Swannanoa,North Carolina 28778 V*a Ontnl&WNh flWQwliry 828.296.4500 I Letter of Approval Town of Fletcher ATTN: Mr. Mark Biberdorf February 14, 2023 Page 2 of 3 Title 15A NCAC 4B.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site- I. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, o C t6 c vdFv-� Laura Christiansen Engineer II Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet Modifications Required for Approval cc: Mr. Nathan Sawyer (Nathan.sawyer@mcgillassociates.com) Mr. Ben Cathey, PE (ben.cathey@mcgillassociates.com) Mr. Mark Biberdorf(m.biberdorf@fletchernc.org cc: Regional Office file Letter of Approval Town of Fletcher i ATTN: Mr. Mark Biberdorf February 14, 2023 Page 3 of 3 i E MODIFICATIONS REQUIRED FOR APPROVAL f Project Name: Multi-Use Courts at Bill Moore Community Park Project 1D: HENDE-2023-017 County: Henderson i 1. Please include construction details and maintenance specifications for the proposed j soil stockpile. Details should include that the silt fence must be a minimum of 5 ft from the toe of the stockpile, and any stockpile that will remain undisturbed for more than 7 days must be stabilized and temporarily seeded. {G.S. 113A-57.3} E E I i i i I CD CD 0. ID C CD CD A CD c° C ,� � G © CD m• �s W CD r4- CD `C rD r+ A� G H � CD CD CD CD n CD EAT CD CD �-. C It � �'• � `'� Mom-+ � �- D rD 0• ~ '�~• CD n Ui CD CD r c� � CD 0 Old eD N y Ow W CD �