Loading...
HomeMy WebLinkAboutSW3220803_Stormwater Report_20230425 STORMWATER MANAGEMENT REPORT FOR: CRESSWIND WESLEY CHAPEL - PHASE 04 WESLEY CHAPEL, NC PREPARED FOR: KH WESLEY CHAPEL, LLC J -#2 7842.0004 \,,11111111111,,,,, MAY 1 2 5, 2 0 2 2 E S S/p q ���i `�.� ��N C A �7 i,�i REVISED• THOMAS "--000e�E A 6w g, 049480 _ ENGINEERING CO. 4/21/2023F�'. No. F-0871 OF II V ����11111111111\\\\ Prepared by: THOMAS & HUTTON STORMWATER MANAGEMENT REPORT Cresswind Wesley Chapel - Phase 04 Project: Cresswind Wesley Chapel - Phase 04 T&H Job Number: J-27842.0004 Location: Potter Road Wesley Chapel, NC 28173 Date Prepared: May 25, 2022 Owner: KH Wesley Chapel, LLC Owner Address: 8913 Silver Springs Court Drive Charlotte, NC 28215 Engineer: Thomas & Hutton Engineer Address: 1020 Euclid Avenue Charlotte, NC 28203 Phone: 980-201-5505 H THOMAS & HUTTON Page 1 TABLE OF CONTENTS Section 1 -Summary of Results.......................................................................................................Page 3 Section 2- Project Narrative...........................................................................................................Page 4 Section3- Purpose...........................................................................................................................Page 4 Section 4- Regulatory Summary ....................................................................................................Page 5 Section5- Methodology.................................................................................................................Page 5 Section6- Hydrology.......................................................................................................................Page 6 Section 7- Runoff Calculations ......................................................................................................Page 6 Section 8- Existing Conditions ........................................................................................................Page 8 Section 9- Post Development Conditions.....................................................................................Page 8 APPENDICES ProjectMapping......................................................................................................................Appendix A Aerial Location Map.......................................................................................................... Exhibit A FEMAMap ...........................................................................................................................Exhibit B WetlandsMap.................................................................................................................... Exhibit D SoilsMap..............................................................................................................................Exhibit E Pre Development Drainage Map...........................................................................................Appendix B Pre Development Conditions Drainage Calculations.........................................................Appendix C Post Development Drainage Map ........................................................................................Appendix D Post Development Conditions Drainage Calculations........................................................Appendix E Water Quality Calculations......................................................................................................Appendix F H THOMAS & HUTTON Page 2 SECTION 1 - SUMMARY OF RESULTS Table 1 - Pre Development Runoff Rates TABLE 1 Summar of Results- Existing Conditions Storm Event Outfall 01 (cfs) 2-year 69 10-Year 154 25-Year 201 50-Year 244 Table 2- Post Development Runoff Rates TABLE 1 Summary of Results- Proposed Conditions Storm Event Outfall 01 cfs 2-year 30 10-Year 98 25-Year 151 50-Year 195 H THOMAS HUTTON Page 3 SECTION 2 - PROJECT NARRATIVE Cresswind is a residential subdivision within Wesley Chapel, North Carolina. Phase 4 consists of approximately 147 single family detached units.The site is located in Union County along Potter Road, north of Newtown Road and south of Weddington Road. It should be noted that a portion of Phase 5 lots and impervious area is included in the post development calculations for the proposed pond. The majority of the site is currently wooded with an understory of brush. Pre-development run- off is discharged into an existing wetland system and FEMA Floodplain. The pre-development drainage basins have been delineated and are illustrated on the Pre-Development Drainage Exhibit found at the end of this report. For the purpose of this report, we will compare the predevelopment runoff rates to the post development runoff rates as shown in the summary at the beginning of this report. The pre- development basin will be routed through one wet detention pond during post development conditions and outfall into the existing wetlands and floodplain. The post-development sub-basins were delineated and are illustrated on the Post-Development Drainage Exhibit found at the end of this report. All design information for ponds and associated drainage pipes and structures can be found in the appendices of this report. The soils on this site consist of type B, C, D and B/D hydrologic soil groups which are shown on the attached NRCS soils map within Appendix A. SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre-development basins that are within this project and determine which drainage basins will be affected by the proposed development. 2. To develop a stormwater model that will: a. Be in compliance with the NCDEQ stormwater regulations. b. Simulate the pre- and post-development conditions for the project. c. Predict water elevations for all proposed ponds. d. Demonstrate that all culverts are of adequate size for drainage under post- development conditions. e. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report; • Pre-Development: examines the drainage basin prior to any development within the site. • Post-Development: examines the drainage basin after site improvements have been installed. The model may need to be revised and updated for each phase that is permitted. H THOMAS & HUTTON Page 4 SECTION 4 - REGULATORY SUMMARY NCDEQ-Stormwater The North Carolina Department of Environmental Quality (NCDEQ) is responsible for administering the storm water management program. Development or re-development activities are required to apply for and receive a stormwater permit from NCDEQ. These permits address water quality and quantity. NCDEQ regulations require that peak post-development discharge rates from the basin shall be at or below pre-development rates for the 10 and 25-year storms events. The regulations also specify the 1-inch volume drawdown shall be released over a time of 48 to 120 hours to minimize hydrologic impacts to the receiving channel. See attached Exhibit E for post-development peak flow control calculations, and Exhibit F for water quality calculations. The stormwater treatment shall be designed to achieve average annual 857o Total Suspended Solids (TSS) removal and must apply to the volume of post-development runoff resulting from the one-inch rainfall. See attached Exhibit E for post-development peak flow control calculations, and Exhibit F for water quality and channel protection calculations. SECTION 5 - METHODOLOGY The pre- and post-development conditions of the site were analyzed using the Storm and Sanitary Analysis (SSA) program developed by Autodesk. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system (including existing and proposed storage/detention features such as wetlands, ponds, and lakes). SSA is an advanced, powerful, and comprehensive modeling package for analyzing and designing drainage systems, stormwater sewers, and sanitary sewers. The software can simultaneously model complex hydrology, hydraulics, and water quality. The SSA program is built on the highly tested and widely utilized SWMM methodologies. For this application of the SSA program, the hydrology was simulated using the NRCS (SCS) TR-55 methodology. The hydraulics was simulated utilizing hydrodynamic routing. Hydrodynamic routing solves the complete St. Venant equations throughout the drainage network and includes modeling of backwater effects, flow reversal, surcharging, looped connections, pressure flow, tidal outfalls, and interconnected ponds. The SSA program graphical user interface (GUI) allows for the input of hydrologic data for each drainage sub-basin. See the appendices for input variables including runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage sub-basin, and time of concentration. The SSA program generates runoff hydrographs for each sub-basin based on these user-specified variables. Hydrographs are generated by SSA using the NRCS Unit Hydrograph (TR-55) Method. H THOMAS & HUTTON Page 5 The model's hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic conveyance such as pipes, channels, control structures, weirs, etc. The sizes, inverts, lengths, and Manning "n" values for all pipes connecting the ponds or lakes are input into the model. In addition to pipe information, all pond, lake, and detention area stage-area information and the respective control structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. Hydrographs for each drainage area are merged within the SSA program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include pond area and discharge rates and stage/storage information during the storm events. The storm drainage infrastructure onsite was modelled using the Storm Sewers program developed by Autodesk. This program utilizes the model rainfall and stormwater runoff through the storm drainage infrastructure to provide hydraulic grade line calculations and profiles for analyzing the proposed storm drain network. SECTION 6 - HYDROLOGY ■ SCS TR-55 Method was used. ■ The rainfall distribution used for each storm event was obtained from rainfall data publicly available for Union County, NC. The following design storms are used in the model simulations: - 2-year, 24-hour Design Storm = 3.50 inches - 10-year, 24-hour Design Storm = 5.20 inches - 25-year, 24-hour Design Storm = 6.10 inches - 50-year, 24-hour Design Storm = 6.90 inches - 100-year, 24-hour Design Storm = 7.50 inches ■ SCS Type II Statistical Rainfall Distribution was used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain-gage data. ■ Soils present on site consist of the following: - Badin channery silty clay loam, 2 to 8 percent slopes (BdB2) - HSG C - Chewacla silt loam, 0 to 2 percent slopes (ChA) - HSG B/D - Goldstone-Badin complex (GsC), 8 to 15 percent slopes- HSG C - Tarrus gravelly silty clay loam, 2 to 8 percent slopes (TbB2) - HSG B SECTION 7 - RUNOFF CALCULATIONS Peak flow rates for the watersheds were calculated by the SSA Program for each design storm.The pre- and post-development drainage basins are shown in appendicies that follow this report. H THOMAS & HUTTON Page 6 Curve Numbers Curve numbers were generated according to procedures set forth in SCS Technical Release 55. The composite curve numbers for each drainage basin were calculated using soils information from the Soil Survey of Union County, NC provided by The United States Department of Agriculture Soil Conservation Service. Curve numbers were weighted based on the land use and soil group within each basin. Time of Concentration Times of concentration were calculated according to procedures set forth in SCS technical Release (TR) 55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Basin information for the area of interest was collected for use in the SSA models. Basins were delineated using surveyed topographic information. Basins were drawn and the longest flow paths were found. The times of concentration were calculated based on the NRCS, three part travel time method documented in TR-55. The three equations used are summarized below: Sheet Flow: (hr) Symbol Dimension Units _ 0.007(nL)0•$ n Mannin 's n -- �� - P 0.05 X SOA L Length of flow ft 2 2 yr event P2 rainfall in S Slope ft/ft Shallow Concentrated Flow: (hr) Symbol Dimension Units L L Length of flow ft tz 3600 X V V* Velocity ft/s *Based on TR-55 velocity-slope relationship Channel Flow: (hr) Symbol Dimension Units L L Length of flow ft _ t3 3600 X V V* Velocity ftA *Assumed to be 2 ft/s Time of Concentration: (hr) Appendices C and E with time of concentration information are attached. Mr. THOMAS & HUTTON Page 7 SECTION 8 - EXISTING CONDITIONS The total acreage of the drainage basins analyzed in the stormwater calculations is approximately 40 acres. The existing conditions described in this narrative will refer to the pre- development condition of the site. The pre-development conditions for the site consists predominantly of woods with an understory of brush. Stormwater runoff on the site was delineated according to the existing drainage patterns found at the site and upon the field topographic survey completed within the site. The watershed delineation was conducted to provide a comparison for pre-development and post- development flows. Outfall "01" discharges into an existing wetland (See Pre Development Drainage Map-Appendix B). SECTION 9 - POST- DEVELOPMENT CONDITIONS The post-development drainage basins are shown on the Post-Development conditions watershed map located in Appendix D of this report. The total post-development watershed area analyzed for this project is approximately 50 acres. This site maintains all pre-development discharge points in the post-development condition. Post-development peak flows are less than pre-development conditions for the 2-yr, 10-yr, and 25-yr storm events. See Appendices B through H for pre- and post-development SSA model input and results. See Summary of pre- development versus post-development results at the beginning of report. After development, the site will consist of approximately 144 single family lots in Phase 4 and associated public roads, private driveways, and stormwater management features such as drainage swales and stormwater detention ponds. It should be noted that a portion of Phase 4 lots and impervious area is included in the post development calculations for the proposed pond. Stormwater runoff from site will be conveyed to a proposed wet detention pond. The detention pond will meet NCDEQ pre- and post-development flows and meet freeboard requirements for the ten (10) year, twenty-five (25) year, and fifty (50) year storm events. The proposed detention ponds were designed to meet criteria found in the NCDEQ BMP Design Manual. Additionally, the required freeboard has been provided beneath the emergency spillways and the pond embankments for the (50) year storm event. The following tables illustrate the maximum water surface elevation for the two (2) year, ten (10) year, twenty-five (25) year, and fifty (50) year storm events both ponds. H THOMAS & HUTTON Page 8 Table 3-Wet Detention Pond 05 Bottom of Pond = 570.00 Crest of Emergency Spillway = 578.50 Top of Embankment= 580.00 Wet Detention Pond 04 Max Elevation Storm Event (f0 10-Year 578.86 25-Year 579.16 50-Year 579.36 100-Year 579.48 H THOMAS & HUTTON Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX A PROJECT MAPPING 27842.0004 T THOMAS & HUTTON 4w . _, - : % � • MAS . ^ \ HUTTON - . ; , . . Phase , Aerial ' 04/05/2022 � : - � • � _ _ : � Pit { - _ . �k spefta Lq f G# mD .\ dd © . it k . � . - • . �� � / � , . � a� 4 r . \� ~� ,», �` ` � ^ � r . . , TA , . . - � Ij I g80 . . jk Ok t�n0 T THOMAS HUTTON b . 27842 - Cresswind Phase 4 FEMA i 04/05/2022 1%Annual Chance Flood Hazard ` * Z Regulatory Floodway * Special Floodway Area of Undetermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1%Annual Chance Flood Hazard F rti�i F F ..17 Area with Reduced Risk Due to Levee Area of Minimal Flood Hazard y Limit Lines SFHA/Flood Zone Boundary r I I This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions THOMAS 4:11 0 T 14 HUTTON 27842 - Cresswind Phase 4 Soils 04/05/2022 A A/D IB B/D ' C C/D ■ D . A Not Classified a EDs i 'I i' S ; This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions T THOMAS HUTTON ,r 27842 - Cresswind Phase 4 Wetlands = 6dS 04/05/2022 Forested Wetland Non-Forested Wetland Salt Marsh ---- . Water 4 4: Y: �'haf�e+bt { Lr This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions Hydrologic Soil Group—Union County, North Carolina (Soils) M M 529600 529700 529800 529900 530000 530100 530200 530300 530400 530500 530MO 530700 530800 5309M 531000 34o 59'20"N 1 1 ,I. I I I _ 1 34o 59'20"N n � Zb r r r 4 V a � � Soil MaN may not 1. valiel at this scale. 340 58'49"N 340 58'49"N 529700 5298M 529900 530000 530100 530200 530300 530400 530500 530600 530700 530800 5309M 531000 in Map Scale:1:6,650 if printed on A landscape(11"x 8.5")sheet. Meters $ N 0 50 100 200 300 $ Feet 0 300 600 1200 1�0 Map projection:Web Mercator Conermordinates:WGS84 Edge tics:UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 12/3/2021 Conservation Service National Cooperative Soil Survey Pagel of 4 Hydrologic Soil Group—Union County, North Carolina (Soils) MAP LEGEND MAP INFORMATION Area of Interest(A01) ❑ C The soil surveys that comprise your AOI were mapped at 0 Area of Interest(AOI) 0 C/D 1:24,000. Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons � A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation Q B/D Rails Please rely on the bar scale on each map sheet for map Q C measurements. ­0 Interstate Highways 0 C/D US Routes Source of Map: Natural Resources Conservation Service D Web Soil Survey URL: Major Roads Coordinate System: Web Mercator(EPSG:3857) LJ Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts * 0 q distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more * 0 A/D accurate calculations of distance or area are required. r*/ B This product is generated from the USDA-NRCS certified data as B/D of the version date(s)listed below. 0 C Soil Survey Area: Union County, North Carolina Survey Area Data: Version 21, Sep 15,2021 r 0 C/D Soil map units are labeled(as space allows)for map scales 0 D 1:50,000 or larger. A 0 Not rated or not available Date(s)aerial images were photographed: Jul 18,2011—Oct 30, Soil Rating Points 2018 0 A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background 0 A/D imagery displayed on these maps.As a result,some minor 0 B shifting of map unit boundaries may be evident. 0 B/D uson Natural Resources Web Soil Survey 12/3/2021 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Union County, North Carolina Soils Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BdB2 Badin channery silty C 16.4 16.0% clay loam,2 to 8 percent slopes, moderately eroded ChA Chewacla silt loam,0 to B/D 11.6 11.3% 2 percent slopes, frequently flooded GsC Goldston-Badin D 5.4 5.3% complex,8 to 15 percent slopes TbB2 Tarrus gravelly silty clay B 69.1 67.4% loam,2 to 8 percent slopes,moderately eroded Totals for Area of Interest 102.6 100.0% USDA Natural Resources Web Soil Survey 12/3/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Union County, North Carolina Soils Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.-None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 12/3/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX B PRE-DEVELOPMENT DRAINAGE MAP 27842.0004 T THOMAS & HUTTON r 1'.•��' `i/ 57F�\j ' �� . ; a / / I�111 I I\1)���`���`'''` �i�✓ � ( r � y S r / � -,� �--i /�//%/ %/ �\ \�\ 59�''..,.. -� `. �s\\\ z � �-�\ �-����\\\� \\\,� \\ � \ / IIII 111 I �\ ''��� ::: / � , /, ,, / , �� - � _, /// �// /�// \\\\\\\\/ f'•.:\ \r e\z� � s/ ���\ �\ — ��\ 1\\\\ \ .�� 1 J\ \`: L��\\ .:.. (�/—=—f —__ � SaS`t1t 1-1��\\�I II — J l r-,/ \\� \, I / :•� r � rl J a — 1//, I � \ I / l ) � \��—�\ � / /�// � IIIIIII I�// / \ \ ' S° � :• �> �` � III \ \\ ..:: ; r / (// X\\�� / //( (�/ Il . / _ •.. \. 5g°� I / � I � \ / IIII I _ �� � \ \ - \ \ ` .. >l � / //// �\\�\ 11 {I J//j 11 � •. : �\ \ // \ \\\�I Illlq IIII II II \\ � � %/T /> ` ,I ` �//i �i�/ /� � \\�\ �\•� �\�\I� \�\ -� ���" I ^I I I IIIII I III IINI /�i//a� %�t� \ � �� -` l ( \\ , ' � I lf�(I!////i T � \\tip\\\�l\1\�\1��11\I\�\\\ �,, \ � , ' IIIIIII �j/ �/�i � •.:. // /// �4\\�\ IIII I�'l r\��a11 � 'X♦'� a I �. " I,�f '� � IIIII I`\ �/ � \\ �y\����\ �,`\\\\���F\' \\\ \ rll v �1 I �° \. ,\� �/ � � ,, 6° I I ♦♦� 1 \ 1 , IIII ��r '• � 11(1j11 / � h� \ ��\� \ \ \ �.. / h/1 / /f// — /� IN EXIST �' h�� r — 15- 1 585�1 — � 'I I1 // l�(J/ :. ✓ l- ,� ,moo \ Y —5s5- 7/ 11 / �� �)� — 1 }'..: 585 1/ \\ /\ \/1/11 fl )>\\ I — =585 III ( — \ J� ` f 'L1\ UNDISTURBED BASIN IIIIII1111 \ { \ =6s0 ° y� y Illlljlll////I I— — v I \ AREA: 13.14 AC. :.: / I / I 1 s90 \ \ ( \ C N: 71 ,- f Tc• 32 MIN. II _ 1�\ \ �/a �<�}I)Il1///%/�� ��\ \ � ^' / I I ��IIII�1 �� - 3.� _ / �i/�i�,� � .... _ 7 r% °1• / t \\\� 1 ( ( \ '\ \ \ �' P J //� / \�\ 1:. I I \L J .-;3h. / t / 1�1 \ ! .t' .;•: �1 J _ _ _ 6 \�\\ _ :". ... h l \ \ \�.1 \��'\ �, \ S. 1 l�/�//�/ \\\\� / \ ——III IIIIIII r fif�-J / �c g / / 1zJ�/� .. :� � _� a� �_�" 6���� � =— J• ,, -_,� < ...= / \ \� � Y c ti�-, � / (� ////// / \\\\ /\\ I IIIIIIIIIII��''�\\ �✓ �-: % _ _ \ t`♦ // .:''•'/ / - - - - - - S�\IIIII I L - \\ � J'� S � J / 6�\ \ I IIIII ? 6 \ �- //_ / d�/e/� -635\\\ / a1 �,� � � ..: � o � , - �- - - - - \\ III I - ,• ! _ \ �,`'�- � �/ii / \ \I • . _= I I � . \ 3. � � � .�' /�/ < � \ -\ h / / `��'/ '`�� � /�� ��� ��a �-_- - - - - - � III ':>, _� `' / // � -\\� �" � �/�%//%%/ � / / II' �'Il�jl�llllZ \ ( I•;: \ \ \ :�-�` ��/ / I�, ����� { , � / ! �r�� ' � E� ry-, r1II ( G — \—____ \ �j \ / _ �1/j////�//✓ �I ll l\\\ 1fJ \ \ \ -� �►:`::::`. \ \� \< �j�i � \ � 1\ 1 l� — // 63`635 1 I \ 1 0 ��! : . :• rcrc'' - SUB-0 3 r-- � \ ,� - - - � \�\� \� " ,, ' � \\ �t ��- �� ti� %/// ,\ 1 l ( �� 1S ♦. J>�' � /-/� - -�-_-_-_-_- 565— `� , �\�\ AREA: 45.3 AC. \\ CN: 86 Tc: 5 MIN. o - - \ PHASE I l ' N Or SHEET -� � :�.•:�.:" UNDISTURBED BASIN 60 . . ` FLOW \ PATH / SUB-02 AREA: 23.79 AC. i /lj% //�� j�j��j// loll �\ v %// (\\ / \ \ C ) ` l c I�C� /� \\\ 63 \ \ / �� :.•' / //// ���5���N� �/ 111 i \ //( /� / ./... �v �\:. I 5635 o- - CN: 79 IJI %/ jig 565 /,�i/%/ / mil/ / / '\�✓ 7 L /� Tc: 37 MIN. 635 U / �� �- _ :. ;.• �-_ .,;� -_;_- - - - - - - s�� ii � / J / I ��l LOW PA — /l � v / �� (r �:..�'' :♦ ' �• -y- - - -_-/- _�; s - l(lll/�y �/ / `� / �\ / / / / /f /`//// / `� "� �- �� l /l 1 ( I � _._ _ lam,\fr-� �-- �?�s� s �l < � ��\ � \�� � _� ��`�' \ \\\\\\\ I I � — �'� •\. /jllr //1 J SHALLOWVI 615 / � ': � � ��\\\ CONCENTRATED / / / � r 1 � �_ \ �•\ � �-•_ \1 /�� ^,(j�r��l{\ � �� � \ J /// �s�s FLOW PATH UNDISTUR D BASIN ` \ \ \ \ \ ` ( / ( \o(j/- - -�� %J1 0 ( / / / f ARE 51.90 AC. ) / l ) /1/1l ? - �/ / / / / 1 11� l l Z \ \ �\ Tc: 32 MIN. \cam —• . , / / \595 \\\�� 1I(l IIII 111 /IIII , 65Ur �✓ . llllll% l 111 \ 1 1 \ \ ' � \ �J / \ Imo ' // t � �� � �\� \I \1 ( 1�\\ l� 1\ �� \� �� < a. ��\ / '// �\ // /ll � l\\\\\� �, = r� // �r� � � } 1 \ \ � c J( f � / ,,, �" ��� � ^ ^ CID // „ ��. :-.- EXISTING ,1 \� �/ / / / // II \ �— — / / � PHASE 3 \ / // ///// ))\\� _ -- - I / 'S \ o , T 1l J z PHASE 3 BASIN TO POND o �SUB ( \ 1 �=,ti\� � `'�' \ • ..: \ .� / / \ I � - — �, / /// ////�//��////i� � -- � lc, \ ��c y -'�/ /,-• _-_-�� (1 / rS( ( 4 J I , /�,� >` •J � / � \ I II �� �/ AREA: 17.9 AC. CN: 86 - a rl-_- / 60 \\\\\ // t / \' : \ �/ ^ f( � \ Tc: 5 MIN. �/ a / / / `\ \ { _ 5°�� \IIII It V- _�)( — � ,: �\ II\ � L \��580� � / �//ice �11I `�r / / / /// /i/ � -�_ I �- ,. --- � _ ^/�,--:i, l T I)/ (11 l l f � � l � \ \\\ ` 1 a ( : 1 -TI \_ `� \•`• o 11 J I 1 S // \\\\ II IIIII 1 ( s / ( /r jt /lI�/ 5 ! f I I _ J \\ b I f I \ �II 1 �r'�'/ I � I I \ .,,.;. � _ � .� ,, ( :�=i� � ,, �• � ,: � � •� �,, , �, �,\�\\ _ \\�\�\� /%/�h /Jf!/r % //I`�I (IIfIII11 / / � IIIIIIIIJJ)II} l / 1 //,� Illl �ot�/// /// � f i � � 1 ) I ( _.. ( �� � ". _ � \r � 111 \\ - f .� I .-.\ \ �\\\ ti � .. �/s°�_ — )\�.� �' FUTURE ro`c 615-III -' -- s �\ PRE-DEVELOPMENT PHASE �� / z I I I 12 I) \`�\\\ \ DRAINAGE EXHIBIT 560 � -, ,� .�� _, N ,�, 6�° o.^•�� Sss•, \����°/ �I�I \\\\ / / / I 1 ( < 1 l � \\ � ��= � ) I S ` \ -,r- — � -� � l 1 I11 ) 1 I \1\\` � . \ \\\\x\\�� ////// �j1� J 1 CRESSWIND PHASE 2 9 � ��I \\\\\ \ \ \�°,\;`�� \\\�' \� \ \ s f 605 \ J /h,/ / / (11 l `� - // o /// �)i 1 1 ` I MONROE, NC \���\ \\�\�\ �-�\\ `�� — � z <ll \`\ \\ \\�\\\� J� \ / � \ \ r / PREPARED FOR: \ ° //%i1J�II////'�`'/ij \\ \\\\\1111�I� \��1.1• it ® J \ �-���``` i'- \ )tf l(( '' `� �11`_ 11.J,-- \ /// KH WESLEY CHAPEL LLC \\_ — z��`. PREPARED BY: 1 004- 1 / \' :.. s� 1 \ I 1 J ) 1 _ .� ���.. ✓� _=1�..�� , II111JJ//rrll>11)II 1 .�` \ :.�'01 .\ t_�_--�r ✓l— \ \ \ \ OUTFACE THOMAS �70 7r 5 \ ,Caso li or z � — _r ! ' H HUTTO N J( k 1020 Euclid Avenue` 565' Charlotte, NC 28202 • 980.201.5505 I w vw.thomasandhutton.com JOB NO: J-27842.0002 DATE: 2/16/2021 DRAWN: KSC SCALE: 1"= 180' REVIEWED: MSK SHEET: N/A STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX C PRE-DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0004 T THOMAS & HUTTON 27842.0004 CRESSWIND WESLEY CHAPEL - PHASE 04 PRE-DEVELOPMENT BASINS MODEL out ■ -0, Pre-Development 002-Year Page 1 Project Description File Name....................................................27842.0004-Pre dvelopment.SPF Project Options Flow Units--------------------------------------------------- CFS Elevation Type Elevation Hydrology Method. SCS TR-55 Time of Concentration(TOC)Method-------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes------------ YES Skip Steady State Analysis Time Periods--- NO Analysis Options Start Analysis On. Dec 03,2019 00:00:00 End Analysis On. Dec 04,2019 00:00:00 Start Reporting On. Dec 03,2019 00:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step---------------- 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step--------------- 0 00:05:00 days hh:mm:ss Reporting Time Step----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step-------------------------------------- 1 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches North Carolina Union 2 3.50 SCS Type II 247hr Pre-Development 002-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 39.76 484.00 73.00 3.50 1.18 46.92 7228 0 00-05-00 Pre-Development 002-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1 Out-01 Outfall 0.00 0.00 0.00 Pre-Development 002-Year Page 4 Subbasin Hydrology Subbasin : Sub-01 Input Data Area(ac)------------------------------------------------------------------------39-76 Peak Rate Factor-----------------------------------------------------------484-00 Weighted Curve Number-----------------------------------------------73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 39-76 73-00 Composite Area&Weighted CN 39-76 73-00 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0-007*((n*Lf)^0-8))/((P^0-5)*(Sf^0-4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf =Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf =Slope(ft/ft) Shallow Concentrated Flow Equation: V =16-1345*(Sf^0-5)(unpaved surface) V =20-3282*(Sf^0-5)(paved surface) V =15-0*(Sf^0-5)(grassed waterway surface) V =10-0*(Sf^0-5)(nearly bare&untilled surface) V =9-0*(Sf^0-5)(cultivated straight rows surface) V =7-0*(Sf^0-5)(short grass pasture surface) V =5-0*(Sf^0-5)(woodland surface) V =2-5*(Sf^0-5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V =(1-49*(R^(2/3))*(Sf^0-5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(W) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Pre-Development 002-Year Page 5 Pre-Development 002-Year Page 6 Subbasin Runoff Results Total Rainfall(in)------------------------------------------------------------3.50 Total Runoff(in)------------------------------------------------------------- 1.18 Peak Runoff(cfs)-----------------------------------------------------------7228 Weighted Curve Number-----------------------------------------------73.00 Time of Concentration(days hh:mm:ss)------------------------0 00-00-00 Pre-Development 002-Year Page 7 Pre-Development 002-Year Page 8 Subbasin:Sub-01 Rainfall Intensity Graph 5 4.8 4.6 44 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph so 75 70 65 60 55 50 N 45 0 40 35 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 002-Year Page 9 Pre-Development 010-Year Page 1 Project Description File Name....................................................27842.0004-Pre dvelopment.SPF Project Options Flow Units--------------------------------------------------- CFS Elevation Type Elevation Hydrology Method. SCS TR-55 Time of Concentration(TOC)Method-------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes------------ YES Skip Steady State Analysis Time Periods--- NO Analysis Options Start Analysis On. Dec 03,2019 00:00:00 End Analysis On. Dec 04,2019 00:00:00 Start Reporting On. Dec 03,2019 00:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step---------------- 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step--------------- 0 00:05:00 days hh:mm:ss Reporting Time Step----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step-------------------------------------- 1 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches North Carolina Union 10 520 SCS Type II 247hr Pre-Development 010-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 39.76 484.00 73.00 520 2.44 96.94 153.99 0 00-05-00 Pre-Development 010-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1 Out-01 Outfall 0.00 0.00 0.00 Pre-Development 010-Year Page 4 Subbasin Hydrology Subbasin : Sub-01 Input Data Area(ac)------------------------------------------------------------------------39-76 Peak Rate Factor-----------------------------------------------------------484-00 Weighted Curve Number-----------------------------------------------73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 39-76 73-00 Composite Area&Weighted CN 39-76 73-00 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0-007*((n*Lf)^0-8))/((P^0-5)*(Sf^0-4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf =Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf =Slope(ft/ft) Shallow Concentrated Flow Equation: V =16-1345*(Sf^0-5)(unpaved surface) V =20-3282*(Sf^0-5)(paved surface) V =15-0*(Sf^0-5)(grassed waterway surface) V =10-0*(Sf^0-5)(nearly bare&untilled surface) V =9-0*(Sf^0-5)(cultivated straight rows surface) V =7-0*(Sf^0-5)(short grass pasture surface) V =5-0*(Sf^0-5)(woodland surface) V =2-5*(Sf^0-5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V =(1-49*(R^(2/3))*(Sf^0-5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(W) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Pre-Development 010-Year Page 5 Pre-Development 010-Year Page 6 Subbasin Runoff Results Total Rainfall(in)------------------------------------------------------------520 Total Runoff(in)-------------------------------------------------------------2.44 Peak Runoff(cfs)-----------------------------------------------------------153.99 Weighted Curve Number-----------------------------------------------73.00 Time of Concentration(days hh:mm:ss)------------------------0 00-00-00 Pre-Development 010-Year Page 7 Pre-Development 010-Year Page 8 Subbasin:Sub-01 Rainfall Intensity Graph 75 7 6.5 6 5.5 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 170 160 150 140 130 120 110 _ 100 N 90 � 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 010-Year Page 9 Pre-Development 025-Year Page 1 Project Description File Name....................................................27842.0004-Pre dvelopment.SPF Project Options Flow Units--------------------------------------------------- CFS Elevation Type Elevation Hydrology Method. SCS TR-55 Time of Concentration(TOC)Method-------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes------------ YES Skip Steady State Analysis Time Periods--- NO Analysis Options Start Analysis On. Dec 03,2019 00:00:00 End Analysis On. Dec 04,2019 00:00:00 Start Reporting On. Dec 03,2019 00:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step---------------- 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step--------------- 0 00:05:00 days hh:mm:ss Reporting Time Step----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step-------------------------------------- 1 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches North Carolina Union 25 6.10 SCS Type II 247hr Pre-Development 025-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 39.76 484.00 73.00 6.10 3.17 126.13 200.56 0 00-05-00 Pre-Development 025-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1 Out-01 Outfall 0.00 0.00 0.00 Pre-Development 025-Year Page 4 Subbasin Hydrology Subbasin : Sub-01 Input Data Area(ac)------------------------------------------------------------------------39-76 Peak Rate Factor-----------------------------------------------------------484-00 Weighted Curve Number-----------------------------------------------73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 39-76 73-00 Composite Area&Weighted CN 39-76 73-00 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0-007*((n*Lf)^0-8))/((P^0-5)*(Sf^0-4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf =Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf =Slope(ft/ft) Shallow Concentrated Flow Equation: V =16-1345*(Sf^0-5)(unpaved surface) V =20-3282*(Sf^0-5)(paved surface) V =15-0*(Sf^0-5)(grassed waterway surface) V =10-0*(Sf^0-5)(nearly bare&untilled surface) V =9-0*(Sf^0-5)(cultivated straight rows surface) V =7-0*(Sf^0-5)(short grass pasture surface) V =5-0*(Sf^0-5)(woodland surface) V =2-5*(Sf^0-5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V =(1-49*(R^(2/3))*(Sf^0-5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(W) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Pre-Development 025-Year Page 5 Pre-Development 025-Year Page 6 Subbasin Runoff Results Total Rainfall(in)------------------------------------------------------------6.10 Total Runoff(in)-------------------------------------------------------------3.17 Peak Runoff(cfs)-----------------------------------------------------------200.56 Weighted Curve Number-----------------------------------------------73.00 Time of Concentration(days hh:mm:ss)------------------------0 00-00-00 Pre-Development 025-Year Page 7 Pre-Development 025-Year Page 8 Subbasin:Sub-01 Rainfall Intensity Graph 8.5 8 7.5 7 65 6 5.5 5 t� 4.5 4 3.5 3 2.6 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 210 200 190 180 170 160 150 140 130 N 120 110 100 � 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 025-Year Page 9 Pre-Development 050-Year Page 1 Project Description File Name....................................................27842.0004-Pre dvelopment.SPF Project Options Flow Units--------------------------------------------------- CFS Elevation Type Elevation Hydrology Method. SCS TR-55 Time of Concentration(TOC)Method-------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes------------ YES Skip Steady State Analysis Time Periods--- NO Analysis Options Start Analysis On. Dec 03,2019 00:00:00 End Analysis On. Dec 04,2019 00:00:00 Start Reporting On. Dec 03,2019 00:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step---------------- 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step--------------- 0 00:05:00 days hh:mm:ss Reporting Time Step----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step-------------------------------------- 1 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches North Carolina Union 50 6.90 SCS Type II 247hr Pre-Development 050-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 39.76 484.00 73.00 6.90 3.85 153.05 243.14 0 00-05-00 Pre-Development 050-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1 Out-01 Outfall 0.00 0.00 0.00 Pre-Development 050-Year Page 4 Subbasin Hydrology Subbasin : Sub-01 Input Data Area(ac)------------------------------------------------------------------------39-76 Peak Rate Factor-----------------------------------------------------------484-00 Weighted Curve Number-----------------------------------------------73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 39-76 73-00 Composite Area&Weighted CN 39-76 73-00 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0-007*((n*Lf)^0-8))/((P^0-5)*(Sf^0-4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf =Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf =Slope(ft/ft) Shallow Concentrated Flow Equation: V =16-1345*(Sf^0-5)(unpaved surface) V =20-3282*(Sf^0-5)(paved surface) V =15-0*(Sf^0-5)(grassed waterway surface) V =10-0*(Sf^0-5)(nearly bare&untilled surface) V =9-0*(Sf^0-5)(cultivated straight rows surface) V =7-0*(Sf^0-5)(short grass pasture surface) V =5-0*(Sf^0-5)(woodland surface) V =2-5*(Sf^0-5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V =(1-49*(R^(2/3))*(Sf^0-5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(W) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Pre-Development 050-Year Page 5 Pre-Development 050-Year Page 6 Subbasin Runoff Results Total Rainfall(in)------------------------------------------------------------6.90 Total Runoff(in)-------------------------------------------------------------3.85 Peak Runoff(cfs)-----------------------------------------------------------243.14 Weighted Curve Number-----------------------------------------------73.00 Time of Concentration(days hh:mm:ss)------------------------0 00-00-00 Pre-Development 050-Year Page 7 Pre-Development 050-Year Page 8 Subbasin:Sub-01 Rainfall Intensity Graph 9.5 9 8.5 8 7.5 7 6.5 6 5.5 v� 5 ° 4.5 4 3.5 3 2.5 2 1.5 1 0.5 L:L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 260 250 240 230 220 210 200 190 180 170 160 150 N 140 130 0 120 110 100 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 050-Year Page 9 Pre-Development 100-Year Page 1 Project Description File Name....................................................27842.0004-Pre dvelopment.SPF Project Options Flow Units--------------------------------------------------- CFS Elevation Type Elevation Hydrology Method. SCS TR-55 Time of Concentration(TOC)Method-------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes------------ YES Skip Steady State Analysis Time Periods--- NO Analysis Options Start Analysis On. Dec 03,2019 00:00:00 End Analysis On. Dec 04,2019 00:00:00 Start Reporting On. Dec 03,2019 00:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step---------------- 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step--------------- 0 00:05:00 days hh:mm:ss Reporting Time Step----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step-------------------------------------- 1 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-100 Intensity inches North Carolina Union 100 7.50 SCS Type II 247 Pre-Development 100-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 39.76 484.00 73.00 7.50 4.37 173.76 275.57 0 00-05-00 Pre-Development 100-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1 Out-01 Outfall 0.00 0.00 0.00 Pre-Development 100-Year Page 4 Subbasin Hydrology Subbasin : Sub-01 Input Data Area(ac)------------------------------------------------------------------------39-76 Peak Rate Factor-----------------------------------------------------------484-00 Weighted Curve Number-----------------------------------------------73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 39-76 73-00 Composite Area&Weighted CN 39-76 73-00 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0-007*((n*Lf)^0-8))/((P^0-5)*(Sf^0-4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf =Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf =Slope(ft/ft) Shallow Concentrated Flow Equation: V =16-1345*(Sf^0-5)(unpaved surface) V =20-3282*(Sf^0-5)(paved surface) V =15-0*(Sf^0-5)(grassed waterway surface) V =10-0*(Sf^0-5)(nearly bare&untilled surface) V =9-0*(Sf^0-5)(cultivated straight rows surface) V =7-0*(Sf^0-5)(short grass pasture surface) V =5-0*(Sf^0-5)(woodland surface) V =2-5*(Sf^0-5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V =(1-49*(R^(2/3))*(Sf^0-5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(W) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Pre-Development 100-Year Page 5 Pre-Development 100-Year Page 6 Subbasin Runoff Results Total Rainfall(in)------------------------------------------------------------7.50 Total Runoff(in)-------------------------------------------------------------4.37 Peak Runoff(cfs)-----------------------------------------------------------275.57 Weighted Curve Number-----------------------------------------------73.00 Time of Concentration(days hh:mm:ss)------------------------0 00-00-00 Pre-Development 100-Year Page 7 Pre-Development 100-Year Page 8 Subbasin:Sub-01 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 � 6 `6 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 290 280 270 260 250 240 230 220 210 200 190 180 _ 170 160 150 0 140 � 130 120 110 100 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 100-Year Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX D POST-DEVELOPMENT DRAINAGE MAP 27842.0004 T THOMAS & HUTTON PID:O 27026 PATRICIA RAU CI AUBREY INSON & � \ DB:3540 P .024 DARLEY L ALKER Tt \ ZONING: -40 DB:7261 P 474 ZONING-R- �PI 06027031 6'' D TIE FRAZIER v / / / / / / / 0 •. B:5668 PG:812 ZONING:R-40 / . '... \ `O�• ';;?:;::;::• / / / / / / / FLORAMI E / B:6419 PG: 06027030 �� '' "• / / / / / / / ':: ONING:R-40 RODNEY & a DB PC YHEW a ♦♦ :♦ ' // // ' // // / .'. ( \- / ZONING:R-40Dc .;:: ••• 06027029 �h}• - I-I-I-I-!- -I- / / / PID 060270 BOBBY WEBSTER MELANIE RYD. DB PG -'- Z / ':.' :• / / // / / \ / DB��B G�G 02 ZONING: PID:06006005 / \ OUTFACE 02 - .: _ _, DON ALQBR HHARGETT \I T ZONING:R-40 - - - SEWER \\ ♦♦ ` �-�- / o //!` ,.�_ E M•ENT per 1897 PG 3 1 / Q /, I •• I o ZLd cD Z \ / r \ \ w ` .•.I' � IL III � < /j / /� \� / / ��� \ >\i � ,�'\ z SANITARY SEWER EASEMENT per DB 897 PG 30 O \�_ C ♦'' r I /I .. Is / / ,. / '.:::'::'. .''.' r '�' -1 I-. :'I'• '•I'I .. I 'L� I'/ , /,/� ^� �� � � PID:06006003 ` \ PID:06006024 THURSTON & z JOE WIN�HESTER MARY THOMPSON G. J .:-1' •I•.. � :'I L /'/ // �� � � NOW OR ORMERLY � / •' -� ^' I -� '' '' -I T r•• I �L , ,\\ � DB.3982 P .091 DB 320 PG 106 - - - // / / ZONING:R-40 \ ZONING:R-40 W FIELD LOCATED TOP BANK OF EAST / L—— —__ / FORK OF TWELVE MILE CREEK r- r - _ UNDISTURBED BASIN SUB-01 -- 7� F -- I I'I / - AREA: 1 3.14 AC. PID:06 02 7005A / :.: :' L-- IL I'I I'� lil \ -- MARK & KATE ROSEN LUM •;;; •; ;;;; -- /� PID 2 f o:. DB PG / / :• :• :• :• r /'/ �,� �' %= M MARK 06006037 WILLOUGHB Y ROA ' L .• CN� 71 \� � L / ZONING:R-4 ''' / / > Tc: 32 MIN. \\ - — / ••• ••;••• • •• •• I � ' ` , /`\ ' STEPHANIE OOSCH ARBARA CHERRY � / • •• • •• _ a - �-" ` // i/ � -' • •••• •_�;'- \ � � I .• DB:3801 P 703 DB:D128 PG:0254 60 PUBLIC R W ,� ;.•• � // � t , ZONING:R- ZONING:R 40 ' / �� �':•, .... .. I L __� � .Y 'VAC/ I�' -�-�--�- -- - - -_ --- -- / -- • I I I I ,e 1 f — / L— APB 54 50Q�V L?,IaOCI I \ \ T \�� 'L \/ '� N r AERIAJERSE EL PID:06006001 (PAINEVRON 1 / / 1 •.. L ——J!n I IL L L J L J` /�/ i/ �. SF/j �^\� I l DAVIDBBPG SCH '���..y;;�:? ' .�" /\� llll �� WITH PK IN A#L)N // G r =T _-- _ ` / /, / f OO7// \ I --� ZONINGvR-40 •d% Q� /\' \\\ L f'' ELEV 631.6 \ / > ♦♦•it. I L =_J _ - - - `�< / may\ '/ • I /� ::? Zg / \ PROJECT BEN MARK 6 / % II PHASE 2 BASIN TO \ �< /,/ /�/ �• / < // // > / / j D:o6009031 T :�:��` I,•;; ...: 'I - -- �/ / /' � i ' � \- � I SRBRINA OE PG:518\-,-- 06009032 L Tc: 5 MIN. .` < ��/^ �/� / _ >� \v ' / ^ / «< /'/ — PAUL & E �\ / •` ATHY MCCRAB rn Z -0 0 < C\ 7 < // NING:RA-40 U — // \\ / /�/ r— r \ ✓ /� E 1 J \\\ < // // DOMIN�CK & L- \ -. /HAS \ \ N SANTEVECCHI09033 O // / 0933 PG:0626 O� RA-40 _ < \ \ \ 6009034 M a I, ;n //�/ •:,:; UNDISTURBED BASIN "' _ / � •- I l-='=� l � \ / � /,/� \ // \ - � � �\ / \ \�- \ ,. �� < \� O � Q SUB-0 2 /' , \ / / \ - \� / \ / \ \\ \\ \ \\\ NTR & O / / // / \ � \ / / \ /^� \% / �Y^ "i\ < \\ / \` \ ' e GET TREFETHEN = N 0 AREA. 23.79 AC. / / < J \ \ /i / / r \� /� �\ < / \ / : \� % \\ 939 RA-40 U � V) CN: 79 /,/ / \ \ \ 09035 � � // /_ I ...• .•:••: Tc: 37 MIN. / �\, ;, � '� \\,/ -• < �\� \ \� � \ �'� /�/ \` --1 O O _c N // �'/ ".:.:. / \✓ / 'c / \\ \`C\ \� �� -� ^� \� \ t, \J / /\\\ ` -- ONING:RA-40 •_ I ` /\ KENNETH & V, :.• < \`� \ \ / /. , \\ "" \.\ \\ "r" *.:r v 11 I11 _\ �� \ / \// .1 JORDAN 3 649 / / � � U ;; ice\'\ \ � � •. ' \: � \\ -\ .... f'-. < \ �\ > \\ / i \ \ ' �� - �- 390,37 `V ABROWN \ �v \�A / / - ICI l�l \\' \✓ / _ \` / � %'� \\\ \ \\ / ' / \\. \ ,' \ N RA-40 I al PG:149 TO POND 05 I,I II I,I 11 _ _ \ / \. \ �/ r /\ �I `" SUB-05 Ntf-�\� �u37 --- 42.25 AC. _ / \\ I I \ �� <� \ \\✓ \\ / Tc: 5 M I N. PID:06009061 "• \/ - '\ � \ \ � ,. / -., � \, �\\ � \\ � / / .. � \ ' , Ir i i � ,l \`\ \ ��;: ,� <° \\ �/ � ^ \ ` ' // > � �. `�,'/ / �\\\\ \ � WELLINGTON & c PAMELA DEPUSOIR/ C DB:6031 Woo__ tp ZONING:RUC V v�\ '�\ PID:06009062 V RODNEY & v < \ \ \ PATRICIA BLACKNALL PID:0603 56 2 ` /i' \� \� \ v / \ w �\� \`\ / ( / 1 .� v /,/ /r/ - / / \ ` \/< / / \ J / ZONING:RUC w LI \ '' / /' � \ \\ > � \ \/- .. / � �� � U � DB:4401 PG:275 EASTHAMPT IA HO EOWNERS �6 �\ > \ / \� \�\ \ \ ✓ / �� v I,l I ✓ ��� /\< \ \\ / \ / 1\ ASSOCIATION c ;/ d;� \ , / \ \\ / < ^ ` /� Id b• _ DB:1604 PG:8 .�/'� �\ \ s \ \\ z \ \ / /,/ > V L l ,I II ICI ICI - / ^�< \� \ �\ / _ o I —-- (n Z f v ,,. \ / I \ \\ � < \\ \ \-�"= tp PID:06009063 ZONING:R-40 \ \ \ \� .. \ \ / > L JIL �- v<" \ CHARLES THOMAS W • � / \` PHASE 3 BASIN TO � .. \ // /,/ � � II /- < :•. •;:;\ ,� `/ \ � POND 04 � \ \ `, v / /_II•.'- - '- :ki /\< \\ \ v � <"' < \\ \/ \jam"� -� DB:4435 PG:628 /\ \� ` // /' \ -- f - - - /< \\ \\ \//' \\ \\�� L ZONING:RA-40 U = LIB SUB-04 �, \ �\ � // 7/ \ \ \ I --1 - - - - - 1 < \� �\ �%/ < �\ >\� F__ I --� � � < z AREA: 1 7.9 AC. / . \ \�\ � /j �\ L J /�.:_- - - \\ �\ i �\ >' I F -- L__ I PID:06ONNIE 090GSTON O_j \ Q \ / % \ \\ v /� / \ \v / I L 1 DB:5182 PG:246 T r � _ _ _ � -- _ ZONING:RUC V + z Tc: 5 MIN. �� \� \`\ , � ' / %�' J / - - - - �� ' �'%/ \ % %' - -JI r _= I I r - - - ' /' / ,r 1 r L -J L I PID:06009065 J O ` / I I I I SANI ,, d �\� -• I \ %� �RES� \ ' �\ / / — __ Irl r-_ -= SIDNEY BOSTICK Q m O // 61 Ir I L I DB:4681 PG:358 w oio / / / // ' %\ \ ZONING-RA-40 � Z \ // - ' =� I / i ^< \� �\✓ _ l 06009066 LL/- � \ \\ \ .. _J 1 I I r ELWOOD & J Q L � Z - I / v vV / / - L_ DB 559 H DALE N 6 ".. vL i II I I / ZZONING.:RUC :180 Q '^ / // , � I - 1 / \� \ / / -- ' '- �� FUTURE / , L--� I I v, / II -I PID:06009067 V J Ld L_ -I - - % A i G PHASE 1 ` l/ I,I I I I - - /� \\ j/ / T \ = v / II I I II L � CHRISTOPHER COOPER \ / - DB:ING: PG:645 LLJ o.'• � \ ZONING:RUCui L/L� -J I 200 �—I_ ;1 \ \ �,i \ � � � 4 I ,PID:06009068 L PHI LIP PETTEY 1 r _--J I, I DB 4273 PG:423 hi T,777I - I ZONING:RUC PID:060090 9 iy \ / / II Irl I ORVILLE SAUNDERS WET DETENTION \ / / I I II L_ Q _ DB.4261 PG:109 FUTURE WET DETENTI II I -J , PITOWN 0005E - - \��v POND 05 % '1 \ POND 06 / / JII -_ I ZONING:RUC /1 _ I LL NEW TOWN FARMS LLC � I _ D8:5683 PG:046 ZONING:R-40 \\ -�_ \ RODERICK MACLELLAN / •" _ -'`r` r'i ` -' \ \ \ J� Jl/` /�l / / _ ZONING:RUC:071 I APPROXIMATE LOC TION OF J 1 \ r N 6 CENTERLINE OF OUTFALL O1 �/ /^\ / / JOB NO: J 27842.0004 :.::. ....... /26/22 942,. "'\. .._ t'•....1, - - _ • ":.-1,`.Z: ..5�87`29'01♦„':.W....664.86' - J PHASE 4 UNDISTURBED BASIN _ _ .:I G N I DATE: 07 �'�... ..;, .:. ,.;,,.. .:. DRAWN: LSE SUB-01 '' ` ��. (BASE B ARIN - R PHIC DESIGNED: LSE PID:06030008A "' "" - SAMUEL KOENIGSBERG AREA: 7.97 AC. --- 2076.88'(TOTAL) Cr A C ALE REVIEWED: MSK / DB:4460 PG:523 _ -_ _--_` PID: 06009023 APPROVED: MSK ZONING:R-40 CN: 72 PID: 0600 21 WILLAVENE BRA AM ET -1 PID: 06 015 / ftOB€RL & _ STACK JOY ALEXANDER ANNE A BOA:043 200 0 100 200 400 800 Tc: 22 MIN. z _; DB:0896 PG:0463 SCALE: 1" = 200' ioh4RY- 765. ANDER DB:7265 PG:156 W DB:7265 ZONING:R-40 ZONING:R-40 � R-40 PID:06009040 I ( IN FEET WINDING CREEK HOMEOWNERS ASSOCIATION DB:5920 PG:659 1 inch = 200 ft. COMMON OPEN SPACE i z ZONING:R-40 C3 * 30.j STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX E POST-DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0004 T THOMAS & HUTTON 27842.0004 CRESSWIND WESLEY CHAPEL - PHASE 04 POST-DEVELOPMENT BASINS MODEL 0/0 FIERSPILLWAV PoNDD5 j�ORI �1 CS PoNPOS ORIFICE �1 CIIR£fFIPE Post-Development 002-Year Page 1 Project Description File Name................................................. 27842.0004-Post.SPF Project Options Flow Units................................................ CFS Elevation Type.......................................... Elevation Hydrology Method................................... SCS TR-55 Time of Concentration(TOC)Method.......SCS TR-55 Link Routing Method................................ Hydrodynamic Enable Overflow Ponding at Nodes.......... YES Skip Steady State Analysis Time Periods... NO Analysis Options Start Analysis On...................................... 00:00:00 0:00:00 End Analysis On........................................ 00:00:00 0:00:00 Start Reporting On................................... 00:00:00 0:00:00 Antecedent Dry Days................................ 0 days Runoff(Dry Weather)Time Step.............. 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step............. 0 00:05:00 days hh:mm:ss Reporting Time Step................................. 0 00:05:00 days hh:mm:ss Routing Time Step.................................... 1 seconds Number of Elements my RainGages............................................... 1 Subbasins.................................................. 2 Nodes........................................................ 4 Junctions.......................................... 1 Outfalls............................................ 2 Flow Diversions................................ 0 Inlets................................................ 0 Storage Nodes.................................. 1 Links.......................................................... 5 Channels.......................................... 0 Pipes................................................ 1 Pumps.............................................. 0 Orifices............................................. 2 Weirs................................................ 2 Outlets............................................. 0 Pollutants................................................. 0 LandUses................................................. 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series TS-002 Intensity inches North Carolina Union 2.00 3.50 SCS Type III 24-hr Post-Development 002-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 7.97 0.00 72.00 3.50 1.12 8.93 6.51 0 00:21:18 2 Sub-05 42.25 484.00 88.63 3.50 2.32 98.19 100.20 0 00:05:00 Post-Development 002-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 570.00 578.50 0.00 9999.00 1.00 24.87 571.43 0.00 7.07 0 00:00 0.00 0.00 2 OUT-02 Outfall 569.00 30.03 570.12 3 OUT-SPILLWAY-02 Outfall 569.00 0.00 569.00 4 POND-05 Storage Node 570.00 580.00 574.50 1.00 99.03 577.73 0.00 0.00 Post-Development 002-Year Page 4 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) N (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 OUTLET-PIPE Pipe CS OUT-02 80.00 570.00 569.00 1.2500 42.000 0.0130 24.87 112.49 0.22 7.86 1.27 0.36 0.00 Calculated 2 CS-RIM Orifice POND-05 CS 570.00 570.00 60.000 0.00 3 ORIFICE Orifice POND-05 CS 570.00 570.00 4.000 0.75 4 EMER-SPILLWAY Weir POND-05 OUT-SPILLWAY-02 570.00 569.00 0.00 5 WEIR Weir POND-05 CS 570.00 570.00 24.12 Post-Development 002-Year Page 5 Subbasin Hydrology Subbasin:Sub-01 Input Data Area(ac)............................................................................... 7.97 Peak Rate Factor.................................................................. 0 Weighted Curve Number...................................................... 72 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 7.97 72 Composite Area&Weighted CN 7.97 72 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^O.8))/((P^O.5)*(Sf^O.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation V =16.1345*(Sf^0.5)(unpaved surface) V =20.3282*(Sf^0.5)(paved surface) V =15.0*(Sf^0.5)(grassed waterway surface) V =10.0*(Sf^0.5)(nearly bare&untilled surface) V =9.0*(Sf^0.5)(cultivated straight rows surface) V =7.0*(Sf^0.5)(short grass pasture surface) V =5.0*(Sf^0.5)(woodland surface) V =2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation V =(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft2) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Post-Development 002-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 1.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 615 0 0 Slope(%): 1.89 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 2.22 0 0 Computed Flow Time(min): 4.62 0 0 Total TOC(min)..................21.30 Subbasin Runoff Results Total Rainfall(in).................................................................. 3.5 Total Runoff(in)................................................................... 1.12 Peak Runoff(cfs).................................................................. 6.51 Weighted Curve Number...................................................... 72 Time of Concentration(days hh:mm:ss)............................... 0 00:21:18 Post-Development 002-Year Page 7 Subbasin:Sub-01 Rainfall Intensity Graph 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 z 1.7 1.6 - 1.5 m `c 1.4 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 7 6.5 6 5.5 5 4.5 N 4 U 3.5 `0 c c � 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 8 Subbasin:Sub-05 Input Data Area(ac)...............................................................................42.25 Peak Rate Factor.................................................................. 484 Weighted Curve Number...................................................... 88.63 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 15.22 - 72 Paved parking&roofs 27.03 D 98 Composite Area&Weighted CN 42.25 88.63 Time of Concentration User-Defined TOC override(minutes):5 Subbasin Runoff Results Total Rainfall(in).................................................................. 3.5 Total Runoff(in)................................................................... 2.32 Peak Runoff(cfs).................................................................. 100.2 Weighted Curve Number...................................................... 88.63 Time of Concentration(days hh:mm:ss)............................... 0 00:05:00 Post-Development 002-Year Page 9 Subbasin:Sub-05 Rainfall Intensity Graph 3.1 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 z 1.8 c 1.7 1.6 m 1.5 `9 14 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 105 100 95 90 85 80 75 70 65 N 60 55 50 (If 45 40 35 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 10 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 OUTLET-PIPE 80.00 570.00 0.00 569.00 0.00 1.00 1.2500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 002-Year Page 11 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 OUTLET-PIPE 24.87 0 12:33 112.49 0.22 7.86 0.17 1.27 0.36 0.00 Calculated Post-Development 002-Year Page 12 Storage Nodes Storage Node:POND-05 Input Data Invert Elevation(ft)........................................................................ 570.00 Max(Rim)Elevation(ft).................................................................. 580.00 Max(Rim)Offset(ft)...................................................................... 10.00 Initial Water Elevation(ft).............................................................. 574.50 Initial Water Depth(ft)................................................................... 4.50 Ponded Area(ft2)............................................................................ 1.00 Evaporation Loss............................................................................ 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMER-SPILLWAY Trapezoidal No 578.50 8.50 20.00 1.50 3.33 2 WEIR Rectangular No 576.40 6.40 5.00 2.10 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-RIM Bottom Rectangular No 60.00 60.00 578.50 0.63 2 ORIFICE Side CIRCULAR No 4.00 574.50 0.61 Output Summary Results Peak Inflow(cfs)............................................................................. 99.03 Peak Lateral Inflow(cfs)................................................................. 99.03 Peak Outflow(cfs).......................................................................... 24.87 Peak Exfiltration Flow Rate(cfm).................................................... 0 Max HGL Elevation Attained(ft)..................................................... 577.73 Max HGL Depth Attained(ft).......................................................... 7.73 Average HGL Elevation Attained(ft)............................................... 575.72 Average HGL Depth Attained(ft).................................................... 5.72 Time of Max HGL Occurrence(days hh:mm)...................................0 12:33 Total Exfiltration Volume(1000-ft3)................................................ 0 Total Flooded Volume(ac-in).......................................................... 0 Total Time Flooded(min)................................................................0 Total Retention Time(sec).............................................................. 0 Post-Development 010-Year Page 1 Project Description File Name................................................. 27842.0004-Post.SPF Project Options Flow Units................................................ CFS Elevation Type.......................................... Elevation Hydrology Method................................... SCS TR-55 Time of Concentration(TOC)Method.......SCS TR-55 Link Routing Method................................ Hydrodynamic Enable Overflow Ponding at Nodes.......... YES Skip Steady State Analysis Time Periods... NO Analysis Options Start Analysis On...................................... 00:00:00 0:00:00 End Analysis On........................................ 00:00:00 0:00:00 Start Reporting On................................... 00:00:00 0:00:00 Antecedent Dry Days................................ 0 days Runoff(Dry Weather)Time Step.............. 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step............. 0 00:05:00 days hh:mm:ss Reporting Time Step................................. 0 00:05:00 days hh:mm:ss Routing Time Step.................................... 1 seconds Number of Elements my RainGages............................................... 1 Subbasins.................................................. 2 Nodes........................................................ 4 Junctions.......................................... 1 Outfalls............................................ 2 Flow Diversions................................ 0 Inlets................................................ 0 Storage Nodes.................................. 1 Links.......................................................... 5 Channels.......................................... 0 Pipes................................................ 1 Pumps.............................................. 0 Orifices............................................. 2 Weirs................................................ 2 Outlets............................................. 0 Pollutants................................................. 0 LandUses................................................. 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series TS-010 Intensity inches North Carolina Union 10.00 5.20 SCS Type III 24-hr Post-Development 010-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 7.97 0.00 72.00 5.20 2.35 18.74 14.35 0 00:21:18 2 Sub-05 42.25 484.00 88.63 5.20 3.93 165.83 164.22 0 00:05:00 Post-Development 010-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 570.00 578.50 0.00 9999.00 1.00 69.15 572.80 0.00 5.70 0 00:00 0.00 0.00 2 OUT-02 Outfall 569.00 83.45 570.98 3 OUT-SPILLWAY-02 Outfall 569.00 15.05 569.00 4 POND-05 Storage Node 570.00 580.00 574.50 1.00 163.01 578.86 0.00 0.00 Post-Development 010-Year Page 4 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) N (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 OUTLET-PIPE Pipe CS OUT-02 80.00 570.00 569.00 1.2500 42.000 0.0130 69.15 112.49 0.61 9.88 2.39 0.68 0.00 Calculated 2 CS-RIM Orifice POND-05 CS 570.00 570.00 60.000 14.46 3 ORIFICE Orifice POND-05 CS 570.00 570.00 4.000 0.88 4 EMER-SPILLWAY Weir POND-05 OUT-SPILLWAY-02 570.00 569.00 15.05 5 WEIR Weir POND-05 CS 570.00 570.00 53.82 Post-Development 010-Year Page 5 Subbasin Hydrology Subbasin:Sub-01 Input Data Area(ac)............................................................................... 7.97 Peak Rate Factor.................................................................. 0 Weighted Curve Number...................................................... 72 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 7.97 72 Composite Area&Weighted CN 7.97 72 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^O.8))/((P^O.5)*(Sf^O.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation V =16.1345*(Sf^0.5)(unpaved surface) V =20.3282*(Sf^0.5)(paved surface) V =15.0*(Sf^0.5)(grassed waterway surface) V =10.0*(Sf^0.5)(nearly bare&untilled surface) V =9.0*(Sf^0.5)(cultivated straight rows surface) V =7.0*(Sf^0.5)(short grass pasture surface) V =5.0*(Sf^0.5)(woodland surface) V =2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation V =(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft2) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Post-Development 010-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 1.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 615 0 0 Slope(%): 1.89 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 2.22 0 0 Computed Flow Time(min): 4.62 0 0 Total TOC(min)..................21.30 Subbasin Runoff Results Total Rainfall(in).................................................................. 5.2 Total Runoff(in)................................................................... 2.35 Peak Runoff(cfs).................................................................. 14.35 Weighted Curve Number...................................................... 72 Time of Concentration(days hh:mm:ss)............................... 0 00:21:18 Post-Development 010-Year Page 7 Subbasin:Sub-01 Rainfall Intensity Graph 4.4 4.z a 3.8 3.6 3.4 3.2 3 2.8 2.6 z c 2.4 m 2.2 `c 2 � 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 15.5 15 14.5 14 13.5 13 12.5 12 11.5 11 10.5 10 9.5 9 w 8.5 U 6 `0 7.5 = 7 6.5 6 5.5 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 8 Subbasin:Sub-05 Input Data Area(ac)...............................................................................42.25 Peak Rate Factor.................................................................. 484 Weighted Curve Number...................................................... 88.63 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 15.22 - 72 Paved parking&roofs 27.03 D 98 Composite Area&Weighted CN 42.25 88.63 Time of Concentration User-Defined TOC override(minutes):5 Subbasin Runoff Results Total Rainfall(in).................................................................. 5.2 Total Runoff(in)................................................................... 3.93 Peak Runoff(cfs).................................................................. 164.22 Weighted Curve Number...................................................... 88.63 Time of Concentration(days hh:mm:ss)............................... 0 00:05:00 Post-Development 010-Year Page 9 Subbasin:Sub-05 Rainfall Intensity Graph 4.s 4.a 4.2 4 3.8 3.6 3.4 3.2 3 2.8 z 2.6 c ._. 2.4 2.2 `c 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 180 170 160 150 140 130 120 110 N 1oo U 90 O C � 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 10 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 OUTLET-PIPE 80.00 570.00 0.00 569.00 0.00 1.00 1.2500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 010-Year Page 11 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 OUTLET-PIPE 69.15 0 12:19 112.49 0.61 9.88 0.13 2.39 0.68 0.00 Calculated Post-Development 010-Year Page 12 Storage Nodes Storage Node:POND-05 Input Data Invert Elevation(ft)........................................................................ 570.00 Max(Rim)Elevation(ft).................................................................. 580.00 Max(Rim)Offset(ft)...................................................................... 10.00 Initial Water Elevation(ft).............................................................. 574.50 Initial Water Depth(ft)................................................................... 4.50 Ponded Area(ft2)............................................................................ 1.00 Evaporation Loss............................................................................ 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMER-SPILLWAY Trapezoidal No 578.50 8.50 20.00 1.50 3.33 2 WEIR Rectangular No 576.40 6.40 5.00 2.10 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-RIM Bottom Rectangular No 60.00 60.00 578.50 0.63 2 ORIFICE Side CIRCULAR No 4.00 574.50 0.61 Output Summary Results Peak Inflow(cfs)............................................................................. 163.01 Peak Lateral Inflow(cfs)................................................................. 163.01 Peak Outflow(cfs).......................................................................... 84.2 Peak Exfiltration Flow Rate(cfm).................................................... 0 Max HGL Elevation Attained(ft)..................................................... 578.86 Max HGL Depth Attained(ft).......................................................... 8.86 Average HGL Elevation Attained(ft)............................................... 575.92 Average HGL Depth Attained(ft).................................................... 5.92 Time of Max HGL Occurrence(days hh:mm)...................................0 12:19 Total Exfiltration Volume(1000-ft3)................................................ 0 Total Flooded Volume(ac-in).......................................................... 0 Total Time Flooded(min)................................................................0 Total Retention Time(sec).............................................................. 0 Post-Development 025-Year Page 1 Project Description File Name................................................. 27842.0004-Post.SPF Project Options Flow Units................................................ CFS Elevation Type.......................................... Elevation Hydrology Method................................... SCS TR-55 Time of Concentration(TOC)Method.......SCS TR-55 Link Routing Method................................ Hydrodynamic Enable Overflow Ponding at Nodes.......... YES Skip Steady State Analysis Time Periods... NO Analysis Options Start Analysis On...................................... 00:00:00 0:00:00 End Analysis On........................................ 00:00:00 0:00:00 Start Reporting On................................... 00:00:00 0:00:00 Antecedent Dry Days................................ 0 days Runoff(Dry Weather)Time Step.............. 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step............. 0 00:05:00 days hh:mm:ss Reporting Time Step................................. 0 00:05:00 days hh:mm:ss Routing Time Step.................................... 1 seconds Number of Elements my RainGages............................................... 1 Subbasins.................................................. 2 Nodes........................................................ 4 Junctions.......................................... 1 Outfalls............................................ 2 Flow Diversions................................ 0 Inlets................................................ 0 Storage Nodes.................................. 1 Links.......................................................... 5 Channels.......................................... 0 Pipes................................................ 1 Pumps.............................................. 0 Orifices............................................. 2 Weirs................................................ 2 Outlets............................................. 0 Pollutants................................................. 0 LandUses................................................. 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series TS-025 Intensity inches North Carolina Union 25.00 6.10 SCS Type III 24-hr Post-Development 025-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 7.97 0.00 72.00 6.10 3.08 24.50 18.90 0 00:21:18 2 Sub-05 42.25 484.00 88.63 6.10 4.79 202.42 197.93 0 00:05:00 Post-Development 025-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 570.00 578.50 0.00 9999.00 1.00 95.66 574.06 0.00 4.44 0 00:00 0.00 0.00 2 OUT-02 Outfall 569.00 112.98 571.48 3 OUT-SPILLWAY-02 Outfall 569.00 38.13 569.00 4 POND-05 Storage Node 570.00 580.00 574.50 1.00 196.68 579.16 0.00 0.00 Post-Development 025-Year Page 4 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) N (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 OUTLET-PIPE Pipe CS OUT-02 80.00 570.00 569.00 1.2500 42.000 0.0130 95.66 112.49 0.85 10.93 2.99 0.85 0.00 Calculated 2 CS-RIM Orifice POND-05 CS 570.00 570.00 60.000 35.54 3 ORIFICE Orifice POND-05 CS 570.00 570.00 4.000 0.91 4 EMER-SPILLWAY Weir POND-05 OUT-SPILLWAY-02 570.00 569.00 38.13 5 WEIR Weir POND-05 CS 570.00 570.00 59.21 Post-Development 025-Year Page 5 Subbasin Hydrology Subbasin:Sub-01 Input Data Area(ac)............................................................................... 7.97 Peak Rate Factor.................................................................. 0 Weighted Curve Number...................................................... 72 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 7.97 72 Composite Area&Weighted CN 7.97 72 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^O.8))/((P^O.5)*(Sf^O.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation V =16.1345*(Sf^0.5)(unpaved surface) V =20.3282*(Sf^0.5)(paved surface) V =15.0*(Sf^0.5)(grassed waterway surface) V =10.0*(Sf^0.5)(nearly bare&untilled surface) V =9.0*(Sf^0.5)(cultivated straight rows surface) V =7.0*(Sf^0.5)(short grass pasture surface) V =5.0*(Sf^0.5)(woodland surface) V =2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation V =(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft2) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Post-Development 025-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 1.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 615 0 0 Slope(%): 1.89 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 2.22 0 0 Computed Flow Time(min): 4.62 0 0 Total TOC(min)..................21.30 Subbasin Runoff Results Total Rainfall(in).................................................................. 6.1 Total Runoff(in)................................................................... 3.08 Peak Runoff(cfs).................................................................. 18.9 Weighted Curve Number...................................................... 72 Time of Concentration(days hh:mm:ss)............................... 0 00:21:18 Post-Development 025-Year Page 7 Subbasin:Sub-01 Rainfall Intensity Graph 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 z 3 c 2.8 m 2.6 `c 2.4 m 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph z0 1s 18 17 1s 15 14 13 12 11 U 10 O � 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 8 Subbasin:Sub-05 Input Data Area(ac)...............................................................................42.25 Peak Rate Factor.................................................................. 484 Weighted Curve Number...................................................... 88.63 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 15.22 - 72 Paved parking&roofs 27.03 D 98 Composite Area&Weighted CN 42.25 88.63 Time of Concentration User-Defined TOC override(minutes):5 Subbasin Runoff Results Total Rainfall(in).................................................................. 6.1 Total Runoff(in)................................................................... 4.79 Peak Runoff(cfs).................................................................. 197.93 Weighted Curve Number...................................................... 88.63 Time of Concentration(days hh:mm:ss)............................... 0 00:05:00 Post-Development 025-Year Page 9 Subbasin:Sub-05 Rainfall Intensity Graph 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 z 3 c 2.8 m 2.6 24 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 210 200 190 180 170 160 150 140 130 N 120 110 100 (if 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 10 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 OUTLET-PIPE 80.00 570.00 0.00 569.00 0.00 1.00 1.2500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 025-Year Page 11 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 OUTLET-PIPE 95.66 0 12:15 112.49 0.85 10.93 0.12 2.99 0.85 0.00 Calculated Post-Development 025-Year Page 12 Storage Nodes Storage Node:POND-05 Input Data Invert Elevation(ft)........................................................................ 570.00 Max(Rim)Elevation(ft).................................................................. 580.00 Max(Rim)Offset(ft)...................................................................... 10.00 Initial Water Elevation(ft).............................................................. 574.50 Initial Water Depth(ft)................................................................... 4.50 Ponded Area(ft2)............................................................................ 1.00 Evaporation Loss............................................................................ 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMER-SPILLWAY Trapezoidal No 578.50 8.50 20.00 1.50 3.33 2 WEIR Rectangular No 576.40 6.40 5.00 2.10 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-RIM Bottom Rectangular No 60.00 60.00 578.50 0.63 2 ORIFICE Side CIRCULAR No 4.00 574.50 0.61 Output Summary Results Peak Inflow(cfs)............................................................................. 196.68 Peak Lateral Inflow(cfs)................................................................. 196.68 Peak Outflow(cfs).......................................................................... 133.79 Peak Exfiltration Flow Rate(cfm).................................................... 0 Max HGL Elevation Attained(ft)..................................................... 579.16 Max HGL Depth Attained(ft).......................................................... 9.16 Average HGL Elevation Attained(ft)............................................... 576.02 Average HGL Depth Attained(ft).................................................... 6.02 Time of Max HGL Occurrence(days hh:mm)...................................0 12:15 Total Exfiltration Volume(1000-ft3)................................................ 0 Total Flooded Volume(ac-in).......................................................... 0 Total Time Flooded(min)................................................................0 Total Retention Time(sec).............................................................. 0 Post-Development 050-Year Page 1 Project Description File Name................................................. 27842.0004-Post.SPF Project Options Flow Units................................................ CFS Elevation Type.......................................... Elevation Hydrology Method................................... SCS TR-55 Time of Concentration(TOC)Method.......SCS TR-55 Link Routing Method................................ Hydrodynamic Enable Overflow Ponding at Nodes.......... YES Skip Steady State Analysis Time Periods... NO Analysis Options Start Analysis On...................................... 00:00:00 0:00:00 End Analysis On........................................ 00:00:00 0:00:00 Start Reporting On................................... 00:00:00 0:00:00 Antecedent Dry Days................................ 0 days Runoff(Dry Weather)Time Step.............. 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step............. 0 00:05:00 days hh:mm:ss Reporting Time Step................................. 0 00:05:00 days hh:mm:ss Routing Time Step.................................... 1 seconds Number of Elements my RainGages............................................... 1 Subbasins.................................................. 2 Nodes........................................................ 4 Junctions.......................................... 1 Outfalls............................................ 2 Flow Diversions................................ 0 Inlets................................................ 0 Storage Nodes.................................. 1 Links.......................................................... 5 Channels.......................................... 0 Pipes................................................ 1 Pumps.............................................. 0 Orifices............................................. 2 Weirs................................................ 2 Outlets............................................. 0 Pollutants................................................. 0 LandUses................................................. 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series TS-050 Intensity inches North Carolina Union 50.00 6.90 SCS Type III 24-hr Post-Development 050-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 7.97 0.00 72.00 6.90 3.74 29.82 23.06 0 00:21:18 2 Sub-05 42.25 484.00 88.63 6.90 5.57 235.25 227.79 0 00:05:00 Post-Development 050-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 570.00 578.50 0.00 9999.00 1.00 116.23 575.83 0.00 2.67 0 00:00 0.00 0.00 2 OUT-02 Outfall 569.00 136.57 572.50 3 OUT-SPILLWAY-02 Outfall 569.00 57.85 569.00 4 POND-05 Storage Node 570.00 580.00 574.50 1.00 226.49 579.36 0.00 0.00 Post-Development 050-Year Page 4 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) N (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 OUTLET-PIPE Pipe CS OUT-02 80.00 570.00 569.00 1.2500 42.000 0.0130 116.24 112.49 1.03 12.33 3.50 1.00 5.00 SURCHARGED 2 CS-RIM Orifice POND-05 CS 570.00 570.00 60.000 52.85 3 ORIFICE Orifice POND-05 CS 570.00 570.00 4.000 0.92 4 EMER-SPILLWAY Weir POND-05 OUT-SPILLWAY-02 570.00 569.00 57.85 5 WEIR Weir POND-05 CS 570.00 570.00 62.57 Post-Development 050-Year Page 5 Subbasin Hydrology Subbasin:Sub-01 Input Data Area(ac)............................................................................... 7.97 Peak Rate Factor.................................................................. 0 Weighted Curve Number...................................................... 72 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 7.97 72 Composite Area&Weighted CN 7.97 72 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^O.8))/((P^O.5)*(Sf^O.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation V =16.1345*(Sf^0.5)(unpaved surface) V =20.3282*(Sf^0.5)(paved surface) V =15.0*(Sf^0.5)(grassed waterway surface) V =10.0*(Sf^0.5)(nearly bare&untilled surface) V =9.0*(Sf^0.5)(cultivated straight rows surface) V =7.0*(Sf^0.5)(short grass pasture surface) V =5.0*(Sf^0.5)(woodland surface) V =2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation V =(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft2) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Post-Development 050-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 1.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 615 0 0 Slope(%): 1.89 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 2.22 0 0 Computed Flow Time(min): 4.62 0 0 Total TOC(min)..................21.30 Subbasin Runoff Results Total Rainfall(in).................................................................. 6.9 Total Runoff(in)................................................................... 3.74 Peak Runoff(cfs).................................................................. 23.06 Weighted Curve Number...................................................... 72 Time of Concentration(days hh:mm:ss)............................... 0 00:21:18 Post-Development 050-Year Page 7 Subbasin:Sub-01 Rainfall Intensity Graph s 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 z 3.4 3.2 — 3 m `c 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 25 24 23 22 21 20 19 18 17 16 15 n 14 13 `0 12 c c 11 10 9 8 7 6 5 4 3 - 2 - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page S Subbasin:Sub-05 Input Data Area(ac)...............................................................................42.25 Peak Rate Factor.................................................................. 484 Weighted Curve Number...................................................... 88.63 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 15.22 - 72 Paved parking&roofs 27.03 D 98 Composite Area&Weighted CN 42.25 88.63 Time of Concentration User-Defined TOC override(minutes):5 Subbasin Runoff Results Total Rainfall(in).................................................................. 6.9 Total Runoff(in)................................................................... 5.57 Peak Runoff(cfs).................................................................. 227.79 Weighted Curve Number...................................................... 88.63 Time of Concentration(days hh:mm:ss)............................... 0 00:05:00 Post-Development 050-Year Page 9 Subbasin:Sub-05 Rainfall Intensity Graph 6.z s 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 z 3.6 � 3.4 3.2 m 3 `9 28 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 240 230 220 210 200 190 180 170 160 150 140 � 130 w 120 0 S 110 100 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 10 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 OUTLET-PIPE 80.00 570.00 0.00 569.00 0.00 1.00 1.2500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 050-Year Page 11 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 OUTLET-PIPE 116.24 0 12:14 112.49 1.03 12.33 0.11 3.50 1.00 5.00 SURCHARGED Post-Development 050-Year Page 12 Storage Nodes Storage Node:POND-05 Input Data Invert Elevation(ft)........................................................................ 570.00 Max(Rim)Elevation(ft).................................................................. 580.00 Max(Rim)Offset(ft)...................................................................... 10.00 Initial Water Elevation(ft).............................................................. 574.50 Initial Water Depth(ft)................................................................... 4.50 Ponded Area(ft2)............................................................................ 1.00 Evaporation Loss............................................................................ 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMER-SPILLWAY Trapezoidal No 578.50 8.50 20.00 1.50 3.33 2 WEIR Rectangular No 576.40 6.40 5.00 2.10 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-RIM Bottom Rectangular No 60.00 60.00 578.50 0.63 2 ORIFICE Side CIRCULAR No 4.00 574.50 0.61 Output Summary Results Peak Inflow(cfs)............................................................................. 226.49 Peak Lateral Inflow(cfs)................................................................. 226.49 Peak Outflow(cfs).......................................................................... 174.08 Peak Exfiltration Flow Rate(cfm).................................................... 0 Max HGL Elevation Attained(ft)..................................................... 579.36 Max HGL Depth Attained(ft).......................................................... 9.36 Average HGL Elevation Attained(ft)............................................... 576.1 Average HGL Depth Attained(ft).................................................... 6.1 Time of Max HGL Occurrence(days hh:mm)...................................0 12:14 Total Exfiltration Volume(1000-ft3)................................................ 0 Total Flooded Volume(ac-in).......................................................... 0 Total Time Flooded(min)................................................................0 Total Retention Time(sec).............................................................. 0 Post-Development 100-Year Page 1 Project Description File Name................................................. 27842.0004-Post.SPF Project Options Flow Units................................................ CFS Elevation Type.......................................... Elevation Hydrology Method................................... SCS TR-55 Time of Concentration(TOC)Method.......SCS TR-55 Link Routing Method................................ Hydrodynamic Enable Overflow Ponding at Nodes.......... YES Skip Steady State Analysis Time Periods... NO Analysis Options Start Analysis On...................................... 00:00:00 0:00:00 End Analysis On........................................ 00:00:00 0:00:00 Start Reporting On................................... 00:00:00 0:00:00 Antecedent Dry Days................................ 0 days Runoff(Dry Weather)Time Step.............. 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step............. 0 00:05:00 days hh:mm:ss Reporting Time Step................................. 0 00:05:00 days hh:mm:ss Routing Time Step.................................... 1 seconds Number of Elements my RainGages............................................... 1 Subbasins.................................................. 2 Nodes........................................................ 4 Junctions.......................................... 1 Outfalls............................................ 2 Flow Diversions................................ 0 Inlets................................................ 0 Storage Nodes.................................. 1 Links.......................................................... 5 Channels.......................................... 0 Pipes................................................ 1 Pumps.............................................. 0 Orifices............................................. 2 Weirs................................................ 2 Outlets............................................. 0 Pollutants................................................. 0 LandUses................................................. 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series TS-100 Intensity inches North Carolina Union 100.00 7.50 SCS Type III 24-hr Post-Development 100-Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 Sub-01 7.97 0.00 72.00 7.50 4.26 33.93 26.23 0 00:21:18 2 Sub-05 42.25 484.00 88.63 7.50 6.15 260.01 250.01 0 00:05:00 Post-Development 100-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 570.00 578.50 0.00 9999.00 1.00 129.65 576.65 0.00 1.85 0 00:00 0.00 0.00 2 OUT-02 Outfall 569.00 151.88 572.50 3 OUT-SPILLWAY-02 Outfall 569.00 71.33 569.00 4 POND-05 Storage Node 570.00 580.00 574.50 1.00 248.74 579.48 0.00 0.00 Post-Development 100-Year Page 4 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) N (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 OUTLET-PIPE Pipe CS OUT-02 80.00 570.00 569.00 1.2500 42.000 0.0130 129.66 112.49 1.15 13.48 3.50 1.00 11.00 SURCHARGED 2 CS-RIM Orifice POND-05 CS 570.00 570.00 60.000 64.40 3 ORIFICE Orifice POND-05 CS 570.00 570.00 4.000 0.92 4 EMER-SPILLWAY Weir POND-05 OUT-SPILLWAY-02 570.00 569.00 71.33 5 WEIR Weir POND-05 CS 570.00 570.00 64.53 Post-Development 100-Year Page 5 Subbasin Hydrology Subbasin:Sub-01 Input Data Area(ac)............................................................................... 7.97 Peak Rate Factor.................................................................. 0 Weighted Curve Number...................................................... 72 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 7.97 72 Composite Area&Weighted CN 7.97 72 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^O.8))/((P^O.5)*(Sf^O.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation V =16.1345*(Sf^0.5)(unpaved surface) V =20.3282*(Sf^0.5)(paved surface) V =15.0*(Sf^0.5)(grassed waterway surface) V =10.0*(Sf^0.5)(nearly bare&untilled surface) V =9.0*(Sf^0.5)(cultivated straight rows surface) V =7.0*(Sf^0.5)(short grass pasture surface) V =5.0*(Sf^0.5)(woodland surface) V =2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation V =(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft2) Wp=Wetted Perimeter(ft) V =Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Post-Development 100-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 1.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 615 0 0 Slope(%): 1.89 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 2.22 0 0 Computed Flow Time(min): 4.62 0 0 Total TOC(min)..................21.30 Subbasin Runoff Results Total Rainfall(in).................................................................. 7.5 Total Runoff(in)................................................................... 4.26 Peak Runoff(cfs).................................................................. 26.23 Weighted Curve Number...................................................... 72 Time of Concentration(days hh:mm:ss)............................... 0 00:21:18 Post-Development 100-Year Page 7 Subbasin:Sub-01 Rainfall Intensity Graph 6.5 6 5.5 5 4.5 4 z c 3.5 m `c 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 28 27 26 25 24 23 22 21 20 19 18 17 N 16 `0 15 14 `o � 13 (If 12 11 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 8 Subbasin:Sub-05 Input Data Area(ac)...............................................................................42.25 Peak Rate Factor.................................................................. 484 Weighted Curve Number...................................................... 88.63 RainGage ID......................................................................... Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 15.22 - 72 Paved parking&roofs 27.03 D 98 Composite Area&Weighted CN 42.25 88.63 Time of Concentration User-Defined TOC override(minutes):5 Subbasin Runoff Results Total Rainfall(in).................................................................. 7.5 Total Runoff(in)................................................................... 6.15 Peak Runoff(cfs).................................................................. 250.01 Weighted Curve Number...................................................... 88.63 Time of Concentration(days hh:mm:ss)............................... 0 00:05:00 Post-Development 100-Year Page 9 Subbasin:Sub-05 Rainfall Intensity Graph 7 6.5 6 5.5 5 4.5 z 4 c m 3.5 `c 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 260 250 240 230 220 210 200 190 180 170 160 150 � 140 w 130 0 c 120 (If 110 100 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 10 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 OUTLET-PIPE 80.00 570.00 0.00 569.00 0.00 1.00 1.2500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 100-Year Page 11 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 OUTLET-PIPE 129.66 0 12:13 112.49 1.15 13.48 0.10 3.50 1.00 11.00 SURCHARGED Post-Development 100-Year Page 12 Storage Nodes Storage Node:POND-05 Input Data Invert Elevation(ft)........................................................................ 570.00 Max(Rim)Elevation(ft).................................................................. 580.00 Max(Rim)Offset(ft)...................................................................... 10.00 Initial Water Elevation(ft).............................................................. 574.50 Initial Water Depth(ft)................................................................... 4.50 Ponded Area(ft2)............................................................................ 1.00 Evaporation Loss............................................................................ 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMER-SPILLWAY Trapezoidal No 578.50 8.50 20.00 1.50 3.33 2 WEIR Rectangular No 576.40 6.40 5.00 2.10 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-RIM Bottom Rectangular No 60.00 60.00 578.50 0.63 2 ORIFICE Side CIRCULAR No 4.00 574.50 0.61 Output Summary Results Peak Inflow(cfs)............................................................................. 248.74 Peak Lateral Inflow(cfs)................................................................. 248.74 Peak Outflow(cfs).......................................................................... 200.98 Peak Exfiltration Flow Rate(cfm).................................................... 0 Max HGL Elevation Attained(ft)..................................................... 579.48 Max HGL Depth Attained(ft).......................................................... 9.48 Average HGL Elevation Attained(ft)............................................... 576.15 Average HGL Depth Attained(ft).................................................... 6.15 Time of Max HGL Occurrence(days hh:mm)...................................0 12:13 Total Exfiltration Volume(1000-ft3)................................................ 0 Total Flooded Volume(ac-in).......................................................... 0 Total Time Flooded(min)................................................................0 Total Retention Time(sec).............................................................. 0 25-YR CAPACITY H EC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) 18 578.86 578.86 576.04 17 52.8 579.03 578.86 0.06 579.09 578.92 7.4 579.13 581.01 16 52.4 579.19 579.03 0.10 579.30 579.13 6.5 579.44 582.78 34 51.9 579.50 579.34 0.05 579.56 579.39 6.0 579.64 583.56 33 43.1 579.71 579.53 0.09 579.80 579.62 5.5 579.87 584.44 32 41.5 579.94 579.77 0.09 580.03 579.86 5.1 580.071 585.50 52 1 41.41 580.14 579.97 0.12 580.26 580.09 4.7 580.40 588.10 108 1.5 583.47 583.301 0.18 583.66 583.49 0.8 583.81 588.00 29 38.7 580.50 580.25 0.08 580.58 580.33 4.7 580.64 587.24 28 39.0 580.83 580.36 0.51 581.33 580.86 4.9 581.71 585.21 27 33.3 581.85 581.50 0.09 581.94 581.59 5.0 582.02 585.21 26 30.6 582.14 581.85 0.31 582.45 582.16 4.8 582.56 583.91 25 19.91 582.81 582.19 585.81 583.75 3.1 585.81 592.95 24 12.7 585.91 585.65 0.11 586.02 585.77 2.6 586.12 592.95 23 9.6 586.30 585.84 589.89 588.31 2.4 589.89 594.90 22 6.9 589.99 589.75 595.58 593.96 2.2 595.58 600.04 21 5.6 595.71 595.38 601.08 599.61 2.1 601.08 603.69 20 4.5 601.17 600.96 603.50 602.651 1.5 603.501 607.54 131 2.91 603.53 603.451 607.28 606.61 1.2 607.28 616.98 133 1.0 607.28 607.27 609.54 609.16 0.7 609.54 610.34 73 3.8 585.86 585.72 593.16 591.85 1.8 593.16 597.02 118 2.1 593.18 593.13 594.25 593.31 1.3 594.25 597.41 62 4.8 582.66 582.42 0.94 583.60 583.36 3.3 583.70 586.66 61 2.8 583.74 583.65 0.29 584.02 583.94 1.4 584.09 589.63 60 0.81 584.10 584.09 585.49 585.21 0.6 585.49 592.60 64 2.8 582.59 582.52 583.60 582.66 1.4 583.60 587.38 63 1.2 583.61 583.59 586.24 585.65 0.9 586.24 589.82 105 3.2 581.75 581.65 585.18 584.24 1.4 585.18 589.44 104 1.5 585.19 585.17 585.96 585.29 1.0 585.96 589.43 96 1.1 580.40 580.25 0.14 580.54 580.391 0.7 580.66 584.44 76 9.01 579.69 579.56 0.06 579.75 579.62 5.7 579.81 583.34 120 8.8 579.86 579.73 0.13 579.99 579.87 4.6 580.03 581.79 75 4.9 580.07 579.96 0.33 580.40 580.28 2.8 580.46 583.31 74 1.4 580.47 580.46 581.93 581.58 0.7 581.93 586.22 129 578.86 578.86 1 574.33 79 48.71 579.09 578.86 0.14 579.23 579.00 6.6 579.33 582.08 78 48.4 579.48 579.09 0.40 579.88 579.49 4.9 580.04 583.59 77 48.0 580.19 579.81 0.14 580.33 579.94 4.5 580.43 584.20 128 47.2 580.70 580.01 0.33 581.04 580.34 4.7 581.54 584.00 127 46.2 581.80 581.14 0.34 582.15 581.48 4.8 582.70 589.95 50 46.4 582.97 582.30 585.10 582.311 4.3 585.10 591.11 41 44.11 585.34 584.731 589.78 587.07 4.2 589.78 594.91 39 11.6 589.86 589.65 595.85 593.63 2.9 595.85 597.95 38 8.5 596.00 595.63 603.43 601.50 2.6 603.43 606.29 37 5.8 603.50 603.33 608.86 607.28 2.1 608.86 613.20 36 3.1 608.90 608.80 616.38 614.97 1.8 616.38 620.06 35 1.4 616.38 616.36 618.28 617.39 1.2 618.28 621.60 114 1.41 608.87 608.85 0.02 608.89 608.87 2.0 608.91 613.61 113 1.4 603.44 603.42 0.02 603.46 603.44 2.3 603.47 605.61 112 1.4 595.86 595.84 0.02 595.88 595.86 2.3 595.89 598.23 49 11.6 589.86 589.65 0.29 590.15 589.94 3.6 590.31 592.42 48 10.7 590.39 590.20 0.08 590.47 590.28 3.5 590.56 592.42 47 7.4 590.60 590.51 0.06 590.66 590.57 3.1 590.71 594.46 46 5.61 590.77 590.62 595.34 594.00 1.9 595.34 598.19 45 4.0 595.37 595.29 600.55 599.44 1.6 600.55 605.05 44 2.6 600.57 600.53 605.74 604.86 1.3 605.74 611.95 E121 21.1 589.89 589.60 0.15 590.04 589.75 3.5 590.25 595.48 122 20.7 590.52 589.84 0.30 590.82 590.14 3.9 591.39 595.48 58 20.4 591.651 590.99 1.151 592.801 592.141 3.41 593.79 598.86 HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) 57 9.6 593.98 593.52 0.57 594.55 594.09 3.2 594.72 596.32 56 6.2 594.88 594.48 600.74 599.19 2.2 600.74 604.86 55 5.8 600.88 600.54 603.04 601.18 2.4 603.04 607.97 54 4.6 603.13 602.91 606.86 605.21 2.1 606.86 611.44 53 1.9 606.88 606.84 614.24 613.22 1.3 614.24 617.35 59 0.6 593.80 593.791 593.80 593.79 1.8 593.80 598.83 69 1 9.81 593.85 593.70 595.62 594.35 2.0 595.62 603.98 67 7.0 595.82 595.31 604.74 602.83 2.5 604.74 609.47 66 2.9 604.77 604.68 614.09 612.90 1.6 614.09 618.20 65 1.4 614.09 614.07 615.24 614.45 1.1 615.24 618.64 115 2.0 605.37 605.16 0.18 605.55 605.35 1.0 605.71 609.23 116 1.1 595.62 595.61 0.01 595.63 595.62 1.7 595.65 603.98 110 2.01 587.01 586.80 0.19 587.20 587.00 1.0 587.36 590.87 130 578.86 578.86 576.04 81 28.2 578.91 578.86 0.02 578.93 578.88 7.4 578.96 580.83 80 1.0 578.96 578.95 0.01 578.97 578.97 2.3 578.97 581.37 84 25.9 578.97 578.93 0.03 579.00 578.96 6.7 579.01 581.61 83 3.11 579.01 579.01 0.01 579.02 579.02 5.8 579.03 581.70 82 1.2 579.03 579.03 579.03 579.03 5.2 579.03 580.27 94 1.5 579.04 579.01 0.02 579.05 579.03 5.3 579.07 581.59 95 21.4 579.02 578.99 579.03 579.00 6.6 579.05 581.61 14 20.9 579.06 579.02 0.01 579.07 579.03 6.4 579.10 582.06 13 19.8 579.13 579.06 0.05 579.18 579.12 5.9 579.21 583.46 12 16.71 579.24 579.15 0.04 579.28 579.19 5.4 579.31 584.02 11 15.5 579.46 579.08 0.81 580.27 579.89 4.9 580.39 586.32 9 14.3 580.52 580.19 0.94 581.46 581.13 4.1 581.72 591.13 8 12.2 581.81 581.58 0.42 582.23 582.00 3.4 582.31 594.08 6 10.7 582.38 582.20 0.66 583.04 582.86 2.2 583.80 592.66 4 7.1 584.01 583.49 2.16 586.18 585.65 3.3 586.56 596.40 3 4.51 586.65 586.44 0.30 586.94 586.73 2.3 587.06 598.79 2 3.1 587.10 587.00 0.30 587.40 587.30 1.4 587.47 601.37 1 1.5 587.48 587.46 588.85 588.57 0.7 588.85 591.89 132 1.6 590.72 590.43 591.80 591.51 0.7 591.80 600.47 102 1.3 591.82 591.77 592.08 591.82 0.6 592.08 600.47 103 1.1 592.39 592.24 0.18 592.57 592.42 0.7 592.74 598.79 91 1 1.61 590.44 590.16 591.15 590.88 0.7 591.15 597.72 90 1.3 591.17 591.12 591.40 591.15 0.6 591.40 597.72 89 1.1 591.41 591.37 592.29 592.07 0.6 592.29 597.01 88 0.9 592.30 592.26 592.69 592.50 0.5 592.69 596.61 93 1.1 590.32 590.08 591.01 590.77 0.6 591.01 596.19 92 0.5 591.02 591.01 591.33 591.181 0.4 591.33 595.38 100 3.11 588.91 588.49 589.25 588.83 1.2 589.43 592.66 98 1.3 587.16 586.80 587.70 587.34 0.7 587.70 594.08 123 1.5 585.69 585.14 587.36 586.82 0.9 587.36 593.32 87 3.1 579.21 579.20 0.01 579.22 579.20 5.1 579.23 583.26 86 1.9 579.24 579.211 .06 579.31 579.27 3.6 579.32 580.18 15 0.5 579.101 579.101 579.10 579.10 5.11 579.11 582.08 HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 17 18 84 0.251 0.55 9 6.16 52.8 52.8 54 181.3 11.40 9.881 571.71 571.00 0.85% 16 17 147 0.19 0.55 9 6.21 52.4 52.41 54 181.3 11.40 9.86 572.96 571.71 0.85% 34 16 77 0.22 0.55 9 6.24 51.9 51.9 54 181.3 11.40 9.83 573.62 572.96 0.85% 33 34 96 0.25 0.55 9 6.27 43.1 43.1 48 132.5 10.54 9.41 574.43 573.62 0.85% 32 33 109 0.15 0.55 9 6.32 41.5 41.5 48 101.7 8.09 7.67 574.97 574.43 0.50% 52 32 146 0.42 0.55 81 6.38 41.4 1 41.4 481 101.7 8.091 7.67 575.70 574.971 0.50% 108 52 37 0.371 0.55 5 7.031 1.5 1.5 15 4.6 3.73 3.31 583.00 582.82 0.50% 29 152 1 53 0.01 0.55 8 6.40 38.7 38.7 42 71.2 7.40 7.55 575.97 575.70 0.50% 28 29 147 0.81 0.55 8 6.47 39.0 39.0 36 51.3 7.26 7.98 576.84 575.97 0.59% 27 28 36 0.83 0.55 8 6.48 33.3 33.3 36 49.4 6.99 7.50 577.03 576.84 0.55% 26 27 147 1.00 0.55 7 6.55 30.6 30.6 36 47.2 6.67 7.10 577.77 577.03 0.50% 25 26 167 1.01 0.55 7 6.60 19.9 19.9 24 35.1 11.16 11.51 582.67 578.66 2.40% 24 25 36 0.86 0.55 7 6.61 12.7 12.7 241 35.1 11.16 10.25 583.53 582.67 2.40% 23 24 1 145 0.76 0.55 7 6.66 9.6 9.6 18 17.4 9.87 10.10 587.51 583.53 2.75% 22 23 164 0.34 0.55 7 6.71 6.9 6.9 18 19.9 11.24 10.20 593.35 587.51 3.57% 21 22 159 0.32 0.55 6 6.77 5.6 5.6 15 12.2 9.95 9.75 599.01 593.35 3.57% 20 21 151 0.44 0.55 6 6.83 4.5 4.5 15 9.1 7.45 7.41 602.03 599.011 2.00% 131 20 205 0.48 0.55 5 6.941 2.9 2.9 15 9.1 7.45 6.58 606.13 602.03 2.00% 133 131 137 0.26 0.55 5 7.03 1.0 1.0 15 9.2 7.47 4.92 608.88 606.13 2.01% 73 25 211 0.44 0.55 5 7.01 3.8 3.8 15 13.0 10.57 9.17 591.39 582.90 4.03% 118 73 39 0.54 0.55 5 7.03 2.1 2.1 15 13.0 10.57 7.77 592.97 591.39 4.03% 62 26 169 0.53 0.55 6 6.83 4.8 4.8 15 8.0 6.53 6.82 580.37 577.77 1.53% 61 62 149 0.52 0.55 6 6.91 2.8 2.8 15 8.0 6.53 5.96 582.65 580.371 1.53% 60 61 149 0.22 0.55 5 7.03 0.8 1 0.8 151 8.0 6.531 4.23 584.94 582.65 1.53% 64 26 112 0.40 0.55 5 6.98 2.8 2.8 15 11.6 9.45 7.76 582.25 578.66 3.22% 63 64 97 0.31 0.55 5 7.03 1.2 1.2 15 11.6 9.45 6.13 585.38 582.25 3.22% 105 28 207 0.45 0.55 5 7.01 3.2 3.2 15 11.1 9.02 7.80 583.78 577.72 2.93% 104 105 36 0.38 0.55 5 7.03 1.5 1.5 15 11.9 9.67 6.57 584.99 583.78 3.37% 96 33 28 0.29 0.55 5 7.03 1.1 1.1 15 4.6 3.73 3.08 579.97 579.831 0.50% 76 34 35 0.06 0.55 6 6.75 9.0 1 9.0 24 27.5 8.76 7.84 574.14 573.62 1.48% 120 76 88 1.06 0.55 6 6.79 8.8 8.8 24 27.5 8.76 7.80 575.44 574.14 1.48% 75 120 1 151 0.93 0.55 6 6.86 4.9 4.9 18 12.8 7.24 6.75 577.67 575.44 1.48% 74 75 242 0.35 0.55 5 7.03 1.4 1.4 18 12.8 7.24 4.72 581.25 577.67 1.48% 79 129 121 0.16 0.55 8 6.52 48.7 48.7 48 170.0 13.53 11.67 572.70 571.00 1.40% 78 79 172 0.17 0.55 7 6.57 48.4 1 48.4 42 119.1 12.38 11.73 575.10 572.70 1.40% 77 78 61 0.24 0.55 7 6.59 48.0 48.0 42 119.1 12.38 11.70 575.95 575.10 1.40% 128 77 67 0.30 0.55 7 6.61 47.2 47.2 36 78.9 11.17 11.66 576.88 575.95 1.40% 127 128 72 0.02 0.55 7 6.63 46.2 46.2 36 78.9 11.17 11.60 577.88 576.88 1.40% 50 127 145 0.21 0.55 71 6.67 46.4 46.4 36 95.2 13.471 13.38 580.84 577.88 2.03% 41 50 236 0.03 0.55 71 6.731 44.1 44.1 36 95.21 13.471 13.201 585.63 580.84 2.03% 39 41 188 0.47 0.55 6 6.84 11.6 11.6 24 44.7 14.22 11.95 592.94 585.63 3.89% 38 139 203 0.35 0.551 61 6.911 8.51 1 8.51 181 20.71 11.741 11.161 600.821 592.94 3.89% HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 37 38 1 152 0.351 0.55 51 6.96 5.8 5.8 18 20.7 11.741 10.07 606.74 600.82 3.89% 36 137 1 151 0.441 0.55 5 7.01 3.1 3.lj 15 14.7 12.01 9.50 614.58 606.74 5.19% 35 36 49 0.36 0.55 5 7.03 1.4 1.4 15 14.7 12.01 7.57 617.13 614.58 5.19% 114 37 35 0.37 0.55 5 7.03 1.4 1.4 15 4.6 3.73 3.30 606.92 606.74 0.50% 113 38 39 0.36 0.55 5 7.03 1.4 1.4 15 4.6 3.73 3.29 601.16 600.97 0.50% 112 39 38 0.37 0.55 5 7.03 1.4 1.4 15 4.6 3.73 3.29 593.64 593.451 0.50% 49 41 111 0.23 0.55 61 6.78 11.6 11.6 24 22.7 7.221 7.25 586.74 585.63 1.00% 48 149 1 36 0.88 0.55 6 6.79 10.7 10.7 24 22.7 7.22 7.12 587.11 586.74 1.00% 47 48 53 0.49 0.55 6 6.82 7.4 7.4 24 22.7 7.22 6.46 587.64 587.11 1.00% 46 47 181 0.43 0.55 6 6.89 5.6 5.6 18 18.8 10.64 9.29 593.43 587.64 3.20% 45 46 173 0.37 0.55 5 6.95 4.0 4.0 18 18.8 10.64 8.47 598.97 593.43 3.20% 44 45 172 0.68 0.55 5 7.03 2.6 2.6 18 18.8 10.64 7.51 604.48 598.97 3.20% 121 41 55 0.11 0.55 6 6.75 21.1 21.1 30 58.6 11.93 10.95 586.75 585.63 2.03% 122 121 36 0.12 0.55 6 6.76 20.7 20.7 24 32.3 10.28 10.91 587.49 586.75 2.03% 58 122 141 0.13 0.55 6 6.80 20.4 20.4 24 32.3 10.28 10.87 590.35 587.49 2.03% 57 58 68 0.91 0.55 6 6.85 9.6 9.6 18 13.8 7.81 8.44 591.52 590.35 1.72% 56 57 197 0.12 0.55 6 6.92 6.2 6.2 15 12.2 9.96 10.01 598.55 591.52 3.58% 55 56 43 0.31 0.55 5 6.93 5.8 5.8 15 14.1 11.53 10.94 600.62 598.56 4.79% 54 55 86 0.70 0.55 5 6.96 4.6 4.6 15 14.1 11.53 10.30 604.72 600.62 4.79% 53 54 171 0.50 0.55 5 7.03 1.9 1.91 15 14.1 11.53 8.08 612.91 604.72 4.79% 59 58 36 0.16 0.55 5 7.03 0.6 0.6 15 13.8 11.21 5.71 591.98 590.35 4.53% 69 58 160 0.48 0.55 6 6.86 9.8 9.8 24 32.3 10.28 9.02 593.59 590.35 2.03% 67 69 199 0.56 0.55 6 6.92 7.0 7.0 15 13.4 10.96 11.06 602.19 593.59 4.32% 66 67 239 0.38 0.55 5 7.01 2.9 2.9 15 13.4 10.96 8.73 612.51 602.19 4.32% 65 66 39 0.37 0.55 5 7.03 1.4 1 1.4 151 13.4 10.96 7.12 614.18 612.51 4.32% 115 67 37 0.52 0.55 5 7.03 2.0 2.0 15 4.6 3.73 3.61 604.76 604.58 0.50% 116 69 36 0.28 0.55 5 7.03 1.1 1.1 15 6.5 5.27 3.91 593.95 593.59 1.00% 110 50 39 0.52 0.55 5 7.03 2.0 2.0 15 4.6 3.73 3.62 586.41 586.22 0.50% 81 130 113 0.50 0.55 10 6.06 28.2 28.2 54 139.2 8.75 6.85 571.57 571.00 0.50% 80 81 125 0.26 0.55 5 7.03 1.0 1 1.0 18 21.2 12.01 6.20 576.66 571.57 4.07% 84 81 147 0.52 0.55 9 6.13 25.9 25.9 54 139.2 8.75 6.69 572.30 571.57 0.50% 83 84 185 0.13 0.55 6 6.88 3.1 3.1 30 29.0 5.91 3.87 573.23 572.30 0.50% 82 83 131 0.31 0.55 5 7.03 1.2 1.2 24 16.0 5.10 2.99 573.88 573.23 0.50% 94 83 30 0.39 0.55 5 7.03 1.5 1.5 15 4.6 3.73 3.35 573.79 573.64 0.50% 95 84 28 0.16 0.55 9 6.15 21.4 21.4 54 139.2 8.75 6.33 572.441 572.30 0.50% 14 95 44 0.25 0.55 9 6.171 20.9 20.91 48 101.71 8.09 6.36 572.66 572.44 0.50% 13 14 136 0.13 0.55 9 6.24 19.8 19.8 42 71.2 7.40 6.34 573.34 572.66 0.50% 12 13 57 0.38 0.55 9 6.27 16.7 16.7 36 64.1 9.07 7.62 573.86 573.34 0.92% 11 12 171 0.40 0.55 8 6.34 15.5 15.5 24 21.7 6.92 7.51 575.45 573.86 0.92% 9 11 234 0.25 0.55 8 6.45 14.3 14.3 24 21.7 6.92 7.39 577.60 575.45 0.92% 8 9 143 0.14 0.551 81 6.52 12.2 12.2 24 21.7 6.92 7.12 578.92 577.60 0.92% 6 8 292 0.22 0.55 7 6.66 10.7 1 10.71 241 21.71 6.921 6.901 581.61 578.92 0.92% HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 4 6 1 178 0.001 0.55 61 6.76 7.1 1 7.1 15 6.2 5.061 5.80 583.26 581.61 0.92% 3 14 1 62 0.091 0.55 6 6.79 4.5 4.5 15 10.2 8.33 8.05 584.80 583.26 2.50% 2 3 129 0.02 0.55 6 6.87 3.1 3.1 15 6.5 5.27 5.21 586.08 584.80 1.00% 1 2 208 0.38 0.55 5 7.03 1.5 1.5 15 6.5 5.27 4.26 588.17 586.08 1.00% 132 2 108 0.08 0.55 5 7.00 1.6 1.6 15 6.5 5.27 4.37 591.08 590.00 1.00% 102 132 36 0.33 0.55 5 7.03 1.3 1.3 15 6.5 5.27 4.12 591.44 591.081 1.00% 103 3 36 0.29 0.55 51 7.03 1.1 1.1 15 4.6 3.73 3.07 592.00 591.82 0.50% 91 14 1 78 0.09 0.55 6 6.86 1.6 1.6 15 6.2 5.02 4.21 590.44 589.73 0.91% 90 91 36 0.06 0.55 6 6.89 1.3 1.3 15 6.2 5.02 3.96 590.77 590.44 0.91% 89 90 105 0.05 0.55 5 6.98 1.1 1.1 15 6.2 5.02 3.75 591.72 590.77 0.91% 88 89 51 0.22 0.55 5 7.03 0.9 0.9 15 6.2 5.02 3.55 592.18 591.72 0.91% 93 4 69 0.15 0.55 5 6.98 1.1 1.1 15 6.5 5.27 3.93 590.42 589.73 1.00% 92 93 52 0.13 0.55 5 7.03 0.5 0.5 15 6.5 5.27 3.15 590.94 590.42 1.00% 100 6 1 34 0.80 0.55 5 7.03 3.1 3.1 151 6.5 5.27 5.21 588.22 587.88 1.00% 98 8 36 0.33 0.55 5 7.03 1.3 1.3 15 7.9 6.45 4.76 587.00 586.46 1.50% 123 9 67 0.38 0.55 5 7.03 1.5 1.5 15 10.2 8.33 5.921 586.49 584.82 2.50% 87 13 34 0.31 0.55 5 6.99 3.1 3.1 24 34.5 10.98 6.82 574.14 573.34 2.32% 86 87 69 0.50 0.55 5 7.03 1.9 1.9 15 9.8 8.03 6.24 575.74 574.14 2.32% f15 14 25 0.12 0.55 5 7.03 0.5 0.5 15 4.6 3.73 2.38 574.001 573.881 0.507, HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting 4 IN/HR INLET SPREAD H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 17 18 84 0.251 0.55 10 4.07 34.8 34.8 54 181.3 11.40 8.801 571.71 571.00 0.85% 16 17 147 0.19 0.55 10 4.07 34.3 34.31 54 181.3 11.40 8.76 572.96 571.71 0.85% 34 16 77 0.22 0.55 9 4.07 33.9 33.9 54 181.3 11.40 8.72 573.62 572.96 0.85% 33 34 96 0.25 0.55 9 4.07 27.9 27.9 48 132.5 10.54 8.35 574.43 573.62 0.85% 32 33 109 0.15 0.55 9 4.07 26.7 26.7 48 101.7 8.09 6.81 574.97 574.43 0.50% 52 32 146 0.42 0.55 91 4.07 26.4 1 26.4 481 101.7 8.091 6.79 575.70 574.97 0.50% 108 52 37 0.371 0.55 5 4.051 0.8 0.8 15 4.6 3.73 2.84 583.00 582.82 0.50% 29 152 1 53 0.01 0.55 8 4.07 24.6 24.6 42 71.2 7.40 6.72 575.97 575.70 0.50% 28 29 147 0.81 0.55 8 4.07 24.6 24.6 36 51.3 7.26 7.18 576.84 575.97 0.59% 27 28 36 0.83 0.55 8 4.07 20.9 20.9 36 49.4 6.99 6.69 577.03 576.84 0.55% 26 27 147 1.00 0.55 8 4.07 19.0 19.0 36 47.2 6.67 6.31 577.77 577.03 0.50% 25 26 167 1.01 0.55 7 4.07 12.3 12.3 24 35.1 11.16 10.17 582.67 578.66 2.40% 24 25 36 0.90 0.55 7 4.07 7.9 7.9 241 35.1 11.16 9.01 583.53 582.67 2.40% 23 24 1 138 0.68 0.55 7 4.07 5.9 5.9 18 17.1 9.68 8.77 587.18 583.53 2.65% 22 23 127 0.37 0.55 7 4.07 4.3 4.3 18 17.1 9.68 8.08 590.54 587.18 2.65% 21 22 175 0.37 0.55 6 4.07 3.5 3.5 15 10.5 8.58 7.71 595.18 590.541 2.65% 20 21 175 0.44 0.55 6 4.07 2.7 2.7 15 10.5 8.58 7.16 599.82 595.18 2.65% 131 20 209 0.48 0.55 5 4.071 1.7 1 1.7 15 10.5 8.58 6.27 605.37 599.82 2.65% 133 131 130 0.26 0.55 5 4.05 0.6 0.6 151 10.5 8.58 4.61 608.81 605.37 2.65% 73 25 1 211 0.44 0.55 5 4.07 2.1 2.1 15 13.0 10.57 7.77 591.39 582.90 4.03% 118 73 53 0.49 0.55 5 4.05 1.1 1.1 15 11.2 9.10 5.80 592.97 591.39 2.98% 62 26 169 0.53 0.55 6 4.07 2.9 2.9 15 8.0 6.53 5.98 580.37 577.77 1.53% 61 62 149 0.52 0.55 6 4.07 1.7 1.7 15 8.0 6.53 5.15 582.65 580.37 1.53% 60 61 149 0.22 0.55 5 4.05 0.5 1 0.5 15 8.0 6.53 3.60 584.94 582.65 1.53% 64 26 112 0.40 0.55 5 4.07 1.6 1.6 151 11.6 9.45 6.66 582.25 578.66 3.22% 63 64 1 97 0.31 0.55 5 4.05 0.7 0.7 15 11.6 9.45 5.21 585.38 582.25 3.22% 105 28 207 0.45 0.55 5 4.07 1.9 1.9 15 11.1 9.02 6.70 583.78 577.721 2.93% 104 105 36 0.38 0.55 5 4.05 0.8 0.8 15 11.9 9.67 5.59 584.99 583.78 3.37% 96 33 28 0.29 0.55 5 4.05 0.6 0.6 15 4.6 3.73 2.64 579.97 579.83 0.50% 76 34 35 0.06 0.55 7 4.07 5.4 5.4 24 27.5 8.76 6.81 574.14 573.62 1.48% 120 76 88 1.06 0.55 6 4.07 5.3 5.3 241 27.5 8.76 6.76 575.44 574.14 1.48% 75 120 1 151 0.93 0.55 6 4.07 2.9 2.9 18 12.8 7.24 5.85 577.67 575.44 1.48% 74 75 242 0.35 0.55 51 4.05 0.8 0.8 18 12.8 7.24 4.01 581.25 577.67 1.48% 79 129 121 0.16 0.55 8 4.07 30.7 30.7 48 170.0 13.53 10.25 572.70 571.00 1.40% 78 79 172 0.17 0.55 8 4.07 30.3 30.3 42 119.1 12.38 10.33 575.10 572.70 1.40% 77 78 61 0.24 0.55 8 4.07 29.9 29.9 42 119.11 12.38 10.29 575.95 575.10 1.40% 128 77 1 67 0.30 0.55 7 4.07 29.4 29.4 36 78.9 11.17 10.34 576.88 575.95 1.40% 127 128 72 0.02 0.55 71 4.07 28.7 28.7 36 78.9 11.17 10.27 577.88 576.88 1.40% 50 127 145 0.21 0.55 7 4.07 28.6 28.6 36 95.2 13.47 11.77 580.84 577.88 2.03% 41 50 236 0.03 0.55 7 4.07 27.0 27.0 36 95.2 13.47 11.58 585.63 580.84 2.03% 39 41 188 0.47 0.55 6 4.07 6.9 6.9 24 44.7 14.22 10.32 592.94 585.63 3.89% 38 39 2031 0.351 0.55 6 4.07 5.01 1 5.01 181 20.71 11.741 9.671 600.82 592.941 3.89% HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 37 38 1 152 0.351 0.55 51 4.07 3.4 1 3.4 18 20.7 11.741 8.66 606.74 600.82 3.89% 36 37 151 0.44 0.55 5 4.07 1.8 1.8 15 14.7 12.01 8.13 614.58 606.74 5.19% 35 36 49 0.36 0.55 5 4.05 0.8 0.8 15 14.7 12.01 6.43 617.13 614.58 5.19% 114 37 35 0.37 0.55 5 4.05 0.8 0.8 15 4.6 3.73 2.83 606.92 606.74 0.50% 113 38 39 0.36 0.55 5 4.05 0.8 0.8 15 4.6 3.73 2.82 601.16 600.97 0.50% 112 39 38 0.37 0.55 5 4.05 0.8 0.8 15 4.6 3.73 2.82 593.64 593.451 0.50% 49 41 111 0.23 0.55 6 4.07 6.9 6.9 24 22.7 7.22 6.34 586.74 585.63 1.00% 48 149 1 36 0.88 0.55 6 4.07 6.4 6.4 241 22.7 7.22 6.21 587.11 586.74 1.00% 47 48 53 0.49 0.55 6 4.07 4.4 4.4 24 22.7 7.22 5.60 587.64 587.11 1.00% 46 47 181 0.43 0.55 6 4.07 3.3 3.3 18 18.8 10.64 8.02 593.43 587.64 3.20% 45 46 173 0.37 0.55 5 4.07 2.4 2.4 18 18.8 10.64 7.27 598.97 593.43 3.20% 44 45 172 0.68 0.55 5 4.05 1.5 1.5 18 18.8 10.64 6.40 604.48 598.97 3.20% 121 41 55 0.11 0.551 7 4.07 13.0 1 13.0 30 58.6 11.93 9.59 586.75 585.63 2.03% 122 121 1 36 0.12 0.55 7 4.07 12.8 12.8 241 32.3 10.28 9.68 587.49 586.75 2.03% 58 122 141 0.13 0.55 6 4.07 12.5 12.5 24 32.3 10.28 9.62 590.35 587.49 2.03% 57 58 68 0.91 0.55 6 4.07 5.7 5.7 18 13.8 7.81 7.44 591.52 590.35 1.72% 56 57 197 0.12 0.55 6 4.07 3.7 3.7 15 12.2 9.96 8.70 598.55 591.52 3.58% 55 56 43 0.31 0.55 6 4.07 3.4 3.4 15 14.1 11.53 9.47 600.62 598.56 4.79% 54 55 86 0.70 0.55 5 4.07 2.7 1 2.7 15 14.1 11.53 8.87 604.72 600.62 4.79% 53 54 171 0.50 0.55 5 4.05 1.1 1.1 15 14.1 11.53 6.88 612.91 604.72 4.79% 59 58 36 0.16 0.55 5 4.05 0.4 0.4 15 13.8 11.21 4.84 591.98 590.35 4.53% 69 58 160 0.48 0.55 6 4.07 6.1 6.1 24 32.3 10.28 7.91 593.59 590.35 2.03% 67 69 199 0.56 0.55 6 4.07 4.1 4.1 15 13.4 10.96 9.63 602.19 593.59 4.32% 66 67 239 0.38 0.55 5 4.07 1.7 1.7 15 13.4 10.96 7.47 612.51 602.19 4.32% 65 66 39 0.37 0.55 5 4.05 0.8 1 0.8 15 13.4 10.96 6.05 614.18 612.51 4.32% 115 67 37 0.52 0.55 5 4.05 1.2 1.2 151 4.6 3.73 3.12 604.76 604.58 0.50% 116 69 36 0.41 0.55 5 4.05 0.9 0.9 15 6.5 5.27 3.74 593.95 593.59 1.00% 110 50 39 0.52 0.55 5 4.05 1.2 1.2 15 4.6 3.73 3.12 586.41 586.22 0.50% 81 130 113 0.50 0.55 10 4.07 18.9 18.9 54 139.2 8.75 6.11 571.57 571.001 0.50% 80 81 125 0.26 0.55 5 4.05 0.6 1 0.6 18 21.2 12.01 5.26 576.66 571.57 4.07% 84 81 1 147 0.52 0.55 10 4.07 17.2 17.2 541 139.2 8.75 5.94 572.30 571.57 0.50% 83 84 185 0.13 0.55 6 4.07 1.9 1.9 30 29.0 5.911 3.32 573.23 572.30 0.50% 82 83 131 0.31 0.55 5 4.05 0.7 0.7 24 16.0 5.10 2.54 573.88 573.23 0.50% 94 83 30 0.391 0.55 5 4.05 0.9 0.9 15 4.6 3.73 2.87 573.79 573.64 0.50% 95 84 28 0.16 0.55 10 4.071 14.1 14.1 54 139.2 8.75 5.62 572.44 572.30 0.50% 14 95 44 0.25 0.55 10 4.07 13.8 13.8 48 101.7 8.09 5.65 572.66 572.44 0.50% 13 14 1 136 0.13 0.55 9 4.07 12.9 12.9 42 71.2 7.40 5.62 573.34 572.66 0.50% 12 13 57 0.38 0.55 9 4.07 10.8 10.8 36 64.1 9.07 6.74 573.86 573.34 0.92% 11 12 171 0.40 0.55 9 4.07 10.0 10.0 24 21.7 6.92 6.76 575.45 573.86 0.92% 9 11 234 0.25 0.55 8 4.07 9.0 9.0 24 21.7 6.92 6.60 577.60 575.45 0.92% 8 9 1431 0.14 0.55 8 4.07 7.61 7.6 24 21.7 6.92 6.311 578.92 577.60 0.92% 6 8 2921 0.221 0.55 7 4.071 6.61 1 6.61 24 21.7 6.92 6.061 581.611 578.92 0.92% HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) NO U/S D/S 4 6 1 178 0.001 0.55 71 4.07 4.3 1 4.3 15 6.2 5.06 5.45 583.26 581.61 0.92% 3 4 62 0.09 0.55 6 4.07 2.7 2.7 15 10.2 8.33 7.02 584.80 583.26 2.50% 2 3 129 0.02 0.55 6 4.07 1.8 1.8 15 6.5 5.27 4.53 586.08 584.80 1.00% 1 2 208 0.38 0.55 5 4.05 0.8 0.8 15 6.5 5.27 3.64 588.17 586.08 1.00% 132 2 108 0.08 0.55 5 4.07 0.9 0.9 15 6.5 5.27 3.75 591.08 590.00 1.00% 102 132 36 0.33 0.55 5 4.05 0.7 0.7 15 6.5 5.27 3.51 591.44 591.081 1.00% 103 3 36 0.29 0.55 5 4.05 0.6 0.6 15 4.6 3.73 2.63 592.00 591.82 0.50% 91 14 1 78 0.09 0.55 6 4.07 0.9 0.9 151 6.2 5.02 3.63 590.44 589.73 0.91% 90 91 36 0.06 0.55 6 4.07 0.8 0.8 15 6.2 5.02 3.40 590.77 590.44 0.91% 89 90 105 0.05 0.55 5 4.07 0.6 0.6 15 6.2 5.02 3.20 591.72 590.77 0.91% 88 89 51 0.22 0.55 5 4.05 0.5 0.5 15 6.2 5.02 3.02 592.18 591.72 0.91% 93 4 69 0.15 0.55 5 4.07 0.6 0.6 15 6.5 5.27 3.36 590.42 589.73 1.00% 92 93 52 0.13 0.551 5 4.05 0.3 0.3 15 6.5 5.27 2.68 590.94 590.42 1.00% 100 6 1 34 0.80 0.55 5 4.05 1.8 1.8 151 6.5 5.27 4.50 588.22 587.88 1.00% 98 8 36 0.33 0.55 5 4.05 0.8 0.8 15 7.9 6.45 4.06 587.00 586.46 1.50% 123 9 67 0.38 0.55 5 4.05 0.8 0.8 15 10.2 8.33 5.041 586.49 584.82 2.50% 87 13 34 0.31 0.55 5 4.07 1.8 1.8 24 34.5 10.98 5.811 574.14 573.34 2.32% 86 87 69 0.50 0.55 5 4.05 1.1 1.1 15 9.8 8.03 5.33 575.74 574.14 2.32% 15 14 25 0.12 0.55 5 4.05 0.3 0.3 15 4.6 3.73 2.02 574.00 573.88 0.50% HTHOMAS s HUTTON T:IAutoC4DlReportslHEC-221HEC-22 Reporting STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 04 APPENDIX F WATER QUALITY CALCULATIONS 27842.0004 T THOMAS & HUTTON Water Quality Calculations Cresswind-Wesley Chapel Project No.27842.0003 WET POND 04 Project/Drainage Area: 42.25 Acres Required Water Quality Volume: 95,975 Cubic Feet Impervious Area: I 27.03 Acres (Project Area(Acres)X 43,560 SF X 1''/12=Required Cubic Feet Volume) 64.0%Percent Impervious Runoff Coeifficient: R-05+0.9(I)= 0.63 (Required Collection of First 1''of Rainfall from the Project Site and Release over a Minimum 48 Hour(Maximum 120 Hours)in Cubic Feet Per Second) Min.48-Hour Release Rate: 0.555 CFS Required Orifice Si— 4.00 Drawdown Time(Hours): 63.05 ater Quality Elevation Orifice Flow Calculation Elev. Area Storage Q-CdA*sgrt(2gh) (ft) (sf) (cu.ft) Cd= 0.62 (Sharp Orifice) NWL 574.50 46,123.00 0.00 A= 0.087 sf TOP OF BERM 580.00 69,643.00 318,356.50 g= 32.174 ft/s, Elevation Pond Depth Storage h= 1.90 ft (ft) (ft) (cu.ft) Q= 0.423 cfs 576.40 2.40 95,975.00 Colculotedfrom Stage-Storage Table VPP—Vshelf D" Abottomofshelf nere. = T-I me or perm�ehehr pool(reer) only(leap)—aee below Average Depth Calculation �a,•=„ Area or wa�a woe�e�ne mhem rn,he aherc(ree�� Vpp Designed @ Elevation 1574.50 136,114.00 ,„.„= o.s^oePth„„„„„,„^Pehreerer,•„„„„^Width.,„„,.„.„­ Permanent Pool SA Designed @ Elev 1574.50 37,629.00 here. o—„„„, = Depth orwa�-th1deepelaeortheebelras brae ar vermarcem vohl Deep Area of wet pond at the bottom ofthe shelf 34,219.00 aerlmerer,.m....�,�o� = aaame er or vermahem ve°i ar me eonom or ma Dmax over shelf 0.50 width fr-tha aeav s�aem ma a.y aide erma sM1elf as measuratl al peananent pool(fiat) Perimeter of Permanent Pool 1,141.00 Width of submerged part of shelf 3.00 Volume over the shelf only 855.75 _ �e reo�=� oe�=�� „me wa„Pees nem u.;eeen,tsael Average Depth 1 3.95 1 . SA/DA Method - - - Drainage Area 42.25 acres o , Table value 1.75 Surface Area Required 32,207.18 Isquare feet Stage Storage Calculations Cresswind-Wesley Chapel Project No. 27842.0002 WET POND 05 FOREBAY 01 VOLUME CONTOUR CONTOUR INC.VOL. CUM.VOL.AVG. ELEV AREA(SF) DEPTH (FT) AVG. END END(CU. FT.) 570 4,201 N/A N/A 0 571 4,846 1 4,523 4,523 572 5,535 1 5,191 9,714 573 6,268 1 5,902 15,615 574 7,045 1 6,657 22,272 574.5 8,096 0.5 3,785 26,058 TOTAL FOREBAY VOLUME:1 26,058 CU.FT PERCENTAGE OF PERMANENT POOL VOLUME:1 19% PERMANENT POOL VOLUME CONTOUR CONTOUR DEPTH (FT) INC.VOL. CUM.VOL.AVG. ELEV AREA(SF) AVG. END END(CU. FT.) 570 24,933 N/A N/A 0 571 27,208 1 26,071 26,071 572 29,515 1 28,362 54,432 573 31,852 1 30,683 85,115 574 34,219 1 33,036 118,151 574.5 37,629 0.5 17,962 136,114 PERMANENT POOL VOLUME:I 136,114 CU.FT TEMPORARY PONDING ZONE CONTOUR CONTOUR DEPTH (FT) INC.VOL. CUM.VOL.AVG. ELEV AREA(SF) AVG. END END(CU. FT.) 574.5 46,123 N/A N/A 0 575 49,902 0.5 24,006 24,006 576 53,737 1 51,819 75,825 577 57,629 1 55,683 131,508 578 61,577 1 59,603 191,111 579 65,582 1 63,579 254,690 580 69,643 1 67,613 322,303 TEMPORARY PONDING ZONE VOLUME:1 322,303 CU. FT. Cresswind Wesley Chapel-Phase 04 Job: J-27842.0004 KH Wesley Chapel,LLC Date: 4/16/23 Thomas&Hutton Engineering Co. Revised: nlfeac+ Anti-Flotation Design Considerations By: MSK ANTI-FLOTATION DESIGN CONSIDERATIONS FOR: Wet Pond 05 CONTROL STUCTURE ELEVATIONS Top Structure Elevation: 578.50 Bottom Structure Elevation: 570.00 CONTROL STRUCTURE FLOTATION Buoyant Force Calculate submerged volume: V,= (A.,x H,j Where: V,= Submerged volume(cf) Leg= Length of control structure(ft) = 8.50 ft Wig= Width of Control structure(ft) = 5.00 ft Aug- Cross-sectional area of control structure(ft) = 42.50 ft Hag= Height of control structure(ft) = 8.50 ft Solve equation for V,: V,= (A.,x H,j = 361.25 cf Calculate buoyant force: Fb= Vg x Ywalu Where: Fb= buoyant force(lbf) y,= Specific weight of water = 62.40 lbf/cf Fb= 22,542 lbf Z:A27842\27842.0004\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0004-Wet Pond 05-Anti Flotation Design Calculations-updated Page 1 of 3 Cresswind Wesley Chapel-Phase 04 Job: J-27842.0004 KH Wesley Chapel,LLC Date: 4/16/23 Thomas&Hutton Engineering Co. Revised: nlfea�c+ Anti-Flotation Design Considerations By: MSK Downward Force Calculate Downward Force of Control Structure Fdcs= (Vcs-Vwcir-Vorifice)x yconcrete Where: WtC3= Weight of control structure(lbs) Yconcrete= Specific weight of concrete = 140.00 lbf/cf Acs= Cross-sectional area of control structure(ft) = 42.50 ft Hcs= Height of control structure(ft) = 8.50 ft Tcs= Wall thickness of control structure(ft) = 0.50 ft Vcs= Volume of control structure(cf) = 106.25 cf Wweir= Width of weir(ft) = 5.00 ft HWeir= Height of weir opening(ft) = 2.10 ft AWeir= Area of weir opening(ft) = 10.50 sf VWeir= Volume of weir = 5.25 cf DIAorifice= Diameter of orifice opening(in) = 4.00 in Aorifice= Area of orifice opening(sf) = 0.087 sf Vorifice= Volume of orifice opening(sf) = 0.044 cf FdC3= 14,134 lbf Size Anti-Flotation Footing to Resist BoUant Force FdC3+Fda>Fb Fdft—(Lb X Wb X Db)X 7concrete Where: Fdcs= downward force of control structure(lbf) = 14134 lbf Fb= buoyant force(lbf) = 22542 lbf Yconcrete= Specific weight of concrete = 77.60 lbf/cf Lb= Length of Concrete Block = 15.00 ft Wb= Width of Concrete Block = 15.00 ft Db= Depth of Concrete Block = 12.00 in Fdit= downward force of anti-flotation footing(lbf) = 17460 lbf Z:A27842\27842.0004\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0004-Wet Pond 05-Anti Flotation Design Calculations-updated Page 2 of 3 Cresswind Wesley Chapel-Phase 04 Job: J-27842.0004 KH Wesley Chapel,LLC Date: 4/16/23 Thomas&Hutton Engineering Co. Revised: nlfea�c+ Anti-Flotation Design Considerations By: MSK Fd,s+ Fd,= 31594 lbf>Fb= 22542 lbf _ Factor of Safety Confirm anti-flotation block is sized for minimum factor of safely((F j of 1.10. F, = (Fd.+Fdft)/Fb 1.40 > 1.10 Z:A27842\27842.0004\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0004-Wet Pond 05-Anti Flotation Design Calculations-updated Page 3 of 3