Loading...
HomeMy WebLinkAboutNCC231020_Site Plan or Location Map_20230426 P1 ENGINEERS mcn o PLANNERS I 3"---r' SITE ,O SURVEYORS / MOORMAN, KIZER & REITZEL, INC. a' • d7 I yP° rA of ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY / \ NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. 4A AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED / \ 'IIIN1/'��4 ! EROSION AND �� `�-; 40011, NCAICE04BTI01MCOTAR05 THAAN THDOCUMENTATOIONTSHALLOBECACCOMPLSHEDI BY I \ \ >2., INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE I !' APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, I I \\ \ t5' / t�� DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, V Tr PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION' iIIII_ d T-" CONTROL PLAN.' VICINITY MAP I \ 16 / (NOT TO SCALE) I \ \ 4" CONSTRUCTION SCHEDULE I \\ I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control I / 2150 CAMP EASTER ROAD / \ / P\ (E&SC)permit and a Certificate of Coverage(COC)must be obtained before any land disturbing activities / 'I' occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a Lot Plan �_ f \ permits box,and accessible during inspection.2. I �O 2. Install gavel construction entrances first,thee silt fences,reinforced silt fence outlets and wattles _ 3. Finish clearing and grubbing any necessary areas on the lots as they are started. \l 4. Begin lot grading and excavation activities I I / 5. Begin or continue with house construction activities. 6. Finish all rough grading and house construction. ) `I 7. Install driveways,walks and patios. I 8. Begin f e grading ofl°t areas 9. Final gassing,mulching and stabilizing of lot In most cases this will involve the installation of sod on the lot. The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold. I / 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete the fallowing combined self-inspection f found on the DEMLR website mtns:Miles.nc.covmedeWEnerm 20Minemlr20and%2Olandr20Rsowees(SmrmwaterTIPDEs°ra0 THIS PROJECT IS IN A HIGH-QUALITY General%2OPermits/DEMLR-CSW-Moniorng-Forme-Rev-August-B-2019.pdf.Twelve months of complete / WATER ZONE AND ALL REQUIREMENTS inspection forms shall be kept on site and available for inspection at all times.It is recommended a wily be REGARDING SENSITIVEAREA kept in a permits box.(GS I I3A-5.1(e),15A NCAC 0 11.013T NCG01 Pan III Sections A and B) II. Self-inspections for erosion and sedimentation control measures are to be performed at least°nee every seven WATERSHEDS SHOULD BE FOLLOWED calendar days and within 24 hours of every rain event of greater than 1 inch.Any needed repairs shall be \ INCLUDING 7 DAY STABILIZATOION. made immediately to maintain measures as designed.All ESC measures shall be maintained as specified in the construction details on this plan.A min gauge shall be addled at the project site for monitoring. \ 12. Inspection and final acceptance letters.When the project is complete,the penninees shall contact DEMLR to close out the E&SC Plan.After DEMLR informs the permitted of the project close out,via inspection report, the permittee shall visit"deq.nc.gov/NCGOI"to submit an eleemnnic Notice of termination(e-NOT).A S100 5 N. 390 amnia]general permit fee will be charged until the a-NOT has been filled out. 1 I ) _ s s / _I s,s / l 4, 1 a - ro ewssen,aemrI A nu 12 Min.'I 2--' -.. M =2 s to te desired length such that logs..net eprop 5 St ameH I a pare o SECTION SECTION and a minimum 10 feetbeyond the toe or a \ / slope.Sit socww (e))occalee below flat areas should be meted at the edge of the / KM aleturrerere The ends ofte sin KO. me(e)m� ,11 ,Ii 4. Oak or other durable hard..stakes vertIcally plumb,through g W W Inch x 2 Inch cross sect.sock/wattle.Stakes should smaximum interval of 4 fest orhoued atld be Sg1�53 Wood Mules or ght iom irenc d 4 Min nterval of 8 feet if a silt sock/wattle is placed In a 4 inch Oa.� To gr°a" n. blege.aren Ste�R on aoTRIUNTRENCHEVIEw INSTALLATION wa a°..m..� •°.__p ,.. ,r p during e')maR'enM l sockhvattle to hold it in MAINTENANCE CaVe19 1. Inspect glt socktwattle at least weekly and after 1 x INMAL FLOWRATES / \ Mulch or Compost pp meane.het I a.aToBeP eo °�`m,ra(12,°=)Iram)I;oa t/ 3�'m,h mamert: plareaeel�pedor / Silt Sock/NLengtninnum(a.fl (unarest 750 m) (22arest m) (' ) (� ) (5�) e Work Nea IIl Wattle S Reinstall II damaged or.larger diameter or a agem.d a / x�°g.n. g M 176 R ppm/ft nm/R gpm/rt g676 R _ • re bil Ira,, I,in'/m) I/Ira/m) Via/m) Use/m) �etasubrehas een Is �te n inspected rmanently e1aboove the / SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION DATE: PAGE: DATE: PAGE: DATE: PAGE: r F n Filter Fabric b c / Steel Foot •8.Max,Standard Ste N fence Wire °Bockflll trench I� �p G �, ,� 'b"x 4 ate B Max. strength w,,e f.nce Wire Fence thorn gnlpyOet 1f F t ll T ll I '6 % T D � % %I a /ice IWA A Steel Past _ r� .� t k ""` I i - '"` "°" I OHO :L}�"l tip THISPROJECTIS INAHIGH-QUALITY1} up°epeFig ¶ J ll � y J`OX� / v ."v� a''" WATERZONEANDALLREQUIREMENTSPwre tiestkazaIM. n» .-.lal.l IL.-t� :. ,-! ILIy L_% zli L � 1. .J Q }m.'. A. 'el. 1,4- '`°^rnr rpvae REGARDING SENSITIVEAREA B m R Vry' °F 0 AY 1tO PAY RU AY -HU AY -RD WAY -RO AY / .w � .� . WATERSHEDS SHOULD BE FOLLOWED t I IIr Le°O 4�`^` ` I`' '^ `p4 �►may` INCLUDING 7 DAY STABILIZATOION. 24 [s downaa forward eng the cn EGRB INLET Notes , 1.} s --s M�.}l 00101+0+0+01 • , END 1.If needed,Tree Protection fencing should be installed along me buffer zone wetland AAA'tirt" ' boundary and/or around protected trees,providing a radius of at least 1.25 feet for eachinch of trunk �./��il� I�ry��`�`'�p Filter Fabric - 2.1 tall SiltFence on diameter, thesides of each lot Install Silt Fence outlets shown on - ' a T �IPAPE J^.^. g i' CROSS SECTION VIEW DIRECTION FLOW h f Id g tlheldadjusted,(necessary for placement at low points If lots are SILT FENCE earsa n.n°daeemreamewR�.npnarreaaamar mp°me wumaamwamr contiguousand have different land owners holders each IA should have � Y p� eeawc etmm,emro...a,e�u When an n.eessayseearey fasten u. e: n , Fences. r.v ann,sma., ® 3.InstallrequredSltFencewith°10feetofpropertylnetoensure tall readconflictwith '� General Erosion Control Notes m.m.menesee.nneapanpeaeeruner.m.pnnwlr.d N.su`apsesm.aemv.. ml.pse,,.m,e...m anal me.m. ENTRANCEseptic system.It is the responsibility of the builder to ensure the installation of sediment s. CURB INLET ontrol measures doe not impact the septic system and repair area(s). 1.Only the show shall be disturbed. temelsasea,wapnusa m.mm�maer..,ao. rwrn smuemarc.en ny ro e>. a ma.rixeammawe 4.At least one Construction Entrance/Exit is to be installed per lot. all vegetation.rums.and ah.rogeaior,abla nil alter earn,man greater,e�nfall, p2. All disturbed a shall be grassed and Wa ste airs bins and other areas dedicated o buildingmatena waste shill be at rs immediately a n,aaa.scrotal renaa uemm,reemam mmanaging wa rernts gravel tote specific grace and dimensions shown an the plans.and g mulched a as possible and maintained apea to ore,e and least 5o rest awe from storm drain se inlets o Coma a achieved, unless i[can be shown that Ilmltm.m.amemwaaem�aag..,.a n,.m.. Y g until pemanent cover Is established.o 0.Place ix inghes of reed,along.egnom ana ewe otthe tench Maori comp...m,mp.auena .maenesastao miner. oemnedhemad Sill Fence. this separef°ncann°t be acbevetl mess areas must be , spilled,wasnm°r,mckedo ropub is P.Beckfiti...hymn soap...ever.finer rmen end w,murlvwgn mmpsswna n.arty.r,a we ranee Moe, contained behind Sill Fence. rev ry at themuneatm in locations roadways edam iihnpbyes. - R.Inlets downstream of disturbances should be protected'streets should be swept when seepageg water table. sediment from the construction activity is present .\NC-Environmental.jpeg 7.Details for Sllt Fence,Silt Fence Ouflats,Construction Entrances and other measures am ..\isC-Ennac Intorno!.;peg - L provided on additional sheets.Erosion and sediment control details are not dawn to scale. CONSTRUCTION ENTRANCE/EXIT TYPICAL LOT LAYOUT WITH CURB AND GUTTER ..\N C-E n vi eon men fa I.jp eg non- SILT FENCE SODDING THIS PROJECT IS IN A HIGH-QUALITY WATER ZONE AND ALL REQUIREMENTS DATE: PAGE: REGARDING SENSITIVEAREA II a MIN. FENCE WATERSHEDS SHOULD BE FOLLOWED PAGE 1 of 2 T /s M INCLUDING 7 DAY STABILIZATOION. I I I I III I I I I I IIIIIIII Tlus arum y remove ction 2el „t� rho eaanwpublicMAINTENANCE OF EROSION APM SEDIMENTATION CONTROL aa roadways. FOR in a condition w paw.mulct°°°ap°°°a `and ed sneaee9r w� Ora"""°Raa� GROUND STABILIZATION LOT EROSION CONTROL PLAN FOR Gravel SDI Fence-Sedimmt fences should be instnected at least once a week and after each rainfall event.Any repairs should be made immediately. MAEr w INCORRECT °" WU BE SITE AREA STABILIZATION ONSITE HOMES, LLC TOP , tie ,ama,n.a, p nan,ae,ne mares""""`°`°""CiL° DESCRIPTION TIME FRAME EXCEPTIONS MUST .fmeN .cam mrome,.m , nmc..ilaa,e,ma fen Ana,,.a rom w eba m: CORRECT Muir ,u,rn:e.Takec"rawnma ail"`aomopmaona. PERIMETER DIKES, 7 DAYS NONE TOTAL DISTURBED ACREAGE: 1.08 ACRES THE WASHED ,red,nFnsa SWALES,DITCHES sTo Soddin - - am in the STEEL FENCE (� to maintain - Tne sod enoumaanx _ adequate i &SLOPES q gmomh and stabilization of the root NM Ille sod should he Inn.and fertilized as per am,yperaem tyre A T WIRE FEN end HARDWARE a Tn FRONT VIEW F Grassing BURN'WIRE FENCE. p pa the he propaly fertilized and limed as necessary as an enm n p g mane temporary grassing anti used ,the HIGH QUALITY 7 DAYS NONE WATER ZONES ned ss needed to insure that all ems are germinating properly.Any bare areas should be repaired. : FILTER FABRIC. and reseeded.soon as possible.If the time dm does not AND HARDWARE �µ ("°w' 2150 CAMP FASTER ROAD FILTER OF WASHED sTo pia _ CLOTH IN TRENCH ilia - } igyNl - SLOPES STEEPER 7 DAYS IF SLOPES ARE SET MAX Diversion Berms-Diversion bem.shall be inspected weekly or Mier....nmotiproducing raidall to insure that tern ,p�11�11�IIH�P,w .gel THAN 11 10'OR LESS IN 3'FILTER FABRIC GROUNDntograarea LENGTH AND ARE McNEILL TOWNSHIP MOORE COUNTY, N.C. ON GROUND ,pp me sauna w,m ma nm,marena, WITH THE salt ACT Lao AS �s XGX raT THE NOT STEEPER 1.Hardware clot and gravel should overlay.sig..,at least 12 in... �a°° THAN 2:1, 14 SCALE: 1 e= 40' DECEMBER 2022 °I� Stone outlets ass on houldhes denlm.Mevationareasofsiltfenceand arcarrmenvwmaa man me be ma pea duringi aa.eeonl,eeonawrna.aNwme:. APPEARANCE OF GOOD SOD DAYS ARE commo BURY WIRE FENCE AND HARM CLOT each,inchH mmnn..ma m as a. pie . e a . p il e, ilanr 2 a A ALLOWED GRAPHIC SCALE ENMAINTENANCE Per mea s SLOPES 3:1 OR 14 DAYS 7 DAYS FOR 40 o zo agao 1Ro am a ems. mTMeae0rr. FLATTER SLOPES GREATER 1, - FILTER FABRIC NSediment pane THAN 50'IN 4.Remove s.lment when half of stone outlet Is covered. that impair We filtration capability of the wattle shall be removed when the udiment reaches one-third of the wattles 11 s.Replaceam needed stare eaea facilitatem ae.wa g am,ma,n anallb w aew,m,a p, m.a=n r nma.xe,mam,a a., r mama, r .a orwan,. `"wa'ue1O1t= aw LENGTH RCIN FEET) SECTION VIEW _ reduce aec °° ALL OTHER AREAS 14 DAYS NONE(EXCEPT 1 inch= 40 ft. ..\NC-Environmentol.jpeq pressure on the fenceiontlet.Take care to avoid undermining the fence during cleanout.Reinove and replace stone as necessary bcontributing ,mr. Maas as 6Enc,oa, nreaeaomn., WITH SLOPES FOR PERIMETERS SILT FENCE OUTLET and stabilize it after the contnn . as area has p p y b b,.ed. FLATTER THAN 4:1 AND HQW ZONES) MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. - - - PHONE (910) 484-5191 FAX(910) 484-0388 License #: F-0106 -/e/ze22 I-, La 2/8/.c -a 05 2150 LAMP 5455515 RID EC/n03S/ -ea E F eI'.,