Loading...
HomeMy WebLinkAboutNCC231210_Site Plan or Location Map_20230426 , / `\ ,� �� / CONSTRUCTION SCHEDULE 5"'Aryg / /�\ ^ \\ \ \/ 1. Obtain all necessary permits and plan approvals.Erosion and Sedimrn[Control poNo ® \ \ ` \ \ -"I / ` \ \\ \ / .cur. perm and the a CSC i er ,the (COL)must be the obtained mustbefor any lard disturbing pi f activities a `wk I \ ocw.Awpy oftM1eE&SC penvit,tM1e COC and ahwd copy of the plan must be kept on site,preferably iva ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY permits box,and accessible during inspection. NCGS 113A-54.MIS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR �n / 2. Ir,s[all®avel construction rntrances first,thrn silt fences,reinforced silt fence outlets and wattles. COMPLETED AS AN EXCEL SPREADSHEET. 'r0 " 1 \/ \\ \ \\ 3. Finish clewing and grubbing any necessary areas on Ne lots es thry are started. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED _ a�� o \ 4. Begin lot grading and excavation activities EROSION AND .� 5. Heginwcovnnue with house construction activities. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A �� N /x 6. Finish all rough grading and house construction. NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY O�S4AS`b / / \N 1 / ` ` / \\\ \ T. Ir,sWldriveways,walks and patios. INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE 8. Begin true grading of lot areas APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, ,s0 e \ �� \.\\\� 9. Final grassing,mulching and stabilizing of lot.In most cases Nis will involve the installation of sod on the lot DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, \� /// TM1e siltfmce will remain inplace until Ne lot is eadded°r grassing is stabilized and takes M1olor PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION 9� \ \ / 10. The conhacmr shall conduct self-inspections of the erosion and sedimentation colter measures and complete CONTROL PLAN.' a - / \\ �_ Ne [les,oc vg combined self-inspmtiov f found on the DEMLR webeite • • • • • --\) '� titsps://tles,nogov/ncdeMLnergNW-Moo,oral%20and%211Land%20Resources/Stforal Twelve why • \�\ / \ \\ \- - Gevaml%2OPamils/DEM[,R-CSW-Movitorivg-Ponve-Rev-August-S-]019.pdP.Twelve mouths of complete p io f M1ll be ken d lble[or i713701 speUiona II' .[' rid copy be \\\ kepi tip b (G9113A 56.1()ISA NCAC OdH 0131,NCGOIP Ifni; .A dH) SODDING ®$ • 11 S If'sp f ri d t t chol measures ar bap f d l cry even 1 dwdy d 'N'24h f cry mtof greatwth 1' hAny dad p hallb _ made im d' ly d igned All ESC mea. h II b d p if din 2 \ I \ I �� \ \ \ the conshu de-I h pl .A -S Se shall be installed h p j - f To B � � 7',,,, 15 --- I2. IdfillerWhenthprecmlhm+ hallctDEMLR tonnnxnvauxsienWwq DO ZO' \ 1 ) I \ ' close out MSC Plan.After DEMLR mfonru the permittee of the project close out,via inspection report l��'�� xor ow^uP nsxnaPaxe° /1 .+� �-� Mnsorv�smower is>rveri°v SR.,Z,,, V. I \ \ the permitteeshpaeLlsitder.vogovMCeG01"wsubmit anelectranics tiuof termination(e-NOT).A8100 Toaroa.ucwx=DowN ms r \ \ wmualgmeral permit fee will be charged until Ne o-NOT hw barn filled out axon Axo TmNxw=maces. / / Bulmrvc�nx=-som+os SITE �' ' ' 1 1 — \ \ /\• �eAMarwa..xa.aT= I _ / \ / / rirnr s ( \ _ _ — J / / \---. A , MATCHED CORRECT,. it I ( (\\_____ _ _ ��� rot III I. �`� mq �� y PACE / IISPIIK� ) uu)1 ..Mow'w�EN,"al�o & p Lore WATER TOAIlEamar..nldll. o l¢ x•\\i r36 I _ _ _ N°MarnMx qq 6w.,>.a z \l \ \ �,1 \ / 60NTIeT rxD.LS D.wATEnwELLErcs�asTMN=-rla ?o E Tyf,xoAo R \\ \/ l=- / \ \ wmIEVNesar.IAT APPEiRANCIEasmcsools eMowea I il OF GOOD SOD a "" / — _ � / / / \ l I I III«VICINITY MAP, \ — // — / N.ww r N.T.S. VA y y — / /j\ — yeti v 24 I ��. �e� �� ,,,v_ ,111. a MAD DATE: PAGE: \ Jv/ / \\\� / I - N °E°sEa°o<wr \ 25 \ v MIN .{ faLTPENGE \ /I / �. \ o�/.P l / ' ( 26 / Q \ 'iI I I I I I I I I I I I I I I I I I I I I I I;Ii _ , \ t � ��\\�30 // I I I I I i / 2DI , / DATE: STEEL FENCE-.ST \�/77 \ Fb ) 40, L011 19 a n WIRE FEN \\ \///\ t as 4 ,� seG \ � ll HARDWARE GL FRONT VIEW \FPR RIG _� IAND HARDWARE J i 1Ory / \ ¶FILTER OF- wABNEDBTa ^';� STEEL ET MAX EPO axINTRENGN \1� \/\/� F / �17Le // n w. ON GROUND �, / / , LJ �I1 �HAy R A j •`4s . Stone outlets should be placedm low elevation areas(,least and I \ / 2' o4 / r- ypt. Or�YAV Z20 AV RO V SRO AV -i WAV RO AV rO �I se on era conditions / / ' j RIIB L Notes: i\ \ / / \ �� ��/ 30\ / LEaErvINLET orcuae 1 If neetleQ Tree Protection tinting should be installed along the buffer zone,wetland ,Per 14..01,Inepect outlet et lest once a week and after each 1 My bountlary and/or around protectetl Vees,provitling a retlius of at least 1.25 feet for each e,ery� II •V \` (((111.., inch of bunk diameter. auav wIRE PENCE AND RARDw ctOTH FILTER FABRIC IN TRENCH,'Pr rnc0ea. \ / / \ N2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on sECTsoxvlEw \ \ -\ 'L p schematiGtliagram and field adjusted,if necessary,for placement at low points.If lots are s. p emne as needeewwcuna,e aawe e I /� \ / _,_ contiguous and have diferent lend owners or builders,each lot should have individual Silt / / �_ nT PENCE Fe . A \ ASILT PENCE OUTLET MI 3.Install required Silt Fence within 10 feet of property line to ensure there Is no conflict with I „\NC-Env enlal.Jpeg / / / // "+' \\ / ` / cONSTaucnToo ENTRANCE septic system.It is the responsibility of the builder t"ensure the lnstelletlon INsetlimen[ SILT FENCE OUTLET \ / / / rtN GBRBINLET cnntroisrmresdoeanotimpadmesepticsyetemandrepaire=11). L_ ----- / 4.At least one Construction Entrance/Exit is to be Installed per lot. \ /\\ \/\ \ \ 5.Wast50 feetns away yfro areas dedicated for managing ditches material wastenbesshall be at / \ least 50 feet away from storm diva inlets or naginge ditches unless h can be shown that other alternative exists.If this separation cannot be achieved,these areas must be / / \ I 42 no behind Silt Fence. / —� "' 6,Inlets downstream of disturbances should be protected;streets should be swept when / CONSTRUCTION \ / sediment from the construction activity is present. \ / \ LIMITS \NC-Environmental.jp ay 7,Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are / \ 5Y 41 ' J provided on additonaI sheets.Erosion and sediment control details are not drawn to stele. \ \ \S --bat Plan Lot Plan \ ---- TYPICAL LOT LAYOUT WITH CURB AND GUTTER \S,TO H ::8,: 6 \• 4� DATE: PAGE: I I I / \/y�na' 55 /— —/— � ,a 41".,• DATE: 5tS k/ atte SItS k/Wtt \O t�FLOw-__ - II �Ire Oneguvaen, "ono" IIII / \ .S \ �JL B nCONSTRUCTION�N ^TI If�I,_ Paneug mey°e sues,mea / ( ///� CONSTRUCTION \/O� 556 �dP LIMITS / M,n11 12 'I roll.ill. 3 Fill oat sommatac neffing e aatt Connooti Moor ' / LIMITS \Fy .�.4 ro / 2 2 2 x 2 )s 35fi\S CONSTRUCTION O 39 OPEN V t1 Stakes Stokes n , \tii.. LIMITS 57 �- SPACE �-1 SECTION SECTION - „ of GROUND STABILIZATION \\ -\\ rrG ,„e, / \ a \ ,FeY.e flat areas should land disturbance.The be!matedtime SITE AREA STABILIZATION \ \ /\ \ 0 Ord J J J sackiwattle(s) slightlyapsfo:to EXCEPTIONS \ i \ \ 58 t. A,M+- zta 00. 'soun the DESCRIPTION TIME FRAME \ z i \ / / �b \ so 4x, sill 11 PERIMETER DIKES, 7 DAYS NONE \ \ Q, QJD � � rum 11)I III, Ill 4 -sock/wattle.Slak.should be placed at a SWALES,DITCHES \ \ \ U Roo.. W W w'° Nw et SLOPES \�\ \ tD' / / \ i 1 1 1'1 1 1 1 1 1 1 1 maximum interval of 4 feet or a maximum intervai HIGH QUALITY 7 DAYS NONE \ jr, 9ti 3 �.� �� Tgruunan4 Mn. of 8 fe.if Ole silt sock/wade is placed in a 4 n WATER ZONES \�\ •'.At' •111 :::;:;;;:;;if:.:wove MM oh or tom at • - yr yr yrTo /2 hegghht of og s. - 1 (HOW) 35E \•5'y,T\ / \ ,�_be TLi.�r'JI� I I��uNTRENcusD Ns]AL TON ,.w., «w.°„ew econcrete docks shall be used behind the silt SLOPES STEEPER 7 DAYS IF SLOPES ARE V \*awe to hold it in place during runoff eve.. N. 60I , B Nn. $0;:S_ "sOMETRCVEW THAN 3:1 101 OR LESS IN / '�\ -�-� d'+ LENGTH AND ARE \RO\ I / �4 COMPOSTSOCK xnAL FLOW RATEeach 1 inch or reater S a.Remove NOT STEEPER / \IIS`qi\ 61 Mulch or Compost THAN 2:1, 14 - \4,. m,unaen=nea socks Area Toae Prom Mon ter SRO' (1 m)lIt,Anm> 1^mm s. anlamxxbe,aplaeada(wooed or DAYS ARE 'N s. rei m) ALLOWED NN,N eNt area allvegetation,mon,am other objectionable inspect. moaner eacn+mcno greamr,alnmll sheetnww� s.lt sock/ ( xLaeu 1 zzi i 00 Fmi,....) a a SLOPES 3:1 OR 14 DAYS 7 DAYS FOR 354 \4�l\ 62 make wanly (mss°. Wm at) 1ao", - \ . I`\ gravel tothe soe grade anti dimensions shown on plans,and one work f FLATTER SLOPES GREATER CONSTRUCTION Lot Plan \ I- 6. LIMITS4T ally remow�oDj.d im eal,°e mwaLenels apl�iea9wa nee inch tracked' onto public m.wao et. oa'm:e (;ix ;m8n (281 (374 THAN 50'IN . stability.." foundation a es liim) li++/Si lira/m) li/m) lira/ml measure has been permanently stabilized. e LENGTH \\ It \ subtetto.caage ornate atermxe. ennoca anti ma eve. ..\NC-Env mental. ALL OTHER AREAS 14 DAYS NONE(EXCEPT �� N 63 SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH SLOPES FOR PERIMETERS Lot Irg1m ^ IC_ \ .ANC-Envirgrmen tat.jpeg ----- FLATTER THAN 4:1 AND HQW ZONES) / \ \ \\ LIMITS/ CONSTRUCTION ENTRANCEI EXIT DATE: Filter PAGE: \\ OPEN I \ \ Wire Fenno / SPACE sted Po' Max.sn fetid= wire fence Bn=kfll trench PAGE 1 of 2 6.MaxE rem fad.van,. rebn Wire Fence w'r` 1 and Compact General Erosion Control Notes I Steel Post D.°uglil °"9hly TOTAL DISTURBED ACREAGE: 2.39 ACRES t k 1.Only the areas shown shall be disturbed 2 All disturbed areas snail be grassed and / - G• use LOT EROSION CONTROL PLAN f t+sue f tied ass °er possible nd maintained Wire lies � ucemw unt pemanent co tab)shed �� ` I / / LOTS 40, 41, 54, 55, 62 & 63 f k / CAROLINA CROSSING E the..er lomartl 010,0.1ail I / / PHASE ONE Filter Fabric CROSS MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FOR 2. °wA«�=.°m°Be0wP1e°-e a�.—�a�.�a�°n.°— BENJAMIN STOUT °I^a511n.Sa•,.,«w.v...w +..1..m. n.•e.w„Imn«o m« General-All measures will be inspected and corrections made after runoff producing rainfalls or at least once perweek minimum.The builder will insure that the construction activities on anyparticular lot do not adverse) affect an of the instated erosion control measures.If lot construction dictates,measures will be P P 9 Y Y a.,a °•°°' °•'°«°^v°reoi°�'^° relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and ravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper round stabilizing cover. P P 9 99 9, 9 9 P P 9 9 REAL ESTATE SERVICES LLC •.°re I- ,re 1.,m,.--- xs° a.mWlsa,aaw^..w, I^xn,m°^s, ^'° Gravel Construction Entrance-The ravel ad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic to dressin with 2-inch stone.After each rainfall inspect an structure used to try sediment and clean it out as necessary. Immediate) remove all w mom w p p 9 v q ° top dressing P v v ry v QUEWHIFFLE TOWNSHIP HOKE COUNTY P rm«.sea Mr.°m°^x.•,.......mml�,w a. 1..Imerpt emend ding the objectionable materials spilled,washed,or tracked onto public roadways. Iae,.ae,w°•°,a«„s°am.°..waa..a°°° Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.An repairs should be made immediately. Dame ed or decomposed fabric should be replacedpromptly.An sediment deposits that build u against the fence should be removed and disposed ofproperlyto insure I.xxrl,.d_ a ° P Y P Y 9 P P Y P P 9 P SCALE: 1"=100' MARCH 2023 Nan<«ewr„P.w_Tnwe,a,wr„o.wl°.am=a«NrLar�Iw.Irn„«P.r°w,.e... °'°°"v that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence M tall times.Take care to not undermine the fence during elem.(operations. Os.D°°«marnmx,Msrem,wwl°°,«,,. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 1I, o 50 too 200 400 Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies ups)ope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) .ANC-Envirq.menlol.Jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE liF-0106 LAST SAVED:3/0/2023 2:38 PM LAST PLOTTED:3/8/2023 3:11 PM PLOTTED BY.Dennis Gilbert ninnoue:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-12 CAROLINA CROSSING—EC\PLANS\CAROLINA XING EC—LOTS 40.41.54.55.62 A 63.sWG