Loading...
HomeMy WebLinkAboutNCC221568_Modification Review CLOSEOUT LOT 51_20230419 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 4/5/2023 12:26:22 PM (ADD TO FILE Submittal) Approve by bethany.georgoulias 4/19/2023 10:31:32 AM(Construction COC ADD TO FILE Review-NCC221568) • The task was assigned to bethany.georgoulias.The due date is:April 10,2023 5:00 PM 4/5/2023 12:26:24 PM Ago DEQMODIFICATION Permit for Construction Activities 0itltl 0000 Certificate of NCC221568 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Information associated with this permit: Project Name Laurel Ridge Lots 1, 10,51 Address 38&478 Brook Green Lane,351 Blufftonwood Drive, Pittsboro, NC County Chatham Latitude 35.8026 Longitude -79.2023 Permittee Listed Laurel Ridge Development, Inc. Legally Responsible Hadlley Kirkland Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2022-1568 E&SC Plan ID WP-22-190 Original NOI Tracking 88701 No.* Date COC Issued* 04/21/2022 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. LOT IS STABILIZED AND WOULD LIKE TO REMOVE IT FROM THE PROGRAM SO A NEW HOMEOWNER CAN START THEIR OWN CONSTRUCTION WITH THEIR OWN EROSION CONTROL PLANS You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) Inspection Report 8-1-2022 Lot 51.pdf 669.09KB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.6B(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' "This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature W,-;0 ltf cAW_.�tb(0',Ah0 Type Name* HADLEY KIRKLAND Title* VICE PRESIDENT Organization* LAUREL RIDGE DEVELOPMENT Date* 04/05/2023 Email Address* hadley@swainco.com Email for confirmation Telephone Number* 9194172990 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee hadley@swainco.com Email Original Site Contact hadley@swainco.com Email Review Date 04/19/2023 Rescinded Since Submitted?