Loading...
HomeMy WebLinkAboutNCC231103_ESC Approval Submitted_20230419 MAILING ADDRESS: TELEPHONE: (336) 222-5050 425 S. LEXINGTON AVE. FAX: (336) 513-5467 BURLINGTON, NC 27215 WWW.BURLINGTONNC.GOV CITY OF BURLINGTON ENGINEERING DEPARTMENT W. Todd Lambert, P.E. City Engineer August 12, 2022 LETTER OF APPROVAL AF-Brooks Creek, LLC ATTN: Jeff White 1300 Sunday Drive Raleigh, NC 27607- RE: MOTL Parcel I, Sec I-2 Acres Approved: 5.00 Acres Project ID: 703 County: Alamance City: Burlington Address: Bonnar Bridge Parkway River Basin: Cape Fear Stream Classification: West Back Creek: WS-V;NWS Submitted By: Evans Engineering, Inc. Date Received by City: 07/26/2022 Plan Type: Residential Subdivision Alamance Tax Map: 3-23-7 Dear Jeff White, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Letter of Approval Jeff White August 12, 2022 Page 2 of 3 Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Letter of Approval Jeff White August 12, 2022 Page 3 of 3 Your cooperation is appreciated. Sincerely, David B. Bowman, PE CFM Principal Engineer Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Lee Bryant, PE Evans Engineering Inc. 4609 Dundas Drive Greensboro, NC 27407 Office file