Loading...
HomeMy WebLinkAboutNCC230913_Site Plan or Location Map_20230418 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION SODDING /12° GROUND STABILIZATION General-All measures will be inspected and corrections made after runoff producing rainfalls, o at least once per week minimum. The builder will insure that the wA construction activitieson any particular lot ado not adversely affect any of the installed erosion control measures. If lot construction dictates. measures will be MART relocated n the lot to insure that the potential for sedimentation runoff is eliminated a rmurch as possible. Snt fences and gravel construction entrances will be •� DISTRIBUTION CENTER SITE AREA STABILIZATION maintained as suggested ins the erosion control manual. Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. Na�aA .. DESCRIPTION TIME FRAME EXCEPTIONS s r DO NOT LEAVE SPACES AND DO ��x'. Gravel Construction Entrance-The gravel pad should r ain a condition to prevent mud or sediment from leaving the c nstruction site. This may require periodicNOT OVERLAP A SHARPENED y PERIMETER DIKES, 7 DAYS NONE topdresseg with 2-inch stone. After each rainfall,remain trany structure used to trap sediment and clean It out as necessary. Immediately remove an objectionable minENOS-ANGLED ' Fi SWALES,DITCHES materials spilled.washed,or tracked onto public roadways. INCORRECT ENOSPNOTRIMMING PIECES. �.TOOL FOR TUCKING DOWN THE i in: % •^^ p0 FC SLOPES Silt Fence-Sediment fences should be fed at least once a week and after each rainfall event. An shoul0 be made immedialel Doma d or detain d la ri aF MATCHED coRREcnv. 11 n spec y repairs y. ge pose . O_._., ON' HIGH QUALITY 7 DAYS NONE fabric should be replaced promptly. Any sediment deposits that band up against the fen should be removed and disposed of properly to are that the rem the I-T" Tr"II'' a ce care I-11 I':�II ZII 5 CYPREss LAKES ROAD WATER ZONES sediment tl°es not wash back against the fence. Adequate storage volume should be provided for behind the fence at tall times. Take c fist°not undermine me if11. I .-11 .--Mules fence during cleanout operations. � - (HQW) g �5%Elf t -Awl!' ..----- Sodding The sod should be err maintained to insure that the stake holds n the areas ben secured. The sod should be watered a to maintain I-If=- --I' SLOPES STEEPER 7 DAYS IF SLOPES ARE q properly m sat gran r g S s necessary I lf=g T=IfWf- ,w,.-. THAN 3:1 adequate moisture n the root zoneand prevent dormancy of the sod. The sod should not be snowed to close, since tns could nh'bt adequate growth and 411001941 I-n jlejlf=ll=n. „"^-„ 10'OR LESS IN stab ll;ze lion of the root bed. The d should be Fined and fertilized as per soil type recommendations nd type of grass recommendations when and if possible. 1-11�IBgll-1-II -,w LENGTH AND ARE =4=II=I •�.m..iwn"„„ eRAXi05 RD Grassing and Mulching-The a ea to re ve grassing and mulching should be properly fertilized and I;med as necessary as a initial step;n soil preparation. Once the ,ua..,.. NOT STEEPER r area s n insure are ° reds y d'!I - 3 1/` 3 $ THAN 2:1, 14 grossing has been placed, the a should be main lain root a needed to;n a that all a e germinoting properly. Any bare a should be repaired, and A cp,._ O� reseeded OSss on as possible If If the time of year does not permit the establishment ofreaaspermanent grass,then a temporary grassing should be used until the n- �'" • '., DAYS ARETO ACHIEVE FIRM OF a.AS NEEDED ESTABLISHED r�''& '. "� ALLOWED growing season permits me useof a permanent grass. CONTACT WITH THE SOIL AS SOD IS LAID MOWER HIGH TMEEo N..., •.�a' 7,• ' SITE Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies up slope of the wattle and any undercutting is to be repaired Sediment deposits that Gn(z•-s")� in" r SLOPES E OR 14 DAYS 7 DAYS FOR the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall t WATER WELL As sooty w r yet Impair ails v g 4S43, _ FLATTER SLOPES GREATER be deposited within file to such a that me sediment is not subject to erosion bywind or water. APPEARANCE OF GOOD SOD poll project way j I® .. s GRAYS CREEK 'hY�n` THAN 50'IN p ) • °" .-11:`.IIF HIGH SCHOOL 2) LENGTH Reinforced Silt Fence Outlet-Removesediment deposits as necessary to provide adequate storage volume for the next rain to reduce pre n the fence/outlet.Take IV ,'� TAX '4" EME a to ascot undermining the fence during cleanout Remove and replace stone a necessary as t becomes clogged with sediment.Remove all fencing materials and �(� I�^ I��I1( Hy•MpwEp 1I~ ALL OTHER AREAS 14 DAYS NONE(EXCEPT - NEAS unstable sediment deposits on bring the area to de and stabilize it the contributing drainage area has been stabilized. R II'II1� -llkglll �..ql — ='I. WITH SLOPES FOR PERIMETERS pas g intog ge properly s I Y- B_B_n n L ➢I w Y I-1-11 II n__ TI -z�.00,ii '0U FLATTER THAN 4:1 AND HOW ZONES) C• \ M•N AREA WITH DENSE FOR �`� ."i."" RAss cL PP NcsA IL AND _ PTOID THICK ._. BE VICINITY MAP .1,77 S.F. 319 s,RENG x. �..,n...-m _,, N.T.S. az AC.) N 76 Pursuant to G.S.113A(3), provisions for permanent a CONSTRUCTION SCHEDULE ground cover sufficient to restrain erosion must I. Obtain all necessary permits and plan approvals.PxvsizeerdSedimem Control be accomplished for all disturbed areas within 14 Ai ?j (Esse)permir and a certificate of Coverage(Cec)mnalbe obtained Wormy land disturbing activities occur.A working days or 90 calendar days (whichever is �yof the sible tsbCpaow,the COCaad a bard ropy oftheplmmoabe kept ma'trA preerablymap�t has,and shorter) following completion of construction. rob 7 a. Install gravel construction entances first,then silt fences,reinforced olllmueonada and waves. d 4/ 5 3. ;will clearing and grvbbwgamnecasary areas on the lots as they aresnrted COMMON AREA Begin latghadmg and exmoanonacrenea \PB 137, PG 168 EASEMENT R Begin oar d omeconeWG;oncuon. _ es li ;limb 11 h gradingd house in Control L CO�w/ �.DRA,NEAS T Install driveways, Ile and patios. S. oi areas General Erosion Control Notes 1 160 9 Final gassing ulhradmg of lg dstabilizing of lot.I cages Go will I he installation f sod on the lot The �� ^, I f 'I placeuntil the lot sodded ga E subdued dlakanld. 1. Only the areas shown shall be disturbed. ler 6 /1 WD,�''-'6MEM 10 The ntruor shll dui self-inspectionsof the erosionud lid ann I and complete the 0 Q following wmbnled selfirmpecnon roan found on the SLUR sabots 2. All disturbed areas shall be grassed and '� q� O Na helps:'/fides.nogovmcdeq/EnerpM.20Mmcral%20and%20LandYaOltesarresrsmrmwater/NPDESN30 mulched as soon as possible and maintained d 6.S/0 �!I Genml9a20PelmWDEMLR-Csw-MoniwrmoFonnsRevAugust-8-2019,AL Twelvemonths of complete until pemonent cover is established. 73 C -7 irepxoon/culls anon be lepl on a;ce and a.aaamerrm,pen;onman umes.nisreammnmdmecopyae Ikeoun apermits box.(0S 113A-54.1(e),ISA\GC WB.0111,NCA01 Pmt III S1ioa Amtl�II. Self-mm:caws forerosion and udinlamtioa conwl measures me m be pert ed mlea.tonce every sevenI din days od a 24h f ery fgratyrt' 1 h.AY ded w hall be DATE: PAGE: node diately as desgned.All ESC eat, M1ml be taiond specfiedm wire Fence Filter Fabrc 'x10' r� \ Q me m details thisplan gang shall be totalled th p j for g. 47 / M DNS 12 I pad aMf I acceptance1 When they 1 L ill m Pe tree hen IDEM1B.Rm • L O 5 1 ttLe E8SC P1 AOsrOEMLR f W P of De project pet report, °°" a°`kill trencALh LIMITSWIAP • and Compact \� NCDOTGHT/ ' ,0'x70' email 8awal Pe^nit fee ME kchetgM wNthe eNOThu been filled out MIMIJ steel Post Fo rn E 1 - 1l 16� "A" ` EASEMENT 71 ° ESMTI'lll� S'x10' \\ ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY Wire nee. a 1 e /� ESMT 471 466 NCGS 113A-54.1.1S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR eslode P• •r z4• ` COMPLETED AS AN EXCEL SPREADSHEET. W all /I 6/� 70'x T0' AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED g 1 - /•} �} _, NCDOT SIGHT EROSION AND 1 s EASEMENMM SEDIMENTATION CONTROLSTATES PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A e^awned^fammeaxaaawnN Fqd„ • NCAC 048.NDTIG EACH MEASURE ORN PRACT SHALL N ACCOMPLISHED BY I 50� FCC ,THE INITIALING AND DATING MEASURE OR PRACTICE SHOWN ON A COPY OF ss as, z4 �� � APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING 470 DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, ammo Fitter Fabric mOSESECTIDNWw, 463 NA r PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION `` 468 • CONTROL PLAN.- oans shsom is A �- t Z Prewitt Land Company,LLC n.nroarn.meineeo iial5x�dd. Demea..a.a50•.sWe.am,rrm.e0Me e ea®..tae.peen w row ar wiinw EBRAT /I/ EN' �" 0432-25-3989 "wsoa5as w loi, /I 6� �\ qyo• YYY,' // �' (Future Development) =wwwa uwmim wFo ,nwmewme= "ww�r.avm. "s,a..m '"FVO`. 2 `� / DATE: PAGE: V""°""°r' W CONSTRUCTION to m^bm,mewr„„„wa50 m.,m�walnwwnemmmit.tea.aa®eareee wmm. \ S' 10' 469 — LIMITS ESA4 tN / ENSEM0Nt / 356 .10 :ivjv Lot Plan oaa J.j�-.-.�- NG-EnMiranmenlal.peg Aia 461 357 "A" Jp„,, / � wr SILT FENCE 460 N 35 Lo"Plan Q ENS`NE s4k �R( AIr i Q i 741,04,..� a DATE: PAGE: 459 - ��� LOt Alan /,� .,• •.,. a Rx. FENCE \05 NCDOT SIGHT ... . I ----- -+;� Lagaltga1M4 5'UE EN/ EASEMENT ' •' Mn. •j 7 + f T 458 j �v 360 Lot Plan s4 4$C a ; S'x10' "Art .I 457 ESMT �� / »�1rr �1 61 CO •TRUCTION MUST SEAT LEAST I' COMMON ARE ESMT' 62 ,,f s I.Clear Ihe entance and eut area of all vegelabon roots and OW e enamel and as n TxswrsxspsT �� S'x10' VIPIP" �` wel N ravel Oen speak eta smooth OWMph rndmam hen Ong M1 ma are ee MEL FENCE ESMT2 Rate. dede pullet Mrvyae GB'KTD' S'XID' 363de aMarwarry wake imamn„ofDeWWI&nkwrmaaN,atamaw& a tedaw,•�m anabemadaawM"weak aWawaamwWMarest,, HARDWARE.WIREFENC FROND-MEW NCCOT EASEMENT ESMT an9nwalwmda" �xUm 1� /EASEMENT AND FORMATE ,ryFILTER FABRIC. x 70, � / 3 64 :% ANC-Boot.Tmentol.jpeg ° CLOTH In TRENCH NCDOT SIGHT �Jr� 365 CONSTRUCTION ENTRANCE/EXIT 3'FICER FABRIC GROUND MIN.IVINTO 5° EASE NT / . ON GROUND rV- WASHED STONE 4^ mmwarrs Ind ceplmnmlwelesGmareadt Wed Id Wee& on Lela ' arta euc000�NaEAx°x.�aesoLo ddaa \ "OGa;AamosHaa an°m ltm,e.arliaaareaWreim. 5'x10' �vs 366 BURY D OF UPPER EDGE Ofrcna ESMT \ FLFERFARiC WRENCH dald.efi e a Kmpmeshlreentetee Me stone a Reda..lea sediment vmmd Wm.men ism* re•{� a Replma srmeas nemmrormonale mwareima. Y mN- SEmroNVIEw a \NC-Environmental.jpeg 370 3� Prewilt Land Company,LLC SILT FENCE OUTLET '?,,a 0432-25-3989 m (Future Development) 161 DATE: PAGE: IallSilt So,/wet. 5t Sock/Wattle .A. .a. .r re. now MI H wnnean £ 'C .x, N0i meets r �,- �— - -� 11="c PAGE 1 of 2 n I % i findeeded length such Mal lop de ned deter "M q "" a TOTAL DISTURBED ACREAGE:0.98 ACRES t 1 . as. 4 A ✓e e % Slaked slakes wvim��im�eo amnrea<graded slope SECTION of fie lanaadssmam.Me eras be out u u �m SECTION oe,,,enmMaa ARAI rdenee nWesofheat EROSION and SEDIMENTATION CONTROL PLAN FOR !woe hom rote harrw 000dstakes wile a 220 sat inch I—I L_ J = . �J°�L �— R°� x elranroa,xmm file LOTS 356N 59&465 A� Id nlSa��mnndaA(aabn cenies rRa Y/ a�r-a —Ra .Ar It AY _ —RD �Y -R AY -RaA AY s nl:re�aa reelr�& Ca THE GARDENS AT C1tl1PB L ,a a aiaia4incetnence ,mm.are INLET Notes: me�nenot mnade a whennaupA. 1.Ifneetlnd,Tree ProteNon fencing should beinstallnd along the buffer zone,wetland boundary and/or around ins eromnu noiare N v LEGEIL prole-Md trees,pmeidinga radius o,at least 1.25 feet for each Inch of trunk dlameler. ° MUICM1OrCOM a r9roCundn4'Min evens CYPRESS LAKES VILLAGE 2.Ins.11Silt Fence on the low elevalim sides of each lot Install Sill Fence outlets shown on schematdd;agmm To 1/k2 height of log t and held adjusted.n necessary.for placement al law points.If lots are conbgeous and have different land owners unREATEDI wen ENTRENCHED FLOW DIRECTION or builders each lot should have mdMdnalSilFences . .—. F--�� —e PHASE 4 PART 2 SILT FENCE ° 3.Install required Silt Fence Mth;n 10 feet of property line.ensure there is no conflict wit septic system.It is the ISOLETRIC VIEW ® respmslbolry of the builder to ensure the mstallalim of sediment control measures does not impact the septic 1.MAINTENANCE.nal ilimawanlefir Ant wmalyy.10 Wawa l min SILT FENCE OUTLET FOR system and repa;rarea(s) Ieemand any ENTRANCE 4.AL least one Construction Entrance/Exnia to be Installed per lot. much wPos rxinAL FLOW tarts 's. le awls CURS INLET 6 wa.mbm.and o firarea.dedlaatedfnrmanagingbnlldingmal alwe a M1allbemleam59 Way final NrDmnN N relaMed ezr e1e,m`,zs° or.may need CATES BUILDING, INC. amrm dram Inlets or drainage dashes unless a can be shown that no other altema 6.IfN epemlbn .I ha t sock ^mar (J00.m)(BSc"tern")(600.m) eT1h Mae= 8 In°°tbeaceaaBhe.araaem°albeOeeoleamh°as"Fenno w GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY,N.C. lets downstream ofa 1 Nantes should he protected,streets showy be so*when seam.from the S't sock/a�°'9,nm(<u7 1,m)(varm) 'rF 'Fnx 'rex 5. 'repecled e am,olio"nd„N present. °'m, less m, (coo m, ENGINEERS SCALE:1"=50' FEBRUARY 2022 ].Demilshr Silt Fence,StltFmce Outlets,Constructim Entrances and other measures are prowled on additional was AsaI,I watts roe T. r1. ts. zz. au m r teed. mwre"mom IV/ER sheets,Erosion and sediment contra details are not drawn to scale. e5 =e a /n m/" amid e is /n GRAPHIC SCALE IN FEET a. its as ia, ieTa PLANNERS I I/Mull I/m/col 1/ie/m) I/e/col A//I -so -Oh D Oo 150 -\NC-Environmental.pegEimmi SURVEYORS TYPICAL LOT LAYOUT WITH CURB AND GUTTER SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION MOORMAN, KIZER & REITZEL, INC. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C. PHONE(910)484-5191 FAX(910)484-0388 FIRM LICENSE F-0106 LAST SAVED 2/22/2023 3:47 PM LOST PLOTTED:2/22/2023 4:51 PM PLOTTED BY:Dennis Gilbert FILENAME:G:\CURRENT JOBS\GATES BUILDING INC\14-1803-G1 CYPRESS LAKES VILLAGE-EC\PLANS\EC CYPRESS LAKES VILLAGE PHASE 9 LOTS 356-359 0 465.DWG