Loading...
HomeMy WebLinkAboutNCC231000_ESC Approval Submitted_20230418 ROY COOPER .sure,-_ Governor ELIZABETH S.BISER Secretary . . BRIAN WRENN Director Ei vironotenrai Qualify March 6,2022 LETTER OF APPROVAL WITH MODIFICATIONS KLK Properties, LLC Attention: Kenneth Baucom, Managing Member 2723 Horse Pen Creek Road, Suite 105 Greensboro,North Carolina 27410 RE: Project Name: Bridges of Cabarrus Phase 2 Acres Approved: 9.80 Project ID: CABAR-2022-024 County: Cabarrus City: Kannapolis Location: South Ridge Road River Basin: Yadkin-Pee-Dee Stream Classification: Other Submitted By: KLK Properties, LLC Date Received by LQS: March 01, 2022 Plan Type: Revised Dear Mr. Baucom: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO 1 permit require that the following documentation be kept on file at the job site: Q -4)�D E North Carolina Department ofEnvironmentalstCent u Division 0 of Energy,Mineral and Land Resources Mooresville Regional Office I 610 East Center Avenue,Suite 30l I Mooresville,North Carolina 28115 704-663-1699 I Letter of Approval with Modifications KLK Properties LLC March 6, 2022 Page 2 of 4 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, jija Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section KSL Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet cc: Inspection Department Timmons Group Attn: Skylar Patton, 610 East Morehead Street, Suite 2500, Charlotte,North Carolina 28202 Letter of Approval with Modifications KLK Properties LLC March 6, 2022 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Bridges of Cabarrus Phase 2 Project ID: CABAR-2022-024 • County: Cabarrus 1. The new NCGO1 Construction stormwater permit requires Ground Stabilization and Materials Handling and Self-Inspection, Recordkeeping and Reporting requirements on your plans. The NCGO1 compliance plan sheets for these can be found attts:;,'deq.nc .i3c?�:ai�octtii�isio� s,'ener - :i�era1 laid esc� �rce5 ntr �--rnieral- i and-cerrni tsistorrnwater-perrnitsi Constructio n-sw. 2. All measures, including stone drive, will be inspected after rain and at least weekly for adequacy and needed maintenance. [N.C.G.S. 143-215.1] 3. Additional measures may be necessary during the course of this project. [15A NCAC 4B .0115].