HomeMy WebLinkAboutNCC231025_ESC Approval Submitted_20230418 DocuSign Envelope ID:65FBF032-E3B7-45D4-B485-59D444AE7D23 ROY COOPER Governor ELIZABETH S.BISER _ Secretary ` BRIAN WRENN NORTH CAROLINA Director Environmental Quality December 2, 2022 LETTER OF APPROVAL WITH MODIFICATIONS York Road Kings Mountain Inv. LLC Attention: Bill Hester, Manager 5925 Carnegie Blvd., Suite 200 • Charlotte, North Carolina 28209 RE: Project Name: Southern Artisan Spirits Project ID: CLEVE-2023-014 Acres Approved: 5.71 County: Cleveland City: Kings Mountain Location: York Road River Basin: Broad Stream Classification: Other Submitted By: Diamond Engineering, PLLC Date Received by LQS: November 21,2022 Plan Type: Revised Dear Mr. Hester: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: �- North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office I 610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 D. 704.663.1699 DocuSign Envelope ID:65FBF032-E3B7-45D4-B485-59D444AE7D23 Letter of Approval with Modifications York Road Kings Mountain Inv. LLC December 2, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of period il' I i i i ion to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, rc,1 1 I I protection of existing natural resources and adjoining properties. If, following the commencenrrni , ,Iii . project, it is determined that the erosion and sedimentation control plan is inadequate to meet thi i iiii nlcnts of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 111 \ ,,,"oh 66), this office may require revisions to the plan and implementation of the revisions to en hi i rip!iance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with I;r i . Ili I state water quality laws, regulations, and rules. In addition, local city or county ordinances or rill, II.so apply to this land-disturbing activity. This approval does not supersede any other permit or ;Ii,i 1 Note that this approval is based in part on the accuracy of the information prov hi i i die Financial Responsibility Form, which you provided. You are requested to file an amended i i i i 1 I here is any change in the information included on the form. In addition, it would be helpful i I , 1 1\ this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, c DocuSigned by: \ 8B37DAC4A101441: Kenny S. Llywelvll Assistant Regional I Hi i i, i Land Quality Sect i(0 i Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Diamond Engineering, PLLC Attn: Johnny Denton 440 Old NC 277 Loop Road Dallas,North Carolina 28034 _� NorthMooresv CarolinaillR Departmentegi !Offi of I Env6l0ironmentalEastC Quality Al venue,S Iuite Di isi m nt\FL h aces e nace lQl - a•im. l31 15 '"rT"C�'r(e sl.'. 704.663.1699 kinnmen1 al EmlN.,./m l ot.ot sCERTIFICATE OF PLAN APPROVAL �nAr w ma, t, 7 �.t. tz't `t vo0 Qt.i!,f The p•iysting of this certificate certifies that :. n erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with N,arth . General St: tute 113A — 57 (4) and 113A — 54 (d) (4) and North , Car i lino Ad inistrative Code, Title 15A, Chapter 4B.0I07 (c). This certificate must be posted at the prim .zry entrance of the job site before c,instruction begins and until establishment of permanei;t grondcover as required by North Carolina Adn .inistrative Code, Title 15A, Ch;. Ater 4 t.0127 (b). F Sout ' ern Artisan Spirits York Road Kings Mountain, North Carolina Project Name and Location December 2, 2022 CLEVE-2023-014 f Plan Approval Project Number Kenny S. Llywelyn N CGO1 Certific;. to of Coverage # °' # ° � '"' Asst. Regional Engineer DocuSign Envelope ID:65FBF032-E3B7-45D4-B485-59D444AE7D23 Letter of Approval with Modifications York Road Kings Mountain Inv. LLC December 2, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Southern Artisan Spirits Project ID: CLEVE-2023-014 County: Cleveland Reviewed by: Kenny S. Llywelyn 1. Emergency Spillway from basin is shown outside the LOD (limits of disturbance) and outside of the property line. Correct the spillway that it is on the same tract and include it into the LOD. 2. Emergency Spillway is not shown on the plans. There is no information about an emergency spillway in the calculations either. Submit calculation and proposed location of emergency spillway. It is highly - recommended that the emergency spillway be located in the least amount of fill or in cut area of the impoundment crest, as much as possible. 3. Additional measures may be needed for this project including check dams and additional silt fence throughout the different phases of development. • —,..--ANorthCarolina Departmv Quality I Division of Energy,Mineral and Resources �}� MooresaCaroliille Regina!Officenet of IEn 610ironmental East Center Avenue,Suite 101 I Mooresville_North Carolina 78115 'I— ' 'I' wennwm n en.'���,�- ,w 704.663.1699 Fact Sheet on the New NCGO1 Permit _E V) April 2019 ,. ,a>_,.. Q The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably,there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or(919)707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; e-NOI: Notice of Intent, application form for the NCG01 permit • Is clearly organized by topic; and e-NOT: Notice of Termination, form for closing out the NCG01 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be - � included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCG01 Process "calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1,2019. consistency (p. 11 14);Z Permittees will no longer receive a copy of the NCGO1 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours) to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);3 and Under the new NCG01 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. 1 This list is based on website guidance by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCG01 2The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per §143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCGO1 to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the New NCGOI Permit, Why do construction sites have to do this extra application step? How does =01 affect the DEMLR is required by the EPA to issue a specific COC to every construction delegated i oograms? site that disturbs one acre or more. DEMLR is working to create a form Local progra,,: n nue to review that combines the E&SC plan approval and e-NOI processes, but that will and approve His However, take more time. For now, DEMLR has created an efficient e-NOI process. they will no [en ,d copies of the NCGO1 with I 1 approvals. If an E&SC Plan is approved before April 1, which permit applies? DEMLR will 1,aple language to Projects with already approved E&SC Plans will automatically follow the use in local approvals to new NCGO1 permit, but will not need to fill out an e-NOI or pay an annual advise perm !hey must permit fee. However,the permittees should print the new permit and the submit an e \„1LR. two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCGO1? Yes, DEMLR will provide two sample plan sheets at deq.nc.gov/NCG01 that kr' can be placed into the E&SC plan set. The first covers the site stabilizationa ,. and materials handling portions of the permit. The second sheet covers the inspection, record-keeping and reporting portions of the permit. t 1: ", How will the new a-NOI submittal and COC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before.The E&SC approval letter will instruct the permittee to visit deq.nc.gov/NCG01 to submit an e-NOI form to DEMLR. Local progr Inquired to The permittee maybegin the construction activity after receipt of the COC check if r,,_ submitted e- (within three days*).The permittee must print and retain a copy of the NOIs to Di �, r. if they wish permit and the COC on site. Initially, the COC will be issued for free but on to do this re will be a or around June 1, 20'19, a $100 annual general permit fee will be charged. tool av�ilai, s web site for them to instruction Who is allowed to submit an e-NOI form? projects i_ i.a, ted e-NOls. Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary,treasurer, or vice When to `'' "`c out an E&SC president or a manager that is authorized in accordance with IV.B.6 of the Plan, the cl will advise NCGO1 permit. Additional signatory options are set forth in IV.B.6 of the permittee t submit an e permit. It is possible for consultant to prepare the e-NOI, save it as a draft NOT. DF�,ll_ L, ;ample and email it to the responsible entity for signature & submittal. Iangua F Local prof;,-,, move E&SC What happens to the COC when the construction activity is complete? plans that iirrient laws When a project is complete, the permittees will contact DEMLR or the local and rules rHans are not delegated program to close out the E&SC Plan. After DEMLR or the local compliant NCGO1 E&SC program inform the permittee of the project close out via inspection requires Tins their report, the permittee will visit deq.nc.gov/NCGO1 to submit an e-NOT. permittee wed to add two Will there be a grace period for adherence to the new process? plan shee !,f, provided by DEMLR does not have the authority to grant a grace period from a DEMLR) tr i,,ns to ensure federally mandated permit. Permittees will be informed of the new that theyii t}h the ground process via web site, E&SC Plan approval letters and list servs. If a stabilizatic r , indling, and inspection. gig and construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an e-NOI reporting ICGOl permit. after approval of its E&SC Plan,this is a violation of federal permitting *requirements and the permittee could be subject to a penalty assessment. Or`, °`' project approvrcr„ 1LR Express reviews nr,,,;