HomeMy WebLinkAboutNCC231017_Site Plan or Location Map_20230414 CONSTRUCTION SCHEDULE - \ // // M ( \` \\ -N /'- // ( I \ \ --'N - J / I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control \ N / • \ \ 7 // \ -'1 7 ( (EASE)permit and a Certificate of Coverage(COC)must be obtained before any land dienubing activities / • \• \- I \ �/ 7 /, /. (r \ `- `---�" 1 ` f 1-tl/---�PONDEROSA TRAIL occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a / 1 \\��• / / I ' \ \ / �/ \ \ \ \ \\ -_ \ \ is boa,00d oAhess�IA d inspection. \ \N. / /� \ \ \ \ - ` ` 1\ _ \\\ wAGonSEALL"x 2. permits gravel construction grabbing cjoneOng` sthes,h�enneinm�medsiltAoeo°ud�and wattles. SODDING 1 �// / 1 �/ / / AV AA• \ A "- v Av Vv'-__ �P oLo g ang necessary scary areas they are / /.w// � � ---� \ V \ �� \ v vvA -- SITE 4 4. Begin lot grading and excavation activities J r 1 \ ------ v 5. Begin al continue with House house conch activities. J / \ N \ \ \ Oo, 6. Finish all rough grading and n°nee construction. r `�� ,f"' J \ \ •\ \ \\ / ----- \\ \\ o10 . ]. install driveways,walks and Patios. �� I00 NOT LEAVE SPACES AND DO , /- ` \ / . . 8. Begin fine grading of lot areas '.'� ^'i _� "- -"." s_ \ \ J../ /� �����-- \\ \=, 9. Final grassing,mulching and stabilizing of la.In most cases this will involve the installation of sod on the lot.2�w The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold. M�� axgsengrwMwxa vicccs. \ a' /� `�/ ) �' \ / \ �' \ \ I/ ,^.-..ewe"" _ \R \ ` 10. The contactor shall conduct self-inspections of the erosion and sedimentation control measures and complete II t ( \-�\\ / APPROXIMATE ` 1 / \ �\• 1) `J/ // ,� - �� \ \ ® the following combined self-inspection form found on the DEMLR website IRla BnmxsDcowv or4"- / \ N—_✓ AE FLOOD ZONE AREA \ - J \__ / i �`. 111 hops://files.nc.gOv/ncdeq/Enerpv%20Mmeral%20and%2VLaud%20Resources/StonnwaterMPDES%20 . 1 / j`` / j \ - �, General%20Permita/DEMkey 00 -MoniWdnI Forms-Rev-August-8-2019.pdf.Twelve months of complete M / / / / ( \ inspectionf shall be kept on sit and available for inspec' all .f' din copy be / 1 \ keptp box.(G5113A 54.1(),ISA NCAC 04B.01oN NCGOI Pad III Sections A tie, 1 / // -- ) I S 11. Self' p f d A non control measures b Aoyperformed I shall en 4` ) / A 7----_Y� " I calendar daysd within 24h f cry him event ofgrea h I inch.Ay rid p- ran be ��� t i /�� I \ / / A / I / mad immediately in measures as designed All ESC shall b d p ified in - /- _�� �—= ` 1`- ` ' ( C v-/ Ie ]♦PROXIMATE / (mi the details on this plan A rain gauge shall be installed the project f monitoring. _ 1 •/' --AE. k� J 12 Inspectiond final acceptance letters.When the project is complete,h p shall DEMLR to / �•y i^ -" v -, I F B� AREA closeh E&SC Plan After DEMLR info..pemet of the project I inspection report, � � / /�' / / / \ \\ - \ / �/ ^ \ J / \ jp ® t�epermftee shall visit`daq vc.govMCA01'to submit an el is Notice of termination(a NO'I').Ag100 l�� I i // / / /� -_��\�`• \\Y-/ ��'�-� \ \ \ • --- / ` annual general permit fee will be charged until Noe NOT has been filled out II�7 �" / / / / \ �_�-`� _� - \ p 'Irul »,Neil / / — �' i A v ) ) < I GROUND STABILIZATION .ro AssomE° opIs J , / / / �- ; �'� \\��\ VICINITY MAP SITE AREA STABILIZATION wlmrxcsoaON�gppEARANCEOFGOODSOD Lao xcxtzal eMvax --j//// // // // / / `_- �- \ \� / ///��\\\\ v �_ r') - DESCRIPTION TIME FRAME EXCEPTIONS ,� -/_J / / / / - \\\�/ / \ \-� / _ _-- J -� N.T.S. PERIMETER DIKES, 7 DAYS NONE ----- / / / / // �\ \ \\\�/ / /� \`www\ \\\ /�_ - __�" -- / /// \��— SWALES. DITCHES �- 7�/ �/ / / ( �--\ \ \\�J� I l \\ \\\ .�.. --- __ &SLOPES °n'"°""°"`' - __ ( \ • - / HIGH QUALITY 7 DAYS NONE non / -��'...�_i--/ (1 \� \ \ I / / \ \` \ .� / - /�\\``�..�. --�__- , - WATER ZONES —=P.°�,,,»e". I - I \ \ \ / \---^ \,`,',....\ / /-� .tam\ �`.. �" \(�•.�-' ( ) ear-ax.r" na.,=ag.rer / --- -- \\ \i �� / •l - \ \ \\ \J / i // ` \ �', 1\ / - - HQW -- \ \ \\ / / /���- _� \ \\ �_ `�-\-33z-\�� `____/ SLOPES STEEPER 7 DAYS IF SLOPES ARE / / / __--—- -- �^ 1 I -• �\\ \\ J / / CONSTRUCTION \ \\ / _ ---_ - A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10 OR LESS IN 4/ / 7- ____-_ J- -/ \ \\ REINFORC D / LIMITS-- \ \\ \ \ / / /_ _- \ '- '--'-__ J/ NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE - ^ \ \\SILT FEN E - \ V/ / / - \\ _ COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER General Erosion Control Notes // / / ��-----�-.��_ �� / \ \�\\\ounp \\\\\�.. J \� ' ------- ___ EROSION AND DAYS ARE 1.Only the areas shown shall be disturbed. / 7 / -- _- - \\ \\\ f." , WATTLE \\ \\-� // / /-_ \N N\ Y. ----_ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2.All disturbed a shall be grassed and / - - \ \\ \_- / -- \\ \ / / \ N N. ♦ \ -_ _- ---- ALLOWED s fleas 28 / - _ �/ / \ \ // -^ \ - NCAC 046.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY m Iched as as possible and Maintained N qy / / __- �..�I"u "WATT-LE \ \\ / / \ \ \ \ w` m. _ --- INITIALING _ AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY of THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR until pemanent cover Is established. \l / / / / \ -- p• \ \ / , / / \ \ \ \ ___ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER I O' / •1/ / / - ---- \ -\ \ R / _ -'\p \ \\\ \ / 1 / r N \ N �1♦ �• - - DAPNG AND SIGNING AN INSPECTOR REPORT THAT LISTS EACH MEASURE, THAN 50'IN / / / / \\\\ / /7 CON LIIMIRUCTIOI��-IaN, / - S \4\\ \ / // // I ` N\\\'---_---_ \ �► \ww PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH x / / �So \\ / IMTS, \ I+ 7 \ y',\ \ / // I \ \ --- \_�-- \ \. CONTROL PLAN." ¢ // / / / ...... �\ _ / \ \\\ \/ / 1 \ \\ -- _ _ OTHER AREAS 14 DAYS NONE(EXCEPT / / / / // - _ \�N. 7--\L�T�\ \ �t�, / / / 1\ GONSS}��P c ON / / I I I / 'CP \\ \ \�' - -� \ ^8, .....- ALL \ WITH SLOPES FOR PERIMETERS / \ \`� / \ \ • / / y \ \ \bn1FTs 1 �• - \ \ ��„i' "���'�T-G�\\\ \ FLATTER THAN 4:1 AND HOW ZONES) / / / ( / /-^ ""N \_��`-�� /- . \ \\ Ih / \ \ \ \ / I I / / J \ \_•..--- _ \ \ DATE: PAGE: / / / / / //// /- \` \-�\�-▪ �_ �— �`\\\\ ) / (�\ �',� \\\\\\\\V I ( I I I /e/�• \`----�� -\\\\�\\\\ _ N. \ \ \ \� \ N —- \ \ N \ DATE PAGE: / / —--__— --—— —\ \ Silts«k wale / ///// /// / //// /��\\\�����--� __------1� `` / :`�a. aa.•. \ \\\\\ ` I I I I / - '������ �\ \ \ \\ / ° sus k win / \ / / �� 1 \ \ / �/ / J 1 / �_ \ \\� \ FLOW--,..._ .I .I . e w°oF re b // / / / / �___1 vJ ' / > I \ ./ —� '------ ♦ \ "\"N' use in silt socks or wattles. 11.1—'—, fr. ;71 • �I_-stakes ,2 rl 2x2JL, to the desired Stokes a length ins2. Fill silt sock/wattle netting talled parallel ¶ R 1 1 4 9 `y /� // //////- - --.- ------ �\`\\ LT-FENCE-1 \ 1 \/ I \\ ( / I I tPs ___/ / �-N\ \\ \ \\\ • SECTION SECTION nlaated µilaa toe of R 4 ll "°` 1 ",Q .".. �,. I // // / / / //�------ ------�\\\N N\\\:g ���\ \ 1 I 1 / / \\ \ 1\ 1 1 / i/ __--�\\ \�\ `• \\\\ land aw%Ic`e.haflat areas shoukl be endedMemed e sli edge of ghtly a V e I X /// /// - ii _ \\ ,''\\� ;l - \ \11 I ��/ ( \ \ \ 11 I I / �i _♦♦\ \\ \\�\ <a A,M... <a ,„.0. from a around ern = ,_.I®�.� i. �H �.� q L.— J L J // / / / / \ ` I \\\\ \ \� silt weld.a - // / / / / / / / —_-- __ 1 \ nTnE�€� \ > I 1 \ 1 I / /--� � \\ \ \ ♦ III III 4_ inch x 2 inch cross section should be driven tl0 �HU Vpyr �HU AV 1tU AV H HU AY -HU AV -HU WAY -RO AV / //// / // - -_ \ ♦ '� \ \ \\ \ `I \ / / \ \ \ I `l�a / \ \ W wvertically through the center of the silt soce. CURB INLET LaorEarwae Notes: // / / / / // // --------- CONSTRUCTOR ♦\\ \ \ V \\\\\• `._� / J I 1 I / / / / (J, ����� `\\\\\\, 1mum interval .If needed,Tree Protection fencing should be installetl along the buffer zone,wetland `// / / / / - LIMITS \ \ \\ _`\\\\ \ \_-J J I I I I / / / 6 - \ \\ \\ of 8 feet bound.and/or around protected trees,providing a radius of al least 1.25 feet for each ` - - -__ \ )'/ -----\--, � - I / ' - \ \\ r Coro g nd 4 Min =,�It,n=t°.ant plmaximum interval of 4 feet or a aced�na4lnnx LEGEND inch of trunk diameter. `�\\ / / / --- \\\ \ \ � \\�\\\ \ \ l l I I I I / / / // l` - \\\\;\ Wood°ji/z Mulch ° log s0 s. n+l=�t=.when 2.Ins[all Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown on 1 \ \ /�/ \ - \ \\ \ - - I J I \ \ \ ` uNTRENweD INSTALLATION concrete •a hem, DIRECTION schemadoldiagmm and field adjusted,if necessary,for placement at low points.If lots are "> \\\\\ ( 1 ( /' N N \\ \\ \ _- - \ 1 -\ \ \\ \ FLOW CONSTRUCTION I \ -- -e ) ) I / / / \ N '"""`""'°"""""°"""'°"'"""'°0BH6X'''""""""" w n in Plata during moon events. SILT FENCE ences. sand have different land owners or builders,each lot should have Individual Silt \ \ \\\\ \ \ I I / ENTRANCE \ \:\ \\\` \\\\\\`- -- \ J I 1 / / / / 1 / / / 1 \\;\\\ ISOMETRIC VIEW sock/wattle Fences ) / 1.MAINTENANCE span after ® 3 Install required red B It Fence with n 10 feet of properly line to ensure there s no conflict with / \f \ \ \ I 1 / / --- ( •\ C�N6TRUCTI�N\ \ \\\\ \ \ \ // / / / / 1 / / / \ \ \-- COMPOST septcsystem Its the respons blty of the builder to ensure the installaton of sediment / \ I \ L \\\ Lukrs-\ \ \\\\\\\-//�� \ /// / / � / / / \ \� \\ Mulch Or om ocx x nu now BATES a= CURB INLET EhRRPN control measures does not impact fie septic system antl repair areals). \ 1 \ ( �/ \ \ \\ \ N \ \ /// / / / / / / // \ \ for Umrewhed S. Area T°Be Pr°teal0go tie (2odh 'Ob 2. awe must..retrace.nee r 4.At least one construction Entrance/Exit is to be installed per lot / / \ I \ Y rl �\ \ \\ \\\\� ——� \ \ / // / / 1\ \ \\ needed to allow for °m) 5(�0O m)Alt, "'M"1(600"M"') °m) 5.Waste bins and other areas dedicated for managing building material waste shall be at ( I 1 \ \ \ ` e •• \map\ -, \ \\ \ \ ,- \ \ ��/ // / / / / / / / / \ \ Shen Flow tic adequate flow. least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that ` l ) \ \ \ \ \ \\ ,. \\ \ \ \\ \ \`— \\ �// / / / / / \ \` silts«k/N3r...( na3`mt iva`m1000 pattle may n.d to bnarep..00,cootie° no other alternative exists.If this separation cannot be achieved,these areas must be \ L. \ \ \ ♦ \N" ,,,N‘ \\ __ -� \\�- -:,LOTP=J3--� / / // / work w°llle pos, (ems 1 (eel1 contained behind Silt Fence. \ \ \ \„ \ --- —/ / / / / I __` Area x raulican1v 0.0t1, f6 22 so 6 B.Inlelsldownslream of disturbances should be (ectetl;streets should be swept when \ \ \ \ \ \ ♦ \ N.\ \\\ \ --—// —— / as °. n .mi tie" zs�" ]:" pro p \ I \ \ \ \ \ - \\ \\\ �� i�—�� �� / / - ie+ n o i is h b1� a sediment from the construction activity is present \ \ \ N. \ \ \ \ P 1 - \ -.✓ -/ __ / / I / \\ /m/ml /mime /m/ml /m/m1 imiml meaexre tie Pe nil r .\Nc-Envnonmentol.jpeg ].Details for sal Fence,Silt Faroe.chats,Construction Emmnmea and other measmrea are •\ \ \ \ \ \ \ \ \\\ \\ --Y. a1 F \\\\\ -_`\_- - __ / / / J / 1 \NC-En tyros mre,rlutfyey aswmanra isemmP icons urea�aenven r provided on additional sheets.Erosion and sediment control details are.drawn m scale. \ \ \\ \ \ \\ \\ \\ ram, �`—=__ — —=l-- i - �- $ILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION DATE , TYPICAL LOT LAYOUT WITH CURB AND GUTTER \\ \ S\\ \\•\\ \\ `9�e\\ \\ \\ \ • / ,/ / / i / I DATE: PAGE: DATE: PAGE: \\\\ \\ \ \ \\\ \\\\\\ \\\\ N. \N7 \\mm \\ \ A4� -�--- ��-��=,, �\ // // // / / / / - ., Filter Fabric S. \ \ / Stool Post V Max.Standard Mr.,raencww,*Rahnna Plastic or Backfill trench / \\ \\\ �\ \ \\\� -.•`♦ \\ \\ \\\ \\ \ \ \\ ( \ aS' - --- �\ \�-�/ // // / / 9 Max. arrant ne wwpNwire ten Wire Fence wire / I anti compact \ \ \ \ \ \\...Sr \ \ \\ \ \ \ \ `- -----_ / / thoroughly \ \ \ \ \ \ \ \ \ 0� - ---N \ / / / / / Steel Post / N \ \ \•\ \ \ \ \ /-- \ / / - Wire ties Mn a•Mln. \a /.. °'rah \ \ \ \\ / // 4 r 24• Q`Yb rF,n,rrw \\�\l\\\\\\ \\\\`\\\\ \\ \ \\ \ De \\\ I // / \ / / / / I Filter Fabric • �,.°a.. �,.,�n°n�w,..wmw, CROSS SECTION VIEW / '"" -"4 ((\ \\---- \ \\ \ 1 1 1 / I 1 / 1 / / i l / / / \\ / 4 !m _ \ 1 I I 1 / -� / / .. as- s 4�c \\�\\ --\ \\` \, , \ \ 1 1 I I I 1 I / 1 / r r w.. te� -M,te n "s.°��w=a w pw as .. a.. of all vegetation, a ands.objectionable awN ndafter each,inch a own �v Vv��V V A \V A A V A \ \\ \\ \ 1 1 1 II I 1 / 4 1 .....w.Tao,°wammP..,-..tem —,.xrare.P.xm,�.e. material and rade e..mownontheman>and e l 1 \ \ \ \ \ \ \ \ I I / / I ) p n mmw.w aw..rro 3.Provide drainage to carrys4.Use ubject.a. water to table. stability "�locations objectionable P washed public \\ \ \ \1 \ \ \ \ \ \ \`\ \ I 1 I I i I \ \ ( / / / fabrith itcs / I l \ � \ \ 1 � 1 � ) � 1 � 1 ; 1 Ne-Envo- ore Ngtjpeg \hE E gl.jpegh� I \ I 1 1I `\ r SILT FENCE CONSTRUCTION ENTRANCE/EXIT `� ` \\ \\ ; \\ �I II I . 1 I , I I 1 1\ \\ 1 1 I I I\ 1 1\ \\ • ' ,_ / > ( \ V 1 A II I II 1 I I II II k l \\ \\ A l \ \ V A �\ I Pa,///'111 //� / DATE: PAGE / �\ \\ 1 \ I I 1 1 I I I , \ \A\\�\ \ \ 1\ \\ \ \ \ - \, \ -....... PAGE'V of L MIN. _I �SILTFENCE I TOTAL DISTURBED ACREAGE: 1.80 ACRES + LOT EROSION CONTROL PLAN ' LI.Hill I.IIIIIIII.IIIIIIIII < MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOT-I . SPARTAN General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be TxE wasxsD j v relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. - I - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove NISTEEL FENCE ST 17-:,t. T,T■■���F objectionable materials spilled,washed,or tracked onto public roadways. RIDGE L WIRE FEN HARDWARE CL TH FaonTwEw Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure FOR .._...._...._.. BUR FILTER FABRIC, that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. AND HARDWARE FILTER OF WASHED sro SET MAX REAR CLOTH IN TRENCH Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth O N S I T E HOMES L L C 3'FILTER FABRIC GROUND GROUND sotD and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ON areth ets should be mlo,=levaean as„ma,nwnm and Grassing and Mulching The area to receive grassing and mulching should beproperlyfertilized and limed as necessa as an initial step In soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating JOHNSONVILLE TOWNSHIP HARNETT COUNTY �st 12 g g- g 9 g ry p' p p g g properly.Any bare areas should be 2.Stone 00`17�� on.anna.xm. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. SCALE: 1"_ 1 00' DECEMBER 2022 1.Per NCO.01.inspect outlet at lest VICO a week and after each 1 inch Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SCALE BURY WIRE FENCE AND HARDWA CLOTH E...Off's.IRKeepmeshfree. d 7 s'W sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. leo 0 50 100 200 400 HLTERFAemc IN del.h arm.ad..Sow. 4.mineve moment..hair..owet is cave.. a.Reptew atone as needed'to facilitate da.awnng. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next min to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all SECTION VIEW fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) ..\NC-Envirormen M.lpeg 1 inch = 100 ft. -s-r T.r r,,-.ill ,:.r..,. SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE 4F-0106 LAST SAVED:12/6/2022 1:31 PM LAST PLOTTED:12/6/2022 1:34 PM PLOTTED er.Dennis Gilbert FILENAME:G.\STAFF\DENNIS\DENNIS WORK FILES\PROJECTS\EC NEW PROJECT\SPARTAN RIDGE\SPARTAN RIDGE EC—LOT 1 OWC