HomeMy WebLinkAboutNCC230863_Site Plan or Location Map_20230414 CONSTRUCTION SEQUENCE NOTES: CIVIL CONSTRUCTION PLANS FOR I I J a I. EROSION AND SEDIMENT CONTROL(E&SC)PERMIT AND A CERTIFICATE OF COVERAGE(COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES(INCLUDING TIMBERING AND • O DEMOLITION)OCCUR."THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF 4 INTENT(E-NOI)FORM AT DEQ.NC.GOVMCGOI.PLEASE NOTE,THE E-NOI FORM MAY ONLY BE FILLED H OUT ONCE THE PLANS HAVE BEEN APPROVED.A COPY OF THE E&SC PERMIT,THE COC,AND A HARD 8 Ij COPY OF THE PLAN MUST BE KEPT ON SITE,PREFERABLY IN A PERMITS BOX,AND ACCESSIBLE • 0 ,'� F DURING INSPECTION. ,'j y N 2. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE TOWN �i N£n Z OF MOORESVILLE INSPECTIONS. I c 0 3. CONTACT EROSION CONTROL INSPECTOR AT TOWN OF MOORESVILLETO ESTABLISH A W y' w„O PRE-CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. :o�o z SELF INSPECTION EFFECTIVE OCTOBER 1,2010,PERSONS CONDUCTING THUMBS UP CARWASH t..,0,,.,i LAND-DISTURBING ACTIVITIES,LARGER THAN ONE(1)ACRE,MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT,AND DOCUMENT THE '1 2? INSPECTION IN WRITING ON APPROVED FORMS AVAILABLE FROM THE pWj Zp,-1 TOWN OF MOORESVILLE INSPECTIONS OFFICE. i--i a Z E THE PHASES ARE AS FOLLOWS: Z g FFF... Cp/j I. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. Fy I) 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER i I 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 0 U O 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. fa 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TOTOWN PROJECT #766277 RESTRAIN EROSION. 4. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: a. TEMPORARY CONSTRUCTION ENTRANCE/EXIT THESE DRAWINGS ARE THE b. TEMPORARY SEDIMENT BASINS.FOR SITES OVER ONE(1)ACRE, PROPERTY OF ONSITE CIVIL OUTLET STRUCTURES[SKIMMERS]THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN,SHALL BE UTILIZED.NO SEDIMENT TRAPS OR GROUP,LLC AND SHALL NOT BE ROCK DAMS ALLOWED. REPRODUCED IN WHOLE OR IN c. TEMPORARY DIVERSION BERMS PART WITHOUT THEIXP.RESS d. TEMPORARY SILT FENCING TOTAL SF=6,818 SF EAST PLAZA DRIVEWRITTEN PERMISN OF SEED EMBANKMENTS AND DISTURBED AREAS OF 2.5 SPACES PER 1,000SF(6,818 SF/1,000=6.8*2.5=17 PARKING SPACES REQUIRED FOR ONSITE CIVIL GRO ,LLC. DEVICES(INCLUDING"CLEAN"WATER DIVERSION)UPON EMPLOYEES) COMPLETION OF CONSTRUCTION. 17 PARKING SPACES HAVE BEEN PROVIDED FOR EMPLOYEES. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION 5. CONTACT TOWN OF MOORESVILLE FOR A COMPLIANCE INSPECTION PRIOR TO CLEARING AND GRUBBING THE REMAINDER OF THE SITE 6. BEGIN CLEARING,GRUBBING,AND STRIPPING OF SITE AS REQUIRED. .`�CA RO EARTHEN-MATERIAL STOCKPILES ON-SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, MOORESVILLE NC � AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, ��1 If 55/p� , CONSTRUCTION AND DOMESTIC WASTE,AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS '��' 1 •a5943 (UNLESS IT AND WITHINAAREAS PROTECTEDN BE SHOWN T BY NO EROSIONONTROL OTHER IMEASURESVES ARE�.ASONABLY AVAILABLE), '1 PROFESSIONAL m 7. BEGIN SITE GRADING.MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH PFJ.r PROFESSIONALfNaIREfP S t(�� THE MAINTENANCE PLAN.INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. M/CHAE`' 8. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES.STORM PIPING SHALL BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE.COMPLETION OF PIPING WILL4667173734 ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR.INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED PARCEL ID . 9. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE(AT APPROXIMATELY 45 REVISIONS DAYS PRIOR TO DEMOBILIZATION),THE FINANCIALLY RESPONSIBLE PARTY(OR THEIR DESIGNEE)WILL NOTIFY(TOWN OF MOORESVILLE AND THE DESIGNATED EROSION No. DATE DESCRIPTION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE AN ON-SITE INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE COUNTY AND THE DESIGNATED EROSION CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTION ITEMS HAVE DEED BOOK 2391 PAGE 1209 _ BEEN ADDRESSED BY THE CONTRACTOR. 10. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES AND SEDIMENT BASINS ONLY AFTER FINAL INSPECTION AND APPROVAL BY TOWN OF MOORESVILLE INSPECTOR. I I. COMPLETE THE E-NOI AND UPLOAD AS REQUIRED,ONCE COMPLETED,APPROVED,AND FEES PAID,AN EMAIL WILL BE SENT WITH THE COC.ONCE PROJECT IS COMPLETED AND : : STABILIZED,AN E-NOT IS REQUIRED TO BE SUBMITTED. 12. WHEN THE PROJECT IS COMPLETE,THE PERMITTEE SHALL CONTACT CCWPD TO CLOSE GUT THE E&SC PLAN."AFTER CCWPD INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT,VIA INSPECTION REPORT,THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCGOI TO SUBMIT AN ELECTRONIC NOTICE OF HAS BEEN FILLE-NOT).A5100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT MAP BOOK HAS BEEN FILLED OUT. .4 SITEIREDELL COUNTY NORTH CAROLINA 66 ■ 25 PAGE ■ ,_, : 0,., pN „ . ,,, g '55 x9z . ° ° COUNTY , H ° zW HaeaMagla PROJECT CONTACTS z " 5pe e PROJECT INFORMATION SHEET INDEX _ 2 1 o L. 4 ..,v,oad Rd OWNER/ EMCW, LLC,A NORTH CAROLINA LIMITED O GD C101 COVER SHEET a A o Brookwood Dr ZONING HB(CC) DEVELOPER: LIABILITY COMPANY a «)Q Play It Again , W L\ c. Sports Mooresville Mooreavi a C201 GENERAL NOTES AND LEGEND H ,-I x Sporting goads BRIe - ADDRESS:17510 LANGSTON DR 3 1-1 U RIIm"�w ® / SETBACKS FRONT 15',REAR 10',SIDE 5' C301 EXISTING CONDITIONS&DEMO PLAN CHARLOTTE,NC 28278 U PFod Lion 5 E Plaza Dr, 1+67en C401 SITE PLAN CONTACT PERSON:GARY CANGELOSI W o Delivery a�da, oresville,NC 28115 OVERALL SITE AREA 1.4 ACRES CONTACT PHONE:(704)904-3720 9 The Power Outlet C401.1 NCDOT EXHIBIT ,„ Burke JF W � Cavin-cook Funeral 4 Oilier.. DISTURBED AREA 1.38 ACRES C501 GRADING AND DRAINAGE PLAN Home&Cremut ry4/ i a / School S C503 STORM DRAINAGE PLAN CIVIL ENGINEER ONSITE CIVIL GROUP,LLC O N m a x MCDIUS(d's® „6 ' EXISTING IMPERVIOUS AREA 1.19 ACRES C504-0505 STORM PROFILES 980 BIRMINGHAM RD,SUITE 501-340 To U z , Piedmont Pointe C601 UTILITY PLAN MILTON,GA O A H EX.IMPERVIOUS TO BE ®� REMOVED 1.19 ACRES C602-C603 UTILITY PROFILES 678-615-3347 U 8O rrito Loco z PROPOSED NEWLY FORMED C701-C703 EROSION CONTROL PLANS a a i' kI Google 0.96 ACRES a upLii W C.,)IMPERVIOUS AREA C704-706 EROSION CONTROL NOTES LANDSCAPE o a w VICINITY MAP DENNIS TERRY DESIGN,INC.P.A. 0 ARCHITECT U <n 5 NOT TO SCALE NEW NET IMPERVIOUS AREA 0.96 ACRES C801-C811 CONSTRUCTION DETAILS xcipO ADDRESS 160 WESLEYAN DRIVE,MCADENVILLE,NC F L1.00 LANDSCAPE PLAN 28101 0 p4 DENNIS C.TERRY,RLA a gEFQRE )-� 704-202-8160 cY� Qc [AUTION! I I E. Plaza Dr.Site:e locations and elevations of existing STORMWATER NOTE: • Parcel number:4667-17-3734 COVER SHEET SINCETHESITEWASDEVELOPEDPRIORTO1993,ANDTHEPROPOSEDCONDITION(0.96 derground utilities as shown on this' ACRES)HAS LESS IMPERVIOUSAREATHAN EXISTING(1.19ACRES IMPERVIOUS The Ordinance requires a minimum of 10%open space.The Lot is 1.38 awing are only APPROXIMATE. No guarantee W/BUILDING ,NO STORMWATERDETENTION ORTREATMENT IS REQUIRED. acres,Or 60,112 5 ft.X 10%=6,011 s ft minimum O en 5 ace re wired.� either expressed or implied eo to the ) q' q' P P S APPLICANT 24 HOUR CONTACT: (4 `fig ~ m letenes of accurac theeof. The THEREFORE,PROPOSED CONDITION IS PROPOSING LESS STORMWATER RUNOFF THAN The buildin and arkin area is 47,381 S ft.Which leaves 12,731 S ft.or 21%h P Y g p g q• q DATE: 3/3/23 -� EXISTING. EMCW,LLC.ANORTH CAROLINA LIMITED GARY CANGELOSI ntractor shall be exclusively responsible of open space.cy r determining the exact utility locations LIABILITY COMPANY ' • Note hei ht of 27 feet 17510 LANGSTON DR.CHARLOTTE,NC 28278 PROJECT: 22-014 NA ON d elevations prior to the start of construction building B 704 904-3720 CONTACT GARY CANGELOSI PHONE:704-904-3720 SHEET: C 101