Loading...
HomeMy WebLinkAboutSW8081207_Compliance Evaluation Inspection_20190617ROY COOPER Governor NUCHAEL S. REGAN seamy S. DANIEL SMITH Director July 17, 2019 Reserve Development Company, LLC Tri-Brunswick, LLC (dissolved) St James Plantation, LLC St James Development Co., LLC Attn: John A Atkinson, Manager PO Box 10879 Southport, NC 28461 NORTH CAROLINA EnY&=mwdW Quality First St James, Inc. (former legal Homer E. Wright Jr., Inc.) Brunswick Harbor, Inc. Attn: Kenan C. Wright, President PO Box 610 Eden, NC 27289 Subject Notice of File Review Inspection (not compliant) And Permit Transfer Process St James Plantation - Various State Stormwater Permits (see attached list) Brunswick County Dear Messrs. Atkinson and Wright: Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified.. Please note that this letter references DEMLR as the Division responsible for issuance of the state stormwater permits for St James Plantation. The Wilmington Regional Office of DEMLR has recently fielded several calls regarding flooding and the state of compliance with the permitted low density swale conveyance system throughout St. James. As has been relayed in the past to the complainants and to the HOA, flooding is not the purview of the Division. A Swale or ditch that holds water or floods is not a violation of the permit. The permittee is responsible for restoring the swales to design condition in the event that flooding or the normal wear and tear over time cause erosion, deposition of sediment, or slope failure. This letter is being sent to the main development companies noted above, since they hold the lion's share of all currently issued stormwater permits in St James. It has come to the attention of DEMLR that the development will allegedly be turned over to the HOA by the end of 2020. Prior to that turnover date, all of the permits as listed on the attached, need to be transferred to the HOA. In recent years, a process to transfer and consolidate the permits was agreed to between the developers, the consultants, and the Division. However, the Division has received applications to consolidate or transfer a total of 9 permits in the last 5 years. The slowness of the process can be mainly attributed to a lack of a timely response on the part of the consultant, and the submission of incomplete information, necessitating a couple of rounds of requests for additional information. Other factors include expired permits that have not been renewed, a lack of routine maintenance, unapproved changes in the number of lots, or in the lot or road layout, missing curb outlet swales, piping of swales, overbuilding on the lot, or adding sidewalks where none were approved. North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources %MbmingWn Regional Office I IV Cardma[ Drive Extension I WlhTdngton. North Carolina 28405 worrrH canauNn �� St. James Plantation Page 2 of 3 In addition to these more common compliance issues, it has come to our attention that the golf course fairways were purchased by Troon St. James, LLC early last year. If any of these fairways are part of the project area covered by the low density permits issued for St. James, their sale would be a compliance issue that would need to be addressed prior to transfer. The Division can accept a signed agreement from Troon St. James, LLC stating that the golf course fairways will not be developed with additional built -upon area or developed for any use other than a golf course. If Troon St. James, LLC does not agree to this, then any of the permits held by the corporate entities above for St. James that depend on those fairway areas to maintain density, cannot be considered for transfer as currently,permitted. If the project(s) covered by an existing permit can demonstrate and sustain low density without including the fairway areas, then modified permits can be issued, consolidated and transferred to the HOA, following the process described below: 1. No more than 5 active permits can be proposed for transfer and consolidation at any one time. The permittee or consultant should pick one of the 5 permit numbers as the "surviving" permit number going forward. 2. The permittee's consultant should schedule a file review appointment to familiarize himself or herself with the approved plans and details. 3. The consultant should conduct their own inspection of the 5 sites and address any obvious compliance issues based on how the as -built project may vary from the permitted/recorded condition. 4. If there are major differences that only a permit modification will resolve, then the permittee shall either restore the project to compliance with the approved plans or submit an application to modify the individual permit 5. Upon the issuance of any required permit modifications, and the consultant's satisfactory inspection, an application to consolidate the 5 selected permits can be submitted. The Division will not conduct a compliance inspection prior to consolidation. 6. Upon issuance of the consolidated permit, the permittee shall submit an application to transfer the consolidated permit to the HOA. The application must be accompanied by all the required supporting documentation such as certifications, recorded deed restrictions and plats for all projects covered by the consolidated permit 7. The projects covered by the consolidated permit will be inspected by the Division for compliance. If the inspection indicates that the project is in compliance, the Division will approve the transfer and issue the permit to the HOA. 8. If the project is not in compliance, then an inspection report will be sent to the permittee and to the HOA, listing all the items to be addressed. When the necessary actions to restore compliance have been completed and/or when the requested information is received and reviewed and found to be complete, the permit will be transferred. 9. If a follow-up inspection is required, it can be completed either by the permittee providing dated pictures of the finished product (minor issues), or another inspection can be scheduled (major issues). This is where the process can bog down. It is imperative that the permittee complete any necessary actions to restore compliance in a timely manner and it is imperative that the Division reinspect in a timely manner to keep things moving forward. Please contact the Division by Augusi 17.2019. to discuss this process and to designate a point person within each respective organization through which all correspondence, pictures, questions, scheduling of inspections and follow-up inspections, modifications, consolidations and transfers will go through. The permit application form (to modify or consolidate) and the permit transfer application form are available on our website at: httos://dea.nc.Lrov/about/divisions/`energv-mineral-lanri- Please note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. Failure to follow the process described above, or to deal with the impact to a low density project due to the sale of the fairway area, may initiate enforcement action including the assessment of civil penalties. St. James Plantation Page 3 of 3 If you have any questions, please contact me in the Wilmington Regional Office, at telephone number (910) 796-7215 or via email at linda.lewis@ncdenr.gov. Sincerely, 'i� ' avzec-ta Linda Lewis, E.I. Environmental Engineer III 7GD5/arl: G:\\\Stormwater\Linda Lewis\St James Plantation\2019 07 CEI-deficient St James Attachment - Project Owner List cc: St James Plantation Property Owners Association Inc. Jay M. McGrath, President Troon St James, LLC (15044 N Scottsdale Rd. Ste. 300 Scottsdale, AZ 85254) STATE, OF NORTH CAROLJ A Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 FLU ACCEi9L RFCORD SECTION S'�iarrh /a ez /e TIME/DATE NAME REPRESENTING Guidelines for Access: The staff of WBmin g on Regional Office is dedica#ed to maldl g public' records in our custody readily available to the public for review and copying. We also have tlae responsibility to the public to safeguard these records and to garry out our day-to-day program obligations. Please read carefully the following guidelines signing the form. x, Due to the large public deman d for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointmyo� arx wing Khon au bet+�e % 9=00am and 3:®Opm. Viewing time ends at 4:45pm. F — a ointment ma view the des to the extent that time and staff sra errision is avaiilabie. 2. You must specify files you want to rM facitii_ v � The number of files that you may review at one time will be hinted to five. 3. You may make copies of a file when the copier is not in use by the staff and if time Permits. Cost per copy is $,05 cents. Payment mmy be made by check, monep order, or cash at the r�eptiom desk. Co ies totalin5A0 or mare can be mvoie+ed for our convenience. 4. T lL£S 1NdiJST EE 1[�PT IlV7 ORi)Eft yoU 1[r0» 'f UM ' Files may not be taken from the office. To remove, alter, deface, mutilate, or destzoy material in one these files is a misdemeanor for which you can be fined up to $500.00. No briefcases lame tg etc. are ennitied in the file review area. 5. cordance with General Statue 25-3-512, a $25.00 processuarged ig fee will be chan In acd eollected.for checks on which payment has been refused. EAQLM NAME 3. Signature and Name of Firm/Business Date .'lease attach a business card to this fOM COPIES MADE ,_,._._____ PAID S:Admin.fUe access Time in 19VOICE COrJNTY Time Out Energy, .Mineral & . Land Resources ENVIRONMENTAL QUALITY January 12, 2017 John A. Atkinson, Jr., Manager Reserve Development Co. LLC PO Box 10879 Southport, NC 28461 Subject: Notice of Inspection — Not Compliant The Signature Clubhouse at St. James Plantation State Stormwater Management Permit No. SW8 081207 Brunswick County Dear Mr. Atkinson: ROY COOPER Governor WILLIAM G. ROSS, JR. Acting secretary TRACY E. DAVIS Director On January 11, 2017, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected The Signature Clubhouse, located at Fairlawn Blvd in Brunswick County to determine the status of compliance with the State Stormwater Management Permit Number SW8 081207 recently revised, corrected and re -issued on April 15, 2016. DEMLR file review and site inspection revealed that the site is not in compliance with the terms and conditions of this permit. Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter, which summarizes the findings of the recent inspection. As indicated in the attached inspection report the following deficiencies must be resolved: 1. According to aerial photographs available online, the footprint of the clubhouse constructed differs from the footprint shown on the approved plans. Additionally, it appears that SW8 — 070618 overlaps the approved project area. Per Section II.4 of the permit, the revised plans must have been submitted to the Division and received approval prior to construction of My modification to the approved plans. Please re-evaluate the permitting for this section of the cJ p -7,0bp$ development and submit all necessary modifications or revisions to resolve any changes from the approved plans and, if necessary, resolve any overlap between permits vQJO-� 2. Per Section 111.9, please submit a copy of the certification. 3. Per Section 11.15 of the permit, please submit a copy of the recorded deed restrictions for the lots associated with this development. Please be advised that until you submit the required Name/Ownership Change Form to the Division and receive approval from the Division to transfer the permit, you are required to comply with the terms, conditions and limitations of the Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7, including the operation and maintenance of the penpitted stormwater system. Failure to provide the requested information, or to respond to this letter with a plan of action, including a timeline to resolve the identified deficiencies, by February 13, 2017, are considered violations of the permit. If the requested information is not submitted to this office by the due date, then DEMLR staff will re -inspect the site and may issue a Notice of Violation. Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to $25,000 per day. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 26405 410 7%7215 Page 2 of*2 If you have any questions, please contact me at the Wilmington Regional Office, telephone number (910)- 796-7215 or via email at christine.hall@ncdenr.gov. Sincerely, Christine Hall Environmental Engineer Enc: Compliance Inspection Report ,.;L GDS\canh: \\\Stormwater\Permits & Projects\2008\081207 HD\2017 01 CEI_deficient 081207 cc: Tim Clinkscales, Paramounte Engineering Robert Masters, Authorized Agent, PO Box 10879, Southport, NC 28461 Georgette Scott, Wilmington Regional Office Stormwater Supervisor WiRO Stormwater Permit File State of North Carolina I Environmental Quality . Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 Compliance Inspection Report Permit: SW8081207 Effective:04/15/15 Expiration: 12/30/21 Project: The Signature Clubhouse at St James Plantation Owner. Reserve Development Co LLC County: Brunswick Adress: Fairlawn Blvd Region: Wilmington City/State/Zip: Southport NC 28461 Contact Person: Robert Masters Title: Authorized Agent Phone: Directions to Project: Take US 74 west for 3.6 miles, bear right on Hwy 17, south for 22 miles, left onto NC 211, east for 11 miles to main entrance of The Reserve on the right. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Beaverdam Creek) (03-06-17 } ( SC;Sw,HOR 2- On-Site Representative(s): Related Permits: SW8051221 Reserve Development Co LLC - The Reserve at St. James, Phase V Inspection Date: 01/11/2017 Entry Time: 03:OOPM Exit Time: 03:30PM Primary Inspector: Christine A Hall Secondary Inspector(s): Phone: 910-796-7215 Reason for inspection: Other Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant Not Compliant Question Areas: E State Stormwater (See attachment summary) page: 1 Permit: SW8051207 owner - Project: Reserve Development Co LLC Inspection Date: 01M 112017 Inspection Type Compliance Evaluation Reason for Visit: Other Inspection Summary: 1. Per Section 11.4 of the permit, the revised plans must have been submitted to the Division and received approval prior to construction of any modification to the approved plans. Please re-evaluate the permitting for this section of the development and submit all necessary modifications or revisions to resolve any changes from the approved plans and, if necessary. resolve any overlap between permits 2. Per Section 11.9, please submit a copy of the certification. 3. Per Section 11.15 of the permit: please submit a copy of the recorded deed restrictions for the lots associated with this development. Fife Review Yes No NA NE Is the permit active? E ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? El El El Copy of the recorded deed restrictions is in the file? ❑ F.i ❑ ❑ Comment: Neither a copy of the certification or the recorded deed restrictions could be found in the file. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ 7 ❑ ❑ Is the drainage area as per the permit and approved plans? ❑ ❑ ❑ 1 Is the BUA (as permitted) graded such that the runoff drains to the system? ❑ ❑ ❑ E Comment: According to aerial photographs available online the footprint of the clubhouse constructed differs from the footprint shown on the approved plans. Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ❑ ®❑ ❑ Comment: It appears that SW8 070618 overlaps the approved project area. page: 2