Loading...
HomeMy WebLinkAboutNCC230804_ESC Approval Submitted_20230329ROY COOPER Governor EUZABETH S, si.;. Secretary DO€1GLAS R. t! Rtterim Director NORTH C.AROLINA Eh14ronn,aE ;q'Qaallty December 30, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Dare County Attn: Mr, Robert L. Outten, County Manager PO Box 1000 Manteo, North Carolina 27954 RE: Project Name: Dare County EMS #7 Med Flight Project ID: Dare-2023-005 County: Manteo Acres Approved: 2.2 City: Manteo Address: Driftwood Drive River Basin: Pasquotank Date Received by LQS: December S, 2022 Submitted By: Timmons Group Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at . Please direct questions about the eN01 form to the Stormwater Pro. in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413,0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: rrs" ' -'n' (-z-rolina Department f Environmental Quality 1 DIvlslon of Energy, ► ineral and Land Resources I _ , l:g'.on Regional O'F,ce i c43 Washington Square Mall ' Washington, North Carolina 27889 o,c, 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by ..13A 61.1(a) of our right of periodic inspection to insure compliance with the approvedplan. North Carolina's Sedimentation Pollution Canatpol adjoining g si. If, fallowing the requiring protection of existing natural resources 1i g propertie commencement of this project, it is determined ��� Sedimentation Pollthe erosion and ution Cotntrol Act of ion control plan is inadequate to meet the requirements of 1973 (North Carolina General Statute 113A 51 through surcomipliafice may nce with ithe Actrevisions to the plan and implementation of the revisions to ene Acceptance and approval of this plan is conditioned dditioon n local cur ity or county Federalliance with ordinances State water quality laws, regulations, and rules. or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided.i to permit exceallows he for approved disturbance, as called for on the applicationplannot acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Sincerely, Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: Robert L. Outten, Dare County (email) Kimberly Hamby, PE; Timmons Group (email) WaRO Division of Water Resources (email) North Carolina Department of Environmental Quality iiIVi5lnn of VM r; iarui,ra ::7859 E Q Washington Regional Office 1943 Washington Square llal'! I Washingt.: D =c 252.946,6481 oe$,.m.y ti brr�.i uwa. The developer is responsible for the control of sediment on -site. if the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on -site natural watercourse or adjoining property. (NCGS 113A-57) .,Irolina DepartMey,,. o° Environmental Quality I Division of Energy, Mineral and Land Resources .ton Regional Of€ict ! R43 Washington Square Mail I Washington, North Carolina 2709 ovl.l r.0481 PROJECT [NPOR114 .TION SHEET APPROVAL DATE RESPONSIBLE PARTY: PROJECT NAME: COUNTY: OFF -SITE BORROW AND/OR DISPOSAL SITE: START-UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: December 30, 2022 Dare Cou Dare County EMS #7 Med FIi ht Dare NO.: Dare-2023-005 NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START -OFf QNSTRUC'?!0N TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@ncdenr.gov North Carolina Department of Divironmental Quality • isien a; L,.:: rces DWashington Regional Office , 443 Washington Squai Washirr..- a.� /"'� 252.946.6481 CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control approved for this project -by the North C'a�°�.�lina Department plan has beep p ent of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 d Carolina Administrative Code, 'Title 15A, ,hc� per 4�,0 { 1(4) and North p 107 {c). This certificate must be posted at the primary entrance of the ,doh site before construction begins and until establis hment of permanent groundcvver as required by North Carolina Administrative Code, 'Title 15A Chapter 43.01/27 (b). �rims it17z �AXAW60J 0rib 10.- 00k s Project Warne and Location Date of Plan Approval Certiflicate of Coverage Number �i►rrr ►C �ar -�-�, Regional engineer 'O�D E �fC IL6 21 -M Oar