December 30, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Dare County
Attn: Mr, Robert L. Outten, County Manager
PO Box 1000
Manteo, North Carolina 27954
RE: Project Name: Dare County EMS #7 Med Flight
Project ID: Dare-2023-005
County: Manteo Acres Approved: 2.2
City: Manteo
Address: Driftwood Drive
River Basin: Pasquotank
Date Received by LQS: December S, 2022
Submitted By: Timmons Group
Plan Type: New
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed
at . Please direct questions about the eN01 form to the Stormwater
Pro. in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 413,0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
rrs" ' -'n' (-z-rolina Department f Environmental Quality 1 DIvlslon of Energy, ► ineral and Land Resources
I _ , l:g'.on Regional O'F,ce i c43 Washington Square Mall ' Washington, North Carolina 27889
o,c,
2
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by ..13A 61.1(a) of our right of periodic
inspection to insure compliance with the approvedplan.
North Carolina's Sedimentation Pollution Canatpol adjoining g si. If, fallowing the
requiring protection of existing natural resources 1i g propertie
commencement of this project, it is determined ��� Sedimentation Pollthe erosion and ution Cotntrol Act of
ion control
plan is inadequate to meet the requirements of
1973 (North Carolina General Statute 113A 51 through
surcomipliafice may nce with ithe Actrevisions
to the plan and implementation of the revisions to ene
Acceptance and approval of this plan is conditioned dditioon n local cur ity or county Federalliance with ordinances
State water quality laws, regulations, and rules.
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided.i to permit
exceallows he for approved
disturbance, as called for on the applicationplannot
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Sincerely,
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Robert L. Outten, Dare County (email)
Kimberly Hamby, PE; Timmons Group (email)
WaRO Division of Water Resources (email)
North Carolina Department of Environmental Quality
iiIVi5lnn of
VM
r; iarui,ra ::7859
E Q Washington Regional Office 1943 Washington Square llal'! I Washingt.:
D =c
252.946,6481
oe$,.m.y ti brr�.i uwa.
The developer is responsible for the control of sediment on -site. if the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCAC 04B .0113).
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within the
limits of disturbance, of any land disturbing activity to prevent sediment from leaving the
limits of disturbance, entering existing drainage systems, impacting an on -site natural
watercourse or adjoining property. (NCGS 113A-57)
.,Irolina DepartMey,,. o° Environmental Quality I Division of Energy, Mineral and Land Resources
.ton Regional Of€ict ! R43 Washington Square Mail I Washington, North Carolina 2709
ovl.l r.0481
PROJECT [NPOR114 .TION SHEET
APPROVAL DATE
RESPONSIBLE PARTY:
PROJECT NAME:
COUNTY:
OFF -SITE BORROW
AND/OR DISPOSAL SITE:
START-UP DATE:
CONTRACTOR:
ON -SITE CONTACT:
ON -SITE PHONE NO.:
OFFICE PHONE NO.:
December 30, 2022
Dare Cou
Dare County EMS #7 Med FIi ht
Dare
NO.: Dare-2023-005
NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START -OFf QNSTRUC'?!0N TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@ncdenr.gov
North Carolina Department of Divironmental Quality • isien a; L,.:: rces
DWashington Regional Office , 443 Washington Squai Washirr..-
a.� /"'� 252.946.6481
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control
approved for this project -by the North C'a�°�.�lina Department plan has beep
p ent of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 d
Carolina Administrative Code, 'Title 15A, ,hc� per 4�,0 { 1(4) and North
p 107 {c). This certificate must be posted
at the primary entrance of the ,doh site before construction begins and until establis
hment of
permanent groundcvver as required by North Carolina Administrative Code, 'Title 15A
Chapter 43.01/27 (b). �rims it17z
�AXAW60J 0rib 10.- 00k
s
Project Warne and Location
Date of Plan Approval
Certiflicate of Coverage Number
�i►rrr ►C
�ar
-�-�, Regional engineer
'O�D E
�fC
IL6 21 -M Oar