Loading...
HomeMy WebLinkAboutNCC230778_ESC Approval Submitted_20230328DocuSign Envelope ID: CE917538-0162-4C2E-AF92-E90C103E5BB5 ROY COOPER Governor EUZABETH S. BISER Secmfery DOUGLAS R. ANSEL fh1win Dkvcfor NORTH CAROLINA Envlronmerntat QuaW February 22, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Gate Petroleum Company Attention: Rebecca Hamilton, Vice President 9540 San Jose Boulevard Jacksonville, Florida 32257 RE: Project Name: Gate Petroleum C-Store #0418 Project ID: CABAR-2023-048 Acres Approved: 2.13 County: Cabarrus City: Concord Location: Hwy 73 River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: V3 Southeast Date Received by LQS: January 24, 2023 Plan Type: New Dear Ms. Hamilton: CV RECEIVED FEB 2 7 2023 Prgwt# This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.govINCG01. Direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 a 704:663.1699 DocuSign Envelope ID: CE917538-0162-4C2E-AF92-E90C103E5BB5 Letter of Approval with Modifications Gate Petroleum Company February 22, 2023 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G. S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: V3 Southeast Attn: David Klausman 2923 South Tryon Street, Suite 320 Charlotte, NC 28203 Sincerely, DocuSigned by: �8B37DACWOE49A... Kenny S. Llywelyn Assistant Regional Engineer Land Quality Section E5 i:i.:;ir,�,rr.�� �lwi+r North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704_663.1699 DocuSign Envelope ID: CE917538-0162-4C2E-AF92-E90C103E5BB5 Letter of Approval with Modifications Gate Petroleum Company February 22, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Gate Petroleum C-Store 90418 Project ID: CABAR-2023-048 County: Cabarrus Reviewed by: Kenny S. Llywelyn 1. This site uses the pipe network and basin that is designed for the overall site that includes a subdivision located south of this project. The basin and pipe network will need to be maintained during erosion control phase of construction of this project since there are no basins located within the project work area. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.663.1699 •\ \ 1 J, \ ` "NOW OR FORMERLY , _ _ ; \\ \• �WILCOHESS LLC DEED 6K,. 5082, PG. 294 \ I MAP BIZ 9, PG. 57 `♦ 1 1 1 1 \ I / °y ' PIN #4661597779 \ \ ' CABARRUS C6 REGISTRY - - ' ' - - - - - `- _ 1 1 ► \ 11 0- ,-CO�-� )HP- P----OHP----OHP----OHP----OI;P----OHP----OHP----OHP----OHP----OHP---- HP� ' ---1 H�'-- - �{ -- - --- I _OHP- _, =OH OHP OHP- - - �QHP� -OHP----OHP----OHP----OHP----OHP -OHP-- _ Y - _ _ _ _ - _ _ _ • , ----,�--------- -R W� ----- ---R W---= ��--R/W----R/W----R/W----R/W----R/W ____ R/W-- ---/- D/\AI----- /W---R/W--- O� W --- - -----___>- _____ ------ ------ �_�_ �� �/ aN'--- _ - -� --- >--------------- >-----------------------, � ■ - - - - - EXISTING OVERALL DEVELOPMENT Q/ EXISTING POWER POLES TO BE RELOCATED, 1`r_ SEE APPROVED PLANS TITLED "ODELL "oeI I - - - (TITLED ODELL CORNERS BY C „S- -- �� ..� -1� _ - -' BGE, INC. ) CONSTRUCTION LIMITS / CORNERS OFFSITE ROADWAY IMPROVEMENTS" �- - - - - - - - - / BY BGE, INC. DATED MARCH 25TH, 2021 FOR ` -yr--------CJ�-�=CJT---- --------�--_ _-_ _ I `. / ' ` ` ` / ROADWAY IMPROVMENTS DNL DNL I DNL DNL SAIL DNL DNL DNL ' DNL DNL DNL WWII DNL DNI�' DNL DNL DNL DNL DNL DNL DNL DNL DNL DNL j� DNL �_ _ ��_L DNL DNL DNL DNL DNL L DNL DNL DNL _CZNL / DAVIDSON HWY (N.C. HWY 73) // ,,' / --- / I VARIABLE WIDTH PUBLIC R/W / _ -' " " r ►• (PB 91 /88) \? / ' ' EDGE OF PAVEMENT - - /, II C 0 __--721 Q - - `.� O / �---UT----UT----UT--- UT ---UT- UT----UT�i===1T UT----UT----UT 1 --- _ _ _ OLD POWER LINES �j- -UT EX. CB-r108 PP EXISTING POWER POLE AND i PP UT ----UT---- UT- -"UT,---- GRAVEL � okk EXISTING POWER TO REMAIN. -UT�� PP ----------` 15"CPP -io ��ON LINES TO BE RELOCATED. PROTECT AS -UT- - CONTRACTOR TO EX. CB-E09 EXISTING OVERHEAD POWER DNL - - - COORDINATE WITH UTILITY - - - - - - - _ ' POLES TO REMAIN. PROTECT \� �ONP SDMH Uj PP" _ _7 REQUIRED, TYP. \ - - _ ' " o I _ - - - - - - PROVIDER PER BGE PLANS. - _ _ - PP PP AS REQUIRED, TYP. / Uj ' - R -- ANR-- _-OH I tr-I1 / . - __ _ s=s �-l�i��A�-=��6�ff�Pp=--��9FfP�= _ --- ----Ul�Jr'r�Cc6'UNrR-J_ UT---UT�F- Imo'' �' --OHP -'-_ _ -_- P DNL6hiP- DNL DNL/ -Fv I� xKG�� - ----U -U _-- _UT- - 1��Dv��cl� PH 197 -�` ,U/ 1 1 �r-7=-OHP---_ _ PP GW --UT--rtbrTBUFF {I�� ,�s�1�gg - - r `Dl�l N� DNL DNL DNL DN p --- N ' - --�- - - - -- -- -- -- --�- - -- .---� - -- - - -- - "O P ' ' ' _ _ _ -SIG T TRIANGL % - - - - - Y Q�1>-� \ /�..-..---..-..-..-.._ _.._---..-..-..-..-..-..-..-� _-..-_�_..-..-..-..-..-..-..--..-..-..-..-..-..-..-.. �. /..-..-..-..-..-..-..-.. 0 N ` ` 1 ' PB 91 86 _ _ / EXISTING 10' LANDSCAPE BUFFER D ` O/ Nc\ , / ) \ . . Okt I PP ' - -( / ,\ ' SSMH ��� 30' SSE (PB 91/86) SIGHT TRIANGLES SSMH �I� __ SIGHT TRIANGLES `& ' / (PB 91 /86) (PB 91 /86) SIGHT TRIANGLES ,' I T I ,GWk&I-- ss--- ss--- ss--� ss--- ss--- ss--- ss� -- ss--- ss--- -- ss--- ss--- ss--- ss -- ss-- -- --- �s--� ss 1 (PB 91/86) I o SIGHT TRIANGLE `♦ `\ . - - - - ` 1 (PB 91/86) ` ` ` ` ` ' I 1 MANHOLE TO REMAIN. PEXISTING SANITARY SEWER ' Y z \ C �C\' W �'`� ! / SIGHT TRIANGLE z `\ ♦ ♦ `\ ,' I r \ \ y u� PB 91 86 Q \ `♦ \ , N I PROTECT AS REQUIRED, TYP. I U) ..-(... / ) _..-..-..-.,------ ------ -..-....-........ ...... -..L..-........ ------ ------ -. ,-..-..-..-..,........ , TI • - • • - • • • • • • 1 I EXISTING POWER POLE AND `�Ssi i 'iv "'y I\\.•� I , / I EXISTING SANITARY LINES TO BE RELOCATED. L SEWER TO REMAIN. CONTRACTOR TO \ \I / / / / 1 / I PROTECT AS COORDINATE WITH UTILITY Z / / / ICA II REQUIRED, TYP. PROVIDER PER BGE PLANS. , v EXISTING FIRE HYDRANT TO REMAIN. PROTECT AS REQUIRED, TYP. Nt/► n, , ! / In I I I r ♦2 tL �\ 1 ,�C'V / W I / \ I \ N o C� \\ \ I `\ PROPOSED aZ \ ^ N OD I v . 1 71 . r f \� 1 CONSTRUCTION \ / , \ I 1 0 1L \ I ` LIMITS FOR SITE (n I / W I / y� \ \ 00 ` ` %2 1 \ 1 ' ' 1 1 I II y' I � Cn '\% `\ NOW OR FORMERLY" ! i 1 I OD LL 73 INVESTM�`NTS LLC i ; W ' / \ \ EXISTING ±91 LF OF \ / ' ' ' 1 CURB AND GUTTER I \ `' \ A j D B 12364/19� I �♦ I II TO BE DEMOLISHED I �,A PID 46816807910P00 0 ' \ `` \`�0 ` '' - - - ' - - `' EXISTING SEWER CLEANOUTS TO BE 1 N\`, ' ' �n J `� \ _ - ` - ' CUT AND CAPPED AT WYE CONNECTION 1 1 '\�` ,' // n \ \ O zz _ _ _ - _ - _ I , , TO EXISTING 8" SEWER MAIN PER A CITY CO 6" Z / / \ \ \ �� 1 \ \ I�p /`\ - _ 1 \ ► OF CONCORD APPROVED METHOD, TYP. \ , i \ \ C3,0 CO co \ 0 \ � ` J 1 1 I 1 1 15"CPP EX. CB-A07 _ \ cz EXISTING CATCH \` \ \`\ BASINS AND PIPES TO BE REMOVED, TYP. coW co I PO ` \ \ \ \ EXISTING BOTTOM , FENCE SHALL 1 I ' In \ \ 1\ / \\�•� � \ \ \ OF STOCKPILE , PROPOSED SILT F 1 O 1 PROPOSED SILT 1 \ , RETURN INTO SITE ALONG I O m ,' / I `\ , \`\ `\ \ \ `\ \ `\ EDGES OF CONSTRUCTION �I 1 n i , z I \ \ y-O \ `\ `\ \ \ \ > ♦ ♦,\ \\ \ \ I , ENTRANCE, TYP. , ,: Ofn W �' \ \ \ 2� ♦ \ \ ` 1 ' ' ' T '1 N O 1 FENCE OUTLET, TYP. / I co `\ \ \ ` -)1 ♦ \ \ > \ , 1 ► 1 11 1 EXISTING STORM DRAINAGE ,' PROPOSED SILT , CATCH BASIN TO BE FENCE TYP 715 CB-A16 RAV �\\ \\\ y-o 0 . \\ ♦' ♦ \ \ \ \ ', `\ 1 , I O O CONVERTED TO PROPOSED U) OFFSET CATCH BASIN -SEE \>2 \ \\ \\ \ \ I 1 EXISTING STORM DRAINAGE TO REMAIN. n I I O DETAIL 15/CX-103 I ` ' PROTECT AS REQUIRED, TYP. 1 : O I\ ; ' SIGHT TRIANGLES `\ v - , \ \ SIGHT TRIANGLES EXISTING 8" PVC (PB 91 /86) i i O SIGHT TRIANGLES , t `0 1 0 \ ` ` `L \ PB 91 86 1 X. CB-A06 (PB 91 /86) �� EX. C y,0 \ \ . \ \ \ ( / ) , WATERLINE TO I / / 1 REMAIN. PROTECT EXISTING FIRE / ' cn / . � co �` �Q ` 1 AS REQUIRED, TYP. HYDRANT TO REMAIN. ' T/ N() 0 � `� ,' n ' ' \ \\ \ \\ \\ FXCB- 11 CUR1r`\/' - SIGHT TRIANGLES 'ial `. i BENCHMARK �. 1 ,. (PB 91/86) , 1 ° \ , `` \ \ ` \ \ \ I \ TOP OF FH - I ' ELV: 721.25I 1 , EX. CB LA18 - - \ - f - \\ Irk IJN8V-UaCr) \ \ � 1 ,�, \ \ � ♦` \ \ \ , � `- ___ --- ♦ ` � n -T--- /' DRAINAGE-.` WV `� - - �S- - W �S - W �- S- W- - - W�S- - M= W- - �14� VN'� ' - CP- ;'� ' .. ` BOV �s / REMAIN. 1 \ W- - - 1 W-�- - - W--se►a I \ \ \ \ 1 ` �\ \ �; - \ > • . '\ \ O Asa � -ING 1Na -� INa 1 IN I \\ I 2 lNa `\ O O ' � - AS REQUIRED, TYP. � �S � � �S �S �S �S \ 1 ` ` EXISTING RAMP CUTS IN THE \ \ \ a ` \ 0 11 RAMP cn \ \ \ `\ ` ` � L`7 ENO -r � � CURB AND GUTTER TO REMAIN ` , \1 \ ` ♦\ \ \� I \ \ \ \\ , i I EXISTING CURB X. CB -A \\ I ', �j ` EX. C�-A14 1 \ ♦� I_ \ \ \ \ \ \ \ \ \ , AND GUTTER TO \ 1 1 � RAMP ♦ I SEE APPROVED PLANS \ \\ 11 `, �` \♦ _ ' ` \ \ j `\ \♦ \ \ \ 1 1 ` REMAIN, TYP. \ 1 TITLED "ODELL CORNERS END OF \ \ ' II ♦ PHASE 1" BY BGE, INC. DATED ` -' \ \\\ `\ `` \ CURB ` ' ' j i �� \ CONTRACTOR TO UTILIZE `� ODELL CORNER BLVD NW II MARCH 25TH, 2021 FOR WORK \ 1 \ \ \ \ \ ♦ \ �r -� � , EXISTING DRIVEWAY AS / VARIABLE WIDTH P BLIC R/W OUTSIDE OF PROJECT LIMITS. ,1 \ \\ \\\ \\♦♦ N`' ^ ^ I N II EX. SSMH CONSTRUCTION ENTRANCE. (PB 91/88) II END OF I ? \ d \♦ \ ` / CURB , / / / '� , II EX. aumn II ,\ \ \\. \ ♦ `� ` J o i I I - -- -- - , I A05-JB 9W%" ♦ EX. CB- 13 EX. CB-AO9 /' • •/� e / .a I A. / _ a .''n ' j�--R/W---�R/W= f-'--=TR /W�--- \ `; 's / _ R /W - r /W ---/ _ = R /N' R' �I y - _ - - ° `l.3SHHd \ \ ♦ , - , 41 �\ ---- b`A'NOW OR FORMERLY `\ co i , ,-_ z3sti------- - - - - -- �ODELL 43 INVESTME S, LLC Co I ' 1uEsVt ,' DEED 'BK. 12364, G. 209 \ \ ° I b \ \ \ \ \ MAP BK. 72, G. 13 \ \ \` \\ °yo \`\ \\ > \ \\ \\ \ / \\ i i PIN #4681680 73 DI `\ `\ I w LU CABARRUS CO. REG STRY \ EX. CB-A04 f SEE APPROVED PLANSOn �- � 1 TITLED "ODELL CORNERS \ PHASE 1" BY BGE, INC. DATED \ MARCH 25TH, 2021 FOR WORK- ` \ OUTSIDE OF PROJECT LIMITS. t , ° \ CB EX. CB-. I. a I --- -- - - - --- -- �a fibE fitE - - LEGEND SYMBOL DETAIL AREA TO BE DEMOLISHED -/ EXISTING STRUCTURE TO REMOVED -/ DNL DENUDED LIMITS -/ SF PROPOSED SILT FENCE 6/CX-102 SILT FENCE OUTLET 7/CX-102 0 O C PROPOSED STABILIZED 5/CX-102 O 0 O 0 CONSTRUCTION ENTRANCE PROPOSED INLET PROTECTION (SILT SACK) 8/CX-103 UTILITY TO BE REMOVED 4_ DEMOLITION NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND SEQUENCING OF DEMOLITION AS DESCRIBED IN THESE DOCUMENTS. 2. CONTRACTOR SHALL HAVE ALL UTILITIES MARKED BY A PRIVATE UTILITY LOCATING SERVICE PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL LOCATE AND VERIFY ALL EXISTING UTILITIES (INCLUDING PROPOSED CROSSINGS) PRIOR TO CONSTRUCTION BY SOFT DIG OR POTHOLE EXCAVATION. 3. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DEMOLITION OR RELOCATION WITH APPLICABLE UTILITY COMPANIES (GAS, CABLE, POWER, TELEPHONE, WATER, SEWER, ETC.) 4. CONTRACTOR SHALL BE RESPONSIBLE TO IMMEDIATELY FIX ANY UTILITIES DAMAGED DURING CONSTRUCTION AT CONTRACTOR'S EXPENSE. THE OWNER WILL PAY TO MOVE OR REPAIR UTILITIES ENCOUNTERED DURING CONSTRUCTION WHICH ARE NOT IDENTIFIED ON CONSTRUCTION DOCUMENTS, SITE SURVEY, OR THROUGH PUBLIC AND PRIVATE UTILITY LOCATING SERVICE. 5. DEMOLITION OF EXISTING STORM DRAINAGE, DOMESTIC WATER DISTRIBUTION, FIRE PROTECTION DISTRIBUTION AND SANITARY SEWER SYSTEMS BY CONTRACTOR SHALL ALLOW FOR CONTINUOUS USE OF THE SYSTEMS. 6. ALL MATERIAL GENERATED BY THE DEMOLITION WILL BE HAULED OFFSITE AND DISPOSED OF PER APPLICABLE FEDERAL, STATE AND LOCAL CODES, UNLESS OTHERWISE NOTED FOR RE -USE ON SITE. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 7. SAW -CUT PAVEMENT MATERIALS, CURB/GUTTER, SIDEWALKS, WALLS, ETC., BEFORE COMMENCING EXCAVATION WHERE CONSTRUCTION DOCUMENTS SHOW TIE IN LOCATIONS. 8. CONTRACTOR SHALL REPAIR OR REPLACE ALL HARDSCAPE (CONCRETE CURBING, SIDEWALKS, ASPHALT, ETC.) DAMAGED DURING THE CONSTRUCTION PROCESS. TO THE OWNERS SATISFACTION. 9. CONTRACTOR SHALL REPLACE ALL LANDSCAPING DAMAGED AS PART OF THE CONSTRUCTION PROCESS. DAMAGED MATERIALS SHALL BE REPLACED WITH THE SAME SPECIES, CALIPER SIZE, SPREAD AND HEIGHT TO THE OWNERS SATISFACTION. 10. CONTRACTOR SHALL RETURN ALL SIGNS, LIGHT POLES, LIGHT FIXTURES AND SITE FURNISHINGS TO OWNER, UNLESS OTHERWISE DIRECTED BY OWNER TO DISCARD OR RELOCATE. 11. CONTRACTOR SHALL REMEDIATE ALL DAMAGE TO THEIR STAGING, PARKING, AND LAYDOWN/STORAGE AREAS. 12. EXISTING LANDSCAPING ENCOUNTERED DURING CONSTRUCTION WITHIN THE DENUDED LIMITS, SHALL BE CLEARED TO THE TREE PROTECTION FENCE LIMITS TO ALLOW FOR SITE CONSTRUCTION AS INDICATED IN THESE DOCUMENTS. EROSION CONTROL NOTES: 1. APPROVAL OF CONSTRUCTION DOCUMENTS IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION SHALL BE OBTAINED BY CONTRACTOR FROM THE AFFECTED PROPERTY OWNERS AND THE AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED. 2. SEE DETAILS 8/CX-102 FOR REQUIRED SEEDING SCHEDULES. 3. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. 4. ALL NCDOT STANDARD NUMBERS REFER TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROADWAY STANDARD DRAWINGS. 5. SITE SOILS CLASSIFICATION IS CcB2. 6. RIVER BASIN: CODDLE CREEK. 7. ALL LAND -DISTURBING ACTIVITIES, INCLUDING THOSE THAT DISTURB LESS THAN AN ACRE, SHALL PROVIDE ADEQUATE EROSION CONTROL MEASURES, STRUCTURES, OR DEVICES IN ACCORDANCE WITH THE CABARRUS COUNTY (CITY OF CONCORD) ENVIRONMENTAL / LAND DISTURBING ACTIVITIES ARTICLE AND WITH THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY. 8. THE TOTAL SITE ACREAGE IS 2.47 ACRES. THE TOTAL DENUDED AREA IS 2.13 ACRES. 9. THE DRAINAGE AND LIMITS OF THIS SITE SHALL MEET THE LARGER APPROVED DEVELOPMENT TITLED "ODELL CORNERS PHASE 1" DESIGNED BY BGE, INC. DATED MARCH 25TH, 2021. THIS PROJECT FALLS WITHIN THE LIMITS OF THE PREVIOUSLY APPROVED DENUDED LIMITS PERMITTED UNDER "ODELL CORNERS PHASE I, PHASE 2 & ROADWAY IMPROVEMENTS ODELL SCHOOL ROAD" APPROVED ON JULY 8TH, 2020 (PERMIT# CABAR-2020-080). CONSTRUCTION SEQUENCE 1. INSTALL CONSTRUCTION ENTRANCE, TREE PROTECTION, AND SILT FENCE. 2. CLEAR AND GRUB THE SITE. SEE THIS SHEET FOR DEMOLITION LIMITS. 3. BEGIN MASS / ROUGH GRADING SITE. 4. BEGIN FOUNDATION AND BUILDING CONSTRUCTION. 5. INSTALL STORM DRAINAGE PIPING AND UTILITIES. 6. BEGIN INSTALLATION OF HARDSCAPE AREAS. 7. COMPLETE BUILDING CONSTRUCTION. 8. COMPLETE LANDSCAPE INSTALLATION AND PLACEMENT OF MULCH. 9. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 10. AS AREAS ARE FILLED AND BROUGHT TO GRADE, COIR LOGS SHALL BE USED ALONG THE TOP OF SLOPE TO HELP WITH SLOPE EROSION / SCOUR. 11. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. I • I 0 , 1. CONTRACTOR IS RESPONSIBLE FOR PLACEMENT OF ALL BARRICADES, SIGNAGE, FLAGGERS, SHORING, ETC., TO ENSURE THE SAFETY OF WORKERS AND THE PUBLIC. 2. ALL PAVEMENT CUTS SHALL BE REPLACED ACCORDING TO NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND WSACC (WATER AND SEWER AUTHORITY OF CABARRUS COUNTY). V V 3 Southeast 2923 S. Tryon Street, Suite 320 Charlotte, NC 28203 p: 704-940-2883 www.v3co.com ❑■ rip landscape architecture I planning I civil engineering 9540 San Jose Blvd Jacksonville, NC 32257 Gate Petroleum C-Store #0418 8825 Davidson Hwy Concord, NC 28027 VICINITY MAP N.T.S. (j) TOPOGRAPHIC SURVEY DATED MAY 19, 2022 PROVIDED BY CAROLINA SURVEYORS, INC., P.O. BOX 267.704-889-7601. a C-4911 0. _ C-672 /l jllllllllll\\\\ C O/i SEAL - 043764 FNCINEE9- �''''�ST I N C��'.�`♦�` IZ/1 `Az Disclaimer ©2022: Information contained in this document is the property of V3 Southeast and the project client listed on this document. The reproduction, copying, and other use without written consent is prohibited and may be subject to legal action to the fullest extent possible. SCALE: 1 "= 20' N 0 10' 20' 40' DATE: 09.28.2022 MPIC: WLL DRAWN BY: CAC REVIEWED BY: RAC PROJECT NUMBER: 220443.01 DEMOLITION AND EROSION CONTROL PLAN REVISIONS: 1 12.19.22 REVISED PER CITY COMMENTS CD-1 00 100% CONSTRUCTION DOCUMENTS