Loading...
HomeMy WebLinkAboutNCC230557_Site Plan or Location Map_20230327pP��S \ EROSION CONTROL NOTES CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, ACTIVITIES. NOTIFICATION OF COMBINED SELF -MONITORING AND GROUND STABILIZATION CHART STABILIZE THE STOCKPILES BY VEGETATIVE COVER TARPS 12 THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE SELF -INSPECTION FORM \ 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR OR OTHER MEANS. CONTROL EROSION FROM ALL ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. PERFORMING WORK ON THIS PROJECT. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN \ SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR AND INLET PROTECTION DEVICES WHEN THE STORAGE MUST BE NO LESS THAN FIVE FEET FROM THE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH a CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL MORE THAN 24 HOURS. ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE EROSION AND SEDIMENTATION CONTROL PLAN IS BEING NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT DRAINAGE AREA HAS BEEN STABILIZED. INSPECT SLOPES AND FILLS SHALL BE NO GREATER THAN THE o FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS o� PROPER BARRIER. A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR OTHER ADEQUATE EROSION CONTROL DEVICES OR AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR co 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, DEVELOPED A COMBINED FORM. THE SELF INSPECTION o� oo PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF 8• TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED PROGRAM OF THE NPDES STORMWATER PERMIT FOR BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE DENUDED AREAS IN WHICH GRADING OR SITE BUILDING WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES I CONSTRUCTION ACTIVITIES. THE FOCUS OF THE sl� OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ° SELF -INSPECTION REPORT IS THE INSTALLATION AND ov Fp CONSTRUCTION. AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER PURSUANT TO G.S. 113A-57 3 ( )' PROVISIONS FOR MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MEASURES ACCORDING TO THE APPROVED PLAN. THE " \ SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR CONTROL MATTING, AND/OR SODDING AND STAKING IN MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF �6 ( �O SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH GREEN SPACE AREAS AND OTHERWISE APPROPRIATE 90 CALENDAR DAYS FOLLOWING COMPLETION OF ¢ THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND \ CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CONSTRUCTION OR DEVELOPMENT. o� COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: N/F DESIGN MANUAL. AREAS TO BE PAVED. I 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION Z J HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION DIXON LIVING TRUST 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CONTROL MEASURES SHOWN AND ANY ADDITIONAL O m CO 0- TRACT 14 OF OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, NORTH \ DB 1169, PG 642 LAND DISTURBING ACTIVITIES. 910-433-3300 FINAL STABILIZATION AND PERMANENT VEGETATION HAS I THE COURSE OF CONSTRUCTION. p (o PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 5 REMOVE ALL SOILS AND SEDIMENTS TRACKED OR BEEN ESTABLISHED IT IS RECOMMENDED THAT NCDEQ 16. ALL SEEDED AREAS WILL BE FERTILIZED RESEEDED AS 433-3300. SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) \ OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE APPROVE THE ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS u_ \ VICINITY MAP \ PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT \ N/F WHEN TRACKING OCCURS. CIO DONALD W. POWELL, JR. &WIFE, 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET ACTIVITY. ARISE ON SITE IS KIRBY LAFORCE. CONTACT NOT TO SCALE NANCY K. POWELL FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION I 704-608-3085. I \ N/F DB 3789, PG 765 / \ THE ENNIS TRUST DATED SEPTEMBER 12, 2002 KENNETH W. ENNIS TRUSTOR AND/OR TRUSTEE / F 4 �F F �-, I \ TRACT 1 OF / N/F F F%� ( �� F F F F F F F DB 2845, PG 327 / / MONICA DEANGELIS rF F F F F I\ / F �� / F N/F '�-�/M�'��iF F F F I I / / � F�F-\FFj'F�-� F -, FFF� F F—F �� � F� F �F F ,f�<'F�' F-F �-F/�°F�F� F F° esFF F F F{F_ F F F• F F F��F F ✓jFF F FFF FFFo'l�-FF9F' � FFFF�FL�F F F - FF F/ F/ F F(F, Fl C�/F// /F/F(�.�`F�F F` F FIF FF"ry'F; 'i FFP F F'��F/ �,��F`�, F'��F�.-�F.. K' , %/Fj V F F/ F F F FF F FF`•/�F' `F `-F��F/ F F�FFr \F� lFF I Fa-!�F ,F,\ 'FF Ii IF_F��\�FFI/�j/7YKF F F F FF -FF F_\ .F.. F F-F F F F `F�., FFF ,� II I I II ❑ I �!II _DIDRLNEWTON DB 3803, PG 258 N/F DB1243PG598 PB 2020, PG 101 F 1 DIXON LIVING TRUST N/F FF IJEFFREY LTRACT 1 OF. WALKER & PARCEL , O I • ��_ I GARY K. WALKER F DB 3831, PG 774 N/F FO TRACT 2 OF N/F JAMES R. HERRING &WIFE, CA(� 9FF DB 2919, PG 802 DARIN BERGMAN KATHIE T. HERRING ❑ PB 2011, PG 569 DB 3467, PG 709 DB 717, PG 861 196 12 F I/ It �F es� /\ N_ FI I I I �F ` F / F .� FF F CA6 Il OCA1 1 O131 "i 25 130 C121 , HERBERT A ENNIS & ALLEN C. ENNISSF�IF J �iF� A I - DB 3919, PG 1 1F F F r\ 199 1 , �- �� I ` 84 O PB 2019, PG 35 No N 128 '��, ; F F�� ( - �200�� � i\� �l�/� ] I - 1 CENCER���, ♦ �, U 83 �, G_ O 127 126 r ' ; 120 \ 2 N I I IE,,r 7 , Q V/ 89 `�"� 101 I m ° Ix, Pv �p T s/14jc)) O U � N/F `-� �. 85 / o 1 �lit>�o N Ue�IC yP�A o HERBERT A. ENNIS & I rJ (� 71 72 2 O ` ,/� Q a Q �wl & UT CE Q �r Q � / .�, J �`�� W�, 102� l�lTy qo �/� ALLEN C. ENNIS ® Y ` 82 m O C �v ( I T� y r L i / J \ / J O l z 2 Q ESS F D6 319, PG 1 N CC705 O I / O �� O O � Q O CO �-`'73 w O J � -i cu � ` PB 2019, PG 35 �ft cn 86 U •, CA7 U a- w >. ' 90 0 0 , ; � 112 118 I F / I v D 81 �� t ,<v 99 li�rznr Uvm 103 113 �3 I 1 / F �• 42 v / ��8 / F F F� Fi o p ti V m 117 CA5 0 91 �� 104 Q 111 I ter,: /fF a 43 O F� �,� �� I U 80 ,� �' 3i 98 �. a !L -y ��✓-� // � �� F1 1 I O N/F �P��� F( i R� 41 G NrGn)(( 44 J �� " 61 - O 63 64 65 66 �` U m 75 O • O 7 92 ; F F 1 O 110 0 \' i•0 60 O I 62 .... O 76 77 78 /• o ` O /r w (( 105 O I I PA GAILOM. &D RIFE, � F .. F 'i� <�� � rAb'�. O - I _ 67 m 3 �.. DB 667, PG 523 '� F F o O / 59 BRONZE LEAF DRIVE ` d_. : 45 /� • 50' R/W (PUBLIC &UTILITY ACCESS) . _ / 96 q \ `O 109 n O40 �� / 1 93 t / ����Z �^ a, 58 A / O O� /O �`j� / I C� 46 / I� r 13 12 11 10 O O / O O O O 0 / ♦ Imo. 107 108 I❑ I •j 36 39 14 �.� / I f 47 O 56 15 I I �� 4 i N/F I r 00 ��- l ��-�� I _ I TERRY MACK MITCHELL I 38 48 ' 55 ���- I\ 3 / f\2 1 T — N/F I I� 3 `1 TRACT 1 OF 35 -1 O ✓ �� 16 I I FRANK JOSEPH VUTURO, JR. I I 3 I DB 529, PG 4 I _ cn Q �; \ I N/F / N/F TBM & WIFE, N F PB 11, PG 7 I 024D9>�,�o 54 Q�`I CHRISTOPHER H. RABA & WIFE, CHRISTOPHER SUSANHD RR ABA& WIFE, N 609 664.902 KAREN W. VUTURO STANLEY E. WEAVER &WIFEST N c ; SUSAN D. RABA E 2,083,291.562 DB 3869, PG 930 f 1 'A 34 Ni 37 �. i.� o DB 2243, PG 680 _ / I I 17 5 JACQUELINE D. WEAVER F O w PARCEL 3 OF ELEV 218.38 PB 2020, PG 165 i 53 <C/� J Z� 1 DB 2243, PG 680 PB 2010, PG 409 �_ — NC GRID NAD 83 I - I DB 3266, PG 495 C� r 4 � -' �' 2011 N/F PB 11, PG 7 I I I -A ti� 18 �� PB 2010, PG 409 -� NAVD BS V w TERRY MACK MITCHELL �i� 33 O �h 52 O� J�� w- ��. i - D PB90, PG 918 I �\2 1 _ I ,- ` \ 1~ 32 SC R/o-y FO/ 1 �" Q)��� 19 �_ \6 , f `-/ s+ 4 I TERRY MAi LEGEND: O (PUe TO 51 �� Ld ti 1 N/F I TRAC �lC wq y O 20 �- N/F 0 DOT DISK N/F ER a"& UT/Ty �� N(t \ TIMBERRIDGE PROPERTIES, LLC - - � TERRY MACK MITCHELL PAUL YODER &WIFE, �� � KENVERON CA FNETH A. . STEWAR WIFE, PA51 ECM ® ECM -EXISTING CONCRETE MONUMENT _ DB 2676, PG 718 EIP KENNETH A. STEWART, II o EIP-EXISTING IRON PIPE GAIL M. YODER �\ 31 30 CA3 ACC _ DB 2681, PG 756 TRACT 1 OF I EiR Oa EIR-EXISTING IRON ROD II�Jj�-� � ESS) 21 � � PB 11, PG 7 I O DB 667, PG 523 CyF� � � • � LOTS 4-6 OF DB 3616, PG 837 CONSTRUCTION SEQUENCE 8 � ` �O S \ i 29 28 I 22 CA2 PB 98, PG 250 \ I ERe o P qp\ O 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND �/C R 7 _ HOLD PRE CONSTRUCTION CONFERENCE. RAW S3S� 0- ; \ 2. INSTALL STONE CONSTRUCTION ENTRANCES, TEMPORARY 27 ' N/F SILT FENCE, AND TEMPORARY DIVERSION BERMS WHERE TONI M. GAINES SPECIFIED. TRACT 4 OF �♦ 26 IMF N/F 3. CONSTRUCT TEMPORARY SKIMMER & SEDIMENT BASINS. DB 3657PG 454 / \ TIMBERRIDGE PROPERTIES, LLC , 4. CLEAR AND GRUB THE SITE AS NEEDED. 616 ' 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING / ♦ 24 LOT 3 DB 2568, PG TO AREAS REMAIN GRASSED. ♦ 25 F OF PB 98, PG 250 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. - / 7. INSTALL UTILITIES. / . r 2 �� N/F 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER ��_�� TIMBERRIDGE PROPERTIES, LLC \ DB 2512, PG 211 INLETS. N/F LOT 2 OF \ PB 11, PG 7 I I O ERB-EXISTING REBAR \ o COMPUTED POINT N/F - NOW OR FORMERLY I I R/W - RIGHT OF WAY �/ • \ I I PROPERTY LINE oPL - - -OLD PROPERTY LINE ADJACENT PROPERTY LINE ,07 / I I I - - RIGHT-OF-WAY QoV I -SETBACK LINE w WATER LINE 9. PERFORM FINE GRADING. ITONI M. GAINES ��OJ �' I �// OCREEKUTILITY EAD 10. INSTALL AND PREPARE BASE COURSE. / TRACT 2 OF ♦ \ N/F \ PB 98, PG 250 O,Zo / 11. PAVE ROADWAYS. DB 3657, PG 454, JASON L. MILLS N/F WETLANDS 12 AREAISIZE, SEED AND MULCH ALL REMAINING DISTURBED / PB 2003, PG 181 DB 1215, PG 981 TIMBERRIDGE PROPERTIES, LLC I I X FENCE LINE � DB 2520, PG 206 � 0LOT 1 OF TREE LINE 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO / i� 1 i PC F, SLIDE751-C �Z� I PB 98, PG 250 I I I 210 MAJOR CONTOUR REMOVE ALL TEMPORARY MEASURES. / N/F 1 ♦ I 207 MINOR CONTOUR 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED BRIAN P LAGESSE & SPOUSE, AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ♦ SUSAN R LAGESSE \ I I x 208.47SPOT ELEVATION ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL DB 3495 PB 2003, PG 181 PG 807 / \ �` �� \ I I BENCHMARK STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST / \ ❑ / I I B MAILBOX BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF / �\ ' I pp GUY WIRE LE TERMINATION (NOT). THE NOT IS AVAILABLE AT: / HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT / _ _ I I I ❑T TELEPHONE PEDESTAL MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE - - - - - - - - - MITCHELL ROAD - SR 1535 ❑o WATER METER OF TERMINATION PROCESS. / 60' PUBLIC R/W - - - - - - - -I �6j HARDWOOD TREE PINE TREE GRADING NOTES PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE SHRUB TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS 1 I WETLANDS MATCH LINE- SEE THIS SHEET 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE OPERATION. 1 UNSUITABLE SOILS BENCHMARK AND MUST BE VERIFIED BY THE GENERAL 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH I `� / CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED DURING AND AFTER GRADING BY THE CONTRACTOR TO I I ���0 ` , ACCESS/MAINTENANCE EASEMENT / GRADE OF THE CURB, UNLESS OTHERWISE NOTED. DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT a • — 30 — 3o' — VEGETATED STREAM BUFFER I / / 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES IS DETERMINED THAT THERE IS A SLOPE STABILITY 1 I ��$O / SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. c— LIMITS OF CONSTRUCTION I I `�1 ® — roc— — sF — roLo — SILT FENCE LINE LONGITUDINAL SLOPE NO STEEPER THAN 5%. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT EPK 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED I �`� —.IN — JN —JUTE NETTING / LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE BY SILT FENCE. O — DIV — DIV — DIVERSION BERM WITH THE APPROVED EROSION AND SEDIMENTATION 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL - / CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS I l 0INLET PROTECTION / 01 J ��c R� MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY IN PROGRESS. Know what's I�@IOW. / 66 DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. _ —10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE I I 1 I ° Call before you dig. i 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN - — �� PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO I �412 4V / AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL HANDLE THE STORM WATER ARE CONSTRUCTED. THE I' BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE I I I SR 1532 HAS BEEN COMPLETED DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. OAK GROVECHURCHROAD nEPK 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN GRAPHIC SCALE - \ , 66 PUBLIC R�— CONTRACTOR AND THE OWNER TO PROTECT ADJACENT SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR /► - EPK PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING TO IMPLEMENTATION OF THE CHANGE. I" I ,/ 250 0 125 250 500 1000 EPK OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR Il 5/8'', 5ERB ♦� THE UNDERGROUND UTILITY PIPES, CONDUITS, OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN TEMPORARY EROSION CONTROL BLANKET OR EQUAL ERe I I �\ \ 6 IT THEALL LOCATION OCATTIE THE ION OF AOLLTUTILITI SS OR STRUCITBURES ABO ERIFY 13. ALLBS ROUSS-PIPES TO BE CORRUGATED ALUMINUM PIPE S I ( IN FEET ) AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE (CAAP). I,\ 1 I 1 inch = 250 ft. MATCH LINE- SEE THIS SHEET II. II. = � II. II. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com �kESS l0�i •;`9� SEA 0274 Z ��'' SL; G I N1••��````�� ��01 1111g�XWX 1v-31-22 REVISIONS PROJECT NAME BLAKE POND SUBDIVISION OVERALL GRADING AND EROSION CONTROL PLAN CLIENT CAROLINA LAND GROUP, LLC 341 Kilmayne Drive - Suite 201 Cary, North Carolina 27511 Phone: (704) 608-3085 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 1936 DRAWING SCALE HORIZONTAL: 1 "=250' DATE RELEASED OCTOBER 31, 2022 SHEET NUMBER C-3mO