Loading...
HomeMy WebLinkAboutNCC230763_Site Plan or Location Map_20230322TOWN OF FUQUAY-VARINA STANI EROSION CONTROL PLAN FOR SIB ` I14 48 49 50 I 57 . 58 59 46 �, � j` 47 i i 60 " o 00 15 45 ICI 51 74 61 16 1 62 ,\ 44 yy 52 l 73 17 I �'� 5..i I I I 43 i I� 111,E 42 41 0 LL1 a� X U 4 U w LIJ Q W LL LL J N W H LJ E1J O F_ H z 0 z 0 O w 0 z z a a z 0 0 m iD z 0 LLA 0 n Z 0 N Cn3 W CV O � J N O ti N Wo W N a 63 NA 64 "" 19 jdo� 65 66 20 21 r 27 1 30 29 28 22 I 26 f % 24 \� j 25 ,\'' x. 1, VICINITY MAP FOREST BLUFF ESTATE PROJECT NAME: FOREST BLUFF ESTATES TOWN OF FUQUAY-VARINA PROJECT NO.: DATE OF PERMIT ISSUANCE: _ DATE OF PERMIT EXPIRATION: - - - _J DRAWING INDEX )ARD ED S TMENT AIND z o X N w N_ = U) rn z cry w Y 0 S O rY NGLE FAMIL L T WI.— J Q U U) r-� O = � � U) Cj O T _C? N N C) N W � Q CO (Q � O N O Z w J LL. EC-00 COVER SHEET EC-01 EROSION CONTROL PLAN EC-02 EROSION CONTROL DETAILS 1 EC-03 EROSION CONTROL DETAILS 1► Civil Engineering: The Curry Engineering Group, PLLC NC License # P-0799 PO Box 2018 205 S. Fuquay Ave Fuquay-Varina, NC 27526 919.552.0849 (o) 919.880.9857 (m) Contact: Don Curry, PE email: don@curryeng.com Survevor: TYPICAL CONSTRUCTION SEQUENCE FOR SINGLE FAMILY LOTS SEDIMENT AND EROSION CONTROL 1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF FUQUAY-VARINA. OBTAIN A LAND DISTURBING PERMIT. 2. INSTALL MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERS)ONS, BERMS AND BASINS IMMEDfATELY AFTER CONSTRUCTION. 3. CALL ENGINEERING CONSTRUCTION INSPECTOR FOR A COMPLIANCE INSPECTION. 4. MAINTAIN DEVICES AS NEEDED FOR ALL PHASES OF PROJECT. REMOVE EROSION CONTROL DEVICES WITH ENGINEERING CONSTRUCTION INSPECTOR APPROVAL ONLY, 5. MAINTAIN RAIN GAUGE AND SELF -INSPECTION RECORDS PER NPDES REQUIREMENTS. 6. STABILiZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABILIZATION TIME FRAMES ON APPROVED PLAN. 7. WHEN CONSTRUCTION IS COMPLETED, AND ALL AREAS ARE STABILIZED, CALL ENGINEERING CONSTRUCTION INSPECTOR FOR INSPECTION, 8. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC., AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED. 9. WHEN VEGETATION HAS BECOME PERMANENTLY ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENGINEERING CONSTRUCTION INSPECTOR. 0-111, /+4 FUQUAY V/-1PINA ENGINEERING DEPTAPPROVA[L� �7 signature Swwwr l E)ate 10� � Z L Mauldin -Watkins Surveying, PA P.O. BOX 444/1301 W. Broad Street Fuquay-Varina, NC 27526 919.552.9326 Contact: Wayne Mauldin, PLS Projects shall be constructed according to the Standard Specifications and Details in effect at the time the project receives Town approval for construction. The Contractor must have a complete set of stamped plans and specifications on the jobsite any time work is being performed. Stamp shall be affixed to plans below: v 0 0 4 0 C 0 UJ w UJ LJLft afti ca U) LW 0 Lift N N 3 : � N C �U z ?. M N C r 'C rT (11 LL A L j f3 Cr O M N W_ fn a] 0 O N N N rn_rn_ H LL UJ LU Z U) ac 0 SEAL C.7 z LU SAL9r' z 36823 ca ":q✓fNG I W VA lllil; � EC=00