Loading...
HomeMy WebLinkAboutNCC230732_ESC Approval Submitted_20230322ROY COOPER ELIZARFM S. PISER sr� DOUGLAS R. ANSEL rnw" (N.'nn. NORTII CAROLINA Environmental Qualify January 31, 2023 LETTER OF APPROVAL WITII MODIFICATIONS James & Holly Padgett 1170 Christopher Rd. Campobello, SC 29322 RE: Project Name: MOORE RD. SITE Acres Approved: 3.5 Project ID: POLK-2023-003 County: Polk City: Tryon Address: 51 Moore Rd. River Basin: Broad Stream Classification: C Submitted By: James & Holly Padgett Date Received by LQS: November 14, 2022 Date Revision Received by LQS: December 7, 2022 Date Revision Received by LQS: January 17, 2023 Plan Type: Residential Dear Mr. & Mrs. Padgett, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Pro am staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. D E Q North Carolina Department of Environmental Quality I Dlvlslon of Energy, Mineral and Land Resources Asheville Regional Office 12090 US. Highway 70 1 Swannanoa, North Carolina 28778 noAni cwouur� � o.��.nM►.w..��o.rh� /� 828.296A500 Letter of Approval with Modifications James & Holly Padgett January 31, 2023 Page 2 of 4 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on File at the job site: 1. The approved USC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project Your cooperation is appreciated. Sincerely, Fred Walker, PE Engineer III Land Quality Section Letter of Approval with Modifications James & Holly Padgett January 31, 2023 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications Required for Approval ec: Mr. Bryan Shamblin - NCDEQ-LQS (bryan.shamblin@ncdenr.eov) Mr. Landon Davidson, PG -- NCDEQ-DWR (land on. davidsonOncdenr.gov) Mr. Andrew Moore, PG - NCDEQ-DWR (andrew.w.moore(@ncdenr.eov) cc: Regional Office file Letter of Approval with Modifications James & Holly Padgett January 31, 2023 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: MOORE RD. SITE Project 1D: POLK-2023-003 County: Polk 1. Notify NCDEQ-LQS inspector Bryan Shamblin when the project is ready for a close out inspection. 115A NCAC 04B .0106.(a)(2)} 2. File for NPDES NCGO10000 e-Notice of Termination once close-out inspection report is received. {15A NCAC 04B .0106.(a)(2)}