HomeMy WebLinkAboutNCC230732_ESC Approval Submitted_20230322ROY COOPER
ELIZARFM S. PISER
sr�
DOUGLAS R. ANSEL
rnw" (N.'nn.
NORTII CAROLINA
Environmental Qualify
January 31, 2023
LETTER OF APPROVAL WITII MODIFICATIONS
James & Holly Padgett
1170 Christopher Rd.
Campobello, SC 29322
RE: Project Name: MOORE RD. SITE
Acres Approved: 3.5
Project ID: POLK-2023-003
County: Polk
City: Tryon
Address: 51 Moore Rd.
River Basin: Broad
Stream Classification: C
Submitted By: James & Holly Padgett
Date Received by LQS: November 14, 2022
Date Revision Received by LQS: December 7, 2022
Date Revision Received by LQS: January 17, 2023
Plan Type: Residential
Dear Mr. & Mrs. Padgett,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed, you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Pro am
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
D E Q North Carolina Department of Environmental Quality I Dlvlslon of Energy, Mineral and Land Resources
Asheville Regional Office 12090 US. Highway 70 1 Swannanoa, North Carolina 28778
noAni cwouur� �
o.��.nM►.w..��o.rh� /� 828.296A500
Letter of Approval with Modifications
James & Holly Padgett
January 31, 2023
Page 2 of 4
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on File at the job site:
1. The approved USC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project
Your cooperation is appreciated.
Sincerely,
Fred Walker, PE
Engineer III
Land Quality Section
Letter of Approval with Modifications
James & Holly Padgett
January 31, 2023
Page 3 of 4
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications Required for Approval
ec: Mr. Bryan Shamblin - NCDEQ-LQS (bryan.shamblin@ncdenr.eov)
Mr. Landon Davidson, PG -- NCDEQ-DWR (land on. davidsonOncdenr.gov)
Mr. Andrew Moore, PG - NCDEQ-DWR (andrew.w.moore(@ncdenr.eov)
cc: Regional Office file
Letter of Approval with Modifications
James & Holly Padgett
January 31, 2023
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: MOORE RD. SITE
Project 1D: POLK-2023-003
County: Polk
1. Notify NCDEQ-LQS inspector Bryan Shamblin when the project is ready for a close
out inspection. 115A NCAC 04B .0106.(a)(2)}
2. File for NPDES NCGO10000 e-Notice of Termination once close-out inspection
report is received. {15A NCAC 04B .0106.(a)(2)}