Loading...
HomeMy WebLinkAboutNCC230747_NOI Application_20230321Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/13/2023 2:53:42 PM (NCG01 NOI Submission) Approve by Paul.Clark 3/17/2023 10:39:42 PM (Review - NOI 131966 Sunset Grove - Lot 18R) • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 16, 2023 5:00 PM 3/13/2023 2:53:49 PM • The task was assigned to Paul.Clark by round robin distribution 3/13/2023 2:53:49 PM Submit by Tev.Holloman 3/21/2023 10:42:59 AM (Payment Verification for NCC230747) • Wesley Walker The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 28, 2023 5:00 PM 3/17/2023 10:39:59 PM • Tev.Holloman assigned the task to Tev.Holloman 3/21/2023 10:42:30 AM R �o NORTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information Are you submitting an NOI that was rejected before? No Yes Previous Rejected NOI No. 131078 Prior Reviewer Name Paul Clark 1a. Project Name* Sunset Grove - Lot 18R 1b. Specific Lot Numbers This field may be used to list specifc lot numbers. 1c. Parcel ID Number(s) (PIN) List all PINs associated with this project. 94025 2. County* Chatham 3. Highway or Street Address* 103 Shadow Ridge Way Street name only is acceptable if no address number assigned yet 4. City or Township* Pittsboro 5. State* NC 6. Zip Code* 27312 7. Latitude* Enter the latitude in decimal degrees 35.7610 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -79.0800 U If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/13/2023 Estimated Construction Project Start Date 10. Date to End* 03/05/2024 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 0.78 disturbed* (including off -site borrow and waste areas) 13. Total site area 3.34 (acres) * 14. Post -construction 0.10 impervious area (Estimated) (acres) * Project Tracking ID NCC-CHATH-2023-Sunset Grove - Lot 18R Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Waterbody* Parkers Creek Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index No.* 16-41-8-(1) NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 16a. Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA (American Rescue Plan Act) grant funds? No Yes This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. Reviewer may update if status is known. B. Permittee Information Part B. Permittee Information - Legally Responsible Entity and Individual ...................................................................................................................................................................... Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity WMLR, Inc If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership (FRO) Form. 2. First Name* Wesley If Corporation, enter Registered Agent First Name 3. Last Name* Walker If Corporation, enter Registered Agent Last Name 3b. Title Vice President 4. Permitee E-mail wes@walkerbuild.com Address * 5. Permittee 919-234-4284 Telephone No.* 6. Permittee Mailing Street Address Address * 111 Commonwealth Ct. Address Line 2 Suite 105 City State / Province / Region Cary NC Postal / Zip Code Country 27511 United States Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address * Ill Commonwealth Ct. Address Line 2 Suite 105 City State / Province / Region Cary NC Postal / Zip Code Country 27511 United States 8. Type of Ownership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Proiect Site Contact Information 1. Primary Site Wesley Contact - First Name* 2. Primary Site Walker Contact - Last Name* 3. Title Vice President 4. Site Contact E-mail wes@walkerbuild.com Address * 5. Site Contact 9192344284 Telephone No.* 6. Organization Name WMLR, Inc. 7. Site Contact Mailing Address* 8. Consultant Name Street Address 111 Commonwealth Ct. Address Line 2 Suite 105 City Cary Postal / Zip Code 27511 (Optional) First and Last name 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) wes@walkerbuild.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 919-234-4284 Default is legally responsible person telephone State / Province / Region NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 02/28/2023 Approved * 2. E&SC Plan Project WP-23-56 Number/ID * Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. Local Program* Chatham County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan S & EC APPROVAL LETTER (LOT 18 SG) 2-28- Approval letter or 23.pdf 127.49KB Grading Permit Must be PDF format 6. Signed FRO Financial Responsibility/Ownership Form SIGNED FRO FORM (LOT 18R SG) 1-30-23.pdf 751.58KB Must be PDF format 7. Site Location Map Must be PDF format (limit 20 MB) SITE PLAN (Revised) LOT 18R SG) 6-7-22.pdf 170.91 KB Please do not upload entire set of E&SC plans. B. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification NOI CERT FORM (LOT 18R SG) 3-7-23.pdf 728.11 KB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person" (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature WAA* waoq Type Name* Wesley Walker Title Vice President Organization Legally Responsible Entity WMLR, Inc Date * 03/13/2023 F. Tracking and COC Info NOI Tracking No. 131966 NC Reference No. NCG01-2023-0747 Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SIP (passed from workflow if eNOI approved) Certificate of NCC230747 Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC230747-2023 Invoice Due Date 4/16/2023 Initial Fee $ 100.00 Invoice Status OPEN