Loading...
HomeMy WebLinkAboutNCC230535_Site Plan or Location Map_20230321DocuSign Envelope ID: D920BOEO-3635-4453-BOEO-7OE9D538638A INDEX OF SHEETS PE SEAL COVERSHEET.................................................................................... 1 GENERALNOTES............................................................................. 2 DETAILS............................................................................... 2A TO 2P GREENWAY BUILDING CODE SUMMARY ..................2Q TO 2R DRAINAGE SUMMARY................................................................... 3 TYPICAL SECTIONS..........................................................3A TO 3D ORR RD DEMOLITION PLANS ............................................. 4 TO 6 PLAN & PROFILE................................................................... 7 TO 32 OVERLOOKPLAN........................................................................... 33 PCSO PLANTING PLAN.................................................................. 34 TRAFFIC CONTROL PLANS .......................... TCP-01 TO TCP-04 PAVEMENT MARKING & SIGNAGE PLANS.. PM-01 TO PM-02 CONSTRUCTION ACCESS PLAN ....................... CA-01 TO CA-02 EROSION CONTROL PLANS .............................. EC-01 TO EC-30 UTILITIES BY OTHERS PLANS ......................... UBO-01- UBO-22 CROSS SECTIONS............................................................. X1 TO X28 RETAINING WALL PLANS ................................ RW-01 TO RW-06 STRUCTURES PLANS ....................................................... S-1 TO S-7 PROJECT TOTAL SHEETS 157 VICINITY MAP NTS Begin Project Sta. 99+78.11 End Construction Begin Work by Others Know what's below. Sta. 100+01.74 -L1- Call before you dig. SURVEY PREPARED BY: CITY OF CHARLOTTE SURVEY-MAPPING-GIS FROM THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON STATE PLANE COORDINATES ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT WITH NAD 83(2011) STATE PLANE COORDINATES OF NORTHING: 556316.43 EASTING: 1477699.94 ELEVATION NAVD: THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999840238 VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE RANGE OF SURVEY: 06/01/2019 TO 02/14/2020 PLANS PREPARED BY: KImley>>> Horn ()202, NC LICENSE #F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 Phone:(704) 333-5131 CHARLOTTE.. GENERAL SERVICES Construction Plans of Proposed Cross Charlotte Trail - Orr to Rocky River Project No. 171522 Proiect Features0 : CONCRETE MULTI -USE PATH, ASPHALT & CONCRETE GREENWAY, DRAINAGE STRUCTURES, CONCRETE CURB AND GUTTER, UTILITY ADJUSTMENTS, BOARDWALKS, SWALE BRIDGES, RETAINING WALLS Begin Construction End Work by Others Sta. 102+46.98 -Ll- LOCATION MAP MAINLINE LENGTH = 1.76 MILES CONNECTION LENGTH = 0.24 MILES 2018 STANDARD SPECIFICATIONS This electronic collection of documents is provided for the convenience of the user and is NOT A CERTIFIED DOCUMENT. These documents contained herein were originally issued, sealed, andlor signed by the individuals whose names and license numbers appear on each page, on the dates appearing with their signature on that page. This file or an individual page shall not be considered a certified document. The City of Charlotte reserves all rights tied to ownership of work product as contemplated under the parties contract as applicable. DATE CREATED: AUGUST 30, 2022 GRAPHIC SCALES F 6SS Rp Dod11Qjned by: AL 6Q5E55DDBE491... (V 8/31/2022��11 Record Drawings End Project Sta. 315+83.50 -L4- 20 40 60 Plan View ................. 20 40 60 Horz. Profile ............ 4 8 12 Vert. Profile ............. 5 to 15 Cross Section ........... RECOMMENDED FOR CONSTRUCTION CDOT - Design 11 M-4 10/10/2022 CDOT - Implementation 11 w6vul 14*� 10/10/2022 CLT Water wi�,m At. VtA 11/07/2022 E2B65DCF1453463... Construction Administration rain, V. UA 10/27/2022 Contract Administration so'ka " 10/27/2022 Doouftned by: Engineering Services Iseu,dL �)a.su.11n. bv, 10/10/2022 Landscape Management I IA& (,t hr Ill 10/11/2022 D7C4B1B237314C5... oD cuSi9� new Y: Planning, Design &Development 6&i Cenut 10/10/2022 Storm Water Services 1 8,-,z S 10/27/2022 Utility Coordination 11 a" jm6v,�s 10/10/2022 �h CHARLOTTE GENERAL SERVICES APPROVED Bid Set No. DOCUS' ned by: 11/07/2022 75CE6D44BC34483... FOR CITY ENGINEER DATE