INDEX OF SHEETS
PE SEAL
COVERSHEET.................................................................................... 1
GENERALNOTES............................................................................. 2
DETAILS...............................................................................
2A TO 2P
GREENWAY BUILDING CODE SUMMARY
..................2Q TO 2R
DRAINAGE SUMMARY...................................................................
3
TYPICAL SECTIONS..........................................................3A
TO 3D
ORR RD DEMOLITION PLANS ............................................. 4 TO 6
PLAN & PROFILE...................................................................
7 TO 32
OVERLOOKPLAN........................................................................... 33
PCSO PLANTING PLAN..................................................................
34
TRAFFIC CONTROL PLANS ..........................
TCP-01 TO TCP-04
PAVEMENT MARKING & SIGNAGE PLANS.. PM-01 TO PM-02
CONSTRUCTION ACCESS PLAN .......................
CA-01 TO CA-02
EROSION CONTROL PLANS .............................. EC-01 TO EC-30
UTILITIES BY OTHERS PLANS .........................
UBO-01- UBO-22
CROSS SECTIONS............................................................. X1 TO X28
RETAINING WALL PLANS ................................
RW-01 TO RW-06
STRUCTURES PLANS .......................................................
S-1 TO S-7
PROJECT
TOTAL SHEETS 157
VICINITY MAP
NTS
Begin Project
Sta. 99+78.11
End Construction
Begin Work by Others
Know what's below. Sta. 100+01.74 -L1-
Call before you dig.
SURVEY PREPARED BY:
CITY OF CHARLOTTE SURVEY-MAPPING-GIS FROM THE
LOCALIZED COORDINATE SYSTEM DEVELOPED FOR
THIS PROJECT IS BASED ON STATE PLANE COORDINATES
ESTABLISHED BY: NCGS MONUMENT OR CONTROL
POINT WITH NAD 83(2011) STATE PLANE COORDINATES
OF NORTHING: 556316.43 EASTING: 1477699.94
ELEVATION NAVD: THE AVERAGE COMBINED GRID
FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS:
0.999840238 VERTICAL DATUM: NAVD 88 ALL LINEAR
DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES.
DATE RANGE OF SURVEY: 06/01/2019 TO 02/14/2020
PLANS PREPARED BY:
KImley>>> Horn ()202,
NC LICENSE #F-0102
200 South Tryon Street, Suite 200
Charlotte, North Carolina 28202
Phone:(704) 333-5131
CHARLOTTE..
GENERAL SERVICES
Construction Plans of Proposed
Cross Charlotte Trail - Orr to Rocky River
Project No. 171522
Proiect Features0
:
CONCRETE MULTI -USE PATH, ASPHALT & CONCRETE GREENWAY, DRAINAGE STRUCTURES,
CONCRETE CURB AND GUTTER, UTILITY ADJUSTMENTS, BOARDWALKS, SWALE BRIDGES, RETAINING WALLS
Begin Construction
End Work by Others
Sta. 102+46.98 -Ll-
LOCATION MAP
MAINLINE LENGTH = 1.76 MILES
CONNECTION LENGTH = 0.24 MILES
2018 STANDARD SPECIFICATIONS
This electronic collection of documents is
provided for the convenience of the user and is
NOT A CERTIFIED DOCUMENT.
These documents contained herein were
originally issued, sealed, andlor signed by the
individuals whose names and license numbers
appear on each page, on the dates appearing
with their signature on that page.
This file or an individual page shall not be
considered a certified document.
The City of Charlotte reserves all rights tied to
ownership of work product as contemplated
under the parties contract as applicable.
DATE CREATED: AUGUST 30, 2022
GRAPHIC SCALES
F 6SS Rp
Dod11Qjned by:
AL
6Q5E55DDBE491... (V
8/31/2022��11
Record Drawings
End Project
Sta. 315+83.50 -L4-
20
40
60
Plan View .................
20
40
60
Horz. Profile ............
4
8
12
Vert. Profile .............
5
to
15
Cross Section ...........
RECOMMENDED
FOR CONSTRUCTION
CDOT - Design 11 M-4 10/10/2022
CDOT - Implementation 11 w6vul 14*� 10/10/2022
CLT Water wi�,m At. VtA 11/07/2022
E2B65DCF1453463...
Construction Administration rain, V. UA 10/27/2022
Contract Administration so'ka " 10/27/2022
Doouftned by:
Engineering Services Iseu,dL �)a.su.11n. bv, 10/10/2022
Landscape Management I IA& (,t hr Ill 10/11/2022
D7C4B1B237314C5...
oD cuSi9� new Y:
Planning, Design &Development 6&i Cenut 10/10/2022
Storm Water Services 1 8,-,z S 10/27/2022
Utility Coordination 11 a" jm6v,�s 10/10/2022
�h
CHARLOTTE
GENERAL SERVICES
APPROVED
Bid Set No.
DOCUS' ned by:
11/07/2022
75CE6D44BC34483...
FOR CITY ENGINEER DATE