Loading...
HomeMy WebLinkAboutSW8971225_HISTORICAL FILE_20061023 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 C1-1122 5 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 O ou 1 o 23 YYYYMMDD wArt 9 P �Ik Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department or Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 23, 2006 Walter Pancoe, President The Caper Corporation, General Partner 1900 LTD. Partnership 1901 Kent Street, Suite E Wilmington, NC 28403 Subject: Stormwater Permit No. SW8 971225MOD Wrightsville Office Park High Density Project New Hanover, County Dear Mr. Pancoe: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Wrightsville Office Park on October 19, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW8 971225MOD dated October 23, 2006, for the construction of the subject protect. This permit shall be effective from the date of issuance until October 23, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements In this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1506 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely! Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:\WQS\STORMWAT\PERMIT\971225MOD.oct06 cc: Norris, Kuske & Tunstall New Hanover County Building Inspections City of Wilmington Stormwater Services New Hanover County Engineering Chris Baker Wilmington Regional Office n�0.�t,Ca ohme Central Files vaturn//y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: www.newatermrJilv.ore Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 971225MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Walter Pancoe, President The Caper Corporation, General Partner 1900 LTD. Partnership Wrightsville Office Park New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 23, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 92,173.6 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 971225MOD 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft : Offsite, ftz: b. Total Impervious Surfaces, ftz: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ftz: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL j. Controlling Orifice: k. Permitted Forebay Volume, ft3: I. Receiving Stream/River Basin: M. Stream Index Number: n. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 3.94 83,526.3 8,647.3 92,173.6 1 7.5 90% 21 5,600 17,744 22.5 1"0 pipe 3,899 Mineral Springs Branch / Cape Fear 18-74-63-2-1 "C Sw" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 971225MOD 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/2 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 971225MOD 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this�th 23rd day of October, 2006. NOR 'CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION M Z,.1�_ forAan ime .E., erector Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 971225MOD Wrightsville Office Park Stormwater Permit No. SW8 971225MOD New Hanover Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to full time) the construction of the project, (Project) observe (periodically/ weekly/ for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number ME SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 971225MOD Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 7 of 7 N KT #06073 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): The Caper Corporation, General Partner 1900 LTD. Partnership 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Walter Pancoe. President 3. Mailing Address for person listed in item 2 above: 1901 Kent Street, Suite E City: Wilmington State: NC Zip: 28403 Telephone Number: (910) 343-0029 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wrightsville Office Park 5. Location of Project (street address): 2210 City: Avenue 6. Directions to project (from nearest major intersection): Corner of Wrightsville Avenue and Dawson Street County: 7. Latitude: 340 13' 30" Longitude: 770 55' of project 8. Contact person who can answer questions about the project: Name: Joseph K. Bland, E.I. Telephone Number: (910) 343-9653 11. PERMIT INFORMATION 1. Specify whether project is (check one): New Renewal X Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number SW8 971225 Mod And its issue date (if known) 01-31-00 3. Specify the type of project (check one): Low Density X High Density Redevelop 4. Additional Project Requirements (check applicable blanks): General Permit Other _CAMA Major Sedimentation/Erosion Control _ 404/401 Permit _ NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. 111. PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Modification of pond level and orifice locations to accommodate additional impervious surface; wet detention pond. 2. Stormwater runoff from this project drains to the Cape Fear River Basin. 3. Total Project Area: 3.49 4. Project Built Upon Area: 60.6 % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area I Drainage Area 2 Receiving Stream Name Mineral Springs Branch Receiving Stream Class C-SW Drainage Area 3.94 AC Existing Impervious * Area 0.38 AC Proposed Impervious* Area 1.736 AC % Impervious* Area total 60.63% Impervious* Surface Area Drainage Area I Drainage Area 2 On -site Buildings 21,186.4 sf On -site Streets Proposed & Existing 55,464.6 sf On -site Parkin On -site Sidewalks 6,875.3 sf Other on -site Off -site As halt & Walks 8,647.3 sf 'total: 92,173.6 sf = 2.116 AC I Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7,. How was the off -site impervious area listed above derived? As -built surveys along with computer data compiled from CADD systems. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with .state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runofffrom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Form SWU-103 Form SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Underground Infiltration Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 V,I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable supplement form(s) for each BMP • Permit application processing fee of SQQ payable to NCDENR) $ 4 , 0 0 0 • Detailed narrative description of stormwater treatment / management • Two copies of plans and specifications, including: - Development / Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property / project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUT14ORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Norris, Kuske & Tunstall Consulting Engineers, Inc. /Tneanb K_ Bland F. T. Mailing Address: 902 Market Street City: Wilmington State: NC Zip: Phone: (910) 343-9653 Fax: (910) 343-9604 VHL APPLICANT'S CERTIFICATION 28401 1, (print or type name of person listed in General Information, item 2) Walter Pancoe Certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 214.1000. Signature: Form SWU-101 Version 3.99 Page 4 of 4 Date: 10/16/06 NKT #06073 Pemtit No.5NM 7122 5 M o0 State of North Carolina (to be provided by DWQ) Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Wrightsville Office Park Contact Person: Joseph K. Bland, E.I. Phone Number: (910) 343-9653 For projects with multiple basins, specify which basin this worksheet applies to: N/A elevations Basin Bottom Elevation 14 ft. Permanent Pool Elevation 21 ft. Temporary Pool Elevation 22.5 ft. areas Permanent Pool Surface Area 5,600 sq. ft. Drainage Area 3.94 ac. Impervious Area 2.116 ae. (/loor of the basin) (elevation of the orifices) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 17,744 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 6,832 cu. ft. (volume detained above the permanent pool) Forebay Volume 3,899 cu. ft. (approximately 20% of total volume) Other parameters SA/DAt 2.4 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1" in. (2 to 5 day temporary pool draw -clown required) Design Rainfall 1" in. Design TSS Removal t 90 % (minimum 85%required) Form SWU-102 Version 3.99 Page 1 of 4 Footnotes: 1. When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to detemnine the correct value for non- standard table entries. 2. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials N/A a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations. f. The basin length to width ratio is greater than 3: 1. g. The basin side slopes above the permanent pool are no steeper than 3: 1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. N/A 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check are) ❑ does ® does not incorporate pretreatment other than a forebay. Form SWU-102 Version 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of temporary pool occurs within 2 to 5 days as designed. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads Sediment Bottom ral El. 1575 ------------ vation 14 FOREBAY 5.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 21 Sediment Removal Elevation 15_75 75% ------------------------- i ----- Bottom Elevation 14 MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SW U-102 Version 3.99 Page 3 of 4 All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that 1 am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Walter Pancoe Title: President Address: 1901 Kent Street, Suite E Wilmington, NC 28403 Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. l jyl It �S , �1 T-( a Notary Public for the State of _I � Q (�, I n CA County "o"f J,� rI C,Ln u� Q do hereby certify that qe T- �)A Personally appeared before me this _LSLLI day of S%ldil�i�, �, and acknowledge the due Execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal. ��TAgY pUBOG A Signature My commission expires() OJ— - f Form SWU-102 Version 3.99 Page 4 of 4 .\tlC;lrllbtlj/ V 0o;�� NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. October 18, 2006 Mr. Cameron Weaver, Express Review Coordinator NC DENR / Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Express Review Submittal Wrightsville Office Park Wilmington, NC NKT Project No. 06073 Dear Mr. Weaver: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel Enclosed are two (2) sets of plans for the subject project, one (1) set of calculations, one (1) copy of the stormwater narrative, the original Division of Water Quality Stormwater Management Permit application, the original SWU-102 supplement form and a $4,000.00 check for the express permit review fee. The following sheets should be pulled out of the various project documents that are contained within your files to make a complete set of all phased development as Wrightsville Office Park. Pull the following out of Andrew & Kuske # 99317: Sheets: C-1; C-2; C-4 omitting the pond cross section and outlet structure and sheet PR-1. Pull the following from NKT# 04122: Sheet C-1 Along with all the submitted project documents from NKT# 06073, the numerous grading sheets reflect the changes from initial permitting through the final phase with augmentation to the design of permitted structures. Together all three sheets compile grading information of all installed paving. Also, the following items have been added to the detail sheet as requested at the preliminary meeting on October 17, 2006. 1. Detail of augmented outlet structure. 2. New pond cross section reflecting the change in normal pond elevation and forebay modification. 902 Market Street • Wilmington, NC 28401-4733 0 Phone: 910.343.9653 • Fax: 910.343.9604 Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. C Joseph K. Bland, EI JKB/kbh 06073 10-18-06-s-sw express-Itr Enclosures STORMWATER SYSTEM & EROSION CONTROL NARRATIVE RECEIVED 0CT 1 9 2006 BY:SW�R�1225 op WRIGHTSVILLE OFFICE PARK WILMINGTON, NORTH CAROLINA For The Caper Corporation Walter Pancoe 1901 Kent Street, Suite E Wilmington, NC 28403 (910)343-0029 September 2006 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) E-mail: office@nkteng.com NKT Project No. 06073 [.�:1:7t11LVI DESCRIPTION: The project site is a 3.49 acre tract located at the corner of Wrightsville Avenue and Dawson Street. This application is a requested modification of Permit #SW8 971225 Modification. The existing permit for this project lists a total of 1.69 acres of impervious surface coverage which drains to a wet detention pond. The client wishes to proceed with Phase 4 of this project. It has been discovered that the final proposed improvements will exceed the state stormwater permit. An additional 0.426 acres will be required to be permitted to be within compliance. The soils that are present at the Phase 4 location are lightly vegetated sandy clay topsoil. Grades within this area range from 4% to 1%. The final phase will disturb approximately 0.5 acres of which 0.426 acres will be covered with impervious surface. The run-off for the entire site was designed using the TR-55 Method for pre and post development for the 10 year storm event and rainfall data for the area. Construction is scheduled to begin as soon as possible. EROSION CONTROL MEASURES: The attached plans and specifications outline the requirements for erosion control measures. Silt fencing will be provided around the area of the retention pond which abuts to the Phase 4 disturbed area and around any catch basins which lie within the disturbed area. Gravel check dams will not be provided unless the contractor has to temporarily discharge into an open ditch instead of the proposed storm drain outfall. A gravel construction entrance will not be needed for this project since two asphalt entrances already exist upon the property. Any maintenance will be provided by the grading contractor and developer. STORMWATER MANAGEMENT MEASURES: The project site is located in New Hanover County. Land disturbing on the site will not exceed one acre, but it has been determined that the final impervious surface coverage to be installed will be out of compliance with permit #SW8 971225 Modification. The proposed 0.426 acres to be constructed will be diverted to the existing retention pond. It has been determined that the existing retention pond will accommodate the additional stormwater run-off with a small outlet structure modification. First, the permanent pool elevation will be raised from 20 feet to 21 feet. Next, the 1" orifice will be moved up to an elevation of 21 feet and the secondary orifice will be moved up to an elevation of 22.5 feet and its dimension shall be modified to 4 foot wide by 0.5 feet in height. The emergency outlet will remain as permitted on the initial permit. The stormwater detention pond will accommodate approximately 2.116 acres of impervious surface which corresponds to 60.63% impervious area lot coverage. CONSTRUCTION SEQUENCE: Any silt fencing will be installed prior to the beginning of any clearing and grading operations. Additional silt fencing will be installed when and if conditions warrant during construction. All disturbed areas will be landscaped or seeded upon completion. EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. Install erosion control measures before beginning construction or as soon thereafter as possible. All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Install erosion control measures around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain and make repairs immediately. Remove sediment when it becomes 0.50 deep to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade and appropriately stabilize all bare areas around the drop inlets. 3. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. Silt fence stakes shall be spaced 6 feet apart unless a wire backing is used with 8 foot stake spacing. 4. Inspect temporary sediment traps / check dams after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment - producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. 5. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 6. All disturbed areas shall be seeded within 15 days of disturbance. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. 7. More stringent measures shall be used to halt erosion if those shown on this plan are not effective. 8. All erosion shall be controlled including side slopes before the project is completed. 9. Remove temporary measures upon completion of project. All permanent measures will be well established before project closeout. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 15 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by wood or metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A or Class B erosion control stone at minimum two feet high and three feet thick across the watercourse, with a one foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION Dote Design NORRIS. KUSKE &TUNSTALL 902 Market $1. $heel CONSULTING ENGineERs, INC. Wilmington, N.C.28401-4733 �1 �1 1 Check Job For Job No. 4J9q Ui -17�, h�4uD►hr-4'�owt lb 514MSTW-M WffiYuL f9ffA&W #- AV 81-7 If 225 V f 14FiraTsw of 57b«AG L ruL Aw4 "DI jDo•- 4L o • AM4* *,t*r 10 Fit ARLRD 1b 5VM VN#44. wO'l[rU— PLA-A-Vr . Mooi (�i a+s -re txyrlcrr f-)1wcv11-t 7b wrho-i Oct A fm -d RQ,+t) 4,oue s NGu�oHO 571W 51%L#%A wwtA- Pb,-to hUlc iQW a 1k01-0 rw00di rfj WI cl,-riftr 6-1*ug1M4 fKM$►�iT F� era nt�'rR-!�9M Bw�+�o�M x �o►-roran- ���,ws s OCT 1 9 Zoos ��LLIP � •' Date' Design ANORRIS, KUSKE&TUNSTALL 11113 CONSULTING ENGINEERS, INC. Check Job I For 902 Market St. et L Wilmington, N.C. 28401-4733Of 2i Job No. WMItT,-9DR� jj� 5)Ar%, sewnWATO ()UK4I`r0--5w%i71225 / loomica-nc-- - V)WMf /tu.E p=Frfh Pnq; IhG� 0p,4Sltl sTof-e-tiwAme Ptn�au' i rh f4��rii � bra Ey�s-n a4,z- D�r�r2a,rn,rt D.A 3.jq �IAT)ll I "CAV. qo5llrL 64 -f CpslTn-P{NrNt 4 VJ 5 n.3EAL 231swSi 272r� z 21 fro k� 0.aac Ma. —73&''3(,e Fr` 6.3, /.bl Ar- r, srrwb; � St kWhAts �OtIµ O 14/2&1.3/�-� o.3B At- `f7,-739, a Rz to/ `b,eij:,y 2l(0o f*' rr=' -7-74, 0 L ka! yu- — S;Y23,Y�z- 12, 33S ro 6" &-70, 6 fi Sl 2, -7 fFjz 41274- 3 t::r2. �p 0, O�E4, z 2, it (- At- Project: Wrightsville Office Park Drainaae Basin: Drainage Area, DA = Impervious Area = Pervious Area = % Impervious, I = NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. State Stormwater Calculations 171,626 sf 92,173 sf 79,453 sf 53.71 % Storaae Volume Required (Simple Method): Design Depth, D = 1.0 in Normal Pool Elevation = 21 State Storage Pool Elevation = 22.5 Bottom Pool Elevation = 14 ft Runoff Volume. Rv = 0.533 in/in Required Storage Volume = Provided Storage Volume = Required Surface Area: % Imp SA/DA Low 50 1.9 High 60 2.4 SA/DA = Required Surface Area = Provided Surface Area = Drawdown Orifice 7,628 ft3 9,761 ft3 SA = 5,600 sf SA = 7,415 sf Rv = 0.05 + 0,009*1 Depth Proj % Imp 7.00 53.71 V=D/12xRvxDA OKI 2.09 90% TSS removal, no filter strip 3,579 sf 5,600 sf OKI Avg. Head = 0.75 ft Drawdown Time = 2 days 172,800 s Internal Diameter = 0.12 ft Internal Diameter= 1.39in Drawdown Time = 5 days 432,000 s Internal Diameter = 0.07 ft Internal Diameter= 0.88 in Avg Internal Diameter = 1.14 in Design Orifice Diameter = 1.00 in OKI �I21 9/14/2006 NKT No: 06073 C:\Documents and Settings\Joe K\My Documents\Project Documen ts\2006\06073\DWQ Wet Pond Simple pre devolpment wrightsville office park Type 111 24-hr wilmington 10 yr Rainfall= 7. 00" Prepared by {enter your company name here) HydroCADO 7,10 s/n 000479 © 2005 HVdroCAD Software Solutions LLC 9/11/2006 Subcatchment 1S: (new Subcat) [49] Hint: Tc<2dt may require smaller dt Runoff = 14.86 cfs @ 12.14 hrs, Volume= 1.290 af, Depth> 3.93" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.10 hrs Type III 24-hr wilmington 10 yr Rainfall=7.00" Area (ac) CN Description 3.940 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (f /sec) (cfs) 10.0 Direct Entry, entire site ,/1 pre devolpment wrightsville office park Type 111 24-hr wilmington 10 yr Rainfall=7.00" Prepared by {enter your company name here} HydroCAD® 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Subcatchment 1S: (new Subcat) Hydrograph Runoff Time (hours) U�I L1 pre devolpment wrightsville office park Type 111 24-hr wilmington 50 yr Rain/all=9.01 " Prepared by {enter your company name here) Subcatchment 1S: (new Subcat) [49] Hint: Tc<2dt may require smaller dt Runoff = 21.52 cfs @ 12.14 hrs, Volume= 1.874 at, Depth> 5.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.10 hrs Type III 24-hr wilmington 50 yr Rainfall=9.01" Area (ac) CN Description 3.940 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, entire site pre devolpment wrightsville office park Type /// 24-hr wilmington 50 yr Rainfall=9,01" Prepared by {enter your company name here) HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 N U Subcatchment 1S: (new Subcat) Hydrograph Time (hours) ❑ Runoff Ui24 Wrightsville Office Park Type 111 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 @ 2005 HydroCAD Software Solutions LLC 9/11/2006 Subcatchment 1S: entire area including Cowell Ave (49] Hint: Tc<2dt may require smaller dt Runoff = 14.74 cfs @ 12.14 hrs, Volume= 1.280 af, Depth> 3.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.10 hrs Type III 24-hr wilmington 10 year Rainfall=6.72" Area (ac) CN Description 2.095 98 Paved parking & roofs 1.845 49 50-75% Grass cover, Fair, HSG A 3.940 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, entire site 63i�1 Wrightsville Office Park Type 111 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Subcatchment 1S: entire area including Cowell Ave Hydrograph Runoff Time (hours) Wrightsville Office Park Type IN 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} Pond 2P: retention pond Inflow Area = 3.940 ac, Inflow Depth > 3.90" for wilmington 10 year event Inflow = 14.74 cfs @ 12.14 hrs, Volume= 1.280 of Outflow = 2.78 cfs @ 12.72 hrs, Volume= 0.641 af, Atten= 81 %, Lag= 34.8 min Primary = 2.78 cfs @ 12,72 hrs, Volume= 0.641 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.10 hrs Peak Elev= 22.86' @ 12,72 hrs Surf.Area= 7,849 sf Storage= 30,253 cf Flood Elev= 24.00' Surf.Area= 9,358 sf Storage= 40,057 cf Plug -Flow detention time= 242.0 min calculated for 0.641 of (50% of inflow) Center -of -Mass det. time= 128.4 min ( 952.7 - 824.3 ) Volume Invert Avail.Storage Storage Description #1 14.00' 40,057 cf Custom Stage Data (Prismatic�isted below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 14.00 10 0 0 20.00 4,261 12,813 12,813 21.00 5,600 4,931 17,744 21.50 6,132 2,933 20,677 22.00 6,890 3,256 23,932 22.50 7,415 3,576 27,508 23.00 8,026 3,860 31,369 23.50 8,685 4,178 35,546 24.00 9,358 4,511 40,057 Device Routina Invert Outlet Devices #1 Primary 20.00' 24.0" x 60.0' long Culvert Ke= 0.500 Outlet Invert= 19.42' S= 0.0097 T Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 21.00' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 22.50' 4.00' W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Primary 23.20' 16.0' long x 0.8' high Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=2.72 cfs @ 12.72 hrs HW=22.85' (Free Discharge) 1=Culvert (Passes 2.72 cfs of 20.59 cfs potential flow) �2=OrificelGrate (Orifice Controls 0.04 cfs @ 6.5 fps) 3=OrificelGrate (Orifice Controls 2.68 cfs @ 1.9 fps) =Sharp -Crested Rectangular Weir( Controls 0.00 cfs) Wrightsville Office Park Type 111 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Pond 2P: retention pond Hydrograph O Inflow p Primary Time (hours) 12174 Wrightsville Office Park Prepared by (enter your cor Elevation Primary (feet) (cfs) 14.00 0.00 14.10 0.00 14.20 0.00 14.30 0.00 14.40 0.00 14.50 0.00 14.60 0.00 14.70 0.00 14.80 0.00 14.90 0.00 15.00 0.00 15.10 0.00 15.20 0.00 15.30 0.00 15.40 0.00 15.50 0.00 15.60 0.00 15.70 0.00 15.80 0.00 15.90 0.00 16.00 0.00 16.10 0.00 16.20 0.00 16.30 0.00 16.40 0.00 16.50 0.00 16.60 0.00 16.70 0.00 16.80 0.00 16.90 0.00 17.00 0.00 17.10 0.00 17.20 0.00 17.30 0.00 17.40 0.00 17.50 0.00 17.60 0.00 17.70 0.00 17.80 0.00 17.90 0.00 18.00 0.00 16.16 0.00 18.20 0.00 18.30 0.00 18.40 0.00 18.50 0.00 18.60 0.00 18.70 0.00 18.80 0.00 18.90 0.00 19.00 0.00 19.10 0.00 Type 11124-hr wilmington 10 year Rainfall=6.72" name Stage -Discharge for Pond 2P: retention pond Elevation Primary (feet) (cfs) 19.20 0.00 19.30 0.00 19.40 0.00 19.50 0.00 19.60 0.00 19.70 0.00 19.80 0.00 19.90 0.00 20.00 0.00 20.10 0.00 20.20 0.00 20.30 0.00 20.40 0.00 20.50 0.00 20.60 0.00 20.70 0.00 20.80 0.00 20.90 0.00 21.00 0.00 21.10 0.01 21.20 0.01 21.30 0.01 21.40 0.02 21.50 0.02 21.60 0.02 21.70 0.02 21.80 0.02 21.90 0.02 22.00 0.03 22.10 0.03 22.20 0.03 22.30 0.03 22.40 0.03 22.50 0.03 22.60 0.44 22.70 1.18 22.80 2.14 22.90 3.28 23.00 4.58 23.10 5.60 23.20 6.41 23.30 8.80 23.40 12.58 23.50 17.33 23.60 22.93 23.70 29.31 23.80 36.43 23.90 44.27 24.00 52.81 Wrightsville Office Park Type 111 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} Stage -Area -Storage for Pond 2P: retention pond Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.00 10 0 14.10 81 214 14.20 152 427 14.30 223 641 14.40 293 854 14.50 364 1,068 14.60 435 1,281 14.70 506 1,495 14.80 577 1,708 14.90 648 1,922 15.00 719 2,136 15.10 789 2,349 15.20 860 2,563 15.30 931 2,776 15.40 1,002 2,990 15.50 1,073 3,203 15.60 1,144 3,417 15.70 1,214 3,630 15.80 1,285 3,844 15.90 1,356 4,057 16.00 1,427 4,271 16.10 1,498 4,485 16.20 1,569 4,698 16.30 1,640 4,912 16.40 1,710 5,125 16.50 1,781 5,339 16.60 1,852 5,552 16.70 1,923 5,766 16.80 1,994 5,979 16.90 2,065 6,193 17.00 2,136 6,407 17.10 2,206 6,620 17.20 2,277 6,834 17.30 2,348 7,047 17.40 2,419 7.261 17.50 2,490 7,474 17.60 2,561 7,688 17.70 2,631 7,901 17.80 2,702 8,115 17.90 2,773 8,328 18.00 2,844 8,542 18.10 2,915 8,756 18.20 2,986 8,969 18.30 3,057 9,183 18.40 3,127 9,396 18.50 3,198 9,610 18.60 3,269 9,823 18.70 3,340 10,037 18.80 3,411 10,250 18.90 3,482 10,464 19.00 3,553 10,678 19.10 3,623 10,891 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 19.20 3,694 11,105 19.30 3,765 11,318 19.40 3,836 11,532 19.50 3,907 11,745 19.60 3,978 11,959 19.70 4,048 12,172 19.80 4,119 12,386 19.90 4,190 12.599 20.00 4,261 12,813 20.10 4,395 13,306 20.20 4,529 13,799 20.30 4,663 14,292 20.40 4,797 14,785 20.50 4,931 15,278 20.60 5,064 15,771 20.70 5,198 16,264 20.80 5,332 16,757 20.90 5,466 17,250 21.00 5,600 17,744 21.10 5,706 18,330 21.20 5,813 18,917 21.30 5,919 19,503 21.40 6,026 20,090 21.50 6.132 20,677 21.60 6,284 21,328 21.70 6.435 21,979 21.80 6,587 22,630 21.90 6,738 23,281 22.00 6,890 23,932 22.10 6,995 24,647 22.20 7,100 25,362 22.30 7,205 26,078 22.40 7,310 26,793 22.50 7,415 27,508 22.60 7,537 28,280 22.70 7,659 29,052 22.80 7,782 29,824 22.90 7,904 30,596 23.00 8,026 31,369 23.10 8,158 32,204 23.20 8,290 33,040 23.30 8,421 33,875 23.40 8,553 34,711 23.50 8,685 35,546 23.60 8,820 36,448 23.70 8,954 37,351 23.80 9,089 38,253 23.90 9,223 39,155 24.00 9,358 40,057 (yjz1 Wrightsville Office Park Type 111 24-hr wilmington 10 year Rainfall=6.72" Prepared by {enter your company name here} Estimated Pond Sizing for Pond 2P: retention pond Time Desired -Peak Required -Storage (hours) (cfs) (acre-feet) 12.30 9.64 0.104 12.50 5.37 0.379 12.70 2.70 0.556 12.90 2.08 0.609 13.10 1.70 0.648 13.30 1.52 0.671 13.50 1.42 0.687 13.70 1.32 0.704 13.90 1.22 0.722 14.10 1.12 0.741 14.30 1.05 0.756 14.50 1.00 0.768 14.70 0.96 0.780 14.90 0.91 0.793 15.10 0.86 0.807 15.30 0.81 0.821 15.50 0.76 0.836 15.70 0.71 0.851 15.90 0.66 0.867 16.10 0.61 0.884 16.30 0.57 0.894 16.50 0.55 0.903 16.70 0.53 0.912 16.90 0.51 0.921 17.10 0.49 0.930 17.30 0.46 0.939 17.50 0.44 0.949 17.70 0.42 0.959 17.90 0.40 0.970 18.10 0.37 0.980 18.30 0.36 0.986 18.50 0.36 0.990 18.70 0.35 0.994 18.90 0.34 0.998 19.10 0.34 1.002 19.30 0.33 1.006 19.50 0.32 1.010 19.70 0.32 1.015 19.90 0.31 1.019 20.10 0.30 1.024 20.30 0.30 1.028 20.50 0.29 1.031 20.70 0.29 1.035 20.90 0.28 1.039 21.10 0.28 1.043 21.30 0.27 1.047 21.50 0.27 1.051 21.70 0.26 1.055 21.90 0.26 1.059 22.10 0.25 1.063 22.30 0.25 1.068 22.50 0.24 1.072 Time Desired -Peak Required -Storage (hours) (cfs) (acre-feet) 22.70 0.24 1.076 22.90 0.23 1.081 23.10 0.23 1.086 23.30 0.22 1.090 23.50 0.22 1.095 23.70 0.21 1.100 23.90 0.20 1.104 Wrightsville Office Park Type Ill 24-hr wilmington 50 year Rainfall=9.01" Prepared by (enter your company name here) HydroCAD® 7,10 s/n 000479 @ 2005 HydroCAD Software Solutions LLC 9/11 /2006 Subcatchment 1S: entire area including Cowell Ave [49] Hint: Tc<2dt may require smaller dt Runoff = 22.39 cfs @ 12.14 hrs, Volume= 1.955 af, Depth> 5.95" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.10 hrs Type III 24-hr wilmington 50 year Rainfall=9.01" Area (ac) CN Description 2.095 98 Paved parking & roofs 1.845 49 50-75% Grass cover, Fair, HSG A 3.940 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, entire site Wrightsville Office Park Type 111 24-hr wilmington 50 year Rainfall=9.01 " Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Subcatchment 1S: entire area including Cowell Ave Hydrograph 0 RunOR Time (hours) Wrightsville Office Park by (enter your company name he D 7.10 s/n 000479 © 2005 HvdroCAC Type 111 24-hr wilmington 50 year Rainfall=9.01 " Pond 2P: retention pond Inflow Area = 3.940 ac, Inflow Depth > 5.95" for wilmington 50 year event Inflow = 22.39 cfs @ 12.14 hrs, Volume= 1.955 of Outflow = 14.57 cfs @ 12.34 hrs, Volume= 1.312 af, Atten= 35%, Lag= 11.7 min Primary = 14.57 cfs @ 12.34 hrs, Volume= 1.312 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0,10 hrs Peak Elev= 23.46' @ 12.34 hrs Surf.Area= 8,632 sf Storage= 35,212 cf Flood Elev= 24.00' Surf.Area= 9,358 sf Storage= 40,057 cf Plug -Flow detention time= 169.E min calculated for 1.306 of (67% of inflow) Center -of -Mass det. time= 75.3 min ( 887.6 - 812.3 ) Volume Invert Avail.Storage Storage Description #1 14.00' 40,057 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 14.00 10 0 0 20.00 4,261 12,813 12,813 21.00 5,600 4,931 17,744 21.50 6,132 2.933 20,677 22.00 6,890 3,256 23,932 22.50 7,415 3,576 27,508 23.00 8,026 3,860 31,369 23.50 8,685 4,178 35,546 24,00 9,358 4,511 40,057 Device Routina Invert Outlet Devices #1 Primary 20.00' 24.0" x 60.0' long Culvert Ke= 0.500 Outlet Invert= 19.42' S= 0.0097 T Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 21.00' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 22.50' 4.00' W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Primary 23.20' 16.0' long x 0.8' high Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=13.38 cfs @ 12.34 hrs HW=23.42' (Free Discharge) 1=Culvert (Passes 7.87 cfs of 23.52 cfs potential flow) L L2=Orifice/Grate (Orifice Controls 0.04 cfs @ 7.4 fps) 3=Orifice/Grate (Orifice Controls 7.82 cfs @ 3.9 fps) =Sharp -Crested Rectangular Weir(Weir Controls 5,51 cfs @ 1.6 fps) (phi Wrightsville Office Park Type /// 24-hr wilmington 50 year Rainfall=9. 0 1' Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Pond 2P: retention pond Hydrograph © Inflow Primary Time (hours) Wrightsville Office Park Type /// 24-hr wilmington 50 year Rainfall= 9. 01 " Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 9/11/2006 Elevation Primary (feet) (cfs) 14.00 0.00 14.10 0.00 14.20 0.00 14.30 0.00 14.40 0.00 14.50 0.00 14.60 0.00 14.70 0,00 14.80 0.00 14.90 0.00 15.00 0.00 15.10 0.00 15.20 0.00 15.30 0.00 15.40 0.00 15.50 0.00 15.60 0.00 15.70 0.00 15.80 0.00 15.90 0.00 16.00 0.00 16.10 0.00 16.20 0.00 16.30 0.00 16.40 0.00 16.50 0.00 16.60 0.00 16.70 0.00 16.80 0.00 16.90 0.00 17.00 0.00 17.10 0.00 17.20 0.00 17.30 0.00 17.40 0.00 17.50 0.00 1T60 0.00 17.70 0.00 17.80 0.00 17.90 0.00 18.00 0.00 18.10 0.00 18.20 0.00 18.30 0.00 18.40 0.00 18.50 0.00 18.60 0.00 18.70 0.00 18.80 0.00 18.90 0.00 19.00 0.00 19.10 0.00 Stage -Discharge for Pond 2P: retention pond Elevation Primary (feet) (cfs) 19.20 0.00 19.30 0.00 19.40 0.00 19.50 0.00 19.60 0.00 19.70 0.00 19.80 0.00 19.90 0.00 20.00 0.00 20.10 0.00 20.20 0.00 20.30 0.00 20.40 0.00 20.50 0.00 20.60 0.00 20.70 0.00 20.80 0.00 20.90 0.00 21,00 0.00 21.10 0.01 21,20 0.01 21.30 0.01 21.40 0.02 21.50 0.02 21.60 0.02 21.70 0.02 21.80 0.02 21.90 0.02 22.00 0.03 22.10 0.03 22.20 0.03 22.30 0.03 22.40 0.03 22.50 0.03 22.60 0.44 22.70 1.18 22.80 2.14 22.90 3.28 23.00 4.58 23.10 5.60 23.20 6.41 23.30 8.80 23.40 12.58 23.50 17.33 23.60 22.93 23.70 29.31 23.80 36.43 23.90 44.27 24.00 52.81 Wrightsville Office Park Prepared by {enter your company name In Type 111 24-hr wilmington 50 year Rainfall=9.01 " Stage -Area -Storage for Pond 2P: retention pond Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.00 10 0 14.10 81 214 14.20 152 427 14.30 223 641 14.40 293 854 14.50 364 1,068 14.60 435 1,281 14.70 506 1,495 14.80 577 1,708 14.90 648 1,922 15.00 719 2,136 15.10 789 2,349 15.20 860 2,563 15.30 931 2,776 15.40 1,002 2,990 15.50 1,073 3,203 15.60 1,144 3,417 15.70 1,214 3,630 15.80 1,285 3,844 15.90 1,356 4,057 16.00 1,427 4,271 16.10 1,498 4,485 16.20 1,569 4,698 16.30 1,640 4,912 16.40 1,710 5,125 16.50 1,781 5,339 16.60 1,852 5,552 16.70 1,923 5,766 16.80 1,994 5.979 16.90 2,065 6.193 17.00 2,136 6,407 17.10 2,206 6,620 17.20 2,277 6,834 17.30 2,348 7,047 17.40 2.419 7,261 17.50 2,490 7,474 17.60 2,561 7,688 17.70 2,631 7,901 17.80 2,702 8,115 17.90 2,773 8,328 18.00 2,844 8,542 18.10 2,915 8,756 18.20 2,986 8,969 18.30 3,057 9,183 18.40 3,127 9,396 18.50 3,198 9,610 18.60 3,269 9,823 18.70 3,340 10,037 18.80 3,411 10,250 18.90 3,482 10,464 19.00 3,553 10,678 19.10 3,623 10,891 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 19.20 3,694 11,105 19.30 3,765 11,318 19.40 3,836 11,532 19.50 3,907 11,745 19.60 3,978 11,959 19.70 4,048 12,172 19.80 4,119 12,386 19.90 4,190 12,599 20.00 4,261 12,813 20.10 4,395 13,306 20.20 4,529 13,799 20.30 4,663 14,292 20.40 4,797 14,785 20.50 4,931 15,278 20.60 5,064 15,771 20.70 5,198 16,264 20.80 5,332 16,757 20.90 5,466 17,250 21.00 5,600 17,744 21.10 5,706 18,330 21.20 5,813 18,917 21.30 5,919 19,503 21.40 6,026 20,090 21.50 6,132 20,677 21.60 6,284 21,328 21.70 6,435 21,979 21M 6,587 22,630 21.90 6,738 23,281 22.00 6,890 23,932 22.10 6,995 24,647 22.20 7,100 25,362 22.30 7,205 26,078 22.40 7,310 26,793 22.50 7,415 27,508 22.60 7,537 28,280 22.70 7,659 29,052 22.80 7,782 29,824 22.90 7,904 30,596 23.00 8,026 31,369 23.10 8,158 32,204 23.20 8,290 33,040 23.30 8,421 33,875 23.40 8,553 34,711 23.50 8,685 35,546 23.60 8,820 36,448 23.70 8,954 37,351 23.80 9,089 38,253 23.90 9,223 39,155 24.00 9,358 40,057 Wrightsville Office Park Type 111 24-hr wilmington 50 year Rainfall=9.01 " Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 9/11/2006 Estimated Pond Sizing for Pond 2P: retention pond Time Desired -Peak Required -Storage (hours) (cfs) (acre-feet) 12.30 14.30 0.087 12.50 7.86 0.577 12.70 3.92 0.878 12.90 3.01 0.965 13.10 2.46 1.028 13.30 2.19 1.064 13.50 2.04 1.089 13.70 1.89 1.115 13.90 1.75 1.143 14.10 1.60 1.172 14.30 1.51 1.193 14.50 1.44 1.211 14.70 1.37 1.230 14.90 1.29 1.249 15.10 1.22 1.270 15.30 1.15 1.291 15.50 1.08 1.313 15.70 1.01 1.336 15.90 0.93 1.359 16.10 0.86 1.383 16.30 0.82 1.399 16.50 0.79 1.411 16.70 0.75 1.424 16.90 0.72 1.437 17.10 0.69 1.451 17.30 0.66 1.465 17.50 0.63 1.479 17.70 0.59 1.494 17.90 0.56 1.509 18.10 0.53 1.524 18.30 0.51 1.532 18.50 0.50 1.538 18.70 0.49 1.543 18.90 0.48 1.549 19.10 0.48 1.555 19.30 0.47 1.561 19.50 0.46 1.568 19.70 0.45 1.574 19.90 0.44 1.580 20.10 0.43 1.587 20.30 0.42 1.593 20.50 0.41 1.598 20.70 0.41 1.603 20.90 0.40 1.609 21.10 0.39 1.614 21.30 0.38 1.620 21.50 0.38 1.626 21.70 0.37 1.632 21.90 0.36 1.638 22.10 0.35 1.644 22.30 0.35 1.650 22.50 0.34 1.656 Time Desired -Peak Required -Storage (hours) (cfs) (acre-feet) 22.70 0.33 1.663 22.90 0.33 1.669 23.10 0.32 1.676 23.30 0.31 1.682 23.50 0.30 1.689 23.70 0.30 1.696 23.90 0.29 1.703