Loading...
HomeMy WebLinkAboutSW8970401_CURRENT PERMIT_20220621 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 C'10401 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2c>zz o 2� YYYYMMDD f ROY COOPER Governor ELIZ.ABETH S. BISER Secretary BRIAN WRENN Director June 21, 2022 Safrit Properties, LLC Attn: Leonard Y. Safrit, Jr., Manager P.O. Box 388 Beaufort, NC 28516 NORTH CAROLINA Environmental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 970401 Cedar Point Building Supply Carteret County Dear Mr. Safrit: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for ,the subject permit on June 13, 2022. The Division is hereby notifying you that permit SW8970401 has been renewed, updated, and re -issued on June 21, 2022, as attached. Please be aware that the renewal and re -issuance of this stonnwater permit does not imply that the site is currently in compliance. This permit shall be effective until November 5, 2029, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, (�rIJ3t� w t ,4a Brian Wrenn, Director Division of Energy, Mineral and Land Resources D_W& Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 29405 F•�� / 910.796.7215 State Stormwater Permit No. SW8 970401 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\ 1 997\970401 HD\2022 06 permit 970401 cc: Timothy M. Stewart, PE; Tidewater Associates, Inc.; 306 New Bridge Street; Jacksonville, NC 28541 Wilmington Regional Office Stormwater File D QM�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 970401 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Safrit Properties, LLC Cedar Point Building Supply Exterior Storage Additions 143 Sherwood Avenue, Cedar Point, Carteret County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until November 5, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 124.582 square feet of impervious area. 3. This basin must be operated with a 50' vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. The built -upon area for the future development is limited to 17,743 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: 6.5 Onsite, ftZ: 283,922 Offsite, ftZ: Rerouted, per Engineer b. Total Impervious Surfaces, ftZ: 124,582 Future, ftZ: 17,743 C. Design Storm, inches: 1.5 d. Basin Depth, feet: 1 e. Bottom Elevation, FMSL: 68.5 f. Bottom Surface Area, ftZ: 18,818 g. Bypass Weir Elevation, FMSL: 69.5 h. Permitted Storage Volume, ft3: 19,655 i. Type of Soil: Loamy Sand j. Expected Infiltration Rate, in/hr: 4 k. Seasonal High Water Table, FMSL: 66.5 I. Time to Draw Down, hours: 3.2 M. Receiving Stream/River Basin: Boathouse Creek / White Oak n. Stream Index Number: 20-31 o. Classification of Water Body: "SA; HQW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. Page 3 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 21 st day of June 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Sian Wrenn,Uire for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 Cedar Point Building Supply Exterior Storage Additions Stormwater Permit No. SW8 970401 Carteret County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for abilities, due care and diligence was used _(Project Owner) hereby state that, to the best of my in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 Post -Construction Stormwater Management Permit No. SW8 970401 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Carteret County Building Inspections Page 7 of 7 Attachment C - Permitting History Cedar Point Building Supply Permit No. SW8 970401 Approval Date permit Action BIMS Version Description of the Changes 7/16/1997 Original Approval 1.0 1 1/5/2007 Renewal/Modification 2.0 Additional .42 acres of impervious area as a service drive, parking lot, and material storage area 6/21/2022 Renewal 3.0 Expires November 5, 2029 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design speci f icat ions. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stonnwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads NA feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stonnwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. 1 acknowledge and agree by my signature below that 1 am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and'ritle: Mr. Leonard Safrit, Managing Member Safrit Properties LLC Address: P.O. Box 388 Beaufort NC 28516-0388 / Phone: (252) 728-3843 Note: Tltc lrgally responsible part tonld n e a hUc�ters association unless more than 50% of the lots have been sold and a resident of the subdivisio ms been named the president. 4l-hU!' ,aNotary Public for the /State of forth Cc✓o/rn�_ ,County of C�-r %ae- E , do hereby certify that ,(Q , n are sn-tr ; -} JR. personally appeared before me this day of 0�l.,t , 20 c,, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires /0 J f / -� O/ Form SWU-103 Rev 3.99 Page 3 of 3 w DEMLR USE ONLY Date Received I Fee Paid I Permit Number 11 W 3 022 101 5- NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. Stale Slormwater Permit Number. SW8970401 2. Project name: Cedar Point Building Supply 3. Project street address: 143 Sherwood Avenue City: Cedar Polni County: Carteret Zip: 28584 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: hftps:/Ideg.nc.gov/about/divisions/energv- mi n eral-la nd-resources/energy-m ineral-la nd-rules/sto rmwater-orog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: httos:lideg.no.gov/abouUdivisions/energy-mineral-land- resources/eneroy-mineral—land-rules/stormwater-prooramtoosl-construction. State Stormwater Permits do not 1. Current Permit Holder's Company Name/Organization: Safril Properties, LLC 2. Signing Official's Name: Leonard Y. Safrit, Jr. 3. Signing Official's Title: 4. Mailing Address: P. 0. Box 388 City: Beaufort State: NC Zip : 28516 5. Street Address: 1308 Lennoxville Road City: Beaufort 6. Phone: 2( 52 ) 728-3843 Email: Isafdt@safrits.com INC Zip: 28516 JON 13 2022 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMUR Central Office (Urbanizing Areas Ph Z USMP, Non -Coastal HQW/0Rt49. Only applications packages that include all required items listed below will be accepted and reviewed rin d ch Item below to Indicate that the required Information Is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D'North Carolina Limited Liability Company Act; c. Public Entity — a principal executive officer, ranking official, or other duty authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. N/A 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. 0&M Agreements, Please select one: ® 1 have a copy of the current recorded 0&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. _ 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.nov/online services/search/by title/ Business Registration J11N 13 2022 � Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 7' D. PERMITTEE'S CERTIFICATION Leonard Y. Safrit, Jr. , the person legally responsible for the permit, certify that I have a copy of the Permit and 08M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on,th'Ls permit renewal application is, t the b at of my knowledge, correct nd compl t . Signature: r7�Date: d I, tl , a Notary Public for the State of North Carolina County o n m)k'O 4D do hereby certify that Leonard Y. Safrit, Jr. personally appeared before me this the % day of June 2022 , and acknowledge the due e \ecytlW) of the forgoing instrument. witness my hand and official seal, J otary Seal) B� Q OTAR� Not UVCi%rure: /ftQdy commission r%a i w coW\.`• JU�� 13 2022 C1.2022.FORMS, CEOARPTSLOOSUPPLY.FERMITRENMALAPPA60622 Slonnwater Permit Renewal Application Form Page 3 of 3 May 11, 2018