Loading...
HomeMy WebLinkAboutSW8070741_CURRENT PERMIT_20220518 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 o7D7 + 1 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 OS / $ YYYYMMDD C ROY COOPER Governor ELQABETH S. BISER .secreciy BRIAN WRENN Dbvctor May 18, 2022 Con Investments 11, Inc. Attn: Jackson L. Conner, President P.O. Box 1276 Morehead City, NC 28557 NORTH CAROLINA Enrlronmentul Quallty Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SWS 070741 Newport Shopping Center Carteret County Dear Mr. Conner: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on April 28, 2022. The Division is hereby notifying you that permit SW8070741 has been renewed, updated, and re -issued on May 18, 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until September 4, 2029, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must he filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, C�.'WQ .Brian Wrenn, Director Division of Energy, Mineral and Land Resources IfIft E North Carolina Departtnent of Envfronmental Q7tallty I Division of Energy. Mineral and land Resources Wilmington Regional Office I t27 Cardinal Drive Extension I Wilmington North Carollni 28405 State Stormwater Permit No. SW8 070741 Page 2 of 2 Enclosures: Attachment A— Designer's Certification Form Attachment C —Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2007\070741 HD\2022 05 permit 070741 cc: Chase Cullipher, PE; The Cullipher Group, PA.; 151-A NC Hwy 24; Morehead City, NC 28557 Wilmington Regional Office Stormwater File D_E J%Z North Carolina Department of Environmental Quality I Division of Energy. Mneral and land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wthnington. North Carolina 28405 wnni rrnuex r 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 070741 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Con Investments Il, Inc. Newport Shopping Center Hwy 70, Newport, Carteret County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until September 4, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. Pond 1 is designed to handle the runoff from 59,730 square feet of impervious area and Pond 2 is designed to handle the runoff from 72,048 square feet of impervious area. The wet detention basins must be operated with a 30' vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the two wet detention ponds and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Pond Depth, feet: Basin 1 Basin 2 1.78 1.93 77,765 84,255 None None 59,730 72,048 1 1 7 8 (Average Depth 3 (Average Depth 3 ft) ft) e. TSS removal efficiency: 85% 85% f. Permanent Pool Elevation, FMSL: 18.0 18.0 g. Permanent Pool Surface Area, ft2: 8,459 8,367 h. Permitted Storage Volume, ft3: 9,099 8,958 i. Temporary Storage Elevation, FMSL: 19.0 19.0 j. Controlling Orifice: 1.25"0 pipe 1.25"0 pipe k. Permitted Forebay Volume, ft': 5.125 5,551 I. Fountain Horsepower, HP: 1/8 1/8 M. Receiving Stream/River Basin: Newport River/White Oak n. Stream Index Number: WOK03 21-(-1) o. Classification of Water Body: C II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 2 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. a. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is as follows: Maximum Fountain Horsepower Pond Number Maximum Horsepower 1 1/8 horsepower 2 1/8 horsepower 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or, more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur. b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. Page 4 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 18th day of May 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 Newport Shopping Center Stormwater Permit No. SW8 070741 Carteret County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 Post -Construction Stormwater Management Permit No. SW8 070741 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Carteret County Building Inspections Page 7 of 7 Attachment C - Permitting History Newport Shopping Center Permit No. SW8 070741 Approval Date Permit Action BIMS Version Description of the Changes 9/4/2007 Original Approval 1.0 5/18/2022 Renewal 2.0 Expires September 4, 2029 I WMI H I INF (INI Y Date Recei3ed Fee Paid I Permit Number Ll a2 a -a S say 1 s WE p o NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 070741 2. Project name: Newport Shopping Center 3. Project street address: Hwy 70 City: 1 28557 County: Carteret ZIP : 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/e B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at. https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: CON Investments 11, Inc. 2. Signing Official's Name: Jackson L. Conner 3. Signing Official's Title: President 4. Mailing Address: PO Box 1276 City: Morehead City State: NC ZIP 28557 5. Street Address: 105 Gloucester Ct City: Newport St: 6. Phone: (252) 725-3360 Email:50,51 NC ZIP: 28570 emlac� 5���22 CLo tiv ®Fy APR 2 8 2022 BY Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Cy 1. A permit application processing fee of $505.00 payable to NCDEQ. CZ 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. r� A 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. CZ 4. Q&M Agreements, Please select one. r°All I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. C3� 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or n The project has not yet been built. NIA 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration az0 v" APR 2 8 2022 h" BY•__ Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE►'S CERTIFICATION , �G I, 0-r- �� 2 the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership ' formation provided on this permit renewal application is, to the best of my knowledge, correct and rFple Signature: (- Date: NOTARIZATION: County of a Notary Public for the State of do hereby certify that— (W��.�y.yh 1 ` o 11 11.r personally appeared before me this the 'C W day of P�Vy 20 22 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, 111 (Notary Seal) ��jtR IFOSyFci` Notary Signature:/\LAA/JW I R.Q7�l�l�1L� r10TgRY x My commission expires III2�I2�2 1 9 pUBL1G 4 APR 2 ®1t712 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 , Permit No. '5Lg 07p 101 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJ ECT INFORM ATION Project Name: Newport Shopping Center Contact Person: Jackson L. Conner Phone Number: (252 ) 240-2124 For projects with multiple basins, specify which basin this worksheet applies to: 1 elevations Basin Bottom Elevation 11.0 ft. (floor of the basin) Permanent Pool Elevation 18.0 ft. (elevation of the orifice) Temporary Pool Elevation 19.0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 8,459 sq. ft. (water surface area at the orifice elevation) Drainage Area 1.78 ac. (on -site and off -site drainage to the basin) Impervious Area 1.37 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 23,521 cu. ft. (combined volume of main basin andforebay) Temporary Pool Volume 9,099 cu. ft. (volume detained above the permanent pool) Forebay Volume 5,125 cu. ft. (approximately 20%of total volume) Other parameters SAIDA I 6.80 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.25 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1.0 in. Design TSS Removal 2 85 % (minimum 85%required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. 'rhe NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stonnwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. if the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. if a requirement has not been met, attach justification. Applicants Initials C a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). G8� b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. 6?X d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. ?J%iG h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. Ctea� 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. ()QX m. A mechanism is specified which will drain the basin for maintenance or an emergency. Ill. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: it. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads S. D feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 116.0 Sediment Ren oval El. I Soo 75 a -------------- -- Sediment Removal Elevation M-)' 7500 Bottom El e anon 1'±•00 %------E3-----------------J-----------'---------125% ---- oltom Elevation 11. 0 FOREBAY MAIN POND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page of All components of the wet detention basin system shall be maintained in good working order. 1 acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Note: 'rhe legally responsible parly should not be a homeowners association unless more (Iran 50% of the lots have been sold and a resident of the subdivision has been named the president. I, j`�1gn-t}t,� �: �ioV�gnu f. a Notary Public for the State of TI)o2TA QWLOu..o. County of CQ.AJ e t do hereby certify that �) ock5otil � • C' or+e% e r personally appeared before me this Mri�day of V\pcand acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ,,`,,eeeeaueNqO,'`, o'• INVBoG fc;; 'Ott, COUIAIIOII� SEAL My commission expires GAT• C521, Zee Form SWU-102 Rev399 page 4of4 Permit No. &1(/I )Io "f I (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Newport Shopping Center Contact Person: Jackson L. Conner Phone Number: (252 ) 240-2124 For projects with multiple basins, specify which basin this worksheet applies to: 2 elevations Basin Bottom Elevation 10.0 ft. (floor of the basin) Permanent Pool Elevation 18.0 ft. (elevation of the orifice) Temporary Pool Elevation 19.0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 8,367 sq. ft. (water surface area at the orifice elevation) Drainage Area 1.93 ac. (on -site and gfrsRe drainage to the basin) Impervious Area 1.65 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 25,706 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 8,958 cu. ft. (volume detained above the pernnanent pool) Forebay Volume 5,551 cu. it. (approximately 10% of total volume) Oiher parameters SA/DAI 7.29 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.25 in. (2 to S day temporary pool draw -down required) Design Rainfall 1.0 in. Design TSS Removal 2 85 % (nninimum 85% required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool siring should be computed based upon the actual impervious %and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2I-1 .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stonmwater Management Permit Application Form, the agent may initial below. if a requirement has not been met, attach justification. Applicants Initials R bC. a. The pernmanent pool depth is between 3 and 6 feet (required minimum of 3 feet). �'xLL b. The forebay volume is approximately equal to 20% of the basin volume. (�ZG� c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. ll e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) C The basin length to width ratio is greater than 3:1. (V g. The basin side slopes above the permanent pool are no steeper than 3:1. 6�]. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). _ F.@ i. Vegetative cover above the permanent pool elevation is specified. MC j. A trash rack or similar device is provided for both the overflow and orifice. 6P k. A recorded drainage casement is provided for each basin including access to nearest right - of' -way. I. If the basin is used for sediment and erosion control during construction, clean out of the �yy basin is specified prior to use as a wet detention basin. ZLin. A mechanism is specified which will drain the basin for maintenance or an emergency. 111. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check are) 0 does 0 does not incorporate pretreatment other than a forebay. FormSWU-102 Rev3.99 Page 2of4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads G• o feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation /8.0 Sediment Re oval El. /S0 ♦ 75 ° Sediment Removal Elevation 2. 0 75/0 Bottom Ele anon %-------------------------------------------- ---- FOREBAY Bottom Elevation 10.0 25% MAIN POND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: 'TA C KSoA L (f o/✓NER Title: v P— Cam.,..•✓ i Address: LOoO 4 &)a / Z.74 Phone: 25 7 o4 G Signature:— Date: c Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _C`ip� rt}t� �:• �ion�0.n�� a Notary Public for the State of N)OmrA Cnrtou^o. County of CR.A J e J do hereby certify that -S ock5o.3 L• e o n(s e r personally appeared before me this III clay of c %k— , 2to-1, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 10, COUN a`� SEAL My commission expires Oar. cn Zee) i J rylf- PonnSWU-102 Rev3.99 Page 4of4