Loading...
HomeMy WebLinkAboutSW8051137_HISTORICAL FILE_20060908 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0 5 tf 37 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Z006 09 00 YYYYMMDD Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Y September 8, 2006 Mr. Richard E. Vick, Vice President S.T. Wooten Corporation 3801 Black Creek Road Wilson. NC 27894 Subject: Stormwater Permit No. SW8 051137 Modification S.T. Wooten Asphalt Plant High Density Project New Hanover County Dear Mr. Vick: Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for S.T. Wooten Asphalt Plant on August 17, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 051137 Modification dated September 8, 2006, for the construction of the subject project. This modification adds: (a) Drainage Area C at 3.45 ac (within previously permitted project area of 32.44 ac); (b) 69,260 square feet of impervious area within Drainage Area C; and (c) Infiltration Basin C for treatment of stormwater runoff from built -upon area within Drainage Area C. There are no changes to the built -upon areas or drainage areas for previously permitted Basins A and B, and all previously permitted design parameters for Basins A and B remain unchanged. Please replace all previously approved drawings with attached Sheets #1 through #8 plus cover sheet, all approved on September 8, 2006. This permit shall be effective from the date of issuance until September 8, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Paul Bartlett, or me at (910) 796-7215. Sinc"rely,''�� Edward B�clt%� Regional Supervisor Surface Water Protection Section ENB/ptb: S:\WQS\STORMWATER\PERMIT\051137MOD.sept06 cc: Craig M. Fortner, P.E., Withers & Ravenel, Inc. Tony Roberts, New Hanover County Building Inspections City of Wilmington Stormwater Services Beth E. Wetherill, New Hanover County Engineering one Paul T. Bartlett, P.E. N hCarolina Wilmingten fiegienal 9ff4ee and 6entrel files atura/ly North Carolina Division of Wager Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwatcruuality.org Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycledll0% Post Consumer Paper September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY ATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Richard E. Vick and S.T. Wooten Corporation S.T. Wooten Asphalt Plant New Hanover County FOR THE construction, operation and maintenance of three infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This modification adds: (a) Drainage Area C at 3.45 ac (within previously permitted project area of 32.44 ac); (b) 69,260 square feet of impervious area within Drainage Area C; and (c) Infiltration Basin C for treatment of stormwater runoff from built -upon area within Drainage Area C. There are no changes to the built -upon areas or drainage areas for previously permitted Basins A and B, and all previously permitted design parameters for Basins A and B remain unchanged. All previously approved drawings are replaced with Sheets #1 through #8 plus cover sheet, all approved on September 8, 2006. This permit shall be effective from the date of issuance until September 8, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 22147 (Basin A), 16202 (Basin B), and 69260 (Basin C) square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. There is no allotment for future built -upon area at the site. Page 2 of 7 September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the infiltration basins and must be maintained at design conditions: Basin #A Basin #B Basin C a. Drainage Area, acres: 1.09 1.03 3.45 Onsite, ft': 47,480 44,867 150,282 Offsite, ftz: None None None b. Total Impervious Surfaces, ftz: 22,147 16,202 69,260 C. Design Storm, inches: 2 2 2 d. Basin Depth, feet: 0.5 0.5 1.2 e. Bottom Elevation, FMSL: 17.5 17.5 14.0 f. Bottom Surface Area, ft2: 7,130 7,274 10,514 g. Bypass Weir Elevation, FMSL: N/A N/A N/A (Provided volume 4X requirement) h. Permitted Storage Volume, ft': 3,750 3,782 24,310 i. Type of Soil: Kr, Le Kr, Le Kr, Le i. Expected Infiltration Rate, in/hr: 52 52 52 k. Seasonal High Water Table, 13.5 13.5 12 FMSL: I. Time to Draw Down, hours: 0.2 0.3 0.5 M. Receiving Stream/River Basin: Cape Fear River / Cape Fear n. Stream Index Number: 18-(63) o. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 7 September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: 0 a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. Page 4 of 7 September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this he 8th day of September 2006. N R CAROLI VIRONMENTAL MANAGEMENT COMMISSION or Alan W. limek, P.., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification S.T. Wooten Asphalt Plant Stormwater Permit No. SW8 051137 Modification New Hanover County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 September 8, 2006 State Stormwater Management Systems Permit No. SW8 051137 Modification Page 2 of 2 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7 Re: s,r Wooten Concrete Plant resubmittal Subject: Re: ST Wooten Concrete Plant resubmittal From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Fri, 18 Aug 2006 08:51:11 -0400 To: Craig Fortner <cfortner@withersravenel.com> Thanks Craig. Paul Craig Fortner wrote: Paul, We have addressed the comments in your August 9, 2006 letter. A copy of the text of our response without attachments is attached for your information. A complete resubmittal package is being sent to your attention for delivery on 8/17. Please don't hesistate to call if you have any questions. Craig Fortner Withers & Ravenel Inc. 111 MacKenan Dr. Cary, NC 27511 tel: 919.469.3340 fax: 919.535.4545 Direct: 919.535.5211 Cell: 919.697.0568 http://wWw.withersravenel.com <http://www.withersravenel.com/> I of 1 8/18/2006 8:51 AM WITHERS & R"ENEL ENGINEERS I PLANNERS I SURVEYORS August 15, 2006 Mr. Paul Bartlett, PE North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: Request for Additional Information Stormwater Project No. SW8 051137 Modification ST Wooten Asphalt Plant (Modification to Add Concrete Plant) New Hanover County W&R Project No. 205449.10 Dear Mr. Bartlett: We have reviewed your request for additional information for the above referenced project dated August 9, 2006. Your comments follow below in bold followed by our response. Comment 1: Please clarify the location of test boring HA-1 on Sheet #5. According to Figure #1 of the soils report, it is outside the 50' buffer approximately 150' from the illustrated corner of Fredrickson Road (on Sheet #5) and between the 14' and 15' contours. The soils report also states that water was observed 30" from the surface which means that the SHWT was <30" from the surface or at an elevation > 12.0' vs. the 11.0' on the plans and listed on the supplement. Response 1: Test boring HA-1 shown on Sheet #5 of the initial submittal to DWQ was inconsistent with the location show on the soils report, and has been moved to the correct location on Sheet #5. The resulting corrected SHWT is Elevation 12.0 in the vicinity of the proposed infiltration basin and is shown on Sheet #5 and the infiltration basin supplement. The revised Sheet #5 is included as an attachment.to this letter. The minimum design separation from the bottom of the infiltration pond and the SHWT of 2.0' is maintained in accordance with DWQ requirements. Comment 2: Please revise Section 111.6 of the application for the receiving stream to Lake Sutton/Cape Fear River and enter the class as C; Sw. Response 2: Section 111.6 of the application has been revised as directed, and is included as an attachment to this letter. Comment 3: Please label the: (a) shaded area on the plans that is adjacent to the Truck Washdown Tank and label whether or not it is impervious area; and (b) area at the iti MacKenan Drive I Cary, North Carolina 27511 1 tel: 919-4693340 1 fax: 919.535.4545 1 www.withersravenel.com 7040 Wrightsville Avenue, Suite ioi i Wilmington, North Carolina 28403 1 tel : 910.256.9277 1 fax : 910.256.2584 1027 Sabbath Home Road SW i Supply, NC 28462 1 tel: 910-842-9392 1 fax: 910.842.8oi9 WITHERS & RAVENEL ENGINEERS 1 PLANNERS 1 SURVEYORS Mr. Paul Bartlett, P.E. August 15, 2006 hopper and drainage area limits (mine work face?) and whether or not it is impervious area. Response 3: The required items have been labeled and identified as impervious areas as appropriate on Sheet #5. Impervious areas reported on Sheet #5 are included in the previously provided Impervious Area Breakdown shown on Sheet #5 and on the application form. Comment 4: Please delete Weeping Love Grass from the vegetation plan and use a substitute (Weeping Love Grass grows quickly but then typically dies in this area). Response 4: Weeping Love Grass has been removed from the vegetation plan and replaced with Redtop (Agrostis alba), at a rate of 15 Ibs/acre and shown on Sheet #8. The revised Sheet #8 is included as an attachment to this letter. We trust that these responses adequately address your comments. Please do not hesitate to call if you have any questions. Sincerely, WITHERS &cRAVENEL, INC. Crai �Fort , attachments cc: Reade Dawson, S.T. Wooten Corporation Page 2 of 2 WITHERS August 15, 2006 Mr. Paul Bartlett, PE North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RAVEN EL ENGINEERS I PLANNERS I SURVEYORS RE: Request for Additional Information Stormwater Project No. SW8 051137 Modification ST Wooten Asphalt Plant (Modification to Add Concrete Plant) New Hanover County W&R Project No. 205449.10 Dear Mr. Bartlett: We have reviewed your request for additional information for the above referenced project dated August 9, 2006. Your comments follow below in bold followed by our response. Comment 1: Pleas clarify Please the location of test boring HA-1 on Sheet #5. According to Figure #1 Iof the soils report, it is outside the 50' buffer approximately 150' from the illustrated corner of Fredrickson Road (on Sheet #5) and between the 14' and 15, contours. The soils report also states that water was observed 30" from the surface which means that the SHWT was <30" from the surface or at an elevation > 12.0' vs. the 11.0' on the plans and listed on the supplement. Response 1: Test boring FiA-1 shown on Sheet #5 of the initial submittal to DWQ was inconsistent with the location show on the soils report, and has been -moved the correct location on Sheet #5. The resulting corrected SHW1 i�levation 12.C.in the vicinity of the proposed infiltration basin and is shown on Sheet #5 and the infiltration basin supplement. The revised Sheet #5 is included as an attachment to this letter. The minimum design separation frorn the bottom of the infiltration pond and the SHWT of 2.0' is maintained in accordance with DWQ requirements. Comment 2: Please revise Section 111.6 of the application for the receiving stream to Lake Sutton/Cape Fear River and enter the class as C; Sw. Response 2: Section 111.6 of the application has been revised as directed, and is included as an attachment to this letter. Comm nt"3: Please label the: (a) shaded area on the plans that is adjacent to the Truck Washdown Tank and label whether or not it is impervious area; and (b) area at the vi MacKenan Drive I Cary, North Carolina 27511 1 tel: 919-469-3340 1 fax: 919.535-4545 1 www.withersravenel.com 7040 Wrightsville Avenue, Suite ioi I Wilmington, North Carolina 28403 1 let : 910.256.9277 1 fax : 910.256.2584 1027 Sabbath Home Road SW I Supply, NC 28462 1 tel: 910-842-9392 1 fax: 910.842.8oig WITHERS & RAVENEL {M41N{[RS 1 VL.(MN[RS 1 SU9V(VORS Mr. Paul Bartlett, P.E. August 15, 2006 hopper and drainage area limits (mine work face?) and whether or not it is impervious area. Response 3: The required items have been labeled and identified as impervious areas as appropriate on Sheet #5. Impervious areas reported on Sheet #5 are included in the (/previously provided Impervious Area Breakdown shown on Sheet #5 and on the application form. Comment 4: Please delete Weeping Love Grass from the vegetation plan and use a substitute (Weepi g'Love Grass grows quickly but then typically dies in this area). Response 4: eeping Love Grass has been removed from the vegetation plan and replaced with Redtop (AgrosIis alba), at a rate of 15 Ibs/acre and shown on Sheet #8. The revised Sheet #8 is included as an attachment to this letter. We trust that these responses adequately address your comments. Please do not hesitate to call if you have any questions. Sincerely, WITHERS &-RAVENEL, INC. Crai . Porine , PE attachments cc: Reade Dawson, S.T. Wooten Corporation Page 2 of 2 LJL L40 VJVV 08/15/06 14:59 FAX 0195354545 S I WW I tN-WILSON WITHERS & RAVENEL INC. Z 002i006 0 002 State of North Carolina Department of Environmental and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION L Applicants name (specify the name of the corporation, individual, etc. who owns the project): ST Wooten Corporation 2, Print Ownen'Signing Official's name and title (person legally responsible for facility and compliance): Richard E. Vick, Vice President 3. Mailing Address for person listed in (tern 2 above: S.T. Wooten Corporation, 3801 Black Creek Road City: Wilson State: _NC Zip: 27894 Telephone Number: (252) 291-5165 4_ Project Name (subdivision, facility, or establishment name— should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.)_ ST Wooten Asphalt Plant 5. Location of Project (street address): Sutton Lake Road City: Wilmington County: New Hanover 6. Directions to project (from nearest major intersection); From Wilmington take tte.421 North, turn left on Sutton Lake Road, project site is on the right. 7. Latitude: 34' 17' 40" N Longitude: 77° 58' 58" W of project. 8. Contact person who can answer questions about the project:: Name: Craig FortnerPF Telephone Number: (919)469-3340 H. PERMIT INFORMATION., Specify whether project is (check one): _ New Form SWU-101 Version 3.99 Page 1 of Renewal �x_ Modification 08/15/06 TUE 15:58 [TX/RX No 79711 VUilii�vvo io.00 rnn ZDZ z43 VaVV S I WOOTEN-WILSON 08/15/00 15:00 FAX 9195354545 WITHERS ✓£ RAVRNRL INC. a 003/006 0 003 2. If this application is being submitted as the result of a renewal or modification to an trusting permit, list the existing permit number SW 8051 117 and its issue date (if known) 116/06 3. Specify the type of project (check one): Low Density _X_ High Density —Redevelop _ General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major 7I Sedimentation/Erosion Control 4041401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Scrvice Center at 1-877-623-6748 111. PROJECT INFORMATION In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated in 1 infiltration basin. Basin is sized for the 2" rainfall event, and also serves as a stormwater detention pond. 2. Stormwater runoff from this project drains to the Cape Fear River Basin, 3. Total Project Area: 32,44 acres. 4. Project Built Upon Arm: 14.2 %. 5. How many drainage areas does the project have? 5 6. Compictc the following information for each drainage area. If there are more than two drainage areas in the project, attach and additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area To BMP A (previously permitted and unchan ed) Drainage Area To BMP B (previously permitted and unchanged) Receiving Stream Name Lake SUttOn/CaPC Fear River Lake Sutton/Cape Fear River Receiving Stream Class C, Sw C: Sw Drainage Area 1.09 ac 1.03 ac Existing ] ervious«Area 0.00 ac 0.00 ac Proposed Impervious* Area 0.51 ac 0,37 ac % Impervious' Area(Total) 46.8 % 35.9 % lm ervious' Surface Area Drainage Area To BMPA Drainage Area To BMPB On -Site Buildings 0 sf 1,568 sf On -Site Streets 16,940 sf 14 634 sf Asphalt Plant Site 5,207 sf 0 sf Total: 22,147 0.51 ac Total 16,202 sf 0.37 ac --�mpervious area is aermea as me ouut upon area inCtuamg, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, are. 7. How was the off -site impervious area listed above derived? N/A Form S WU-101 version 3.99 Page 2 of 5 08/1.5/06 TUC 15:58 ITX/RX NO 7971) +i c�vu io,v, rnn 404 cvo vyu0 S I WUUTEN-WILSON 08/15/06 15:01 FAX 9195354545 WITHERS &. RAVENEL INC. Z 004 /00 6 9 004 IV. DEED RESTRICTIONS MIA PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, out parcels, and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size, and the allowable built -upon area for each lot must be provided as an attachment. I. The following covenants are ' tided to ensure ongoing compliance with stale stortnwaler management permit number as issued by the Division of Water Quality. These covenants may not be changed or delete without the consent of the State. 2. No more than sguarefeet of arry lot shall be covered by structures or impervious materials. Impervious mate Is include asphalt, gravel, concrete, brick, stone, slate or similar material but not include wood decking or the water surface ofswimmingpaols. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from the oulparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-1(16 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Forrn SWU-101 Version 3.99 Page 3 of 5 08/15/06 TUE 15:58 [TX/RX NO 79711 vw ialc000 io.Vt rAA ZOZ Zvi VUVV S T WOOTEN-WILSON 0005l006 _08/15/08 15:02 FAX 9195354545 _WITHERS & RAVENEL INC. QoOS VI. SUBMITTAL REQUE"MENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office_ 1, Please indicate that you have provided the following requited information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Forth • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of S420 (payable to NCDENR) • Detailed narrative description of stormwater treatmeni/management • 'rwo copies of plans and specifications, including: Development/ Project name Engineer and firm Legend North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location nrap with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and siormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas del inested - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section_ Designated agent (individual or firm): Withers & Ravcnel- Inc. Mailing Address: 11 I Mackenan Drive City Cary State: NC Phone: (919) 469-3340 Vlll. APPLICANT`S CERTIFICATION Zip: 27511 Fax: (919) 535-4545 1, (print or type name ofperson listed in General Information. Item 2) Richard E. VicK Vice -President certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed projC�`t complies with the requirements of 15A NCAC 2H.1000. :S . t �C o0�Vr_ . CD'Vo rA i-.q-�-� Signature: ��=Z , �„\ l V Date: JNL'f g Ls- zoo (0 FormSWU-101 Version3.99 Page 4of5 08/15/06 TUE 15:58 1TX/RX NO 79711 V011o14000 10.Vo rax zoZ zva VUUQ S T WOOTEN-WILSON 0 006/006 08/15/00 15:03 PAX BIe5354545 WITHERS a RAVENEI, INC. fdJ006 6. Additional Drainage Areas_ Basin Information Drainage Area To 13MP C (PROPOSED) Receiving Stream Name Lakc Sutton/Cape Fear River Receiving Stream Class C Sw Drainage Area 3.45 ac Lxistin Xm ervious;Area 0.00 Be Proposed Impervious* Area 1.59 ac % Impervious* Anew oral 9.33 Impervious Surface Area Drainage Area To BMP C On -Site Buildings 870 sf On -Site Streets 30,928 sf Asphalt Plant Site 37,462 sf Total: 69,260 (1.59 ac Basin Information Drainage Arca To Mine" Untreated Area Receiving Stream Name N/A Lake Sutton Receivin Stream Class N/A N/A Drainage Area 12.32 ac 14.55 ac Existing ious"Area 0.00 ac 0-12 se from prev. application) Proposed Impervious* Area 3.41 ac 0.12 ac % Impervious' Area(Total) 27.68 % 1.65 % Impervious Surface Area Drainage Arca To Mine* Untreated Area On -Site Buildings 0 sf 0 sf On -Site Streets 0 sf 10 454 sf As halt Plant Site 52,030 sf 0 sf Concrete Plant site 96,510 sf 0 sf Total: 148,540 4-207c Total 10,454 sf 0.24 ac *Area draining into mine does not include area covered by 3. V1 �c mining permit, and drainage basin has no outfall. Fonn SWU-101 Version 3.99 Page 5 of 5 08/16/00 TUE 15:58 ITX/RX NO 79711 1 r� P. 1 * * COMMUNICATION RESULT REPORT ( AUG. 9.2006 12:19PM ) * /- TTI FILE MODE OPTION 435 MEMORY TX REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ADDRESS (GROUP) 919195354545 * * NCDENR WIP.O i PAGE P. 3/3 -/g E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET Date: 8/9/06 To: Craig Fortner Company: Withers & Ravenel FAX #: (919) 535-4545 William G. Ross, Jr., Secretary No. of Pages: 3 (Incl. Cover) From: Paul Bartlett Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910.796-7301 DWQ Stormwater Project Number: SW8 051137 Modification Project Name: ST Wooten Asphalt Plant MESSAGE: Craig, A Request for Additional Information is attached for the subject project. The original will be mailed to Mr. Vick, and a copy will be mailed to you. 4 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET Date: 8I9I06 To: Craig Fortner Company: Withers & Ravenel FAX #: (919) 535-4545 William G. Ross, Jr., Secretary No. of Pages: 3 (Incl. Cover) From: Paul Bartlett Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 051137 Modification Project Name: ST Wooten Asphalt Plant MESSAGE: Craig, A Request for Additional Information is attached for the subject project. The original will be mailed to Mr. Vick, and a copy will be mailed to you. ENB\ptb: S:\WQS\STORMWATER\ADDINFO\2006\051137Mod.aug06 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Telephone (910) 796-7215 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Y August 9, 2006 Mr. Richard E. Vick, Vice President S.T. Wooten Corporation 3801 Black Creek Road Wilson, NC 27894 Subject: Request for Additional Information Stormwater Project No. SW8 051137 Modification ST Wooten Asphalt Plant New Hanover County Dear Mr. Vick: Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for ST Wooten Asphalt Plant on July 28, 2006 for review on August 1, 2006. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please clarify the location of test boring HA-1 on Sheet #5. According to Figure #1 of the soils report, it is outside the 50' buffer approximately 150' from the illustrated corner of Fredrickson Road (on Sheet #5) and between the 14' and 15' contour. The soils report also states that water was observed 30" from the surface wrr�eans that the SHWT was <30" from the surface or at an elevation 12.00✓��s. the 11.0' on the plans and listed on the supplement. 2., Please revise Section 111.6 of the application for the receiving stream to Lake ✓ Sutton/Cape Fear River and enter the class as C; Sw. 3. Please label the: (a) shaded area on the plans that is adjacent to the Truck Washdown Tank and label whether or not it is impervious area; and (b) area at the hopper and drainage area limits (mine work face?) and whether or not it is impervious area. 4. Please delete Weeping Love Grass from the vegetation plan and use a substitute (Weeping Love Grass grows quickly but then typically dies in this area). Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 17, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. N���ro� Carolina Natura//jl North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquality.org Fax (910)350-2004 1.877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50%Recycled110% Post Consumer Paper Mr. Richard E. Vick, Vice President August 9, 2006 Stormwater Application No. SW8 051137 Modification The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301. Sincer y, Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:\WQS\STORMWATER\ADDINFO\2006\051137Mod.aug06 cc: Craig Fortner, P.E., Withers & Ravenel Paul Bartlett WITHERS 6-r Judy 20, 2006 Mr. Paul Bartlett, PE North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: ST Wooten Concrete Plant Sutton Lake Road W&R Project No. 205449.10 Dear Mr. Bartlett: RAVENEL ENGINEERS PLANNERS SURVEYORS v�"! r�701 �o� i JU� 2 8 CUUo oP On behalf of S.T. Wooten Corporation, we are pleased to provide the attached submittal to modify permit number SW 8051137 for the S.T. Wooten Asphalt Plant. We currently have an Express Review scheduled for August 1, 2006. The purpose of this project is to develop a concrete plant on a portion of an approximate 90 acre parcel on Sutton Lake Road west of US 421, upon which S.T. Wooten Corporation currently holds permits for an asphalt plant and mine. Stormwater management features and BMP's for the asphalt plant were permitted by DWQ on 1/6/06 under permit number SW 8051137. The Concrete Plant and appurtenances are proposed as a modification to the existing permit. Approximately 3.45 acres of disturbance are associated with the Concrete Plant. Erosion and sedimentation control on this project will be accomplished through the use of temporary construction entrances, outlet protection at culverts, and silt fence at the toe of fill slopes. The primary stormwater features include grass swales and pipe culverts leading to the proposed Infiltration/Detention Pond C. Infiltration/Detention Pond C discharges to an existing ditch, which ultimately flows into Sutton Lake. A portion of the graded area will drain toward the permitted mine and does not discharge. Attached for your review and approval are three (3) sets of construction plans and design calculations. Please do not hesitate to call if I may be of any assistance to facilitate your review. 111 MacKenan Drive i Cary, North Carolina 27511 1 tel: 919.469.3340 1 fax: 919.535.4545 1 www.withersravenel.com 7040 Wrightsville Avenue, Suite 1oi I Wilmington, North Carolina 28403 1 tel : 910.256.9277 1 fax : 910.256.2584 1027 Sabbath Home Road SW i Supply, NC 28462 1 tel: 9io-842-9392 I fax: 910-842.8019 WITHERS &- RAVEMEL ENGINEERS I VIRNNERS I SURVEYORS Sincerely, WITHERS &-RAVENEL, INC. Crai . Fortne , PE attachments CC: Reade Dawson, S.T. Wooten Corporation Mr. Paul Bartlett, P.E. July 20, 2006 Page 2 of 2 S T. Wogten HOson NC 17894-2408 CBox 2408 orporation 252.291-5165 FAR152-243-0900 .. DIV. VENDORsREFERENCEJ0JBO CHECKOCO .0 2838 INVOICE NUMBER INVOICE DATE DESCRIPTION GROSS AMOUNT DISCOUNT NET AMOUNT PERMIT 07/27/06 WILMINGTON CONC PLT 4.000.00 4,000.00 -r- �w�w5I�37 �'ECEIVEE) JUL 2 8 2006 B : DETACH AND RETAIN THIS STATEMENT THE ATTACHED CHECK IS IN PAYMENT OF ITEMS DESCRIBED ABDVE 11.fTfM1..GI.T VI FAVF ul1TIGV U V OoIfYYTI V ul. ocfc,oT n F c,o cn TOTALS 4,000.00 4,000.00 WACHOVIA BANK, N.A. S. T. Wogten WILSON, N.C. Corporation PO Bas2408 kviv Wilson, NC 27894.2408 15d-291-516-5/65 FAX252.243-0900 Four Thousand Dollars and 00 Cents PAY TO THE N C DEPT OF ENVIRONMENT ORDER OF AND NATURAL RESOURCES 1617 MAIL SERVICE CTR RALEIGH NC 27699-1617 FORM NO. STWC - 103 66-1040 531 CHECK DATE I CHECK NO. 07/27/06 283885 CHECKAMOUNT Is ******4,000.00 j W(�DjeN ASpNAI�T PLANT SW $ 05113-7 h(AP OFFICE USE ONLY Date Received Fee Paid Permit Number 7 Zr8/OG 783ff5 ALP f'>5(137AtC(-> State of North Carolina Department of Environmental and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original 1. GENERAL INFORMATION Applicants name (specify the name of the corporation, individual, etc. who owns the project): ST Wooten Corooration 2. Print Owncr/Signing Official's name and title (person legally responsible for facility and compliance): CH AR.n C. V,tK Vr Ce—P/2tf'rat:I'r 3. Mailing Address for person listed in Item 2 above: S.T. Wooten Corporation. 3801 Black Creek Road City: Wilson Telephone Number: (252) 291-5165 State: NC Zip: 77994 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): ST Wooten Asphalt Plant 5. Location of Project (street address): Sutton Lake Road City: Wilmington County: New Hanover 6: Directions to project (from nearest major intersection): From Wilmington take rtc.421 North, turn left on Sutton Lake Road, project site is on the right c.N 5 CIA7. Latitude: 34° 17' " N Longitude: 77' 58' S' W of project. 8. Contact person who can answer questions about the project:: Name: Craig Former, Pl? Telephone Number: ( 9 191469-3140 If. PERMIT INFORMATION: L Specify whether project is (check one): New Renewal X— Modification Form SWU-101 Version 3.99 Page I of4-- 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8051 137 and its issue date (if known) 1/6/06 3. Specify the type of project (check one): Low Density X High Density _ Redevelop _ General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III. PROJECTINFORMATION In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated in I infiltration basin. Basin is sized for the 2" rainfall event, and also serves as a stormwater detention nond. 2. Stormwater runoff from this project drains to the Cape Fear 3. 4. 5. 6. 'rotal Project Area: 32.44 acres. Project Built Upon Area: 14.2 %. Ilow many drainage areas does the project have? 5 River Basin. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach and additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area To BMP A (previously permitted and unchan ed Drainage Area To BMP B (previously permitted and unchan ed Receiving Stream Name Lake Sutton Lake Sutton lte.,Jp IC Receiving Stream Class Drainage Area 1.09 ac I me Ito ervious*Area 0.00 ac 0.00 ac —Existing proposed Impervious* Area 0.51 ac 0.37 ac % Ito ervious* Area Total 46.8 % 35.9 % Impervious* Surface Area Drainage Arca To BMPA Drainage Area To BMPB On -Site Buildings 0 sf 1,568 sf On -Site Streets 16,940 sf 14,634 sf Asphalt Plant Site 5,207 sf 0 sf Total: 22,147 0.51 act Total 16,202 sf 0.37 ac *Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas. sidewalks, gravel areas, etc. 7. How was the off -site impervious area listed above derived? N/A 2 CC FOno SWIJ-101 Version 3.99 Page, et+ 6. Additional Drainage Areas. Basin Information Drainage Area To BMP C PROPOSED Receiving Stream Name Lake Sutton Receiving Stream Class c " Drainage Area 3.45 ac Existing Im ervious*Area 0.00 ac Proposed Impervious* Area 1.59 ac % Impervious* Area Total 9.33 % Impervious Surface Area Drainage Area To BMP C On -Site Buildings 870 sf On -Site Streets 30,928 sf Asphalt Plant Site 37,462 sf Total: 69,260 1.59 ac Lk �' , Basin Information Drainage Area To Mine* Untreated Area Receiving Stream Name N/A Lake Sutton Receiving Stream Class N/A N/A Drainage Area 12.32 ac 14.55 ac Existing Im ervious*Area 0.00 ac 0.12 ac from prev. application) Proposed Impervious* Area 3.41 ac 0.12 ac '90 Impervious* Area Total 27.68 % 1.65 % Impervious Surface Area Drainage Area To Mine* Untreated Area On -Site Buildings 0 sf 0 sf On -Site Streets 0 sf 10,454 sf Asphalt Plant Site 52,030 sf 0 sf Concrete Plant site 10 96,5sfac 0 sf Total: 148,540 Total 10 ,454 sf 0.24 ac *Area draining into mine does not include area covered by /, mining permit, and drainage basin has no outfall, 3,04/ ctz- p i� e)js(ob z b Fo`mSWU-101 Version3.99 Pag'�/0+. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANT'S The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, out parcels, and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size, and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stortmvaler management permit number as issued by the Division of Water Quality. There covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but not include wood decking or the water surface ofswimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in ercess of the permitted amount requires a slate stormwater management permit modification prior to construction. 5. All permitted runofffrom the outparcels orfuture development shall be directed into the permitted stormwater control system. These connections to the .stormwater control system shall be pert rmed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons Claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified fir this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of/-. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Slormwater Management Permit Application form Oi�F • One copy of the applicable Supplement Forms) for each BMP • Permit application processing fee of S420 (payable to NCDENR) • Detailed narrative description of stormwater treaunenthnanagement G-�r • Two copies of plans and specifications, including: - Development/ Project name - Engineer and firm - Legend - North arrow Scale Revision number & date Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage casements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VI1. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Withers & Ravenel. Inc. Mailing Address: I I I Mackenan Drive City Cary State: NC Phone: (919)469-3340 V111. APPLICANT'S CERTIFICATION Zip: 27511 Fax: (919)535-4545 1, (print or type nrone ofperson lisietl in Genera! Information, Item 1) � C_,AA b E . V or — certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC2H.1000. Signature: ; Ap�l L, J Date: �j \,.� Z. k 'Zxx)(p FormSWIJ-101 Version3.99 Page 4o* WIiTH Er RS, RAVE.NEL STORMWATER DESIGN CALCULATIONS ST WOOTEN CONCRETE PLANT New Hanover County, North Carolina Prepared For: ST WOOTEN CORPORATION 3801 Black Creek Road Wilson, NC 27894 Attn: Reade Dawson Prepared By: WITHERS & RAVENEL 111 MacKenan Drive Cary, North Carolina 27511 June 2006 W&R Project No. 205449.10 �r`oVk CARQV s 29 J Craig M. F/brtner, PE S.T. WOOTEN CONCRETE PLANT — DWQ REPORT NEW HANOVER COUNTY, NORTH CAROLINA INTRODUCTION The purpose of this study is to document compliance with the NC Division of Water Quality policies, which requires projects to treat the first 1" of rainfall. METHODOLOGY The pond design was conducted using the natural drainage features as depicted by the New Hanover County aerial topographic information, field survey topography for the project area, proposed development for the site, and New Hanover County soil maps. One infiltration pond is proposed to meet water quality requirements for the site. The pond is sized to treat the first 2" of runoff. There is a potion of the site that drains into an excavation and mining pit. That area is not covered by this report. Impervious areas were calculated from the proposed plans. The attached worksheets show our methodology for sizing the pond. SI Wooten concrete Plant W&R project #205449. 10 DWQ Report I June 2006 APPENDIX A CALCULATION WORKSHEETS S( Woolen Concrete Plant W&R Project #205449.10 DWQ Report June 2006 Project Name: ST Woolen Concrete Plant it /Stile: New I lanover County, NC Pr yect #: 205449 at 14-tun-06 STORMWATER BMP C -INFILTRATION BASIN Land Use Area (ac) '7 Impervious Imp. Area (ac) Open Space 0.5 0 0.00 Onsite Impervious 2.06 100 2.06 Tolals 2.56 - 2.06 Total % Impervious Surface Area = 80.5 % 2-Inch Runoff Volume Calculation Using (he runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv - 0.05 1 0.009(l) where, Rv = Runoff coefficient, inlin. I = Percent impervious Rv = 0.77 in./in. Total runoff volume from 2-inch precipitation: Runoff volume, S - (Design rainfall) (Rv) (Drainage Area) S = 0.330 acre4i 14389 cu. ft. Bottom Elevation= Surface Area = Depth = Side Slopes = Storage volume provided = 14.00 feel 10540.00 sf 1.50 feet 3:1 24310 cu.ft 5 r W(x Ien Asphalt I'lan1 W R Project U205449 11MI' Sizing Novemlmr 2005 APPENDIX B SOILS REPORT Sl Wooten Concrete Plant W&R Project 4205449.16 DWQ Report June 2006 ■ deT-12-0; 07:0E PROM:98.ME 41 LM I NGTON ID:9107Ei999S"B u PACE 1/7 October11 S&ME S.T. Wooten Corporation - Post Office Box 2408 Wilson, North Carolina 27894 Attention: `, Mr. Richard Bowen Reference: Double Ring Mltrometer Testing S.T. Wooten Asphalt Plant Sutton Lake Road Wilmington, North Carolina Job No. 1063-05-536 Dear Mr. Bowen: In accordance with S&ME Proposal 968-0S dated September t9, 2005, S&ME personnel have recently conducted double -ring infiltrometer testing of the surficial soils at the subject site at the approximate locations shown in Figure 1. Specifically, our representatives performed the following work items on September 5 and October 4, 2005. 1. Advanced seven hand -angered borings across the site in order to visually classify the in -'place soils. The hue and chroma of the recovered soil samples were compared to a Munsell Soil Color Chart. 2. Conducted four double -ring infiltrometer tests at depths ranging from 6 to 24 inches below the existing ground surface. This testing was conducted in general accordance with American Society for Testing and Materials (ASTM) procedure D-3'385 entitled, "Infiltration Rate of Soils ir1 Field Using Double - Ring Infiltromcter". Based on our field classifications of the excavated soils at the hand-augered boring locations, the in - place soils consist of sands with varying aluounts of silt or clay which extended to the maximum completed boring depth of 96 inches below the existing ground surface. Water was encountered in six of the seven boreholes at depths ranging from 15 to 94 inches below the existing ground surface; no water was enwitntered at HA4 The site water level will fluctuate with climatic grid seasonal conditions, however, and may be higher or lower at other times of the year. SAME, Inr.. (910) 799-9945 6d09 Ainvwdam Way, Building 83 1910) 799-9958 lax Wil.,4Ctan, North Carolina 28405 www-smeinc.com OCT-12-05 07:0E PROM<S&ME WILMINGTON ID.91079999se PACE 2/7 S.T. Wooten Corporation S&ME Job Number 1063-05-536 October 11, 2005 Page Two The average infiltration rate at the test locations ranged from 68.6 to 144.7 inches per hour. A summary of the field test results is presented in Tables 1 and 2. S&ME appreciates the opportunity;to provide our services during this phase of the project. Should you have any questions after reviewing this letter, or if we can be of additional assistance, please do not hesitate to contact us at your convenience. Sincerely, S&ME, MC. C. Richard Connell, fi Senior Engineering Tecluucian Randy Martin, Branch Manager CRCTAMAGM/pI Auwlun is qw- �b_� Paul A. Masten Environmental Professional Tax: Withers & Ravenel, Mr. Mark Hargrove (M 256-2584) OET-12-09 07.07 FROM.SKME WILMINGTON 10.9107999950 PAGE 3/7 TABLE I Hand Anger Borings and Munsell Soil Descriptions ST Wooten Asphalt Plant Site Sutton Lake Road Wilmington, North Carolina S&ME Job Number 1063-05-536 I Depth Location Inches I-Iue Value/Chroma Soil Deserintion HA-1 0-10 5 YR 7/1 Light Gray Medium to Fine SAND 10-18 7.5 YR 4/4 Brown Medium to Fine SAND 18-30 2.5 YR 614 _ Weak Red Slightly Silty Medium to Fine SAND Water was encountered at 30 inches below the existing ground surface. HA-2 0-18 5 YR 7/1 Light Gray Medium to Fine SAND 18-54 2.5 Y 7/8 Yellow Slightly Clayey Medium to Fine SAND 54-84 2.5 Y 6/8 Olive Yellow Slightly Clayey Medium to Fine SAND 84-96 2.5 Y 7/6 Yellow Slightly Clayey Medium to Fine SAND Water was encountered at 96 inches below the existing ground surface e HA-3 0-6 2.5 Y 4/ l Dark Gray Medium to Fine SAND 6-40 5 YR 7/1 Light Gray Medium to Fine SAND 40A6 7.5 YR 3/3 Dark Brown Slightly Silty Medium to Fine SAND 46-48 2.5 Y 2.5/1 Black Slightly Silty Medium to Fine SAND Water was encountered at 48 inches below the existing ground surface. HAA 0-5 2.5 Y 4/1 Dark Gray Medium to Fine SAND 5-37 5 YR 7/1 Light Gray Medium to Fine SAND 37-44 7.5 YR 3/3 Dark Brown Slightly Silty Medium to Fine SAND 44-48 2.5 Y 2.5/1 Black Slightly Silty Medium to Fine SAND Water was encountered at 48 inches below the existing ground surface. OCT.-12-05 07:07 FROM.SBME WILMINGTON ID:9107999950 PACE 4/7 TABLE 1 - Continued Job Number 1063-05-536 Page Two Depth Location Inches Hue Value/Chroma HA-5 0-3 2.5 Y 4/1 3-20 5 YR 7/1 20A0 2.5 Y 6/8 40-96 2.5 Y 7/6 Soil Description Dark Gray Medium to Fine SAND Light Gray Medium to Fine SAND Olive Yellow Slightly Clayey Medium to Fine SAND Yellow Slightly Clayey Medium to Fine SAND Water was encountered at 94 inches below the existing ground surface. HA-6 0-8 5 YR 7/1 Light Gray Medium to Fine SAND 8-30 7.5 YR 4/4 Brown Mediums to Fine SAND 30-40 2.5 Y 6/8 Olive Yellow Slightly Clayey Medium to Fine SAND 4042 2.5 Y 6/6 Olive Yellow Sligbtly Clayey Medium to Fine SAND Water was encountered at 42 inches below the existing ground surface- HA-7 0-3 2.5 Y 4/1 Dark Gray Medium to Finc SAND, 3-15 5 YR 7/1 Light Gray Medium to Fine SAND Water was encountered at 15 inches below the existing ground surface. According to the "Soil Survey of New Hanover County", the areas wherein HA-1 through HA-6 were performed consist of the Kureb and Lakeland soil series. As reported in the "Soil Survey of New Hanover County", the seasonal high water table for those series is greater than 6 feet below the existing ground surfacr._ The area wherein HA-7 was performed consists of the Leon soil series_ As reported in the "Soil Survey of New Hanover County", the seasonal high water table for this series is less than 0-1.0 foot below the ground surface. OCT-12-05 07:07 FROM=SAME WILMINGTON ID.9107999950 PACE 5/7 TABLE 2 Double Ring Infiltrometer Testing ST Wooten Asphalt Plant Site Sutton Lake Road Wilmington, North Carolina S&ME Job Number 1063-05-S36 Date of Test: October 4; 2005 Depth of"rest Below Site Grade: 10 inches Depth of Water in Rings: 3'% inches Location: 1 Inner Diameter of Inner Ring: 11114 inches Inner Diameter of Outer Ring: 22%: inches Depth to Water. 30" Average Infiltration Rate at Location 1: 69.1 inches per hour I-Tigh Water "Cable: > 6 feet below land surface* Soil Series: Kureb* Location: 3 Date of Test: September 5, 2005 Depth of Test Below Site Grade: 12 inches Inner Diameter of Inner Ring: 11% inches Depth of Water in Rings: 3%: itches`. Inner Diameter of Outer Ring: 22Y2 inches Depth to Water. 48" Average Infiltration Rate at Location[ 3: 144.7 inches per hour Higl1 Water Table: > 6 feet below land surface* Soil Series: Kureb* Note: *As interpolated from the "Soil Survey ofNew Hanover County" prepared by the United States Department of Agriculture Soil Conservation Service OCT-12-06 07.07 PRoM:6aMF W ILMr NGTON 193.9107999966 TABLE 2 - Continued Double Ring Infiltrometer Testing ST Wooten Asphalt Plant Site Sutton Lake Road Wilmington, North Carolina S&ME Job Number 1063-05-536 Date of Test: October 4, 2005 Depth of Test Below Site Grade: 24inches Depth of Water in Rings: 3%z inches, Depth to Water: 94" Location: 5 Inner Diameter of Inner Ring: 11/. inches PAGF_ rd/7 Inner Diameter of Outer Ring: 22%z inches Average Infiltration Rate at Location 3: 101.2 inches per hour High Water Table: > 6 feet below land surface* Soil Series: Kureb* Location: 6 Date of Test: September 5, 2005 Depth ofTest Below Site Grade: 6 inches Inner Diameter of Inner Ring: 111/4 inches Depth of Water in Rings: 3'/z inches Inner Diameter of Outer Ring: 22'% inches Depth to Water: 42" Average Infiltration Rate at Location 3: 68.6 inches per hour High Water Table: > 6 feet below land surface* t Soil Series: Lakeland' Note: *As interpolated from the "Soil Survey of New I Ianover County" prepared by the United States Department of Agrictilture Soil Conservation Service C L4 cnl n FC TOTnL �n O gip ............ ..._................ C),f:CETRIC... J , f ! ) A ✓ G LEGEND 0 Approximate Hand -Auger Boring Location a Approximate Boring Location 50, D Note: Site plan drawing provided to SUIE by S.T. Wooten Corporation personnel. SCALE: NOT TO SCALE BORING LOCATIONS CHECKED BY: PAM SUTTON LAKE ROAD ASPHALT PLANT WILMINGTON, NORTH CAROLINA DRAWN BY: JNS ENGINEER(NO . TESTING DATE: 10.3.05 ENVIRONMENTAL SERVICES JOB NUMBER: 1083.05.636 8.1 HA-7 HA-6 I HA-1 HA-2 FI OURe NUMBER 1 Worksheet Worksheet for Circular Channel Project Description Worksheet 15" RCP TO POND e EHs i Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coeffic 0.013 Channel Slope 031300 f1/ft Diameter 15.0 in Discharge 1.20 cfs Q fe Results Depth 0.27 ft Flow Area 0.2 ft` Wetted Perime 1.22 0 Top Width 0.00 (1 Critical Depth 0.43 It Percent Full 21.9 % �; U P '�P c ecr (I-- i SS • �--Io r^ Critical Slope 0.005241 IUft Velocity 6.04 Ills 4—'-- VQ L = L/ Velocity head 0.57 It '' II I Specific Energ- 0.84 It Y Froude Numbe 2A3 rr Maximum Disc 12.29 cfs Discharge Full 11.43 cfs /I/err p i2�r P L O 2 Slope Full 0.000345 tt/tt Flow Type supercritical (�� J-eal *li k Project Engineer: Withers 8 Ravenel Inc c:k,--Ncraig%desktophroiectl.fn12 Withers 8 Ravenel Inc FlowMaster v7.0 f7 00051 06/13/06 09:43:08 PM 0 Raestad Methods, Inc. 37 Brookside Road Waterbury, CT06708 USA 1-203-755-1666 Page 1 of 1 Cross Section Project Description Worksheet 15" RCP l"O POW Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coeffic 0.013 Channel Slope 031300 ft/ft Depth 0.27 0 Diameter 15.0 in Discharge 120 cfs Cross Section for Circular Channel 15.0 in 0.27 It J V:1L H:1 N TS Project Engineer Withers & Ravenel Inc a\ ... \craigWesktop`ixolecU.hn2 Withers & Ravenel Inc FlowMaster v7 O U-00051 06/13/06 60:43:20 PM ®Haeslad Methods, Inc. 37 6rookside Road Waterbury, CT 06708 USA *1-203-755-1666 Page 1 of 1 Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Some: "[lank and channel fining procedures", New York Deparunenl of Transportation, Division of Design and Construction, 1971.) Note: To use die following chart you must know: (1) Q full capacity (2) Qlo (3) V full (4) Vlo where Q = discharge in cfs and V = Velocity in 1-l1S. I S 11MATION OF STONE SIZI, AND DIMENSIONS FOR CuIxi.- T APRONS Step 1) Compute flow velocity Vo at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=Ao, where A: cross .sectional area of flow at outlet. For multiple culverts, use Do=1.25xDo of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For [text higher zone. (Zones 1 through 6). Iilm Zee Use T— r- 2 �- S I d®Y�pQ------------------ ltlm,�1 Qp� -------------------- �® II ° S In15' 20' 25 �; )S DIAMETER (Ft.) Figure 8.06.b.1 R. 17A1 8.06.5 13 APRON MALE '.1 AFRON IAAIERIAL E[NGnI Of AP1iON 10 PROTECT CuvEm LI TO VnEVEM SCOnn nUCE USE. V ALWAYS 12 STONE FILLING (FINE) CL A a A D. 4 x 0. FILLING (IJGHT) CL. D a x D 6 x D. ISTONE STONE FILLING(MEDIUM) CL 1 4 x D. B x D. STONE FILLING (HEAVY) CL. 1 4 x 0. 8 x 0. STONE FILLING (HEAVY) CL 2 5 x D. 10 x D. STONE FILLING (HEAVY) CL. 2 6 x D. 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS. STILLING BASIN OR LARGER SIZE STONE). Fig.8.D6.b.2 L, = 3 if /. 2f FI- = 3,7s" FI- L'e. — `/ Ir P /�F Width = 3 times pike dia. (Inin.) = x /. 2C- FF 3. 1' 1F DETERMINATION OF STONE SIXES FOR DUMI'ED STONE CHANNEL LININGS AND REVIs1'MEN7'S Slcp 1) Use figure 8.06.b.3 to detemline maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure 8.06.b.4 to detennine acceptable size range for stone (for 12 PTS it is 125-500 Ills. for 75`Yo of stone, and the maximum and minimum range in weight should be 25-500 lbs.) Note: In detemlining channel velocities for stone linings and revelment, use the following melficicnts of roughness: Diameter Mannin's Min. dlicktuss (inches) "n" of lining (inches) rA n't Hille /i 3 0.031 9 12 Light B 6 0.035 12 18 Medium = 13 0.040 18 24 Heavy ?C 23 0.044 30 36 (Channels) (Dissapazors USG Cfut rj /If " 8.06.6 Rev. IL93 Appendices I W11 — �_=-iLl?liil!j 1';:.ril i11L1!il ...ii1 :ill f 11 .111� .... if --' •1ri !1.L.1 I E 20- .:If:�ti f „ 15,000 - 10 000 5,000 !ii� 1!' it-t7t ;li iliJ; lj Dili !,H1111. _1,000 .• If Ijiltill o 'ij 11 -250 I ili lift -so 3 0 2 4 8 10 12 14 16 18 20 Velocity in FeeYScc. Pv/o- ©:tsed on Isbesh Curve ITIg. 8.00.b.3 Max. Stone Sine for Rip Rap Maximum weight of stone required Minimum and maximum range in weight of stones Weight range of 75% of stones (Ibs.) (Ibs.) (tbs.) 150 25 150 50 - 150 200 25 - 200 50 - 200 250 25 - 250 50 - 250 400 25 - 400 100 - 400 600 25 - 600 150 - 600 800 25 - 800 200 - 800 1,000 50 - 1,000 250 - 1,000 1,300 50 - 1,300 325 - 1,300 1,600 50 - 1,600 400 - 1,600 2,000 75 - 2,000 600 - 2,000 2,700 100 - 2,700 800 - 2,700 Figure 8.0614 Gradation of Rip Rap SOW= 'nmik and channel lining pros ]l , "New York Department of Tienslymuion, Division of Design and Consntrtion, 1971. Rcv. JZ93 8.06.7 Worksheet Worksheet for Circular Channel Project Description Worksheet 15' RCP TO POND C Ogflr' Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coeffic 0.013 Channel Slope 031300 ft/ft Diameter 15.0 in Discharge 6.05 cls �e— Q \C Results Depth 0.65 It Flow Area 0.6 IV Welled Perime 2.01 It Top Width 0.00 It Critical Depth 0.99 It Percent Full 51 7 Critical Slope 0.009284 It/11 Velocity V1 9.45 IVs�— ,o Velocity I lead 1.39 It Specific Energ- 2.03 It Froude Numbe 2.33 Maximum Disc 12.29 cfs Discharge Futf 11.43 cfs Slope Full 0.008772 ft/ft Flow Type ;upercrifical Project Engineer: Withers & Ravenel Inc aigldesktop\projectI trn2 Withers & Ravenel Inc FlowMaster v7.017.00051 06/13/06 09:49:20 PM O Haeslad Methods, Inc. 37 Brookside Road Watemury, CT 06708 USA 1-203-755-1666 Page i of 1 Cross Section Project Description Worksheet 15" RCP TO POW Flow Elemenl Circular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coeflic 0.013 Channel Slope 031300 fVft Depth 0.65 It Diameter 15.0 in Discharge 6.05 cis Cross Section for Circular Channel 15.0 in 0.65 IT V:1L\ H:1 NTS Project Engineer. Withers & Ravenel Inc c.1--- lcraigWeskloplproject l.fm2 Withers 8 Ravenel Inc FlowMaster v7.0 j7.00051 06/13/06 09:49:32 PM © Haestad Methods, Inc. 37 Brookside Road Waterbury, Cl06708 USA +1-203-755-1666 Page 1 of 1 Appe,taices NEW YORK DOT DISSIPATOR MV- MOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel fining procedures", New York Department of Transportation, Division of Design and Construction, 1971) Note: To use the following chart you must know: (1) Q full capacity (2) Qm (3) V full (4) Vlo where Q = discharge in cfs and V = Velocity in FPS. F f`IMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity Vn al culvert or paved channel outlet. Step 2) For pipe culverts D„ is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Da=An, when; A.= cross -sectional area of flow at outlet. For multiple culverts, use Do=1.25xDo of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones I through 6). 20 - inn �m ------------------ �o..o mim m®'�rm�j r �m mom-®vm old ®m®sir-mm� r 0 I xr is:Cm 07 :15.,s Figure 8.00.b.1 I 1 I I 10' 15' 20' 25' DIAMETER (Ft.) R�-12"3 8.06.5 13 a 2 (T %�R�1'1 i�11ER�AE N Ur i o AT N mPq)IECr G1VEm LI TOPq VEm SC R ry E use L2 ALWAYS L2 I STONE FILLING (FINE) CL. A 3 x D. 4 A D. 2 STONE FILLING (LIGHT) CL. B 7 x D. 6 A. D., 3 STONE FILLING (MEDIUM) CL. 1 4 x 0. n A D. 4 STONE FILLING (HEAVY) CL. 1 4 x D. 0 x D. 5 STONE FILLING (HEAVY) CL. 2 5 x D. 10 x D. 6 STONE FILLING (HEAVY) CL.2 6 x D. 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Fig. 8.06.b.2 � � A Widdl = 7 times pipe dia. (muL.) Lf — DF,TERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1) Use figure 8.06.10 to detetntine maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure 8.06.6.4 to detennine accepunble size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should Ix; 25-500lbs.) Note: In detennining channel velocities for stone linings and reveunent, use the following coefficients of roughness: Diameter Mannin's Min. thickness (uncles) "n" of lining (inc (14.0 Fine q 3 0.031 9 Light B 6 0.035 12 Medium = 13 0.040 18 Heavy �_ 23 0.444 30 (OLWHIC15) 12 18 2 36 (Dissapators) 8.416.6 Rev. IW3 60- -,:,trm , ill �' is FIE, , � ,� 1 :: _... •l;}i _'1JI 11 �� i ��I1 fit' li}1 �i; �� i��CIt�i �I�� — _=�........ ,;_1• l=- :�,'_i,l,l�i; ;:,� . ; �=`-._:'•;,:;:;r�::ir:,i ,.� .�, Ij fiilll �, ►; 1 �, � �} It -tf'11•;• ��i;,l—t-° iil .l� ; .._ ��a.i II f IF1} �._.-.._rl;.: }�{f--.�5; i �;}i f,•, � �; 1. ii � i )1 i;' 1i;i i !,.:r !!'1 n i, 77 2 4 6 8 10 12 14 Veloci in Feet/sec. 10=9.Nf rtif Fig. 8.06.6.3 Max. Stone Sixe for Rip Rap Appendices 7 15,000 -10.000 5,000 J N v - 1,000 -500 -250 3 u4zf; a-10: Based on Ishesh Curve Maximum weight of stone required Minimum and maximum range in weight of stones Weight range of 75% of stones (lbs.) (lbs.) (Ibs.) 150 25 150 50 - 150 200 25 - 200 50 - 200 250 25 - 250 50 - 250 400 25 - 400 100 - 400 600 25 - 600 150 - 600 800 25 - 800 200 - 800 1,000 50 - 1,000 250 - 1,000 1,300 50 - 1,300 325 - 1,300 1,600 50 - 1,600 400 - 1,600 2,000 75 - 2,000 600 - 2,000 2,700 100 - 2,700 800 - 2,700 Figure 8.06.1A Grxlation of Rip Rap Source: "Banlr and a mirl lining procedures, "New York Depammcnt 01 'T nsponation, Division of Design and Construction, 1971. Rm 12,93 8.06.7 S.T. WOOTEN CONCRETE PLANT - POND DESIGN REPORT NEW HANOVER COUNTY, NORTH CAROLINA INTRODUCTION The purpose of this study is to document compliance with the New Hanover County Storm Water Management Policy, which requires projects to control "the post development peak discharge rate of the 2-year, I0-year, and 25-year storms to the pre -development condition." MLTLIODOLOGY The pond design was conducted using the natural drainage features as depicted by the New Hanover County aerial topographic information, field survey topography for the project area, proposed development for the site, and New Hanover County soil maps. One infiltration pond is proposed to nle-el peak attenuation requirements for the 2-year, 10-year, and 25-year design storms. The total drainage area for the site is 4.8 acres. Approximately 1.9 acres of the project area drain to an excavation and mining pit. That area is not covered by this report. The scope of work included the following analyses: Hydrology- • Simulation of 2-year, 10-year, 25-year, and 100-year rainfall events for the Wilmington area • Formulation of 2-year, 10-year, 25-year, and 100-year flood hydrographs for pre- and post -development conditions Hydraulic • Routing the 2-year, 10-year, 25-year, and 100-year flood hydrographs for post development runoff through the proposed pond. The results of the hydrology analyses are used in the hydraulic analyses. The hydraulic routing analysis requires the development of stage -storage and stage -discharge functions for the proposed pond. The rainfall/runoff hydrographs, stage -storage and stage -discharge functions have been combined to create a routing computer simulation nnodel using Haestad Methods PondPack 00.0 software. This model was then used to assess the impact of the peak discharges for the design rainfall events. The PondPack computer model analyses results are provided as an appendix to this report. HYDROLOGY The SCS Method was used to develop runoff hydrographs for the Type III, 24-hour duration, 2-year, 0-year, 25-year, and 100-year storm events for the Wilmington area. This method requires three basic parameters: a curve number (CN), time of concentration (tc), and drainage area. Curve numbers were based on soil type and land use. Soil types were delineated from the Soil Survey of New Hanover County, North Carolina (April 1977). Land use for existing conditions was based on the most recent New Hanover County aerial photographs and site visits. Post development land use is residential based on the proposed site plan. Time of concentrations were calculated using methods described in the SCS publication "Urban Hydrology for Small Watersheds, TR-55" and based on New Hanover County topographic maps, piped drainage system design calculations and field survey data. Drainage areas were delineated from the proposed grading plans for post development conditions. Drainage area delineation maps are shown on the full size project d rawings, and a summary of data used to formulate hydrographs and peak discharges are included in the appendices of this report 51 WwAen euncrele Plant W&R Project 9205449. 10 Pond Design Repnil I tune 2006 S.T. WOOTEN CONCRETE_ PLANT - POND DESIGN REPORT NEW HANOVER COUNTY, NORTH CAROLINA HYDRAULICS Computer simulated reservoir routing of the 2-year, 10-year, 25-year, and 100-year storm events utilized stage -storage and stage -discharge functions. Stage -storage functions were derived from the proposed grading for the pond as shown on the construction drawings. Non -linear regression relations for surface area versus elevation were derived for the infiltration pond. This relation estimates the incrernental volume of the basin to the: stage or elevation of the basin. Stage -discharge functions were developed to size the outlet weir for the pond to meet the design requirements. Based on field investigation, the infiltration rate for the soils on -site is 52 in/hr. For the purposes of this report, it was assurned that an average infiltration rate after a large storm would be 10.0 in/hr. CONCLUSIONS The proposed pond is designed to attenuate the post development 2-year, 10-year, and 25-year design storm peak runoff rates to less than or equal to pre -development conditions. Post development untreated areas were included in the analysis to account for all sheet (low off the site that is not tributary to one of the pond. Tables 1 and 2 below summarize the peak attenuation results. Table 1. Drainage Area #1 Peak Discharge Rate Summary Drainage 2-yr Qpeak 10-yf Qpcak 25-yf Qpeak 100-yf Qpeak Area (cfs) (cfs) (cfs) (cfs) (acres) 2.49 0.14 1.81 2.99 5.65 lPre-Developmenl J, l4 � t 4N A 2 F KS3.3j 0 00 0 00'>. fPond"a�U� II8 :y ? Untreated Areas 0.9 0.05 0.75 1.24 2.30 Post Development 3.78 0.05 0.75 1.24 2.43 Table 2. Peak Water Surface Elevations Drainage Area 2-yr 10-yr 25-yr 100-yr ft) (ft) 00 (f ) (acres) Pond 3.78 14.18 14.80 15.11 15.63 Weir Elevation = 15.50' S r Woolen Conaele Plant W&R Proietl #205449.10 fond Design Report 2 June 2006 APPENDIX A PON DPACK OUTPUT 51 Wooten Concrelc I'lanl W&R Projn3 #205449. 10 Pond I lesign Rclmrl 3 June 2006 Table of Contents m 'fable of Contents . .......... ..«........ MASTFR SUMMARY .... ...........+...... Watershed....... Master Network Summary ............. 1.01 ""*""'•"k4°` DESLGN STORMS SUMMARY '+"'*'••`***""" New Hanover..... 2 Design Storms ...................... 2.01 . u ................... TC CAICULATIONS ..................... POST TO POND.... TC Cal.cs ........................... 3.01 PRE DEVELOPMENT Tc Calcs ........................... 3.03 SUBAREA 1.0...... .I'c Calcs ........................... 3.05 ...................... CN CALCULATIONS ..................... POST TO POND.... Runoff CN-Area ..................... 4.01. PRE DEVELOPMENT Runoff CN-Area ..................... 4.02 SUBAREA 10...... Runoff CN-Area ..................... 4.03 . ....................«. POND VOLUMES ....................... POND C.......... VOL: Elev-Area ..................... 5.01 S/N: DOYXYWH3NI.BE Withers a Ravenel Pond Pack (10.00.015.00) 12:11 AM 6/14/2006 Table of Contents I ..............«..... OUTLET S'rRUCTURES ..........«.... ...... Outlet 1........ Outlet Input Data ............ I..... 6.01. SIN: DOYXYW113NLDE Withers S Ravenel Pond Pack (10.00.015.00) 1.2:1.1 AM 6/14/2006 Type.... Master. Network Surmnary Page 1.01 Name.... Watershed File.... IC:\05\05-440\05449.10-Wooten Concrete Plant - Wi.lm\Proj\H&H\S'1' Wooten Ponds.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: New Hanover Total Depth Rainfall. Return Event in Type RNF ID ------------ 2 ------ 4.5000 ---------------- Synthetic Curve -_________--_--_ Typelll 24hr 1.0 7.0000 Synthetic Curve TypelII 24hr 25 8.0500 Synthetic Curve TypeIII 24hr 100 LO.0000 Synthetic Curve TypeIII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrogr<aph Method ('Node=Outfal.l.; +Node=Diversion;) (Tr.un= IIYG Truncation: Blank=None; L=Left; R=Rt; LR=Lefts Rt:) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event: ac-ft 'Trun firs cfs LC ac-ft _________________ 'OUT POST ____ JCT ______ 2 __________ __ .017 _________ 12.3500 ________ .05 ____________________ 'OUT POST JCT 1.0 .081 12.1.000 .75 'OUT POST JCT 25 .117 12.1.000 1.24 OUT POST JCT 100 .241 1.2.4500 2.43 OUT PRE JCT 2 .047 12.4500 .14 'OUT PRE JCT 10 .223 12.2000 1.81 'OUT PRE JCT 25 .324 12.1500 2.99 OUT PRE JCT 100 .544 1.2,1500 5.65 POND C IN POND 2 .368 12.1.000 4.50 POND C IN POND 10 .818 1.2.1.000 1.0.22 POND C IN POND 25 1..026 12.1000 12.79 POND C IN POND 100 1.431 12.1.000 17.69 S/N: DOYXYWI13NLBE Withers a Ravenel Pondl'ack (1.0.00.015.00) 12:11 AM 6/14/2006 ,Type.... Master Network Summary Page 1.02 Name.... Watershed Bile.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi. Im\Proj\N&N\ST Wooten Ponds.ppw MASTER NETWORK SUMMARY SCS Unit Nydrograph Method ('Node=Outfall.; +Node=Diversion;) (True= IIYG Truncation: Blank=None; L=Left; R=Rt; LR=Left:&Rt) Max Return IIYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs Cfs ft ae-ft POND C OUT POND 2 .000 10.4500 00 14.18 .045 POND C OUT POND 1.0 .000 8.7500 .00 14.80 .203 POND C OUT POND 25 .000 8.2000 .00 15.1.1 .289 POND C OUT POND 100 .045 12.4500 1.58 15.63 .442 POST TO POND AREA 2 .368 12.1.000 4.50 POST TO POND AREA 10 .818 12.1000 10.22 POST TO POND AREA 25 1.026 12.1000 12.79 POST TO POND AREA 100 1.431 12. 1000 17,69 PRE DEVELOPMENT AREA 2 .047 12.4500 .14 PRE DEVELOPMENT AREA 10 .223 12.2000 1.81 PRE DEVELOPMENT AREA 25 .324 12.1.500 2.99 PRE DEVELOPMENT AREA 100 .544 1.2.1500 5.65 SUBAREA 10 AREA 2 .017 1.2.3500 .05 SUBAREA 10 AREA 10 .081 12.1000 .75 SUBAREA 10 AREA 25 .117 12.1.000 1.24 .SUBAREA 10 AREA 100 .197 1.2.1000 2.30 SIN: DOYXYWI13NLBE Pond Pack (10.00.015.00) 12:11 AM Withers & Ravenel 6/14/2006 Type.... Design Storms Name.... New Hanover: File.... K:\05\05-440\05449. Storm... TypeIIl: 24hr Tag: Page 2.01 Event: 2 yr 10-Wooten Concrete I'Lant - Wi.lm\Proj\H&fi\ST Wooten Ponds.ppw 2 DESIGN STORMS SUMMARY Desi.gn Storm Fi.Le,ID = Storm Tag Name = 2 New Hanover Data 'Type, File, ID = Synthetic Storm Storm Frequency = 2 yr Total. Rainfall Depth= 4.5000 fn Duration Multiplier = 1 Resulting Duration = 24.0000 firs Resulting Start 'T hne= .0000 firs Step= Storm Tag Name = 10 Data Type, File, ID = Synthetic Storm Storm Frequency = 1.0 yr Total. Rain Pall. Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 firs Resulting Start Time= .0000 hrs Step= Storm Tag Name = 25 __ __-_---__ _- Typelll 24hr 1000 hrs End= 24.0000 firs ------------------ TypelIl 24hr 1000 hrs End= 24.0000 firs Data Type, File, ID = Synthetic Storm TypeT1:I 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration MuLtipl.i.er = I Resulting Duration = 24.0000 firs Resu LLinq Start 'Time= .0000 firs Step= .1000 hrs End= 24.0000 firs Storm Tag Name = 100 Data Type, File, ID = Synthetic Storm Storm Frequency = 100 yr Total Rainfall. Depth= LO.0000 in Duration Multiplier = I. Resulting Duration = 24.0000 firs Resu Lting Start Time= .0000 firs Step= SIN: DOYXYWII3NLDE Pond Pack (10.00.015.00) -------------- Typeill 241hr 1000 firs End= 24.0000 firs 12:11 AM Withers S Ravenel 6/14/2006 Type.... Tc Calcs Name.... POST TO POND Page 3.OI. File.... K:\05\0'i-440\05449.10-Wooten Concrete i'Lant - Wil.m\llroj\11&11\ST Wooten Ponds.ppw TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment 91: Tc: User Defined Segment: 01 Time: .0833 firs ------------------------------------------------------------------------ Total Tc: .0833 firs Calculated Tc < M.in.Tc: Use Minimum TC... Use Tc = .0833 firs S/N: D0YXYWN3NL13E Withers & Ravenel Pondilack (1.0.00.01.5.00) 12:11 AM 6/14/2006 Type.... Tc Cal.cs Name .... POST TO POND Page 3.02 Pi. l.e.... K:\05\05-440\05449.10-Wooten Concrete Plans: - Wi. lm\1'roj\H&H\ST Wooten Ponds.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ===_ User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN : DOYXYWH3NLDE Withers & Ravenel Pond Pack (1.0.00.015.00) 12:.1.1. AM 6/14/2006 Type.... Tc Ca Lcs Name.... PRE: DEVELOPMENT Page 3.03 File.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi.l.1n\Proj\HdH\ST Wooten Ponds.ppw TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ ________________________________________________________________________ Segment Y1: Tc: User Defined Segment: 01 Time: .1700 hrs ________________________________________________________________________ Total. 'rc: -- .1700 hrs SIN: D0YXYWH3NL13E Withers a Ravenel Pond Pack (10.00.01.5.00) 12: 11 AM 6/14/2006 Type.... .I'c Cal cs Name.... PRE DF.VP:LOPMIiNT Page 3.04 Fi. Le.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi1m\Proj\H&H\ST Wooten Ponds.ppw ________________________________ Tc Equations used... -------------------------------- ___= user Defined __________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: ❑OYXYW113N1.131; Withers s Ravenel PondPack (10.00.015.00) 1.2:11 N1 6/14/2006 Type.... Tc Calcs Page 3.05 Name.... SUBAREA 10 Fi.l.e.... K:\05\05-440\05449.10-Wooten Concrete Plant: - Wilm\Proj\U&B\ST Wooten Ponds_ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment: 91: Tc: User Defined Segment #1 Time: .0033 hrs ------------------------------------------------------------------- S/N: DOYXYWH3NI.BE PondPack (10.00.015.00) Total. Tc: .O033 hrs Calculated Tc < Min.'Pc: Use MiniMUm Tc... use Tc = .0833 firs 12:11 AM Withers a Ravenel. 6/14/2006 Type.... To Cal.cs Name.... SUBAREA 10 Page 3.06 Fil.e.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi Ln\Proj\Hafl\S1' Wooten Ponds.ppw ----------------------- To Equations used... ----------------------- ==== User Defined To = Value entered by user Where: To = Time of Concentration SIN: DOYXYWH3NI.BE Withers d Ravenel PondPack (10.00.015.00) 12:11 AM 6/14/2006 Type.... Runoff CN-Area Name.... POST TO POND Page 4.01 File.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi.l.m\Proj\N611\ST Wooten Ponds.ppw, RUNOFF CURVE NUMBER DATA .......................................................................... -------------------------------------------------------------------------- .......................................................................... Impervious Area Adjustment: Adjusted Soil/Surface Description CN acres %C %UC CN Impervious Areas - Paved parking l0 98 1.430 98.00 Open space (Lawns,parks etc.) - Goo 39 1.450 39.00 COMPOSITE AREA a WEIGHTED CN ---> ........................................................................... 2.880 68.30 (68) SIN: D0YXYW113NLBE Pond Pack (10.00.015.00) 12:11 AM Withers 6 Ravenel 6/14/2006 'type.... Runoff CN-Area Name.... PRE DEVELOPMENT Page 4.02 Fi. le.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wi.lm\Proj\11611\S'I' Wooten Ponds.ppw RUNOFF CURVE NUM®Iili DATA .......................................................................... -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- "'--- Woods - grass combination - [air 43 2.490 43.00 COMPOSITE AREA a WEIGIITED CN ---> 2.490 43.00 (43) ........................................................................... ........................................................................... SIN: DOYXYW113N1,13E Withers S Ravenel Pond Pack (10.00.015.00) 12:11 AM 6/14/2006 Type.... Runoff CN-Area Name.... SUBAREA 10 Page 4.03 File.... K:\05\05-440\05449.10-Wooten Concrete Plant - Wil.m\Proj\116H\ST Wooten Ponds ppw RUNOFFCURVE: NUMBER DATA .......................................................................... ----------------------------------------------------------------------- Impe rVious Area Adjustment: Adjusted Soil./Surface Description CN acres %C %UC CN Woods - grass combination - fair. 43 .900 43.00 COMPOSITE AREA s WEIGHTED CN ---> .900 43.00 (43) ....:...................................................................... ........................................................................... SIN: DOYXYWH3Nl,Bl3 Withers a Ravenel. PondPack (10.00.015.00) 12:11 AM 6/14/2006 Type.... Vol.: El.cv-Area Name.... POND C Page 5.01 File.... K:\05\05-440\05449.10-Wooten Concrete Plant - W.ilm\Proj\IISH\Sl' Wooten Ponds.ppw Elevation Pianimeter. Area Al1A2+sgr(A1."A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (acres) (acres) (ac-ft) (ac-ft) 14.00 ----- .2400 .0000 .000 .000 16.00 ----- .3200 .8371. .558 .558 POND VOLUME EQUATIONS ' Incremental. volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) k (E1,2-ELl) k (Areal. + Area2 r sq.r.t.(Areal'Area2)) where: ELL, EL2 = Lower and upper. elevations of the increment Area L,Area2 = Areas computed for ELL, F.L2, respectively Vo Lnme = Incremental. volume between EIA and EL2 SIN: DOYXYWH3NLHE Withers a Ravenel Pond Pack (10.00.015.00) L2:1.1 AM 6/14/2006 Type.... Outlet Input: Data Name.... Outlet 1 Page 6.01 Fi. le.... K:\05\05-410\05449.10-Wooten Concrete Plant - WiJ.m\Proj\H&H\ST Wooten Ponds.ppw REQUESTED POND WS ELEVATIONS: Mi.n. Elev.= 14.00 ft Increment: = .10 ft Max. El.ev.= 16.00 ft- OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Al.l.owed Structure No. Outfall El, ft E2, It __ __ _ ------- --------- _--_ Weir -Rectangular WO ---> TW 1.5.500 16.000 TW SETUP, DS Channel S/N: D0YXYW113NLBE Pond Pack (L0.00.015.00) IPABOWT dl Withers s Ravenel 6/1.4/2006 Type.... Outlet Input Data Name.... Outlet I. Rage 6.02 OUTLET STRUCTURE INPUT DATA Structure ID Structure Type _________________ N of Openings Crest: Elev. Weir Length Weir Coef:f.. Wei.r. TW effects = WO = Weir -Rectangular ------------------ = 1 = 15.50 ft 12.00 ft 2.800000 (Use adjustment equati.on) Structure ID = Tw Structure Type = TW SETUP, DS Channel. ------------------------------------ FREE OUTrALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Mi.n. TW tolerance = .01 ft Max. TW tolerance = .Ol. ft Mi.n. IIW tolerance = .01. ft Max. IIW tolerance = .01. ft Mi.n. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: DOYXYWH3NL13E Withers S Ravenel PondPack (1.0.00.015.00) 1.2:11 AM 6/14/2006 Appendix A A-1 Index o£ Starting Page Numbers for ID Names _____ 0 ----- Outlet L... 6.01 P ----- POND C... 5.01. POST I'D POND... 3.01., 4.01 PRE DEVELOPMENT... 3.03. 4.02 _____ S ----- SUBAREA 1.0... 3.05, 4.03 W ----- Watershed ... 1.01. S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.01.5.00) 12:11 AM 6/14/2006 MTHERS & RAVENEL STORMWATER DESIGN CALCULATIONS ADDENDUM 1 ST WOOTEN CONCRETE PLANT New Hanover County, North Carolina Prepared For: ST WOOTEN CORPORATION 3801 Black Creek Road Wilson, NC 27894 Attn: Reade Dawson Prepared By: WITHERS & RAVENEL 111 MacKenan Drive Cary, North Carolina 27511 July 2006 W&R Project No. 205449.10 Craig M. F�brtner, PE o (o West Driveway Pipe iV" �"�� •t �`t Friction Method Manning Formula Solve For Normal Depth t.Input Data; .-w�t�......-_.i.-..6 C ru....u...a-. �....�.ri`•i:.rW�"`.0.4s....uL._.-:u'�.�.s.l�._....+...._....-.......�-Y'ti...-...N�,....-,.la.,... as era_, u`�fi� Roughness Coefficient 0.013 Q = C i A Channel Slope 0.00170 fVft Q e = O.VS 7- 21) Diameter 1.50 If Q - 2.02 eFS Discharge 2.02 fY/s r;SU1Re6sult t"' r*i""'f.. t4""'_". ,^,g'rz"'•j-, y „'"_.�, .r, — .vTf`""" i".� y. `'. ""`:" .s _.�__._� ,µ. ..,,:�.:::ca" �i 1• � � ;; i ,�� �. Normal Depth 0.72 It Flow Area 0.94 ft' Wetted Perimeter 2.30 It Top Width 1.50 It Critical Depth 0.54 ft Percent Full 48.0 % Critical Slope 0.00494 ft/ft Velocity 2.41 ft/5 Velocity Head 0.09 It Specific Energy 0.81 It Froude Number 0.57 Maximum Discharge 4,66 Wt s Discharge Full 4.33 ft'/s Slope Full 0.00037 full Flow Type SubCritical GVF Input Data' ` e r Downstream Depth 0.00 It Length 0.00 It Number Of Steps 0 `GVF O to put Data ,•r Y � , r "o, Upstream Depth 0.00 it Profile Description Profile Headloss 0.00 It Average End Depth Over Rise 0.00 % Normal Depth Over Rise 48.00 % Downstream Velocity Infinity f /s Upstream Velocity Infinity fus Bentley Systems, Inc. HaestBd Methods Solution Center FlowMaster [08.01.058.00] W712006 S:06:14 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA-1-203-755-1666 Page 1 of 2 West Driveway Pipe utput Data, �G\fV Normal Depth Critical Depth Channel Slope Critical Slope 0.72 It 0.54 It 0.00170 tuft 0.00494 fVft Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.001 717/2006 5:06:14 PM 27 Siemons Company Drive Suite 200 W Watertown, C7 06795 USA +1-207-755-1666 Page 2 of 2 West Driveway Pipe Project Description ,.t' ate_ .�u _ _s ` ` " Friction Method Manning Formula Solve For Normal Depth Roughness Coefficient 0.013 Channel Slope 0.00170 ft/n Normal Depth 0.72 ft Diameter 1.50 n Discharge 2.02 fN/s Cross Section T1.50 it 0.72 n 1 V: i Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.001 71712006 5:06:30 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 East Driveway Pipe ;";;' - , ArIMI, Friction Method Manning Formula Solve For Normal Depth 1.1.117 .77 4, Roughness Coefficient 0.013 A Channel Slope 0.00170 fury Diameter 1.50 it Discharge 3.51 f13/s Resblts W. Normal Depth 1.02 it Flow Area 1,29 W Wetted Perimeter 292 ft Top Width 1.40 It Critical Depth 0.71 ft Percent Full 68.3 % Critical Slope 0.00527 ft/ft Velocity 2.73 fl/s P+/Scc. Velocity Head 0.12 It refs: Specific Energy 1.14 It Froude Number 0.50 Maximum Discharge 4.66 ft3ts Discharge Full 4,33 WIs Slope Full 0.00112 tuft Flow Type SubCritical GVF Input, Data Downstream Depth om It Length 0.00 It Number Of Steps 0 T ,GVF,0ut0tJt baiaa7—, F W, 'k 7 Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 It Average End Depth Over Rise 0.00 % Normal Depth Over Rise 68.31 % Downstream Velocity Infinity ftfs Upstream Velocity Infinity ft/s Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster (08.01.058.001 7I712006 5:05:13 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 East Driveway Pipe Normal Depth 1.02 ft Critical Depth 0.71 ft Channel Slope 0.00170 ft/ft Critical Slope 0.00527 tuft Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster 108.01.058.001 7l712006 5:05:13 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA-1.207-755-1666 Page 2 of 2 East Driveway Pipe protect Description ~� �' : ; ,�' ? ;' • 77-.-7'�r-.-r' 3 ' Friction Method Solve For Manning Formula Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.00170 ft/h Normal Depth 1.02 If Diameter 1.50 h Discharge 3.51 W/s 'Cf035 $eCt!cT Image` T1.50 tt 1.02 n t 1 V: i 1 it 1 Bentley Systems, Inc. Haoslad Methods Solution Center FlowMaster ID8.01.058.00] 7/712006 5:05:44 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA ♦1-203-755-1666 Page 1 o1 1 Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: 'Bank and channel lining procedures", New York Department of Transportation, Division of Design and Construction, 1971.) Note: To use the following chart you must know: (1) Q full capacity (2) Q10 (3) V full (4) Vlo where Q = discharge in cfs and V = Velocity in FPS ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute now velocity V at culvert or paved channel outlet. Step 2) For pipe culverts De is diameter. For pipe arch, arch and box culverts, and paved channel outlets, De=Ae, where A: cross -sectional area of flow at outlet. I -or multiple culverts, use De=I.25xDe of single culvert. Step 3) For apron grades of 10`Ya or steeper, use recommendations For next higher zone. (Zones I through 6). !z x Zp G I 0 Lit SC— Z �m® im®o� memo®a� Q O�� moamo®sue � SaC �} �v`F" Do : rs me 8.00.b.l Rm 12M 8.06.5 W Z (NI APQ0�11�111R�1HOLE OF APRON TONEVENTSCOun USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 4 x Do 2 STONE FILLING (LIGHT) CL. B gxD. 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 8 x Do 4 STONE FILLING (HEAVY) CL. 1 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL.2 6 x Da 10 x Do 7 SPECIALSTUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). I Fig. 8.06.b.2 G -7 x AS x = !� S [. se. 9- Width = 3 times pipe dia. (min.) = Yx /J y'r — &A t DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVFTMEN7:S Step 1) Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 tbs.) Note: In determining channel velocities for stone linings and revetment, use the following coefficients of toughness: Diameter Mannin's Min. thickness (inches) 'In. of lining (in( el�rs Fine 4 3 0.031 9 Light B 6 0.035 12 Medium = 13 0.040 18 Heavy g 23 0.044 30 (Channels) 12 t 24 36 (Dissapato use C (4sc r3 8.06.6 Rm 12 )3 NCDENR , North Carolina Department of Environment and Natural Resources 127 Cardinal Drive, Wilmington NC 28405 (910) 796-7307 FAX (910) 350-2004 t. d Request for Express Permit Review' �t II A' FILL-IN all information below and CHECK required Permit(s). FAX or email to Cameron. Weaver(a)ncmail.net along with a narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name Reade Dawson Company S.T. Wooten Corporation Address 3801 Black Creek Road City/State Wilson, NC Zip 27894 County Wilson Phone (252) 291-5165 Fax (252) 243-0901 Email reade a stwcorp.com PROJECT Name S. T. Wooten Concrete Plant PROJECT SYSTEM(S) TRIBUTARY TO Sutton Lake (STREAM NAME) Cape Fear RIVER BASIN ENGINEER/CONSULTANT Company. Craig Fortner Withers & Ravenel Inc. Address 111 MacKenan Drive City/State Cary, NC Zip 27511 County Wake Phone (919) 469.3340 Fax (919) 535-4545 Email cfortner@withersravenel.com State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑ Yes ❑ No ❑ STREAM ORIGIN Determination; _# of stream calls, Stream N ❑ STORMWATER ❑ Low Density ® High Density -Detention Pond ❑ High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with 3.45 acres to be disturbed. WETLANDS (401) Wetlands on Property ❑ Yes ® No Isolated Wetlands on Property ❑ yes ❑ No Check all that apply Wetlands Will Be Impacted ❑ Yes ® No Wetland Impacts: Acre(s) Wetlands Delineation has been completed ❑ Yes ❑ No ❑ Buffers Impacted: Acre(s) USA COE Approval of Delineation completed ❑ Yes ❑ No 404 Application in process wIUSACOE ❑Yes ❑No I Permit received from USACE ❑Yes ❑No 401 Application required ❑Yes ❑ No If Yes; ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS $ 401 $ Total Fee Amount $ S.T. Wooten Concrete Plan Wilmington, New Hanover County, North Carolina Project Narrative Request for Express Permit Review The purpose of this project is to develop a concrete plant on a portion of an approximate 90 acre parcel on Sutton Lake Road west of US 421, upon which S.T. Wooten Corporation currently holds permits for an asphalt plant and mine. Stormwater management features and l3MP's for the asphalt plant were permitted by DWQ on 1/6/06 under permit number SW 8051137. The Concrete Plant and appurtenances are proposed as a modification to the existing permit. Approximately 3.45 acres of disturbance are associated with the Concrete Plant. Lrosion and sedimentation control on this project will be accomplished through the use of temporary construction entrances, outlet protection at culverts, and silt fence at the toe of fill slopes. The primary stormwater features include grass swales and pipe culverts leading to the proposed Infiltration/Detention Pond C. Infiltration/Detention Pond C discharges to an existing ditch, which ultimately flows into Sutton Lake. A portion of the graded area will drain toward the permitted mine and does not discharge. I & T/ Cbpsutton lake.road, wilmington, nc - Google Maps G o o"S I C, http://maps.google.com/ 6/19/2006