HomeMy WebLinkAboutNCC230606_Site Plan or Location Map_20230316INDEX OF SHEETS
Cover Sheet
General Notes and Standards
Storm Drainage Schedule
Plan and Profile
Details
Traffic Control
Erosion Control
Pavement Plan
CLTWater Utility Plans
SURVEY PI
4-8
DI-D3
TCP1
EC1-EC6
PP1
U1-U2
TOTAL SHEETS 21
CL CHANNEL
ZEPARED BY:
Ln
y�o v 11
aoG Gt. Z o�'�ir
°
011
P`re j / Ot �e
C. e r° 5
a
�°°a
�< r P� hei
�00 0> o NSF
tt�y
9s�0y < Ra
a� o *eti
VICINITY MAP
NTS
0
CHARLOTTE_
,aa STORMWATER SERVICES
Neo
Wpoh
Construction Plans of Proposed
Bonwood Storm
PROJECT Drainage Improvement Project
AREA
Project No. PMSW191584
Project Features
Storm Drain, Storm Drain Rehabilitation, Structures, Curb,
Water Main, Sanitary Sewer & Asphalt Paving
03
0
ZG
Z
0
0
SHE
ET � T
r'-�
\ / C3
/ rJ I .III
CA
LINE"A" `�� P CHAN' (L —1
EXISTING CONDITIONS TAKEN FROM GROUND SURVEY BY
SURVEY AND MAPPING CONTROL, INC.
ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT
WITH NAD 83(2011) STATE PLANE COORDINATES.
VERTICAL DATUM: NAVD 88
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL
DISTANCES. DATE OF SURVEY: 2/22/2019, 9/19/2019, &
6/8/2020
PLANS PREPARED BY:
.Armstrong Glen, P.C.
9771—D Southern Pine Boulevard
P.O. Box 7326
Charlotte, NC 28241
Phone: 704-529-0345
Fax: 704-529-0493
License #: C-1856
Know what°s below.
Call before you dig.
Charlotte -Mecklenburg
STORM
WATER
Services
NCDOT 2018 STANDARD SPECIFICATIONS
---S#EET
II ��
I LINE „B„
WOOD
LINE "A"
L�E 13" _ 1� LINE A
�1
SHEET 6 ,, LINE c
J
II � V
I ---_—
�
/ I - \� 'fin--�
I 11
1
SHEET 7 �k, 'Il
M%,\d
S. WEN D
I OVER RD. \\
LOCATION MAP
SCALE: 1" = 80'
PE SEAL
AR
2� °0000000 O�i i
O "cc
ESs /
O °Oo`9`
p
CP o y
o °
_ p -
00 SEAL °
o p 0 -
0 029996 g =
C— p o J
o 0 �vQ
°°;\N�INE��; °�
C�N 00000000000 0 -11
N. LOB, 1
vJ82.?v,
Record Drawings
RECOMMENDED
FOR CONSTRUCTION
Storm Water Construction
GRAPHIC SCALES Landscape Management
20 40 60 Utility Coordinator
Plan View ................. CDOT - Design
20 40 60
Horz. Profile ............ CDOT - Implementation
4 8 12
Vert. Profile CLTWater
5 10 15 Storm Water Water Quality
Cross Section ...........
Storm Water Project Manager
CONVENTIONAL SIGNS
ProposedProperty Line ..................................
Existing Property Line ...................................
Maintained as R/W Line ................................ R /'W
ExistingStructures .........................................
Proposed Edge of Pavement ..........................
Fence................................................................ X
ExistingEasement .......................................... E
Temporary Construction Easement ............. e
Proposed Utility Easement ........................... PUE
PUE
Storm Drainage Easement ............................ SDE
SDE
SanitarySewer Easement .............................. SSE
ExistingGas Line ........................................... G
G
ExistingWater Line ....................................... W
W
ExistingSanitary Sewer ................................ ss
ss
Existing Underground Telecommunications UT
Existing Overhead Telecommunications ...... oT
oT
Existing Underground Electric ..................... uE
Proposed Limits Of Disturbance .................. LOD
Existing Storm Drainage
ProposedStorm Drainage .............................
ProposedSliplining........................................
Proposed CIPP Lining ...................................
ProposedHandrail .......................................
•
Existing Overhead Electric .......................... of
of
Proposed Sanitary Sewer ss
ss
Proposed High Hazard Silt Fence ...............
StormDrainage Plug ....................................
Proposed Guardrail
SiltFence ....................................................... SF
SF
Special Sediment Control Fence ..................
TreeProtection................................................................................
ExistingTree...........................................................................................
WM
ExistingWater Meter............................................................................. ❑
WV
ExistingWater Valve............................................................................. �a
GV
ExistingGas Valve................................................................................. >a
s
Existing Sanitary Sewer Manhole
s
Proposed Sanitary Sewer Manhole
Existing Storm Drain Manhole
.
ProposedStorm Drain Manhole...........................................................•
wM
ProposedWater Meter........................................................................... ❑
ExistingCatch Basin..............................................................................
ProposedCatch Basin...........................................................................
B
ProposedJunction Box.........................................................................0
ExistingLight Pole.................................................................................
ExistingUtility Pole................................................................................
.a
GuyWire............................................................................................
ProposedUtility Pole...............................................................................W
IronPin.................................................................................................... 0
ExistingFire Hydrant............................................................................
. 6-
ExistingDrop Inlet..................................................................................0
ProposedDrop Inlet................................................................................
AccessibleRamp...................................................................................
Acc
Proposed Curb & Gutter, Conc. Drive, Sidewalk ...................
■
ProposedAsphalt Pavement........................................................
ProposedRip Rap Ditch..............................................................
ProposedGravel ........................................
Proposed Pavement Removal ..................
Proposed Sidewalk Bridging Tree Roots
ProposedFoundation Protection ................................................ FP
�h
CHARLOTTE..
STORMWATER SERVICES
Bid Set No.
APPROVED
STORM WATER SERVICES
DATE