Loading...
HomeMy WebLinkAboutNCC230606_Site Plan or Location Map_20230316INDEX OF SHEETS Cover Sheet General Notes and Standards Storm Drainage Schedule Plan and Profile Details Traffic Control Erosion Control Pavement Plan CLTWater Utility Plans SURVEY PI 4-8 DI-D3 TCP1 EC1-EC6 PP1 U1-U2 TOTAL SHEETS 21 CL CHANNEL ZEPARED BY: Ln y�o v 11 aoG Gt. Z o�'�ir ° 011 P`re j / Ot �e C. e r° 5 a �°°a �< r P� hei �00 0> o NSF tt�y 9s�0y < Ra a� o *eti VICINITY MAP NTS 0 CHARLOTTE_ ,aa STORMWATER SERVICES Neo Wpoh Construction Plans of Proposed Bonwood Storm PROJECT Drainage Improvement Project AREA Project No. PMSW191584 Project Features Storm Drain, Storm Drain Rehabilitation, Structures, Curb, Water Main, Sanitary Sewer & Asphalt Paving 03 0 ZG Z 0 0 SHE ET � T r'-� \ / C3 / rJ I .III CA LINE"A" `�� P CHAN' (L —1 EXISTING CONDITIONS TAKEN FROM GROUND SURVEY BY SURVEY AND MAPPING CONTROL, INC. ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT WITH NAD 83(2011) STATE PLANE COORDINATES. VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE OF SURVEY: 2/22/2019, 9/19/2019, & 6/8/2020 PLANS PREPARED BY: .Armstrong Glen, P.C. 9771—D Southern Pine Boulevard P.O. Box 7326 Charlotte, NC 28241 Phone: 704-529-0345 Fax: 704-529-0493 License #: C-1856 Know what°s below. Call before you dig. Charlotte -Mecklenburg STORM WATER Services NCDOT 2018 STANDARD SPECIFICATIONS ---S#EET II �� I LINE „B„ WOOD LINE "A" L�E 13" _ 1� LINE A �1 SHEET 6 ,, LINE c J II � V I ---_— � / I - \� 'fin--� I 11 1 SHEET 7 �k, 'Il M%,\d S. WEN D I OVER RD. \\ LOCATION MAP SCALE: 1" = 80' PE SEAL AR 2� °0000000 O�i i O "cc ESs / O °Oo`9` p CP o y o ° _ p - 00 SEAL ° o p 0 - 0 029996 g = C— p o J o 0 �vQ °°;\N�INE��; °� C�N 00000000000 0 -11 N. LOB, 1 vJ82.?v, Record Drawings RECOMMENDED FOR CONSTRUCTION Storm Water Construction GRAPHIC SCALES Landscape Management 20 40 60 Utility Coordinator Plan View ................. CDOT - Design 20 40 60 Horz. Profile ............ CDOT - Implementation 4 8 12 Vert. Profile CLTWater 5 10 15 Storm Water Water Quality Cross Section ........... Storm Water Project Manager CONVENTIONAL SIGNS ProposedProperty Line .................................. Existing Property Line ................................... Maintained as R/W Line ................................ R /'W ExistingStructures ......................................... Proposed Edge of Pavement .......................... Fence................................................................ X ExistingEasement .......................................... E Temporary Construction Easement ............. e Proposed Utility Easement ........................... PUE PUE Storm Drainage Easement ............................ SDE SDE SanitarySewer Easement .............................. SSE ExistingGas Line ........................................... G G ExistingWater Line ....................................... W W ExistingSanitary Sewer ................................ ss ss Existing Underground Telecommunications UT Existing Overhead Telecommunications ...... oT oT Existing Underground Electric ..................... uE Proposed Limits Of Disturbance .................. LOD Existing Storm Drainage ProposedStorm Drainage ............................. ProposedSliplining........................................ Proposed CIPP Lining ................................... ProposedHandrail ....................................... • Existing Overhead Electric .......................... of of Proposed Sanitary Sewer ss ss Proposed High Hazard Silt Fence ............... StormDrainage Plug .................................... Proposed Guardrail SiltFence ....................................................... SF SF Special Sediment Control Fence .................. TreeProtection................................................................................ ExistingTree........................................................................................... WM ExistingWater Meter............................................................................. ❑ WV ExistingWater Valve............................................................................. �a GV ExistingGas Valve................................................................................. >a s Existing Sanitary Sewer Manhole s Proposed Sanitary Sewer Manhole Existing Storm Drain Manhole . ProposedStorm Drain Manhole...........................................................• wM ProposedWater Meter........................................................................... ❑ ExistingCatch Basin.............................................................................. ProposedCatch Basin........................................................................... B ProposedJunction Box.........................................................................0 ExistingLight Pole................................................................................. ExistingUtility Pole................................................................................ .a GuyWire............................................................................................ ProposedUtility Pole...............................................................................W IronPin.................................................................................................... 0 ExistingFire Hydrant............................................................................ . 6- ExistingDrop Inlet..................................................................................0 ProposedDrop Inlet................................................................................ AccessibleRamp................................................................................... Acc Proposed Curb & Gutter, Conc. Drive, Sidewalk ................... ■ ProposedAsphalt Pavement........................................................ ProposedRip Rap Ditch.............................................................. ProposedGravel ........................................ Proposed Pavement Removal .................. Proposed Sidewalk Bridging Tree Roots ProposedFoundation Protection ................................................ FP �h CHARLOTTE.. STORMWATER SERVICES Bid Set No. APPROVED STORM WATER SERVICES DATE