Loading...
HomeMy WebLinkAboutNCC230580_Site Plan or Location Map_20230310�10 S V' �0 �I �O �Q ITT�E �'O RIVER O DRIv� �y VICINITY MAP (not to scale) SODDING LAY SOD IN A STAGGERED •'r-yW-NM---Yµ..r»•�.'.w. ,v ' PATTERN. BUTT THE STRIPS ww� TIGHTLY AGAINST EACH OTHER. .-.w DO NOT LEAVE SPACES AND DO »>r w NOT OVERLAP.A SHARPENED MASON'S TROWEL IS A HANDY TOOL FOR TUCKING DOWN THE "�'' '"'• ENDS AND TRIMMING PIECES. BUTTING - ANGLED ENDS CAUSED BY THE AUTO - INCORRECT MATIC SOD CUTTER MUST BE MW MATCHED CORRECTLY. CORRECT I ROLL SOD IMMEDIATELY TO WATER TO A DEPTH OF 4" MOW WHEN THE SOD IS ACHIEVE FIRM CONTACT AS NEEDED. WATER WELL ESTABLISHED - IN 2-3 WITH THE SOIL, AS SOON AS THE SOD IS LAID. WEEKS. SET THE MOWER HIGH (2"-3"). APPEARANCE OF GOOD SOD \ \ SHOOTS - OR GRASS BLADES_ \ GRASS SHOULD BE GREEN AND I HEALTHY, EIGHT AT A2"-3" CUTTING HEIGHT_ \ \1I THATCH - GRASS CLIPPINGS AND DEAD I I LEAVES, UPTO 1/2"THICK_ I ROOTZONE- OIL AND ROOTS SHOULD BE FOR STRENGTH K, WfrH DENSE ROOT MAT FOR STRENGTH_ CONS 1 RUC; I ION SC;HtUULE I 1. Obtain all necessarypermits and plan approvals. Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities DATE: PAGE: 4' MIN. - I ,SILT FENCE TOP OF SILT FENCE MUST BE AT LEAST ABOVE THE TOP OF THE WASHED STO6I STEEL FENCE P ST WIRE FEN HARDWARE CL TH FILTER OF # y� WASHED STONiiA, FRONT VIEW BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE STEEL FENCE POST CLOTH IN TRENCH SET MAX 2' APARjI-~ MIN. 18" INTO SOLID T FILTER FABRIC GROUND / ON GROUND NOTES: 1. Hardware cloth and gravel should overlay the sift fence at least 12 inches. 2. Stone outlets should be placed on low elevation areas of silt fence and based on field conditions. MAINTENANCE: 1. Per NCG-01, inspect outlet at lest once a week and after each 1 inch or greater rainfall event. Complete any required repairs immediately. Fr BURY 6" OF UPPER EDGE OEL. ashen stone when sediment accumulation exceeds 6 inches. FILTER FABRIC IN TRENCH 3. Keep mesh free of debris to provide adequate flow. 4. Remove sediment when haft of stone outlet is covered. 5. Replace stone as needed to facilitate de -watering. SECTION VIEW SILT FENCE OUTLET o, Ta F 'ontof Noose occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on site, preferably in a penllits box, and accessible during inspection. Pe pro \/I S S r r a r e C'^i C C\ e rr S U f f C l e'_ re S, C r^ 2. Install gravel construction entrances first, then sill fences, reinforced sill fence outlets and wattles. r��l_s a���� r �li���e, for all dist_I- rid �rrea� wi �� �� 14 y�,-rking days or 90 eal=r d-r . 3. Finish clearing and grubbing any necessary areas on the lots as they are started. I - 4. Begin lot grading and excavation activities VV i V I- :- h ,- r t e r) f o I I 5. Begin or continue with house construction activities. 6. Finish all rough grading and house construction. 48 I ( I I I I I DATE: Filter Fabric PAGE: 7. Install driveways, walks and patios. /- 8. Begin fine grading of lot areas / I I I General Erosion Control Notes Steel Post 9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot. I 8' Max. Standard Strength fabric with wire fence Wire J4Bckfill trench The silt fence will remain in place until the lot is sodded or grasshng is stabilized and takes hold. 49 I 1. Only the areas shown Shall be disturbed. 6' Max. Extra strength fabric without wire fence Wire Fence d Compact 10. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and complete 2. All disturbed areas Shall be rased and oroughly �� IN.TSANDERS I g Steel Post the following combined self -inspection form found on the DEMLR website DB390PG352 I mulched as soon as possible and maintained https://files.ne.govincdeg/Energy%20Mineral%20and°/u2OLaiad%2OResources/Storiilwater/NPDES°/`20 PIN#94973977920 0 4 I I I I Until pemanent cover is established. General%20Permits/DEMLR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf. Twelvemonths of complete \ rj � Upslope inspection forms shall be kept on site and available for inspection at all limes. It is recommended a copy be r% I I I I I I I kept in a permits box. (GS 113A-54.1 (e), 15A NCAC 04B.0131, NCG01 Part III Sections A and B) 11. Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be inst tied at the project site for monitoring. 12. Inspection on and final acceptance letters. When the project is complete, the pen ittees shall contact DLMLR to \ close out the E&SC Plan. After DEMLR informs the perrnittee of the project close out, via inspection report, the permiltee shall visit"deq.ne.gov/NCG01" to submit an electronic Notice of termination (e-NOT). A $100 23 8 animal general permit fee will be charged until the e-NOT has been filled out. A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED \ EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A NCAC 04B. 0131 STATES THAT "...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, N DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, \� PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION \ CONTROL PLAN.' \ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION \ Gravel Coustruction Entrance - The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site. \ This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. \ Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly. Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not wash back against the fence. Adequate storage volume should be provided for behind the fence \ at tall times. Take care to not undermine the fence during cleanout operations. Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary \ \ to maintain adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth and stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of gmss recommendations when and if possible. \ Grassing and Mulching - The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed, the area should be maintained as nceded to insure that all areas are germinating properly. Any bare areas should be repaired, and reseeded as soon as If the time of does not the establishment of a then a temporary should be used until the \ possible. year permit permanent grass, grassing growing season permits the use of a permanent grass. Diversion Berms - Diversion berms shall be inspected weekly or after each runoff producing rainfall to insure that they are operating as designed and that there \ have been no breaches in the berm. Berms shall not exceed 18" in height, and shall be placed in locations that will not interfere with home construction activities. Once the house construction is completed and the lot is ready to receive sod, then the berm shall be removed and the material incorporated into the graded lot area I I and covered immediately with sod. All proper care shall be taken to insure that the berms are installed according to the applicable detail with the berm material Coalsufficiently to insure that the berm remains in place during the course of the construction activities. CU MBERLAND COUNTY BOARD OF EDUCATION General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the DB 3655, PG 397 �i�� construction activities on any particular lot do not adversely affect any of the installed erosion control measures. If lot construction dictates, measures will be relocated PB 118,PG 061 on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested P7N9L487648656000 in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover.�` / I GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HQW) SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN 3:1 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) DATE: R/W MW I� lr. I� 111111111 �'l1:IL1� '1 11.�11 1 11 1:=11'=If �11.=1L-11. M � 11=1L-1L- Rnlnc�lr�nr�xd Vibratory plan LS not --table be.use of h.I-tal mmpaciion Tap of Fabric Ben top 8" LJ ATTACHMENT DETN LS: •Gather fabr a at posts, n needed. •UI ze three ties per pint, all within fop 8" of fabric. •Position each fie dagonaly, punt .IM holes vedirslly a minimum of 1"apart. • Hang eachfieonaprn nipple andtightenscarcely. Use cable ties (5glbs) arson wire Pow siallsf aner ompac[ian sin Knee Completed ln9allatim PAGE: l% 1 1~� ✓ ✓ �! II 11099E II �, IIdU>E II VY � IIOU9E ! !I! � IIdU>E � 1 KW9E � I`1 % � KW>E !!I 1 HWSE KW9E ! !Il ! ! I � I �+j I ! ✓l � I L. -•1 4-. 6 -.1 L.J L•J L.-.� L.J LEGEND Notes: 1. If needed, Tree Protection fencing should be installed along the buffer zone, wetland boundary and/or around protected trees, providing a radius of at least 1.25 feet for each FLOW DIRECTION inch of trunk diameter. SILT FENCE -- 2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on DIVERSION DITCH TD-Tll schematic/diagram and field adjusted, if necessary, for placement at low points. If lots are WADDLE/ SILT SOCKS > contiguous and have different land owners or builders, each lot should have individual Silt Fences. SILT FENCE OUTLET ® 3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with CONSTRUCTION ENTRANCE septic system. It is the responsibility of the builder to ensure the installation of sediment control measures does not impact the septic system and repair area(s). 4. At least one Construction Entrance/Exit is to be installed per lot. 5. Waste bins and other areas dedicated for managing building material waste shall be at least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that no other alternative exists. If this separation cannot be achieved, these areas must be contained behind Silt Fence. 6. Inlets downstream of disturbances should be protected; streets should be swept when sediment from the construction activity is present. ..\NC-Environmental.jpeg 7. Details for Silt Fence, Silt Fence Outlets, Construction Entrances and other measures are provided on additional sheets. Erosion and sediment control details are not drawn to scale. TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES 679 / 54 I 55 561 107 41 per 1�aple I 105 106 \ 109 57 N 104 110 58 �111 59 103 60 1 112 �• �. 61 101 113 C 62 100 / 114 232 115 63 99 230 116 - 64 228 �98- ;ve R Ci7 C• 0 LotPlan "An 87 88 89 /90 m 81 \ CONSTRUCTION LI ITS 80 79 J 78/ T 77 rc 92 75 /93 � .I it II i Ill i45 41 40 o39co 00 I 111 li` lliCIO COMPOST SOCK INITIAL FLOW RATES tecC4@6lpost Sock 8 Inch (200 12 Inch 18 Inch 24 Inch 32 Inch (750 Design Diameter nm) (300 nm) (450 nm) (600 nm) nm) Maximum Slope 600 Feet 750 Feet 1,000 1,300 1,650 Length (Q5) (183 m) (229 m) Feet Feet Feet (305 m) (396 m) (500 m) Hydraulic Flow(94 7.5 11.3 15.0 22.5 30.0 Through Rate gpm/ft gpm/ft gpm/ft gpm/ft gpm/ft Val I/m1/m) I/Inl Val I/Ini ---- Coe Tree Drives CA165 / 0 I 97-96 PAGE 1 of 2 \ \ \ � 34 - LOT EROSION CONTROL PLAN �- �\ FOR LOT 86 9 ` `� ` `` - ` TOTAL DISTURBED ACREAGE: 0.21 ACRES \ •ve �7\ -� LITTLE RIVER FARMS 72-� I I K PHASE 11 FOR- 120 `\\ \ CAVINESS & CATES 121 \ 31 3�' �� I \ BUILDING AND 122°odll _ ne � _ 123 rI\\\\\\ \ I DEVELOPMENTINC.24 125 \ \ I SEVENTY FIRST TOWNSHIP CUMBERLAND COUNTY \\\ I NORTH CAROLINA SCALE: 1 = 100 FEBRUARY 2023 -- \ \ GRAPHIC SCALE IN FEET \� -100 0 100 200 300 400 ENGINEERS • PLANNERS SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. PHONE 910 484-5191 FAX 910 484-0388 License : F-0106 MOORMAN,KIZER & REITZEL,INC. ( ) ( ) # LAST SAVED: 2/7/2023 9:49 AM LAST PLOTTED: 2/7/2023 11:02 AM PLOTTED BY: Dennis Gilbert FILENAME: G:\CURRENT JOBS\CAVINESS AND CATES DEVELOPMENT INC\22-2017-01 LITTLE RIVER FAR MS-EC\PLANS\LITT LE RIVER FARMS EC -LOT 86.DWG