Loading...
HomeMy WebLinkAboutNCC230632_ESC Approval Submitted_20230310Plan Review Assignment Notification - Lot 16 Arbors at Brookberry - SFD Construction From: Matthew Osborne <matthewo@cityofws.org> Sent: Thursday, February 23, 2023 1:46 PM To: Kent Wall <kentw@citvofws.org> Subject: RE: [EXTERNAL] Plan Review Assignment Notification - Lot 16 Arbors at Brookberry - SFD Construction Kent, I have stamped the plan and approved as noted the review. They will now need to upload an NCGO 1 COC for the lot before providing them with fee payment instructions. Matthew Osborne, CFM, CPESC Erosion Control/Floodplain Program Manager City Of Winston-Salem Field Operations Department Erosion Control Division PO Box 2511 (Mailing) 100 E. First Street, Suite 328 (Physical Winston-Salem, NC 27101 Office: 336-747-7453 Mobile: 336-462-74801 Fax: 336-727-270 Electronic Plan Review Application Portal: httns://winston-salem.idtvlans.com/secure/ Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Lot 16 Arbors at Brookberry - SFD Construction A/P #: EN2300033 Acreage to be Disturbed: 0.25 https://wnston-salem. geocivix.com/secure/project/?proj ectid=950827 Hello X Canter Builder, LLC., Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan for this project has been completed. The design is adequate to meet the ordinance standards and the plan has been approved. Be aware that this plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and approval of this plan is conditioned upon compliance with Federal and State water quality laws, regulations, and rules. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document. If this project will disturb more than I acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https://edocs.deci.nc.eov/Forms/NCGOI-NOI). Once coverage is obtained, please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. *** This approval email serves as the "Approval Letter" that must be uploaded when filing the a-NOI application to obtain the NCGOI Certificate of Coverage. *** As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please contact Matthew Osborne at 336-462-7480 or matthewo&cityofws.org.