Loading...
HomeMy WebLinkAboutNC0060526_LM-2023-0015 case file_20230309ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Certified Mail # 7020 3160 0000 4115 6280 Return Receipt Requested Albert E Finley, President Pope Industrial Park II Ltd. Partnership PO Box 97215 Raleigh, NC 27624-7215 NORTH CAROLINA EnWonmental Quality March 09, 2023 SUBJECT: Notice of Violation and Assessment of Civil Penalty for Violations of North Carolina General Statute (G.S.) 143-215.1(a)(6) and NPDES WW Permit No. NCO060526 Pope Industrial Park II Ltd Partnership Pope Industrial Park WWTP Case No. LM-2023-0015 Wake County Dear Mr. Finley: This letter transmits a Notice of Violation and assessment of civil penalty in the amount of $661.22 ($565.50 civil penalty + $95.72 enforcement costs) against Pope Industrial Park II Ltd Partnership. This assessment is based upon the following facts: a review has been conducted of the Discharge Monitoring Report (DMR) submitted by Pope Industrial Park II Ltd Partnership for the month of September 2022. This review has shown the subject facility to be in violation of the discharge limitations and/or monitoring requirements found in NPDES WW Permit No. NC0060526. The violations, which occurred in September 2022, are summarized in Attachment A to this letter. Based upon the above facts, I conclude as a matter of law that Pope Industrial Park I1 Ltd Partnership violated the terms, conditions or requirements of NPDES WW Permit No. NCO060526 and G.S. 143-215.1(a)(6) in the manner and extent shown in Attachment A. In accordance with the maximums established by G.S. 143-215.6A(a)(2), a civil penalty may be assessed against any person who violates the terms, conditions or requirements of a permit required by G.S. 143-215.1(a). NaihCardmDepartmentofEnAmnmentdQuWty I Dwkionofwow R,eaeta<to Rde1ghRe9lone 0ffke 13&00MM4tDrtW I R99192%.North CamilmZ7409 919.791A200 ■ 06 ■ L ' % ■ ■ 91 .. r II . IM ■ ■ ■ I %m — 060M 0 4!;ai 7 .. r NO ■ NO� _ '�.x 1 4 NO ■ ■ . . ■■■ 1 ■■ NO NO ON ■ ■ 1 `l 0 0 0 0 0 0 4 ■ ■ m 1 ■ Ems m ■ ■ - ■ N . MEN ■ MEN . ■ ■ ■ Ml ■ ■ 1 ■ � '■ 1� ■ ■ ■ ■ NO Ems ■ ■� 1% 1 rr EL 0m1 mmOIL■■ L ■ ■ ■ ■' % ■ ■ NOz m1 ■ ■ m m1 ■ ■ m m■� NO to .NE■ ■ NO ■IME . ■ . NO. _ ■ ■ ■ ■ ' ■ ■ :L NO ` ■ ■ ■ ■ N ■ Based upon the above findings of fact and conclusions of law, and in accordance with authority provided by the Secretary of the Department of Environmental Quality and the Director of the Division of Water Resources, I, Scott Vinson, Regional Supervisor, Raleigh Regional Office hereby make the following civil penalty assessment against Pope Industrial Park 11 Ltd Partnership: 233.00 1 of 1 violations of G.S. 143-215.1(a)(6) and Permit No. NC0060526, by discharging waste water into the waters of the State in violation of the Permit Daily Maximum for BOD, 5-Day (20 Deg. C) - Concentration 0.00 0 of l violations of G.S. 143-215. 1 (a)(6) and Permit No. NC0060526, by discharging waste water into the waters of the State in violation of the Permit Daily Maximum for Coliform, Fecal ME MFC Broth, 44.5 C 332.50 1 of I violations of G.S. 143-215.1(a)(6) and Permit No. NC0060526, by discharging waste water into the waters of the State in violation of the Permit Monthly Average for BOD, 5-DU{20 Deg. C) - Concentration 0.00 for 0 of the I failures to properly monitor BOD, 5-Day (20 Deg. C) - Concentration in violation of Permit No. NC0060526. 0.00 for 0 of the 1 failures to properly monitor Coliform Fecal MF MFC Broth 44.5 C in violation of Permit No. NC0060526. 0.00 for 0 of the 1 failures to properly monitor Nitrogen, Ammonia Total (as N) - Concentration in violation of Permit No. NC0060526. 0.00 for 0 of the 1 failures to properly monitor Solids. Total Suspended - Concentration in violation of Permit No. NC0060526. 565.50 TOTAL CIVIL PENALTY 95.72 Enforcement Costs 661.22 TOTAL AMOUNT DUE Pursuant to G.S. 143-215.6A(c), in determining the amount of the penalty I have taken into account the Findings of Fact and Conclusions of Law and the factors set forth at G.S. 14313-282.1(b), which are: (1) The degree and extent of harm to the natural resources of the State, to the public health, or to private property resulting from the violation; (2) The duration and gravity of the violation; (3) The effect on ground or surface water quantity or quality or on air quality; (4) The cost of rectifying the damage; (5) The amount of money saved by noncompliance; (6) Whether the violation was committed willfully or intentionally; (7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; and (8) The cost to the State of the enforcement procedures. ■ I ■ or ■ NO _ yr AEON -i ■■ 11 ■ ■ _ Ell mymf I'r■ _ NO ■ 1 1 r ■ . 0 ■ NmlM- ■ ir ' mi * I ' ' - - I 14■r .■■r0 0 . ■1-NirY ' ' .' 1 -r ti 1 ■ ■ ■ ■ ■ r 1 ■ ■ ON Ell I ■ :- 1 ti ■ r 0 Within thirty (30) days of receipt of this notice, you must do one of the following: (1) Submit payment of the penalty, OR (2) Submit a written request for remission, OR (3) Submit a written request for an administrative hearing Option 1: Submit payment of the penalty: Payment should be made directly to the order of the Department of Environmental Quality (do not include waiver form). Payment of the penalty will not foreclose further enforcement action for any continuing or new violation(s). Please submit payment to the attention of: Wastewater Branch Division of Water Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Option 2: Submit a written request for remission or mitigation including a detailed justification for such request: Please be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Because a remission request forecloses the option of an administrative hearing, such a request must be accompanied by a waiver of your right to an administrative hearing and a stipulation and agreement that no factual or legal issues are in dispute. Please prepare a detailed statement that establishes why you believe the civil penalty should be remitted, and submit it to the Division of Water Resources at the address listed below. In determining whether a remission request will be approved, the following factors shall be considered: (1) whether one or more of the civil penalty assessment factors in NCGS 1438-282.1(b) was wrongfully applied to the detriment of the petitioner; (2) whether the violator promptly abated continuing environmental damage resulting from the violation; (3) whether the violation was inadvertent or a result of an accident; (4) whether the violator had been assessed civil penalties for any previous violations; or (5) whether payment of the civil penalty will prevent payment for the remaining necessary remedial actions. Please note that all evidence presented in support of your request for remission must be submitted in writing. The Director of the Division of Water Resources will review your evidence and inform you of his decision in the matter of your remission request. The response will provide details regarding the case status, directions for payment, and provision for further appeal of the penalty to the Environmental Management Commission's Committee on Civil Penalty Remissions (Committee). Please be advised that the Committee cannot consider information that was not part of the original remission request considered by the Director. Therefore, it is very important that you prepare a complete and thorough statement in support of your request for remission. ■ ■ C r .' 0 JL■ ■ ME ME ME � M . ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ � ; Ll MME E■ ■ ■ ■ ■ ■ ■ 0: ■ ■ ME 0 0 0 0 JE ME r 7 - V In order to request remissionyou must complete and submit the enclosed "Request for Remission of Civil Penalties Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form within thirty (30) days of receipt of this notice. The Division of Water Resources also requests that you complete and submit the enclosed "Justification for Remission Request." Both forms should be submitted to the following address: Wastewater Branch Division of Water Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Option 3: File a petition for an administrative hearina with the Office of Administrative Hearings: If you wish to contest any statement in the attached assessment document you must file a petition for an administrative hearing. You may obtain the petition form from the Office of Administrative Hearings. You must file the petition with the Office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m., except for official state holidays. The petition may be filed by facsimile (fax) or electronic mail by an attached file (with restrictions) - provided the signed original, one (1) copy and a filing fee (if a filing fee is required by NCGS § 15013-23.2) is received in the Office of Administrative Hearings within seven (7) business days following the faxed or electronic transmission. You should contact the Office of Administrative Hearings with all questions regarding the filing fee and/or the details of the filing process. The mailing address and telephone and fax numbers for the Office of Administrative Hearings are as follows: 6714 Mail Service Center Raleigh, NC 27699 6714 Tel: (919) 431-3000 Fax: (919) 431-3100 One (1) copy of the petition must also be served on DEQ as follows: Mr. William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, North Carolina 27699-1601 Please indicate the case number (as found on page one of this letter) on the petition. Failure to exercise one of the options above within thirty (30) days of receipt of this letter, as evidenced by an internal date/time received stamp (not a postmark), will result in this matter being referred to the Attorney General's Office for collection of the penalty through a civil action. Please be advised that additional penalties may be assessed for violations that occur after the review period of this assessment. C eI ■ ■ ■SM ' ■ �� 1 1 ■ If you have any questions, please contact Mitchell Hayes with the Division of Water Resources staff of the Raleigh Regional Office at (919) 791-4200 or via email at mitch.hayes@ncdenr.gov. Sincerely, r� Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Laserfiche - r A x !14 1)l JUSTIFICATION FOR REMISSION REQUEST Case Number: LM-2023-0015 County: Wake Assessed Party: Pope Industrial Park II Ltd Partnership Permit No.: NC0060526 Amount Assessed: $661.22 Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Please be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 14313-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors apply. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G.S. 14313-282.1(b) were wrongfully applied to the detriment of the petitioner (the assessment factors are listed in the civil penalty assessment document); (b) the violator promptly abated continuing environmental damage resulting from the violation (i.e., explain the steps that you took to correct the violation and prevent future occurrences); (c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); (d) the violator had not been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION: ■ ■ ■ ■ ■ ■ ■ I m ■ C ■ C ■ STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY COUNTY OF WAKE IN THE MATTER OF ASSESSMENT } WAIVER OF RIGHT TO AN OF CIVIL PENALTIES AGAINST } ADMINISTRATIVE HEARING AND } STIPULATION OF FACTS Pope Industrial Park 11 Ltd Partnership } Pope Industrial Park WWTP ) PERMIT NO. NCO060526 ) CASE NO. LM-2023-0015 Having been assessed civil penalties totaling $661.22 for violation(s) as set forth in the assessment document of the Division of Water Resources dated March 09 2023, the undersigned, desiring to seek remission of the civil penalty, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Resources within thirty (30) days of receipt of the notice of assessment. No new evidence in support of a remission request will be allowed after (30) days from the receipt of the notice of assessment. This the day of ADDRESS TELEPHONE SIGNATURE 20 t� f ■ ■ ■ 1■ % ■EEiii ■ ■ ■ ■ ■ ATTACHMENT A Pope Industrial Park II Ltd Partnership CASE NUMBER: LM-2023-0015 PERMIT: NCO060526 REGION: Raleigh FACILITY: Pope Industrial Park WWTP COUNTY: Wake LIMIT VIOLATION(S) SAMPLE LOCATION: Outfall 001 - Effluent Violation Report Unit of Limit Calculated % Over Violation Date MonthNr Parameter Frequency Measure Value Value Limit Type 9/13/2022 9-2022 BOD, 5-Day (20 Deg. Weekly mg/I 7.50 19.4 158.7 Daily C) - Concentration Maximum Exceeded 9/30/2022 9-2022 BOD, 5-Day (20 Deg. Weekly mgll 5 7.4 48.0 Monthly C) - Concentration Average 9/27/2022 9-2022 Coliform, Fecal MF, Weekly #1100ml 400 405 MFC Broth, 44.5 C MONITORING VIOLATION(S) SAMPLE LOCATION: Outfall 001 - Effluent 1.3 Daily Maximum Exceeded Violation Report Unit of Limit Calculated % Over Violation Date MonthNr Parameter Frequency Measure Value Value Limit Type 9/3/2022 9-2022 BOD, 5-Day (20 Deg. Weekly mg/i Frequency C) - Concentration Violation 9/3/2022 9-2022 Coliform, Fecal MF, Weekly #1100ml Frequency MFC Broth, 44.5 C Violation 9/3/2022 9-2022 Nitrogen, Ammonia Total (as N) - Concentration 9/3/2022 9-2022 Solids, Total Suspended - Weekly mgll Weekly mgll Frequency Violation Frequency Violation Penalty Amount $233.00 $332.50 $0.00 Penalty Amount $0.00 $0.00 $0.00 $0.00 DIVISION OF WATER RESOURCES - CIVIL PENALTY ASSESSMENT Violator: Pope Industrial Park II Ltd Partnership Facility Name: Pope Industrial Park WWTP Permit Number: NCO060526 County: Wake Case Number: LM-2023-0015 ASSESSMENT FACTORS 1) The degree and extent of harm to the natural resources of the State, to the public health, or to private property resulting from the violation; Exceeding daily and monthly permit limits for BOD and daily permit limit for fecal coliform could cause water quality standard violations. 2) The duration and gravity of the violation; Daily permit limit for BOD exceeded the permit limit by 158%. Monthly permit limit for BOD was exceeded by 47.9%. Daily permit limit for fecal coliform exceeded the permit limit by 1.25%. 3) The effect on ground or surface water quantity or quality or on air quality; The effect on surface water quality include water quality standard violations. 4) The cost of rectifying the damage; The cost of rectifying the damage is not given. 5) The amount of money saved by noncompliance; It is believed that no money was saved by the noncompliance. 6) Whether the violation was committed willfully or intentionally; It does not appear that the violation was committed willfully or intentionally. 7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; There have been two enforcement cases within the past 12 months. 8) The cost to the State of the enforcement procedures. $95.72 4 9 air '- --, '�; P /' Y�/ Date .Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ JI U ppO o➢a zz Q r-1 N M 0 ,b'a@EC@E2 a 9 z z i U +ao, S 25 � 25 25 2S 25 N w W H K H H w O O O N W N N Li Y L Y L L M i z%z �aaaaaao 0. A �c v C k A vs V r V V Y 3A faQAA.9 Q �j 0 0 0 v1 O O p- oococ-. Z of a V Al A. Al ni..Al Al M b lL Co I cA7 � A N c2 V V V 08, .22.2 r ��V (A7CrAr7 � N N vi G 0 0 0� Vl 0 0 occo o-� V Al A Al Al Al Al I" .8 al AD A V V G L 4 occoo.- V Al A Al Al AI AI I ■ IN r C w ■ sI ti - b is w 0 0 o a y4e� B 0 B h O O O O pp y � n [i. O O O O O C O O O y k. 0. ti k! L $I 'S B N e �w 0 0 0 d d d O O O c Bo EE y �y W O O O O u G O G G G O O 0. 0 H b w Q o 0 0 d c o c m 0 0 o O E 3� o 0 0 0 o y y N w o Q O O b LL J 2� `� R)32 ■ �2»D ©& J222 � k o I3 !� ■� 3� ) k ) =0000- / £ 7 \ 2/� )a4= k2§��/ ■����� as■eat a&#ES§ ■��6�k- Ada■9�b /$■3»� Ss -a ai\9�� m22&do aizzr OCT 2@\&o §232 $2 ) J � g � � . � � cs cig&&2 §222 $& 7 7 � l 2 ) ƒ � a � f f f � I u"'o oM10 n U r U it i! 7k 3t fA N7 N w S w o o—ri Owcc o-. n n P. Vi O h R 'o Ale A .n co G. d en -A ao s I a o 00 sI z° �I m IQQ icZ 466 m E C a C7 n e e � d Y K H49] R m O p p U � O oi��t7 � oil o 0 4 0 E V V V y C C C G C—— Q V Al A Al Al Al Al p$ H o D N G H 50 b `u o a � F x m � o � w F o L• g � � c e V Vonan h VI C � G O V V pL�0��� 0Cp70000 V Al r. AP A, r._ A- B \u k )) / » \ ƒ26a 3 )� \ z � a f 3 ik 2 ;) K f� § 0 ƒ000 � fk � k !®§/§ !9}) - }m I -- w ` 2 � \ f e i= ( J� | z y § 0 )} § f= } ) / !} ) ¢ ■ 0 z!%2§ 32 7K) %® $ !) ) ± } } $ \» % !2 � » k k ) 15 f � � 0 $ � f §§§/§ q @ q k772 ktƒ§ kf§f »�2� ■_2r ��/® jV0A j§\$ .j)\} m 8 8 a � 2 ` 2 ■ T aLZ o2a= a222 e | ■ � w z} too \& f&S JI !± $± - % ( - R ƒ7§§/� J00 000 $000 * - o- V- k $ 2 7 a Al \}> c � \ \k��\§k)()$}k%()( : .k ■��_�� ■tea-�k `) 0 �J/f LA ;S z ' zzo ,ezz»ao / } } . . . _ fƒ J) J) ) ) ) 2 \ } } �000 2 ƒ ƒ 2 _ � $# \ }§ k $§ \ ■± )» CE » 6 ) / } fi i i N n N 00 0o n Uo �G Vi w wN, w r y N � O D F. U O Y5 u Y�9 COMMERCIAL REALTORS' January 12, 2023 Ms. Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Divi5ion of Water Resources, NCDEQ Subject: Notice of Violation and Assessment of Civi., Penalty Tracking Nrrnlher: NOV-2022-I..M-0083 Permit No. NC00E0526 Pope Industrial Park Wake County Mr. Manuel, Thank you for allowing the Pope Industrial Park the opportunity to respond to this Notice of Violation issued November 23, 2022: received on January 05, 2023, for the Monitoring Violation, and the Limit Exceedancc Violation during the September 2022 monitoring period. Our first response corresponds to the Monitoring Violation. The violation was as follows: Monitoring Violations): Sample parameter Date Monitoring Type of Violation Location Frequency 001 Effluent BOD, 5-Day (20 DLg. C) — Concentration 9 3 2022 Weekly Frequency Violation (C0310) Coliform, Fecal MF, MFC Broth, 44.5 C 00t Effluent9-3-2D22 (31616) Weekly FregtrenCy Violalipn 001 Eliluc'nt Nitrogen, Ammonia Total (as N) 3 707' Weekly FrcgtlencyVivlaGon Cowentratiorl 001 Effluent Solids, Solids, Fotal Suspended — Concentration 9-3-2022Weekly Frequency Violation The sampling for BOD, TSS, Ammonia, and I-ecal Coliform is performed by the ORC on Tuesdays or Wednesday, and the September period start on Thursday, so the information for the first week should have appeared on the August period. Examining the reports it was noticed that the August period did not showed the results for the last Meek, and it was because the results were not received, we want to mention that on the bench sheets the ORC wrote down that the sampling was taken the Wednesday P O. BOX 97215 RALEIGH. NORTH CAROLINA 2762, 9t9-8,16-350D [Type here] August 31, 2022, we requested the Lab the report, and it has been received showing a BOO value of 3.3 mg/L, TSS = <2.6 mg/L, Nitrogen Ammonia = 0.7 mg/L, and Fecal Coliform = <1 CFU/ 100 ml, all of these are compliant values for the Daily Maximum Limit established on the Permit. With this new information, the August report has been Revised, Validated and Submitted, in order to amend the Issue. This update, attend the frequency violation that was described above. We have attached the Lab result and as evidence. Limit Exceedance Violations Sample Parameter Date Limit Reported Type of Violation Location Value _Value 001 Effluent BOD, S-Day (20 Deg. Q — 9/13/2022 7.5 19.4 Daily Maximum Concentration.(C0310)_. Exceeded 001 Effluent Conform, Fecal MF, MFC Broth, 9/27/2022 400 405 Daily Maximum 44.5 C (31616 ) Exceeded 001 Effluent BOD, 5-Day (20 Deg. Cj — 9/30/2022 5 7 4 Monthly Average Concentration (CO310) Exceeded The personnel at the facility have detected that during the weekends the recorded flow shows an increased volume, and it is considered as the possible cause of the Irregular and elevated fluctuations on the system. So, the reported value of 19.4 mg/L, when the personnel were notified on Monday September 26, regarding this high result, the sample for September 20t" was already taken, and evidently the SOD got back to its normal parameter, however this high value already caused the Monthly Average Exceedance, no matter all the previous and subsequent registered values were compliant. Regarding the Fecal Coliform exceedance reported on August 27, when notified the personnel took a new sample on September 30 to verify if the system was not in compliance, and it resulted on a value of <1 CFU/100 ml, so we consider that the elevated value could result from an incorrect sample handling, because the Residual Chlorine values reported twice a week are obtained after the dichlorination process, and these have been maintained constant. Before receiving this Notice of Violation, the personnel at the facility started an investigation that has continued through several months to determine if the system shows possible sites of entry, so all the Manholes have been monitored weekly and there have not been identified vulnerabilities, right now the aspects that can prevent the increase of the flow on the weekends. Some of the corrective actions done to the system are: • The replacement of 14 leaking flappers in toilets throughout the entire industrial park, done on December 01, 2022. • The implementation of a digital chart recorder on the meter to help determine what is causing the increase in the flow and the BOD. It is our request that the Division take into consideration the inaccuracies in the Notice of Violation and the immediate corrective actions taken by the permittee when deciding whether further enforcement actions are warranted. [Type here] (Type here] Sincerely, � Albert E Finley, Pope Industrial Park 11 Ltd Partnership CC: Tracy Miller, Envirolink, Inc. William Lamm, Envirolink, Inc [Type here] ROY COOPER Governor ELIZABETH S. BISER Secrefary RICHARD E. ROGERS, JP,. Dpwi<r Certified Mail # 7020 3160 0000 4115 3005 Return Receipt Requested Albert E Finley Pope Industrial Park II Ltd Partnership PO Box 97215 Raleigh, NC 27624-7215 STATC , Y� 4' NORTH CAROUNA Environmental Quality November 23, 2022 SUBJECT: NOTICE OF VIOLATION & INTENT TO ASSESS CIVIL PENALTY Tracking Number: NOV-2022-LM-0083 Permit No. NCO060526 Pope Industrial Park Wake County Dear Permittee: A review of the September 2022 Discharge Monitoring Report (DMR) for the subject facility revealed the violation(s) indicated below: Limit Exceedance Violation(s): Sample Limit Reported Location Parameter Date Value Value Type of Violation 001 Effluent BOD, 5-Day (20 Deg. C) - 9/13/2022 7.5 19.4 Daily Maximum Exceeded Concentration (C0310) 001 Effluent Coliform, Fecal MF, MFC Broth, 9/27/2022 400 405 Daily Maximum Exceeded 44.5 C (31616) 001 Effluent BOD, 5-Day (20 Deg. C) - 9/30/2022 5 7.4 Monthly Average Exceeded Concentration (C0310) Monitoring Violations : Sample Location Parameter 001 Effluent BOD, 5-Day (20 Deg. C) - Concentration (C0310) Date Monitoring Frequency 9/3/2022 Weekly Type of Violation Frequency Violation N-1h Ca.!hm rt panmcntof[n.ironmrotalQuAd)IDi,monAtWafer keso-rc+ R.[,igh Reg'.nlal Olfiec V8008a,retl D,i— Raleigll,Nuath C.-6na2IhDu Monitoring Violation(s): Sample Location Parameter 001 Effluent 001 Effluent Date Coliform, Fecal MF, MFC Broth, 9/3/2022 44.5 C (31616) Monitoring Frequency Type of Violation Weekly Frequency Violation Nitrogen, Ammonia Total (as N) - 9/3/2022 Weekly Frequency Violation Concentration (C0610) 001 Effluent Solids, Total Suspended - 9/3/2022 Weekly Frequency Violation Concentration (C0530) A Notice of Violation/Intent to Issue Civil Penalty is being issued for the noted violation of North Carolina General Statute (G.S.) 143-215.1 and the facility's NPDES WW Permit. Pursuant to G.S. 143-215.6A, a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of any permit issued pursuant to G.S. 143-215.1. If you wish to provide additional information regarding the noted violation, request technical assistance, or discuss overall compliance please respond in writing within ten (10) business day after receipt of this Notice. A review of your response will be considered along with any information provided on the submitted Monitoring Report(s). You will then be notified of any civil penalties that may be assessed regarding the violations. If no response is received in this Office within the 10-day period, a civil penalty assessment may be prepared. Remedial actions should have already been taken to correct this problem and prevent further occurrences in the future. The Division of Water Resources may pursue enforcement action for this and any additional violations of State law. If the violations are of a continuing nature, not related to operation and/or maintenance problems, and you anticipate remedial construction activities, then you may wish to consider applying for a Special Order by Consent. Reminder: Pursuant to Permit Condition 6 in Section E, the Permittee is required to verbally notify the Regional Office as soon as possible, not to exceed 24 hours, from first knowledge of any non-compliance at the facility including limit violations, bypasses of, or failure of a treatment unit. A written report may be required within 5 days if directed by Division staff. Prior notice should be given for anticipated or potential problems due to planned maintenance activities, taking units off-line, etc. If you have any questions concerning this matter or to apply for an SOC, please contact Stephanie Goss of the Raleigh Regional Office at 919-791-4200. Cc: Laserfiche Sincerely, DocuSigned by Vain t,SSct f, ill. V Uu t, 9291 f3E6Af3321441: Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ DECZ�,� WwthCarolinaDapartmentofEmirmunemWQuAi)fMis—of%V.eerResonrcc, Ralclgh Rrq—W Office -3SOOR-nett Difv.• Rnlelgh. North['rrnlina27[ifW dn�.w.•iY��.MOnV� �)If1.f 014Zf�n ;uStgit C-nvelope IC} 91n573v1�-r4f_i.]-d�+ir3.8f=1G-7CE393145E=E=2U1 ROY COOI'l:lt f I.i%ABf_fH S. hiSl-R lrt,t•ru! �. ItIC4RRD L. ROGI-RS JR. Po e vt Certified Mail # 7020 3160 0000 4115 3340 Return Receipt Requested Albert E Finley Pope Industrial Park II Ltd Partnership PO Box 97215 Raleigh, NC 27624-7215 N�` f�.�::.:� j4 r rrosai I., CARc]t_•rrn Emvrunmcnrvr (iriufrt: December 21, 2022 rn M I-r't r-q Q C3 M d _n r-9 M 0 r'U ti F_ ~ D l Ei r r I +�4+C01: FtiB. j:!rc[:c M:"tr-arq. �..ah ^r�Aoca4't'�i�P7, �-a Hu'4n. rincc'(A tCilCi+cnic, S s — -- — L,S �irI:L„-t 7lSIiiYSt/iCtd[i rlo"xivey y_ -- -- — r'o. `EiitrA i3•rii:'s.r, ^R!��fl RCgte'fCti s —. — ` Fl.:lr ;N� "Ulu ri:6I,Wad k$.-- ALRERr E r"Irri EY ITq.VN POPErND USHIM PARK It LTD PARTNERSI 1.p I'O Box 97215 AAIErGN, NC 2)62,1 tVCS:NOV& INTENT TO ASSESS OWL PENALTY/NOV.70)2•LV 0926/ �. N0060526/POPC rndusisiar Pr,6/WAKE 70203160000041153340 - -- M ]2/)2/2D72 I, SUB3ECf: NOTICE OF VIOLATION & INTENT TO ASSESS CIVIL PENALTY Tracking Number. NOV-2022-LV 092.6 Kermit No. NCO060526 Pope Industrial Park Wake County Deal- Permittee: A review of the October 2022 Discharge Monitoring Report (DMR) for the subject facility revealed the violation(s) indicated below: Limit Exceedance Violations : Sample Limit Reported Location Parameter Date Value Value Type of Violation ; 001 Eftluefit BOD, 5-Day (20 Deg.. i . THIS SECTION ON DELIVERY Concentration (CC, 11 SENDER: COMPLETE THIS SECTION COMPLETE w Complete items 1, 2, and 3. A. gnu Slal f p Agent w Print your name and address on the reverse X / �� ✓r ❑ Addressee A Notice of Violation/Intent to Issue Ci so that vie can return the card to you. g. Received by (Arinted Name) C. Date of Delivery Statute (G. S.) 143-2I 5. I and the fa6li, w Attach this card to the back of the mailplece, L ; A� �� , )/_'x I or on the front if space permits. not more than twenty-five thousand do D, is delivery addressdifferent from item t7 ❑Yes t. ArtAticleAddressedto: If YES, enter delivery address below: [3 No fails to act In accordance with the tefn" E I .EY At RCR[ IMI 1 4 3 _'l l C1 21J . i 11 POPi INDUSI RIAI PARK u L1 D PAR HEM1111' vo Box 977 is RALHnII, NC 2767.1 Wo:NOV& IN TEN t TO ASSM CIVIL PENALTY/NUV-2027 - NC4C&0S7G/I'0Ar industlial Pat4/WABE 1O7G3160o00041I%3340 M:17/72/7072 3. Service Type ❑ Priority Mall DpTt sO p Adult S natura ftestrIOWd Delivery ❑ Registered Mail Restridet 9590 9402 3�415 7227 6580 11 ruffed MaIND c�ertirodMail ResUicted0erivory {701wLxy 0RetRRooe�ptfor Mwise ❑ Collect on Delivery it (;r]Ilntt oil Delivery R951rrCted Deliverynatun3 PrrttatlonT"T 4!!mg,"'tura Confirmation 702 Cl 3 T6U 0200 4115 3340 � M'd;i Awiricted Dettvery Restricted Do ivory PERMIT STATUS: Active NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: W W-2 OWNER NAME: Pope Industrial Park It Ltd Partnership ORC: William Edward Lamm GRADE: WW-4. ORC HAS CHANGED: No eDMR PERIOD: 09-2022 (September 2022) VERSION: 1.0 COUNTY: Wake ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO eLJ y e y 7 O z° 50050 00010 004N 50060 C0310 C0610 C05" 31616 00300 Continuous 5 X week Weekly 2 X week Weekly Weekly Weekly Weekly Weekly Recorder Grab Grab Grab Cmb Grab Grab Gnb Grab FLOW TEMP-C PH CHLORINE Sob -Cox NH3-N-Cam TSS - Cons FCOLI BE DO 240 Oak Fin UN cock fin vim m d deg a su ugA ingA m m 01100m1 m 1 1445 0.5 Y O,W46 279 2 1610 0.33 1 Y 0.0018 27.8 3 00019 4 0,0019 S HOLWAY 6 104D I5 Y 0.0019 27.7 6.06 16 6.78 7 1010 0.66 Y 0.0003 278 6.81 12 2.9 0.6 < 2.6 < 1 6.38 8 0800 0.5 Y 0.0006 26.9 9 0815 0.5 Y 0.0014 279 1s 0.0023 31 0.0023 12 1330 0.5 Y 0.0023 27.3 16 13 1030 0.5 Y 0.0018 27.3 713 12 19A 0.4 < 2.6 < I 6.88 14 0920 0.5 Y 0.0019 27.2 is 0910 041 Y 0.0017 26.0 16 1020 1041 Y O.0017 25.8 17 0.0046 Is 0.0046 19 1050 0.58 Y 0.OD46 24.3 14 20 1030 0.5 Y 0.001 24.3 c 88 16 2.4 0.6 < 2.5 < 1 6.91 21 1500 OAl Y 0.0059 24.6 22 1140 058 1 Y OA021 243 23 14W 0,41 1 Y 1 0.0021 242 2s 0.0036 }s 0.0036 26 150D 0.41 Y 0.0036 198 27 ONO 0.5 Y 1 0 0046 199 6 ,.,: 13 4.9 0.6 < 2.6 405 7 13 79 0745 1.25 Y 0.0055 19.6 29 11005 0.75 Y 0.0022 N3 4 30 0955 033 Y 0.0023 19 3 114 < I Kwtaly Awnp Limit: O.,, S 2 30 200 M6.1biy Awm2e; 0.002714 2472381 14.125 7.4 0.55 0 3.322699 6.816 Day Muimpm: 0.0059 279 713 16 19.4 0.6 0 405 713 Day M&W pm: 0.0003 1196 h :In 12 2.4 0.4 lo p 1633 •*** No Reponmg Reason: ENFRUSE .. No Flow-Reuse/Recycle; ENVWTHR - No Visitation Adverse Weather, NOFLOW - No Flow; HOLIDAY - No Visitation Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526-Ver_1.0_9 2022.pdf) NPDES PERMIT NO.; NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 PERMIT STATUS: Active COUNTY: Wake OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamm GRADE: W W-4. ORC HAS CHANGED: No eDMR PERIOD; 09-2022 (September 2022) VERSION: 1.0 ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: DOWNSTREAM DISCHARGE NO.: 001 e F Y 400la Do3a4 wftmy week] Grab Grab YLMP-C DO U" dadk deg c mgA 1 NOFLOW 2 NOFLOW 3 NOFLOW a NOFLOW HOLWAY 6 NOFLOW 7 1049 24.3 213 6 NOFLOW 9 NOFLOW 10 NOFLOW 11 NOFLOW 12 INOFLOW 13 1058 1 24 1 2.21 la NOFLOW i5 NOFLOW 16 NOFLOW 17 NOFLOW 1e NOFLOW 19 1 NOFLOW 20 1053 239 2.18 1t NOFLOW 22 NOFLOW 23 NOFLOW 24 1 NOFLOW 25 NOFLOW 26 NOFLOW 27 0900 19.2 2.96 2s NOFLOW 29 NOFLOW 30 1 INOFLOW Momhly Aix Mgt Lima: Mmthly My gv 22.975 2.345 Daay Mulmnm. 24.3 2.86 Daily mlid um: 19.2 2.13 ""No Reporting Reason: ENFRUSE No Flow-Reuse/Recycle; ENVWTHR - No Visitation -Adverse Weather; NOFLOW- No Flow; HOLIDAY -No Visitation Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526 Ver_1.0 9_2022.pdf) PERMIT STATUS: Active NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamm GRADE: WW-4, ORC HAS CHANGED: No eDMR PERIOD: 09-2022 (September2022) VERSION: 1.0 COUNTY: Wake ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO (Continue) •*ss No Reporting Reason: ENFRUSE No Flow-Reuse/Recycle; ENV W'CHR n No Visitation — Adverse Weather; NOFLOW - No Flow-, HOLIDAY — No Visitation Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526Ver 1.0_9_2022.pdf) NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamm GRADE: W W-4. ORC HAS CHANGED: No eDMR PERIOD: 09-2022 (September 2022) VERSION: 1.0 PERMIT STATUS: Active COUNTY: Wake ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: UPSTREAM DISCHARGE NO.: 001 a 9 aR x' OWN Gem weemy Weekly Grab Grab TEMP-C DO 2400 Hxh deg e m BA 1 NOFLOW 3 NOFLOW 3 NOFLOW 4 NOFLOW s HOLIDAY NOFLOW 7 1045 231 21 7 NOFLOW 9 NOFLOW 19 NOFLOW 11 NOFLOW 11 NOFLOW 13 1055 211 22.9 14 NOFLOW 1s NOFLOW 16 NOFLOW 17 NOFLOW to NOFLOW 19 NOFLOW 20 1050 225 21A !1 NOFLOW 21 NOFLOW 33 NOFLOW 24 NOFLOW 25 NOFLOW M NOFLOW 27 0900 193 319 3d NOFLOW 29 NOFLOW 30 NOFLOW Monthly Awnge Limit: Monthly Areraje: 22 24.5 Dally Maximum: 23.1 319 Daay MBimum: 1193 1216 ****No Reporting Reason: ENFRUSE - No Flow-Reuse/Recycic; ENV WTHR -No Visitation Adverse Weather; NOFLOW -No Flow, HOLIDAY "No Visitation ..Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526_Ver_I.0 9 2022.pdQ PERMIT STATUS: Active NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5 0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 OWNER NAME: Pope Industrial Park II Ltd Partnership ORC: William Edward Lamm GRADE: W W-4. eDMR PERIOD: 09-2022 (September 2022) COMPLIANCE STATUS: Non -Compliant ORC HAS CHANGED: No VERSION: 1.0 CONTACT PHONE #: 2522354900 Electronically Certified by William Lamm on 2022-10-27 14:26:55.645 ORC/Certifier Signature: Wi11iam Lamm I certify that this report is accurate and complete to the best of my knowledge. COUNTY: Wake ORC CERT NUMBER: 11693 STATUS: Submitted SUBMISSION DATE: 11l17/2022 Phone 0 ; 2 5 2 2 3 5 4 9 0 0 Date The permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens public health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall be made as required by part ILE.6 of the NPDES permit. Electronically Signed by Rebecca Manning on 2022-11-17 11:46:34.487 Perm ittee?Submitter Signature: ***Rebecca Manning Phone # : 2 5 2 - 2 3 5 - 4 9 0 0 Date Permittee Address: US Hwy 401 S Raleigh NC 27603 Permit Expiration Date: 02/28;'2023 I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who managed the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. LAB NAME: Meritech. Inc. CERTIFIED LAB #: 165 PERSON(s) COLLECTING SAMPLES: William Lamm CERTIFIED LABORATORIES PARAMETER CODES Parameter Code assistance may be obtained by visiting https:... deq.nc.goviabout/divisions/water-resources/edmr/user-documentation. FOOTNOTES Use only units of measurement designated in the reporting facility's NPDES permit for reporting data. * No Flow/Discharge From Site: YES indicates that No Flow/Discharge occurred and, as a result, no data is reported for any parameter on the DMR for the entire monitoring period. ** ORC on Site?: ORC must visit facility and document visitation of facility as required per 15A NCAC 8G .0204. *** Signature of Permittee: If signed by other than the permittee, then delegation of the signatory authority must be on file with the state per 15A NCAC 2B .0506(b)(2)(D). Discharge Monitoring Report - Copy Of Record (COR_NC0060526 Ver_1.0_9 2022.pdf) NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 PERMIT STATUS: Active FACILITY NAME: Pope Industrial Park CLASS: WW-2 COUNTY: Wake OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamm ORC CERT NUMBER: 11693 GRADE: W W-4. ORC HAS CHANGED: No eDMR PERIOD- 09-2022 (September 2022) VERSION: 1.0 STATUS: Submitted Report Comments: On 9-27 the system reported a high level for Fecal Coliform, and it was due the the slow dilution of the new Chlorination Pellets applied, so when the sampling was taken again on 9-29, the levels were into compliance, the dose schedule has been adjusted to the actual pellets in order to prevent the increased levels on Fecal Coliform. The High BOD registered on 9-13 was result of a flow exceedance. NPDES PER4HT NO.: NCO060526 PERMIT VERSION: 5-0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 OWNER NAME: Pope Industrial Park II Ltd Partnership ORC: William Edward Lanun PERMIT STATUS: Active COUNTY: Wake ORC CERT NUMBER: 11693 GRADE. WW-A. ORC HAS CHANGED: No eDMR PERIOD: M-2022 (Augus(2022) VERSION: 2 0 STATUS: Submitted SAMPLING LOCATION: DOWNSTREAM DISCHARGE NO.: 001 a` I F _ t' r $ Y 7. (N010 9a100 Wmkly Weekly Grab Grah TEhIP-P DO 2400 clock ds c in•il I 2 1158 26' .1 J 5 i 7 a 1228 23.8 2i1 16 I1 11 13 la Is 16 1 126 259, 204 17 Is 19 1a z1 22 23 24 1020 25.6 2.2 25 26 27 26 29 30 31 1222 26 1 2.37 Nlwhy A. t,.p Umn: 3lmmly A+enle: 25.62 2.186 n.nY al,timom: 26.7 2.81 DA IY 5lini.— 23.8 1.01 **** No Reporting Reason: ENFRUSE - No Flo"-Reusc/Recycle; ENVWTHR = No Visitation - Adverse Weather; NOFLOW - No Flow: HOLIDAY - No Visitation - Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526 Ver_2.0 8_2022.pdf) NPDES PERMIT NO.: NC0060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 PERMIT STATUS: Active COUNTY: Wake ORC CERT NUMBER: 11693 OWNER NAME: Jac Industrial Park 11 Ltd Partnership ORC: William Edward Lamm GRADE: WW-4. ORC HAS CHANCED: No eDlINIR PERIOD: 08-2022 (August 2022) VERSION: 2.0 STATUS: Submitted SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO o e F Gr @ n v F' y F = h O � ' :: wo � ¢ y' saes6 00010 00400 56060 C0310 C0616 c053o 3106 00360 Continuous 5 X week Weekly2 X week 1Vcckl R'cckl Wcckl Weckt wcckl Continuous Grab Grab Grab Grab Grab Grab Gob Grab FL633 TEMP•C PH CHLON! BOD-Can, N[13•N•Cw TSS•Conc FCOLI BR in) 2400,1ork 11 s 2400 rtock Hn V DIN an d dcr c %u u 1 mil Mg/1 m l 41100m1 m !1 1 1300 0.75 Y 0.0091 28.9 la = 1220 091 Y 0.00$ 29.9 7.21 17 15.7 0.2 < 2.5 1 6.63 0940 058 Y 00085 2H.9 +s 1045 141 Y O,09 29.2 0910 183 Y 0.005 29.3 6 0.0047 7 0.0047 a 0930 0.83 Y 0.0047 29.3 13 9 1200 0.5 1 Y 0.0052 29.3 7.17 16 5 0.6 < 2.8 < 1 6.71 I0 1030 05H Y 0.0053 129.1 21 M 5 050 Y 0.008 29.1 < 2 12 11-5 041 Y 0.0074 28.7 13 (00078 1+ 0.0078 1S 1050 0.41 Y 0.0078 28.6 14 16 1 LOO 0.5 Y 0.0082 128.5 7,12 17 2 < 0.1 < 2.3 < 1 6,91 1, 1010 1.41 Y 0.0045 28.4 16 1300 0.50 Y 0.0036 29.1 19 1100 0.5 Y OA034 28.1 so D.D102 2I OA102 22 1040 050 Y 0.0102 28A 16 21 1125 0.93 Y 0.0097 28.1 2+ 0935 0.91 Y 0.0044 28.2 6.91 14 5 0,6 <2.5 < 1 103 25 0850 0.91 1 Y 0.0021 28.3 26 0800 0.50 Y 0.002 129.2 27 0.0027 28 0.01127 29 161$ 0.33 Y 0.0027 26.6 16 30 140$ 0.41 1 Y 0.0029 26.9 3t 112. 0.41 1 Y 1 0.0022 27.1 7.07 12.05 3.3 0.7 < 2,6 < 1 6.93 M.Pol3 A„ra;, U.11: 0.003 5 E 30 200 Mewhl) n1,rrlt* 0.005961 28 43913 14,905 5.166667 0.42 0 1 6.822 n,Ig61.,1... : 00102 297 11.21 17 115.7 0.7 0 1 .03 D.11y'NNOW.m: 0.002 126,6 691 12.05 0 0 0 10 16.61 * *** No Reporting Reason ENFRUSE = No Flow-Reuse/Recycle; ENV WTHR = No Visitation - Adverse Wcallmr NOFLOW = No Flow, HOLIDAY = No Visitation - Holiday Discharge Monitoring Report - Copy Of Record(COR_NC0060526_Ver_2.0_8_2022.pdf) NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 PERMIT STATUS: Active COUNTY: Wake OWNER NAME: Pope Industrial Park 11 Lid Partnership ORC: William Edward Lamm GRADE: WW4. ORC HAS CHANCED: No eD\IR PERIOD: 08-2022 (August 2022) VERSION: 2.0 ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO (Continue) **** No Reporting Reason: ENFRUSE - No Flov,-ReuselRecycle; F.NVWTHR- No Visitation Adverse Weather; NOFLOW - No Flow; HOLIDAY - No Visnahon Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526_Ver 2.0_8_2022.pdf) N'PDES PERMIT NO.: NC0060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 PERMIT STATUS: Active COUNTY: Wake OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamin CRADE: WW-4. ORC HAS CHANGED: No eDMR PERIOD: 08-2022 (August 2022) VERSION: 2.0 ORC CERT NUMBER: 11693 STATUS: Submitted SAMPLING LOCATION: UPSTREAM DISCHARGE NO.: 001 ~ 6 s E m a $ 00010 00300 WeeklyWcekl Grab Gmh TEMP•C U11 2400 r1.ek de • c Mg/1 1 = 1155 239 2 1 3 4 5 6 7 8 v 1225 2 1 236 u I 12 13 Id Is 16 ti25 2 1 21 17 Is 14 20 21 22 23 24 22 219 is 26 27 2& 29 36 3t 122 23.6 2 25 \l.pihlt Aram=. Limit: Nip.thy Areoea: 24,06 2.2 Daily Ala,lmum: 21 1 2.36 Dan) Minimum: 22 7 2.1 **** No Reporting Reason: ENFRUSE - No Flogs -Reusc/Recycle: ENV WTHR - No Visitation - Adversc %k:eadicr, NOFLOW - No Flou, HOLIDAY = No Visitation - Holiday Discharge Monitoring Report - Copy Of Record (COR_NC0060526 Ver_2A_8_2022.pdf) NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NALME. Pope Industrial Park CLASS: WW-2 OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lanun GRADE: WW-4. eDMR PERIOD: 08-2022 (August 2022) COMPLIANCE STATUS: Non -Compliant ORC HAS CHANGED: No VERSION. 2.0 CONTACT PHONE #: 2522354900 Electronically Certified by William Lamm on 2023-01-12 11:01:38.876 PERMIT STATUS: Active COUNTY: Wake ORC CERT NUMBER: 11693 STATUS: Submitted SUBMISSION DATE: 01+12:2023 0 R C .-' C e r t i f i e r Signature:Willtam Lamm Phone 0 ; 2 5 2 2 3 5 4 9 0 0 Date certify that this report is accurate and complete to the best of my knowledge. The permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens public health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall be made as required by part 11.E_6 of the NPDES permit. Electronically Signed by Rebecca Mannine on 2023-01-12 11:04:29.102 Permittee/Submitter Signature: ***Rebecca Manning Phone #:252-235-4900 Date Permittee Address: US Ilwy 401 S Raleigh NC 27603 Pennil Expiration Date: 02/28/2023 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who managed the system, or those persons directly responsible for gathering the information, the inforniation submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. LAB NAME: Meritech, Inc. CERTIFIED LAB #: 165 PERSON(s) COLLECTING SAMPLES: William Lamm CERTIFIED LABORATORIES PARAMETER CODES Parameter Code assistance may be obtained by visiting https::'!deq.ne.govlabouvdivisionslwater-resources�ednmrfuser-documentation- FOOTNOTES Use only units of measurement designated in the reporting facility's NPDES permit for reporting data. * No Flow/Discharge Front Site: YES indicates that No Flow; Discharge occurred and, as a result, no data is reported for any parameter on the DMR for the entire monitoring period. ** ORC on Site?: ORC must visit facility and document visitation of facility as required per 15A NCAC 8G .0204_ *** Signature of Permittee: If signed by other than the permittee, then delegation of the signatory authority must be on file with the state per 15A NCAC 2B .0506(b)(2)(D). Discharge Monitoring Report - Copy Of Record (CORTN1C0060526_Ver 2.0 8 2022.pdf) NPDES PERMIT NO.: NCO060526 PERMIT VERSION: 5.0 FACILITY NAME: Pope Industrial Park CLASS: WW-2 PERMIT STATUS: Active COUNTY: Wake OWNER NAME: Pope Industrial Park 11 Ltd Partnership ORC: William Edward Lamm -GRADE: WW-4 eDMR PERIOD: 08.2022 (August 2022) Report Comments: Monthly Average Exceeds Permit Limit! Daily Max Exceeded! on 8-2-2022 Pullcd extra BOD to bring down monthly avcr ORC HAS CHANGED: No VERSION: 2.0 ORC CERT NUMBER: 11693 STATUS- Submitted 0 0 Q Q Q O O C lA sT lO Ln r R a o r r a a 0) O O O 0 O O O O O O O O 0 O 0 O x a a z z z z z z z z z z z z z z z z O O O 0 O O O O O 0 O O 0 O O O O O O O O O O O O O O O O O O O d O FA O 69 C. d9 CD w 69 Q w O w 0 69 O 49 O 69 O 69 Q U) O 6l 0 69 O 69 O 69 O r C N l0 Q1 LD 07 7 Pi In w lO O O O 4 It 0 v v rn Ln O O O O O N a0 L(i co O LO 06 M m Is,(�f m 0 HLS7 a N O (OD C'i Lk O O LO O LOO. O l N O � O lOO OD N LOO Cl) (rp M CV 0 m C G 1A 61 N Vi d9 to Ef3 Efl co 69 to w bi 69 69 m Ea u�� 0 toG Q E m Ora c 0 .y C N � E m wwa CO G d u 3 LU O c $ 0 .N H C c d E Co 60 . w19a 0 a Co w ,,. H c C 0) qt E a u N M 6) O O O O 0 O fi w � 0 0 0 w o Y L9 'i: (y LO r O LO (O O O �r 00 V 4 V m O O O 07 O rn O rn O O O O •• L N O N_ 00L!) 0o O in LO m m m C9 M LO 0 CL W V 69 69 69 69 64 69 69 EA 6i c 0 c (j L0 0 C. 0 0 0 o p 0 O 0 p o d Q O O O O O O O O O O O O O O O O a a-o O 0 to N 0 O 0 O 0 O 0 00 O O 0 0 O 0 LO L0 0 LO o O p 9 h O 00 Cj Cl Ln LO 00 O O N Ln N I+ O LO J f, r 69 LO 69 r 69 r 69 N 69 r 69 LO 64 r 69 M 6) (p 6) r 69 r 69 M 69 N 69 M 69 N 60 d13 H} R 01 00 00 Z 0) W _ O O O N M O M O M O (1) O M O M p a m N O A a 00 LO L+ O r N O O) 0)t37 tti LO L N O. N O`) r Q) r m N LZ] N (� N 0o O CI LO iO Ln Ln id .0 ._ H 06 co m j04 N � O N O N 00 O N N 00 O C M O C O (M [V CV N N Q, Q o d r• Oo r r d, It 0 O V O aL Z0: O p O O N O 01 co [+ fD n a0 N Oi 00 00 O O 4 Q O O O O 4 4 4 tf CO O) T r T O N m O Cl) O M O m O M O m O rn O T O NN O O O O O OG � � � � J � � � J J J 0 1L d Ix fi 2 -5 O 4) O O OOO i I O ODN CO r O m v' N CD NOD CNO N N r N ^i N� N(� N O 0 0 z z O z O z 0 z 0 z 0 z 0 z O z 0 z z o z z O z 0 z O z 0 z 0 z 0 z 0 z 0 z p O O O O O p O O O O O O O O O O O O d O O [7 O C. O O O O O O O O O 0 O O O d M p Q 6(1 C. 69 O 4! O 69 O (f! p E!i O 69 O 69 O 69 O 69 O 69 O fii O 69 O d9 Q 69 4 fA O O 69 O 69 O 69 N O N N 100 tM O tC) O h O M h r'• O CM h M I- M h (D W U) h 1A M N M N M N (D O tD O h O t0 O O O to O r O Q N O T M r W to tD M W N 16 co co O O r O r ci iA m � it') W Oi to 0; O Q O to � 0) co ffl 69 to 69 69 Vi 69 b4 69 44 60 69 b9 69 69 69 fA 69 fA 69 O O O O C so Cl 0 O O h O m fl� M h M h M h M h (D M h O f, O N tM N M N M tD O W O h O (0 O O O to O to N V c'7 LL! O V O v O O O T It M Ili V) (li N O N W N If) 0) to 69 O to 69 O N v) D) I(J Vi to 69 In 69 69 64 w 60a 69 69 69 69 64 60 to 69 O O lf) O O C7 p O O O O O O O O O to O « n O O p to O Q O 0 O O O O O O O O O O O O O O h In coN O O O to p O p O In N t0 N r O to N_ 0 O 0 O O O C.O O In O to O 69 EA r 0% _- 69 _O 69 N fA cn W, In 69 V) Vi N (0 W 69 '- 69 6) 64 O 69 0) 69 69 Cry 69 Ill (A M 69 M M O O to O m O V) O (D O to O co O t0 OO 0 O (D OO (D O l` O 1+ O h O m O W O O 0) O O 00 % T 4 c;s h ti `h q to r LB N M N M N M N N N Q a _ � W (�7 W .- (D ap a`p 01 r r r h h co a) T M M 0 0 IT O to 0 to Q If) Q ui o to O o (D O to 0 O O o 0 o r- Q h C. O W O W Q O to 0 O r r O Q C. O N N O O Q N NNNNNNN O N u) h h M (D h co r N r — V f- 00 lT V r h W M () h h h h Q O 1,•1 N r Q LL) to It lt.i co V W R M1 W r 4 ) V N (') t0 (rl to co U) � VI � V) a I(') N O to N O r O 4J � (V O 'T h N N O O CO M O 4') O th to O Il) O U1 Q In O t0 O (0 O (D O (D O h 9 h h W W m � 4 O O r O O O O O p O O O O O O O O O O 0 O O O O O O O C. O O O O O 0 O d d d O O N N N N N N N N N N N N N N N N N N N N N J J J J >� J J J J J J J J J J J J J J J J N w M r M r M w O O w 0) O OD N ('7 N O r a r a C) CD N O Cl) O O N a a) (O r o3 v 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z Q O C. Q C. Q O Q O Q O Q O Q O Q O O O Q N (O M p N 69 M o 69 0 69 0 69 0 E9 0 6% 0 64 0 6. 0 EA o 6% 0) Cl) N 6A W M N O CD N O) LQ Cl) V) 6�9 T V) p= Ln q Cl) o OQ 0 o a 0 O N m v N = Cl)N CO 1� f- N r 1-� Q r N N m 69 69 69 64 69 69 b9 69 69 69 � N M � N m C a � o H 0 OD r Q 6s 2 a. H O E 0 0 o o Q o a O o 69 o 69 69 fH o 64 o 69 64 N9 n N � O QI O �t f y N U) 69 EA N �r m r V r V r r N O a) r M ` M V N N N N C N d y U o U c 6 W o is s- 0 0 0 0 E 0 O M co d In f- h v W) (o V N 0 O O 0 O O 0 O O C. O m r 69 t� 6`! 69 r 69 H! 69 69 (A Q Q 69 (3 6�9 C O 0 o 0 a 0 O 0 Q 0 Q 0 Q 0 Q 0 o 0 o o a a o o £ ¢ 4Z:O M Cl N b )f] b (1) b O LC) - 0 O O O O O 0 N V) N 69 69 69 N 69 69 63, 6, aD 6fi Op 6% W 69 V9 U) d w CV w M M M w le r O 00 OD W T r V) M N O S6 CO O) N (+S a N w Q V M V O O O N co N a _ O N_ N_ N O _M a_O 0_0 CO O) N N CD N N 6 O N O N N O' O N O N O N O NNN O O V V Lo r U') co r a0 V )A w a0 N N NC p O O OC) p Cl) O CM> M O OV yN CD CV r CV M r M 4 GO CO CO P (n rn (p N N N N N N N N N N N �p J J - J J TG J J J J J H Permit NCO060526 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, the Pope Industrial Park II LTD Partnership is hereby authorized to discharge wastewater from a facility located at the Pope Industrial Park WWTP 5602 Fayetteville Road Raleigh Wake County to receiving waters designated as and unnamed tributary to Swift Creek in subbasin 03-04-02 of the Neuse River Basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1, III and IV hereof. This permit modification is effective August 1, 2018. This permit and authorization to discharge shall expire at midnight on February 28, 2023. Signed this day June 22, 201 ( 5 e n I.k"4 � � a Culpepper, Interim Dire Division of Water Resources By Authority of the Environmental Management Commission Page 1 of 8 Permit NCO060526 Part I A. (1) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B.0400 et seq., 02B.0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from outfall 001. Such discharges shall be limited and monitored' by the Permittee as specified below: PARAMETER LIMITS MONITORING REQUIREMENTS [PCS Code] Monthly Average I daily Maximum Measurement Frequency Sample Type Sample Lacation2 Flow 50050 0.008 MGD Continuous Reoording inffuent or Effluent Total Monthly Flow [822201 Monitor & Report Monthly Recorded or Calculated Influent or Effluent SOD, 5-day (20°C) [003101 (April 1— October 31 5.0 mg1L 7.5 mg1L Weekly Grab Effluent 80D, 5-day (20°C) [003101 November 1— March 31 10.0 mg/L 15.0 mg1L Weekly Grab Effluent Total Suspended Solids [00POI 30.0 m 45.0 mg/L Weekly Grab Effluent NH3 as N [00610] (April 1— October 31 2.0 mg/L 10.0 mg/L Weekly Grab Effluent NH3 as N [00610] November 1— March 31 4 0 mg/L 20.0 mg/L Weekly Grab Effluent Dissolved Oxygen [003001 Dallv avere > 6.0 MR- Weekly Grab Effluent Dissolved Oxygen [003001 Weekly Grab U & D Fecal Collform P16161 eometric mean 2001100 mL 400/100 mL Weekly Grab Effluent Total Residual Chlorine (TRC? 50060 17 ug/L 21Week Grab Effluent Temperature °C) [000101 Monitor & Report Daily Grab Effluent Temperature °C 00010 Monitor & Report Weekly Grab U & D TKN (mg/L) 00625 Monitor & Report Monthly Grab Effluent NO2--N+NO.A maJL [006301 Monitor & Re ort Monthly Grab Effluent Total Nitrogen (mg/L) 0060D] Monitor & Report Monthly Grab Effluent "total Nitrogen Loads .1006001 Total Phosphorus 00665 Monitor & Report (pounds/month) Monitor & Report (pounds/year) Monitor & Report Monthly Annually Monthly Calculated Calculated Grab Effluent Effluent Effluent H 00400 > 6.0 and:S 9.0 standard units Weekly Grab Effluent Footnotes: 1. The permittee shall submit discharge monitoring reports electronically using the NC eDMR system application system [see A. (5)]. 2. U: at least 100 feet upstream of the outfall. D: at Ieast 300 feet downstream from the outfall. 3. The Division shall consider all effluent TRC values reported below 50 µg/i to be in compliance with the permit. However, the Permittee shall continue to record and submit all values reported by a North Carolina certified laboratory (including field certified), even if these values fall below 50 pg/1. 4. For a given water sample, TN=TKN+NO2 +NOa-N, where TN is Total Nitrogen and TKN is Total Kjeldahl Nitrogen. 5. TN load is the mass load of Total Nitrogen discharged in a given period of time [see A. (2)]. There shall be no discharge of floating solids or visible foam in other than trace amounts. Page 3 of 8