Loading...
HomeMy WebLinkAboutNCC230536_Site Plan or Location Map_202303020 U M O C� I- M m 000 ¢ M Z r m Y(0 zo o 2 z O W W �Z c� z 0 2 SCHEDULE I RUNWAY 6 24 REHABILITATION LJ;-o 4 M c14 r\ Z O O W I J U J W = rn O r W Ul Z Ili (n � < Z SCHEDULE 11 APRON REHABILITATION AND EXPANSION W J U Z 00 W W cnF= D=� 0 O H LJ�zOZ U �_ W z H 0 2 2 z OU _ QW ZQM W2 <Y 0=M0��0 m BURLINGTON ALAMANCE REGIONAL AIRPORT BUY Q N C) a- 48 D� w 0 F-_ W N OmC):�WLJ M0 cn=4Li0� QN H ~ ~O W Q BURLINGTON, NORTH CAROLINA 0 m a 0 To Reidsville o B7 �qu, r 013 I V TH P. 0,!1lltfC(rl 'IMrQ is D40 49. 0 4 �q Z QV b ti 'I 614ER31ry ]00 r ;� Aa To Yanceyville 62, Ray . �e RD. 311. CREEK sRs "ROn - Glencoe ` c City oG giuer q Lake 4 w G 35 'QS9 O ENGot- 4� Glen 5 Green r d Level( Raven yG "AG6gRD L� ?aEIO�Ii � �.,or Cant Lake yam• �t University F� o fY Fsh , Fy n J� 0 a -4 �oFy &Uc� :Alamance Regional Apr' fir. Med. 0J44 Lake Ctr. Mackintosh Rd'- IZtC e -.PoNC ova - i A4p=, v Burlingtan'FD o kAmtrak Sfation % s ' S I y� MCA) k4' ER �� Haw Lake _ -Nev�1 River N boo �. 87 ♦ 4R. 54 y Graham m k Cr. Alamance o0 HD a4 b�".. FNOU" r-�V Comm. _VD. fis �,4 OR - -Y f �kFo� ��v `.'�'1�8 Coll. i AR'I Alamance r O O, p11 * cNE p,Z.V Mun PROJECT LOCATIONreek1, �'� �� �yr •,•LR• �• .� BURLINGTON-ALAMANCE S -- REGIONAL AIRPORT Alamance ! y 54 Brg .49 � Fp aELLEMON AubANCg 4bc a f� �C(F-:... N RD. FMpy Oa' 1 O Alamance Battleground SOUTHf� '� Burlington Area q a o 9�oy yam. Rv s\or To Asheboro To Sanford 0 X 0 C3 ca 0 M H NCDOA GRANT NO.: 36244.16.16.1 LIST OF DRAWINGS DRAWING # TITLE OF DRAWING DATE DRAWING # TITLE OF DRAWING DATE Al COVER SHEET MAY 2022 EC1.5 EROSION AND SEDIMENT CONTROL PLAN (SHEET 6 OF 7) MAY 2022 A2 PROJECT LAYOUT AND SAFETY PLAN MAY 2022 EC1.6 EROSION AND SEDIMENT CONTROL PLAN (SHEET 7 OF 7) MAY 2022 S1 SURVEY CONTROL PLAN MAY 2022 M1.1 MARKING PLAN (SHEET 1 OF 5) MAY 2022 EC3.0 EROSION AND SEDIMENT CONTROL NOTES (SHEET 1 OF 3) MAY 2022 M1.2 MARKING PLAN (SHEET 2 OF 5) MAY 2022 EC3.1 EROSION AND SEDIMENT CONTROL NOTES (SHEET 2 OF 3) MAY 2022 M1.3 MARKING PLAN (SHEET 3 OF 5) MAY 2022 EC3.2 EROSION AND SEDIMENT CONTROL NOTES (SHEET 3 OF 3) MAY 2022 M1.4 MARKING PLAN (SHEET 4 OF 5) MAY 2022 SCHEDULE I - RUNWAY 6-24 REHABILITATION M1.5 MARKING PLAN (SHEET 5 OF 5) MAY 2022 EX1.1 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 1 OF 6) MAY 2022 M1.6 MARKING DETAILS MAY 2022 EX1.2 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 2 OF 6) MAY 2022 X1.1 CROSS SECTIONS - RUNWAY 6-24 BASELINE (SHEET 1 OF 4) MAY 2022 EX1.3 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 3 OF 6) MAY 2022 X1.2 CROSS SECTIONS - RUNWAY 6-24 BASELINE (SHEET 2 OF 4) MAY 2022 EX1.4 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 4 OF 6) MAY 2022 X1.3 CROSS SECTIONS - RUNWAY 6-24 BASELINE (SHEET 3 OF 4) MAY 2022 EX1.5 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 5 OF 6) MAY 2022 X1.4 CROSS SECTIONS - RUNWAY 6-24 BASELINE (SHEET 4 OF 4) MAY 2022 EX1.6 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 6 OF 6) MAY 2022 X1.5 CROSS SECTIONS - TAXIWAY A(SOUTH), 'B', C(NORTH), C(SOUTH), 'E', AND 'G' BASELINE MAY 2022 G1.1 GRADING AND PAVING PLAN (SHEET 1 OF 6) MAY 2022 X1.6 CROSS SECTIONS - TAXIWAY A (NORTH-1), A (NORTH-2), AND 'F' BASELINE MAY 2022 G1.2 GRADING AND PAVING PLAN (SHEET 2 OF 6) MAY 2022 SCHEDULE II - APRON REHABILITATION AND EXPANSION G1.3 GRADING AND PAVING PLAN (SHEET 3 OF 6) MAY 2022 EX2.1 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 1 OF 2) MAY 2022 G1.4 GRADING AND PAVING PLAN (SHEET 4 OF 6) MAY 2022 EX2.2 EXISTING CONDITIONS AND DEMOLITION PLAN (SHEET 2 OF 2) MAY 2022 G1.5 GRADING AND PAVING PLAN (SHEET 5 OF 6) MAY 2022 G2.1 APRON DRAINAGE AND PAVING PLAN MAY 2022 G1.6 GRADING AND PAVING PLAN (SHEET 6 OF 6) MAY 2022 G2.2 APRON GRADING PLAN (SHEET 1 OF 2) MAY 2022 G1.7 GRADING AND PAVING PLAN (TAXIWAY'A' (SOUTH), AND'B') MAY 2022 G2.3 APRON GRADING PLAN (SHEET 2 OF 2) MAY 2022 G1.8 GRADING AND PAVING PLAN (TAXIWAY'C' (NORTH), AND'G') MAY 2022 TS2.1 TYPICAL PAVEMENT SECTIONS AND MISCELLANEOUS DETAILS MAY 2022 G1.9 GRADING AND PAVING PLAN (TAXIWAY'C' (SOUTH), AND'E') MAY 2022 L2.1 AIRFIELD LIGHTING MODIFICATIONS MAY 2022 G1.10 GRADING AND PAVING PLAN (TAXIWAY'A' (NORTH-2), AND'F') MAY 2022 L2.2 AIRFIELD LIGHTING MODIFICATIONS DETAILS (SHEET 1 OF 2) MAY 2022 G1.11 GRADING AND PAVING PLAN (TAXIWAY'A' (NORTH-1)) MAY 2022 L2.3 AIRFIELD LIGHTING MODIFICATIONS DETAILS (SHEET 2 OF 2) MAY 2022 TS1.1 TYPICAL PAVEMENT SECTIONS AND MISCELLANEOUS DETAILS MAY 2022 PP2.1 APRON DRAINAGE IMPROVEMENTS AND PROFILES MAY 2022 L1.1 AIRFIELD LIGHTING MODIFICATIONS AND DETAILS (SHEET 1 OF 3) MAY 2022 DD2.1 DRAINAGE DETAILS (SHEET 1 OF 2) L1.2 AIRFIELD LIGHTING MODIFICATIONS AND DETAILS (SHEET 2 OF 3) MAY 2022 DD2.2 DRAINAGE DETAILS (SHEET 2 OF 2) L1.3 AIRFIELD LIGHTING MODIFICATIONS AND DETAILS (SHEET 3 OF 3) MAY 2022 EC2.0 EROSION AND SEDIMENT CONTROL PLAN (SHEET 1 OF 4) MAY 2022 GR1.1 RUNWAY GROOVING PLAN AND DETAILS MAY 2022 EC2.1 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 (SHEET 2 OF 4) MAY 2022 EC1.0 EROSION AND SEDIMENT CONTROL PLAN (SHEET 1 OF 7) MAY 2022 EC2.2 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 (SHEET 3 OF 4) MAY 2022 EC1.1 EROSION AND SEDIMENT CONTROL PLAN (SHEET 2 OF 7) MAY 2022 EC2.3 EROSION AND SEDIMENT CONTROL PLAN (SHEET 4 OF 4) MAY 2022 EC1.2 EROSION AND SEDIMENT CONTROL PLAN (SHEET 3 OF 7) MAY 2022 M2.1 PAVEMENT MARKING AND TIE -DOWN PLAN MAY 2022 EC1.3 EROSION AND SEDIMENT CONTROL PLAN (SHEET 4 OF 7) MAY 2022 X2.1 CROSS SECTIONS - APRON (SHEET 1 OF 2) MAY 2022 EC1.4 EROSION AND SEDIMENT CONTROL PLAN (SHEET 5 OF 7) MAY 2022 X2.2 CROSS SECTIONS - APRON (SHEET 2 OF 2) MAY 2022 Z O_ Z Z o Q a_ X � � W O J p QQ QZ a z = a0 w O Z Lr- OQ Q w O CV UO Q zz Q = Q W Q O Z Z al Z O O� � 11 O - Q m z W I J J m LLJ W = J V / C) U V) W Ld V) W O U �M JIVA 1-- O a- _ C) (� U - Q W ry 0 Z W 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale NONE Drawn NT/PCC Checked JMM/AMS Project No. 2102-2002 Sheet No. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:11 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or ether mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erasion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the PVC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. S. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROL1 A �. Environmental Quality r ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER . ".% OR $TAD■ = SILT FENC W SA Owl) �` 1 T CLEARLY HARM SMAIK �Pr NOTL1A'a ZEVICE GOMM' HWHJ 0 g3ECT1l kU A -A LEA T1JAL LDCATI(M1 DETERNM pl F7ELA 8 THE CI11CFETE WASHOUT YTRUCTUNES SHALL O NAZtiTAM WHEN THE LI ANRmR 75% W THE STRUCTURES 3 MNCRETE WASHOUT STRUCTURE HEEDS TO BE CLEARY HARIEG WITH SIGNAGE NOBIEi DEVICE. ►: H ■ H Now APIES HL PLASTIC TIQi .. + L Mt LATHS EEIEAIOED IN NOTING ZEVICE Li9'1I2i' IGNJ RYTPM VNMW RUCIRM 81tALL X NAIMANO WHM THE LZHHUM A� mm RLA = M W THE McTURCS CAIVAM TO MVIIE ANMMITC H ULD CAPACITY VDTN A IOIOIR/1 eL&L 12 BICHES IF FREEAMM &CONCRETE WASM)UT STRUCTURE HIM TO ME CLEW NARM HITN ABOVE GRADE WASHnUT STRUCTURE HUT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. ❑o not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 (D0w w �0=D=N o� "o� W Q Z O W U Z = L Cn 0 ~o o=�oZc,�8w � 1_ Z a-u m Q Q W= w m Z O0!� O m Q`�CN3 moo= Q'N 0 W O �- Om�L W LLJ a]O cn=Q�O� QN _��� �o N O N L0 Z 0 Q Q O Z O 0 O 0 Z 0 V) aQ z Q J J Q0 ~ z Doe W 0Q o wD fjo�_ wEh� 0 0 zz C�d Q �z - a0 W Q� Iz � Z J oW = _ U z U, D m W Q 0 'AM 01111100 �0 IK U - V)> w W 0 7 0 z CD 0 I� z 0 w o w w w cn = o z Q z 0 (n w 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale Drawn RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC3.0 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as -zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made. - and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. 1 i'A P1 ti NORTH CAROLI NA Environmental Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial Installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or ■ They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) risible sediment e Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case-hy-case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the fed eraI or state impaired -waters conditions, (b) Oil spills and * Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(l)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 RAWu (> L� W W (n0�X:D W r O H Z Cj W� Z W 2 W -� �(/7 Z 'D Zo Zctm�Z�~ ai,,Fhz3<:LES ° a ox:moo:�o Z 00 I ~0 < U) 3: I of Z X Q= F- ft� N 3: W O F- 0 M X LLI m0 (N = Q W 0 F- Q N HN~ F- N O - Z 0 F- a a L� O Z O Ln 0 F_ O 0 O Z W F_ Q 0 alR aWN I-Illlllllpll w O z cn O Q f--- w z � o O U LL_ O = z N w p w � W Ld U) A-- U) W 0 U Q z O V) w 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale Drawn RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC3.1 NOTES: 6. OC MAX r 1) TOTAL DRAINAGE AREA FLOWING TO FENCE MAY NOT EXCEED 1 ACRE. FENCE 2) SILT FENCES SHOULD NOT BE sit, USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW I ► I I/ FLOW OF WATER I (CREEKS, DITCHUNES, SWALES / I (I ETC.) I ► p1j \ g(ORAGE 3) SILT FENCE AND WIRE SHALL BE OT1 $E01aENZ \ ATTACHED TO POSTS WITH WIRE HAVING A MINIMUM TENSIL STRENGTH OF 50 POUNDS. TO INCREASE STORAGE CAPACITY AND PROLONG THE LIFE OF THE SILT FENCE, IT IS GENERALLY ADVISABLE TO DIG A SEDIMENT PIT IN FRONT OF THE SILT FENCE WHENEVER POSSIBLE. 14 GAUGE STEEL WIRE MESH -MAX 6" SPACING HOOKED ONTO PREFORMED CHANNELS ON STEEL POSTS, FILTER FABRIC -ULTRAVIOLET STABILITY OF 70% RETAINED STRENGTH AFTER 500 HOURS OF EXPOSURE REQUIRED. MAX. SEDIMENT STORAGE LEVEL. REMOVE SEDIMENT WHEN THIS LEVEL IS REACHED OR AS DIRECTED BY THE INSPECTOR. o� - N - - TRENCH, COVER W/ SOIL & TAMP BACKFILL. - - - - SHEET DRAINAGE (ONLY) - - - - - - - - - NATURAL GRADE CARRY APPROX.12" OF FABRIC INTO TRENCH. 8" DOWN AND 4" FORWARD ALONG TRNECH. N CARRY 8" OF WIRE INTO TRENCH. METAL POSTS AT 8' O.C. MAX POSTS SHALL BE 2' DEEP MIN. DATE REVISED SCALE DETAIL 8/16/04 9/14/18 NOT TO SCALE SILT FENCE FOR SMALL DRAINAGE AREA LESS THAN ONE ACRE CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT Silt Sack -Type A OOptional Overflow Insert 1" Rebar For p �� Bag Removal From Inlet DEPTH = D LENGTH = L d SIZE L X WX D" (Rebar Not Included) Silt Sack Dump Loops (Rebar Not Included) WIDTH = L Fvr�rincinn A F wr 2831 Cardwell Road Richmond, VA 23234 W W W.ACFENVIRONMENTAL.COM Silt F Steel Fence P Wire Fer Hardware Cie Filter of 1' Diameter Washed Stone Fabric Dund toury wire rence ana maroware I:IOLn — II obll �y SECTION o.$,0awb0 oba ob0obaoba ob0 oba ob0 oQeO -06%%� 6- o o b o O 0. 0 � bo bgo &go oo�b 6g ob 60 $$8 b0 ob u Top of Silr Fence Must Be at Least 1' Above the Top of the Washed Stone Steel Fence Post Set Max. 2' Apart FRONT VIEW Bury Wire Fence, Filter Fabric and Hardware Cloth in Trench DATE REVISED SCALE DETAIL 8/16/04 8/18/04 NOT TO SCALE SE—Z_] SILT FENCE OUTLET CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT DEWATERING CONCRETE BLOCK CONSTRUCTION SPECIFICATIONS —� 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE e ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED �,. AT LEAST 2 INCHES BELOW THE CREST OF THE STORM _ DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST b THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT 0 AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. 00 IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT _ ROWS BY PLACING 2x4 WOOD STUDS THROUGH O O BLOCK OPENINGS. —_ v 0e� 4 = 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS OVER ALL cwavoxn&�00. ° o. � BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL, PLACED TO THE TOP 2:1 SLOPE, GRAVEL IOF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. PLAN DOT #4 WASHED STONE IS RECOMMENDED. WIRE SCREEN TEMPORARY SEDIMENT THIS METHOD OF INLET PROTECTION IS APPLICABLE POOL OVERFLO DEWATERING WHERE HEAVY FLOWS ARE EXPECTED AND WHERE NOFF WATER — AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT W/ SEDIMENT EXCESSIVE PONDING AROUND THE STRUCTURE 1' MINIMUM �� 1I6" 2' MAXIMUM _ ., I STANDARD BLOCK & GRAVEL DROP INLET SEDIMENT FILTER HARDWARE CLOTH (1/2"X1/2") A--� GRAVEL FILTER PLACED TO TOP OF CONCRETE BLOCKS A 12"x4" WOOD STUD EXTENDED INTO CONCRETE BLOCKS RUNOFF PLAN WATER ENT THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLET WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE SECTION FILTERED RUNOFF (THRU BLOCKING) CROSS-SECTION AA STANDARD BLOCK & GRAVEL CURB INLET SEDIMENT FILTER DATE I REVISED SCALE DETAIL S E - 2 3 8/16/04 8/18/0411 NOT TO SCALE 14 STANDARD BLOCK & GRAVEL INLET PROTECTION CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT TRIANGULAR SILT DIKE INSTALLATION FOR ROADWAY DITCH OR DRAINAGE DITCH SILT DIKE UNIT CUT SECTION DETAIL A -A OSTAPLES SHALL BE PLACED WHERE THE UNITS OVERLAP AND IN THE CENTER OF THE 7' UNIT AS SHOWN ONTHE DIAGRAMS O POINT "A" MUST BE HIGHER THAN POINT "S" TO DIKE SECTION ENSURE THAT WATER FLOWS OVER THE DIKE DETAIL B-B AND NOT AROUNT THE ENDS. DATE REVISED SCALE DETAIL S E 8/16/04 8/18/04 NOT TO SCALE TRIANGULAR SILT DIKE CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS UPON COMPLETION AND ACCEPTANCE OF IMPROVEMENTS OUTLINED IN THE PHASING PROGRAM. THE ENTIRE AREA DISTURBED BY PROJECT CONSTRUCTION SHALL BE PROVIDED WITH A PERMANENT VEGETATIVE COVER. THE DISTURBED AREAS SHALL BE FINELY TILLED BY HARROWING. WHERE SOIL CONDITIONS ARE UNFAVORABLE FOR SUCCESSFUL ESTABLISHMENT OF COVER, AVAILABLE TOPSOIL SHALL BE SPREAD. APPLY SOIL AMMF.NDMENTS AND MULCH AT THE RATES SHOWN BELOW. SEED SHALL BE LIGHTLY COVERED AND SOIL SHALL BE FIRMED. STRAW MULCH SHALL BE APPLIED TO THE SEEDED AREA AND ANCHORED WITH A TACK. TEMPORARY SEEDING SPECIFICATIONS DATES RATE (LB./ACRE) JANUARY I - MAY I LIMESTONE 2000 FERTILIZER (10-10-10) 750 RYE (GRAIN) 120 MULCH - STRAW & TACK 4000 MAY I -AUGUST IS LIMESTONE 2000 FERTILIZER (10-10-10) 750 GERMAN MILLET 40 MULCH - STRAW & TACK 4000 AUGUST 15 - JANUARY I LIMESTONE 2000 FERTILIZER (10-10-10) 1000 RYE (GRAIN) 120 MULCH - STRAW & TACK 4000 SCHEDULE FOR PROVIDING PERMANENT VEGETATIVE COVER �-s RATE (LB./ACRE) NOVEMBER I - FEBRUARY 15 WINTER TALL FESCUE 100 RYE (GRAIN) 40 FEBRUARY 16 - APRIL 30 SPRING TALL FESCUE 90 KOBE LESPEDEZA (SEE NOTE 1) 30 Low Maintenance Slopes TALL FESCUE 80 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 MAY I -AUGUST 30- SUMMER TALL FESCUE 80 GERMAN MILLET 10 SEPTEMBER I - OCTOBER 31- FALL TALL FESCUE 120 GENERAL NOTES: 1. FOR PERMANENT VEGETATIVE COVER. SOIL AMENDMENT APPLICATION RATES: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS. OR APPLY 4.000 LB/AC GROUND AGRICULTURAL LIMESTONE AND 1000 LB/AC 10-10-10 FERTILIZER. APPLY 4000-LB/AC GRAIN STRAW MULCH. ANCHOR MULCH WITH TACK, NETTING OR CRIMPING INTO SOIL. 2. TEMPORARY OR PERMANENT GROUND COVER SHALL BE PROVIDED ON ALL EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT SEEDING FOR ALL DISTURBED AREAS SHALL Bli PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, WHICHEVER IS SHORTER. DATE REVISED SCALE DETAIL S E - 2 4 11/15/04 11/04/08 NOT TO SCALE TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT CLASS I Rip RAP SEE SECTION THRU BASIN BELOW a� `.� PART ag, RIP RAP HEADWALL f , J �i l ......I � I.. .... /(. / . /5 WASHED STONE 1' THICK X 3' HIGH MIN. F�STOPAGE ZONE , ' PERSPECTIVE VIEW PIPE INVERT 1' FLOOD DSTBE STORAGE SE 2RIP RAP HEADWALL DISTURBED oENOTES: (CUT, FILL, ETC. 3 GRAVEL &RIP RAP FILTER BERM BASIN DETAIL NATURAL 1 �,,,,-✓'" IS DESIGNED TO PROTECT EXISTING PIPE INVERTS GROUND THAT DRAIN 10 ACRES OR LESS. 1.5 EM NOTE: DIMENSIONS ARE 1.5' MINIMUM ACCEPTABLE UNLESS OTHERWISE CLASS 1 RIP RAP NOTED. SEDIMENT STORAGE #5 WASHED STONE MAX. SEDIMENT DEPTH (CLEAN OUT POINT) SECTION THRU BASIN, FILTER AND CULVERT PIPE DATE REVISED SCALE DETAIL SE 8/16/04 8/18/04 NOT TO SCALE GRAVEL & RIP RAP FILTER BASIN (EXISTING PIPE INVERTS) CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT Stake 2 X 4" wood frame DATE REVISED SCALE DETAIL S E -15 8/16/04 8/18/04 NOT TO SCALE Installation of fabric and supporting frame for inlet protection. CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT CM CRk b bOO-bo nn &ut;OW METAL POSTS GALVANIZED HARDWARE EXTENDS TO TOP OF BOX ° C STONE TO BE MIN. 16" HIGH ° AT A MAX. 2:1 SLOPE 0 DOI�iSooamoo«Xb # 57 WASHED STONE DATE REVISED SCALE DETAIL 8/16/0411 1/31/1811 NOT TO SCALE SE STANDARD CATCH BASIN / YARD INLET PROTECTION CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT UMMMIP ai C ro LA S G� AWNti (> L, W W 0 U) N W r O l­- Z 0 H 6 LLJ Of Z W = LLJ - V) Z H a_ Z p 0 O LLJ Z a- O 0 Z H (� aL,,�zQl?°-=° CD�m00_�O Z Of OD a- -1d <zwo2 Of O_N LLI m X~ W m O (NMQW0� QN F- H OU W F- Q a� I- 0 a_ _ O 0 — N o W I-Illlllllpll Qa Z Q Qo LLJ z0Q o f U I W Z O Q _ Z J O LLJ a c� J Iz � Z J � O LLJ l D _ Om 0 z (n J m M n 0� U LL_ O z r� LLJ Q LLJ W W C/� C/� 0 z Q z 0 0 LLJ 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale Drawn RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC3.2 O �_� �'�- ut. ` ` �' �' -•---- _ � � 1. ME, / \� --_-- - SHEET EC1.1 SHEET EC1.2 - �\�Vff�/- \4l61�s�` \ "rf% � (c ��j� � ` ^os�oN 'o T ��\��\•\ j G �oo��� \ s���� r SHEET EC1.3 ��0•\ 9Si �i ~ ` 600� ca0 ^ �✓1 ^'�n�\ \O-� 6 iO�i O �O 0 rn rn O OQ �O rn w 9 rn _ 4. 4*G l\\\ \_,��� �(� rvaJ6rh\�1 1 / ,di > i \. EROSION CONTROL NARRATIVE: THE PROPOSED SITE IS LOCATED IN THE CITY OF BURLINGTON, NC. THE SCOPE OF WORK INCLUDES GRUBBING AND INSTALLATION OF EROSION CONTROL DEVICES. THE CONTRACTOR SHALL FAITHFULLY FOLLOW THE CONSTRUCTION SEQUENCE AND MAINTAIN ALL EROSION CONTROL MEASURES AND DEVICES ACCORDING TO DETAIL SHEET EC3.2. THE ENGINEER, OWNER, OR CITY OF BURLINGTON MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURE TO BE IMPLEMENTED DURING CONSTRUCTION IF WARRANTED. EROSION CONTROL CONSTRUCTION SEQUENCE - SCH I 1. OBTAIN A LAND -DISTURBING ACTIVITY PERMIT FROM THE CITY OF BURLINGTON ENGINEERING DEPARTMENT. MAINTAIN A COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLANS ON THE PROJECT SITE AT ALL TIMES. 2. CALL ENGINEERING DEPARTMENT AT 336-222-5050 TO NOTIFY START DATE OF CONSTRUCTION SEQUENCE. 3. INSTALL THE FOLLOWING EROSION AND SEDIMENTATION CONTROL DEVICES FOR THE APPROVED PLAN IN THE FOLLOWING ORDER: 3.A. SILT FENCE 4. SCHEDULE AN INSPECTION WITH THE CITY OF BURLINGTON ENGINEERING DEPARTMENT TO COMFIRM COMPLIANCE PRIOR TO BEGINNING ANY FURTHER LAND DISTURBANCE ACTIVITIES. 5. BEGIN RUNWAY SURFACE REHAB PER SCHEDULE I. 6. INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES WEEKLY AND AFTER EACH RAINFALL EVENT. REMOVE ACCUMULATED SEDIMENT WHEN DEVICES REACH CAPACITY AND REPAIR ANY DAMAGES IMMEDIATELY (SEE BELOW): 6.A. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 6-INCHES DEEP AT THE FENCE. THE SILT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 6.B. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 7. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS FOR THE EROSION AND SEDIMENT CONTROL DEVICES AND COMPLETE THE FOLLOWED COMBINED SELF -INSPECT FORM FOUND ON THE DEMLR WEBSITE: https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ erosion-sediment-control/forms TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ONSITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX. 8. STABILIZE SITE WITH VEGETATION AS AREAS ARE BROUGHT TO FINISHED GRADE. ALL GRADED AND BARE AREAS MUST BE STABILIZED WITHIN 14 CALENDAR DAYS OF REACHING FINISHED GRADE. 9. WHEN ALL AREAS HAVE BEEN BROUGHT TO FINISHED GRADE AND STABILIZED AS INDICATED ON THE PLANS, CALL FOR INSPECTION. 10. WHEN SITE IS APPROVED, REMOVE ALL TEMPORARY SEDIMENT AND EROSION CONTROL DEVICES AND STABILIZE ANY RESULTING DISTURBED AREAS. GENERAL NOTES - EROSION CONTROL: 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL STANDARDS AND PRACTICES PRESCRIBED BY THE CITY OF BURLINGTON. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL DEVICES SHOWN ON THE APPROVED PLAN ACCORDING TO DETAIL SHEET EC3.2. 3. ALL AREAS AND SLOPES DISTURBED DURING CONSTRUCTION AND EXPOSED SHALL BE STABILIZED WITH TEMPORARY SEEDING AND MULCHING WITHIN 14 CALENDAR DAYS, FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER IS TO BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS. 4. SLOPES SHALL BE NO STEEPER THAN 2:1, PREFERABLY FLATTER, FOR VEGETATIVE COVER. 5. THE CONTRACTOR SHALL FAITHFULLY MAINTAIN ALL SEDIMENTATION CONTROL DEVICES AND TAKE ANY PRECAUTIONARY MEASURES TO ENSURE THAT SILT DOES NOT ENTER ANY NATURAL STREAM CHANNEL LOCATED WITHIN THE SITE. DRAINAGE CHANNELS MUST BE CLEAN OF SEDIMENT AND STABILIZED BEFORE THE PROJECT IS RELEASED. 6. THE CONTRACTOR SHALL NOT DISTURB ANY AREA LOCATED WITHIN WETLAND AREA UNLESS SPECIFICALLY SHOWN ON THE PLAN. 7. RECEIVING WATERCOURSE: GUM CREEK IN THE CAPE FEAR RIVER BASIN. 8. THE SITE IS NOT WITHIN ANY 100-YEAR FLOOD LIMITS PER FIRM MAPS 3710885300K, 3710886300K, AND 3710886400K, EFFECTIVE DATE 11/17/17. 9. THE CONTRACTOR SHALL SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT OF CONSTRUCTION ACTIVITY (NCG010000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. 10. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. CONTRACTOR SHALL REPAIR ALL EROSION CONTROL MEASURES WITHIN 24 HOURS OF THE RAINFALL EVENT. 11. CONTRACTOR SHALL TAKE EXTREME CAUTIONARY MEASURES TO REDUCE THE POSSIBILITY OF SEDIMENT TRAVELING OFF -SITE ONTO PUBLIC RIGHTS -OF -WAY. SHOULD ANY OF THE INSTALLED DEVICES NOT ADEQUATELY CONTAIN SEDIMENT FROM LEAVING THE PROPERTY, THE CONTRACTOR SHALL COORDINATE WITH THE OWNER (OR OWNER'S ASSIGNED REPRESENTATIVE), THE STORMWATER INSPECTOR, AND NCDENR TO INCORPORATE THE USE OF PAM DEVICES (ALSO KNOWN AS FLOCCULANTS). CONTRACTOR SHALL REFER TO SECTION 6.86 IN THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR CRITERIA OF FLOCCULANT USE, APPLICATION RATES, PERMITS, ETC. 12. NO SEDIMENT AND EROSION CONTROL DEVICES ARE TO BE REMOVED WITHOUT APPROVAL FROM THE STORMWATER INSPECTOR. 14. PIPE TRENCHES ARE NOT ALLOWED TO REMAIN OPEN. ANY TRENCHES OPEN AT THE END OF THE WORKING DAY SHALL BE BACKFILLED. ANY OPEN PIPES SHALL BE PROTECTED WITH PLYWOOD PRIOR TO BACKFILLING PER PIPE END PROTECTION DETAIL. Inspection and Monitoring Records for Activities Under Stormwater General Permit NCGO1000 and Self -Inspection Records for Land Disturbing Activities Per G.G. 113A-54.1 The Sedimentation Pollution Control Act was amended in 2006 to require that persons responsible for land -disturbing activities inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. The self -inspection program is separate from the weekly self -monitoring program of the NPDES Stormwater Permit for Construction Activities. The focus of the self -inspection report is the installation and maintenance of erosion and sedimentation control measures according to the approved plan. the inspections must be conducted after each phase of the project, and continued until permanent ground cover is established in accordance with NCGS 113a-54.1 and 15a NCAC 4B.0131. �/\ thy, EROSION CONTROL LEGEND LOD LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA 250 125 0 250 500 750 SCALE IN FEET 1 "= 250' a) C ro ry WEj?i7j E Z OE50Z z ` M Z� VF= a F IL N ZZ CIO SO V_ H O a W as z ao 0Q W U z z a Qo I z z J O � C9 in z in J m z O_ Q m Q w N I Q0 Q z I w J 0 w U U� c O U) F Z a_ U) �5 ox W W Q J a_ 0 0 -- U LL ZO LU LU � LU w= �C/) C Z Q _0 W 0 LU 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=250' Drawn RAR - WR Chedced WRP - WR Project No. 2102-2002 Sheet No. EC1.0 L0-5F SILT FENCE OUTLET (TYP.) i/� // SEE DETAILS ON SHEET EC1.2 ��/ r e7IG TAXIWAY ",EDGE LG`(HT (TYP.) _5 /011,11 _,—/ / I( EXISTING D T / ffSEEDETAILS FENCE OUTLET (TYP.) //50� ON SHEET EC3.2 / // H / to EZ§TING( RUNWAY 0/ I ENC DENTIFIER (REIL) /LIGHT r I b \ ° \ / I ILL I I I I\ I N ( � 1 I ( I BEGIN RUNWAY 6-24 — \ \ STA:0+00.00 \ 0 1 \ �J I ` i EXIj \ TAXIWAY A (SOUTH) BASELINE SING DUCT TAXIWAY A (TYP. r - \ EXISTING TAXI Y EXISTING TAXIWAY / CIRCUIT (TYP.) 1 EDGE LIGHT (TYP.) \ I SILT FENCE OUTLET (TYP.) SEE DETAILS ON SHEET EC3.2 1 \ \ J \ \ I _ -N, \ EXISTING SIGN (TYP.) \ \ \ \ \ SILT FENCE OUTLET (TYP.) \ SILT FENCE OUT (TYP.) ` I �\ \ SEE DETAILS ON SHEET EC3.2 \ J SEE DETAILS ON SHEET EC3.2 <DO \ SILT FENCE OUTLET (TYP.) \ D \� EXISTING RUNWAY SEE DETAILS ON SHEET EC3.2 I SF SF LODE LO �LOD�LOD—L —LOD —SF �� LOD LOD CIRCUIT (TYP.)—LOD�LOD�5F=5F SF SF —SF LOp_ i•— / F LODE LOD— LOD— LOD— L OD LOD LOD LOD LOD LO D LOD— LOD— LOD— LOD— LOD— LOD— LOD LOD SF D 1 \ / \ —_ IF IF SF / EXISTING - IF RUWA7- S SF IF 5F IF SF—�SF L°p D F LOD IF LOD�SOD—LOD SF LOD LOD HANDHOLE (TYP.) EDGE LIGHT (TYP.) SILT FENCE (TYP.) SEE DETAILS ON SHEET EC3.2 \ \ SILT FENCE OUTLET (TYP.) _ _ _ — — i — \ EXIST*G RUNWAY o SEE DETAILS ON SHEET EC3.2 - THRESHOLD LIGHT Fxis-.TA \ \ ~(TYP.) I is a0,-oo,�ooj,.,-DO, \ — EXISTING RUNWAY \ END IDENTIFIER LIGHT (REIL) \ \ I �s 00, OOlis 00, 00, DOl RUNWAY 6-24 STA:0+33.08= TAXIWAY A (SOUTH) STA:0+00.00 (TYP.) SILT FENCE OUTLET (TYP.) SEE DETAILS ON SHEET EC3.2 I 0 I CD o N ' Q LLI i W RUNWAY6-24 BASELINE J U) RUNWAY 6-24 l I v w - Q U) SILT FENCE (TYP.) SEE DETAILS ON SHEET EC3.2 is ss is is is - DO, ao, ao, ao, ao ,—ao, is is ao, I —00, —OO, —O, 00, —00, OO�aO, OOl OOl aol OoI SOD, —DO, — SILT FENCE OUTLET (T=EC3.02 \ , — / SEE DETAILS ON SHEESILT FENCE OUTLET (TYP.)SEE DETAILS ON SHEET EC3.2 / I/ J Il — _____________ -- EXISTING RUNWAY EDGE LIGHT-(TY-P4 — AS —is iS 0o is is ds is -- js —is fS DO, js a O, �Oo, �Oo, �OOI OOl aol —� Obr�i.i. LEGEND EXISTING BITUMINOUS PAVEMENT PROPOSED BITUMINOUS OVERLAY — 609.0 — EXISTING CONTOUR 609.0 PROPOSED CONTOUR RAISED RUNWAY EDGE LIGHT EXISTING RUNWAY THRESHOLD LIGHT RAISED RUNWAY THRESHOLD LIGHT EXISTING RUNWAY END IDENTIFIER LIGHT EXISTING TAXIWAY EDGE LIGHT RAISED TAXIWAY EDGE LIGHT NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 EROSION CONTROL LEGEND LOD � LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC OL2 LiDAR DATA 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' LLJ J~. W r3 Z o$�z 0 m z�4pc-m kA 0 0 F � O V) LLJ O U z '"' I I I I I I I ii z O z F- Q Q J d aJ �Q Q O Q z Qp = LLJ z 0 OQ � ti it N z L.L 0 UO W N H mz Q w z Q D C~� l z C) 0 I Q (3 _ — Zm z J 0 IIX U) m o 0 = C� W U) 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC1 . 1 Q h / SILT FENCE OUTLET (TYP.)i 1SEE DETAIL ON SHEET EC3.2 y EX 1P INLET I GRAt�:609.39' y 1 \ INV. (15" RCP3:606.24' I INV. (15" RCP):*.54' ° — J TAXIWAY A 1 / I/ i — / � � EXISTING RUNWAY I EXISTING TAXIWAY — CIRCUIT (TYP.) / EDGE LIGHT (TYP.) 00 I SILT FENCE OUTLET (TYP.) ISEE DETAIL ON SHEET EXISTING VCP 1 -EXISTING 24" RCP / EX DROP INLET EX DROP INLET GRATE:608.19' — — — _ _ GRATE:606.95' — — r SILT FENCE OUTLET (TYP.) ° y / ° —INV. IN (15" RCP):604.59' — — — — — — — INV. IN (24" RCP):602.15' — — — — — SEE DETAIL ON SHEET EC3.2 _ �/ _ O{? / \ \ INV-27 RC 693,71' — — — — — INV. OUT (30" RCP):598.18' — \ / EXISTING DUCT �' Co \\ EXISTING RUNWAY 'J \ CIRCUIT (TYP.) EXIST NQ �Q ( 4-UNIT PA'_IN,04 e EXISTING TAXIWAY \ \ EDGE LIGHT (TYP.) o \ � SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 H / �C LOD� LOD LOD,—LODE LOD LOD N SF IF 1'M7ffG_STAXIWAY -EQGE LIGHT (TYP.) / / \ SILT FENCE OUTLET (TYP.) \ \ \ \ \ \ SEE DETAIL ON SHEET EC3.210 / EXISTING ( / HANDHOL (TYP.) — - - - Iv \ _ _ SILT FENCE TYP. ° EXISTING SIGN — — (TYP.) / — — SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET (TYP.) — , SILT FENCE OUTLET (TYP.) I \ s (TYP.) EXISTING RUNWAY \ EDGE LIGHT (TYP.) — — — SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 \ D __,LOD— LOD—LODE 7EC3�.2 LOD LOD D� \ \ / IF L LODE LO0SF SF�� LODE L OD LOD� LOD LOO LODE LODE LOD— LOD— L LODE LODE LOD \ SF IF LODE LOD—� T SF SF LOD SF L00� LODE LOD SF LOD�SFOD SF SF SF SF SF SF SFOD—SLOD LODESF IF LOD//---------- --- ___ SILT FENCEOUTLET(TSEE DETAIL ON SHEET RUNWAY 6-24 STA: 1 0+98.58= TAXIWAY B STA:0+00.00= - — — TAXIWAY G STA:0+00.00 SILT FENCE OUTLET (TYP.) _ \ SEE DETAIL ON SHEET EC3.2 Sao, Sao, �s _ \^�\ ao, Sao, s �fl SI-EXtS7PM GN CIO TYPys I 00, (.) ys SILT FENCE (TYP.) \ys H \ SEE DETAIL ON SHEET EC3.2 \o° I S\ EXISTING DUCT \°°;s (TYP.) \\ EXISTING GLIDE SLOPE SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 RUNWAY 6-24 _ _ _ — •FS TIL T FENCE OUTLET (TYP.) - — — SEE DETAIL ON SHEET EC3.2 s ,s s Ool aol aOl—am —007- - EXISTING SIGN i SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 \ \ FjJJiQWAY 6-24 BASELINE / / / / U W W W W Iz J _ iis oao —ao, ao, ao, o, ao, —aosao�ao, —a ao, ao, 's 0, -J='. SILT FENCE (TYP.) EXISTING RUNWAY EXISTING RUNWAY SILT FENCE OUTLET TYP. (TYP.) SEE DETAIL ON SHEET EC3.2 CIRCUIT (TYP.) EDGE LIGHT (TYP.) SEE DETAIL ON SHEET EC3.2 / \ IN, NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 `-, OSION CONTROL LEGEND LOD T LIMITS OF CONSTRUCTION _SF—\ SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS — EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' 4� C ro LA r W15Zi� Z o$�z 0 m & z�*JF=c-W LA 0 (A G e3SF—O a�C F 12 z O_ H Q O J a m Q Q Q Z = a0 � OQ � WWm U N zz >_ Q m Z z a� 0, I z O �Im - z °D J Ld J m o LLJ u (n Q J d J 0^ U � L.L 5W co 00 G I— W W W U) _ C Z Z 0 Of W 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR - WR C 4m*ed WRP - WR Project No. 2102-2002 Sheet No. EC1.2 \ L—� .................... ..... .... .\ \ \ ° `° LOD °° a SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 � � EXISTING TAXIWAY \ \ � / s CIRCUIT (TYP.) O LOOLOD� / ISILT FENCE OUTLET (TYP.) I I I \ I \ \ `, \ SILT FENCE OUTLET (TYP.) °° OD�10D LO0 _ TAXIWAY A SEE DETAIL ON SHEET EC3.2 , o� II \ ° \ \ `\ \ \ SEE DETAIL ON SHEET EC3.2 \ / OD�LOD� / / I — ' o H m H . ° SILT FENCE (TYP.) — / o — — — I0 SEE DETAIL ON SHEET EC3.2 \ ` � — � I � EXISTING TAXIWAY 9-�Z \ \ \ \I EXISTING TAXIWAY CIRCUIT TjUTB� � / II ❑ \ CIRCUIT TO BE / \ REMOVED -TP. \ I / ----_f - ---o ftE/MOVZD(TYP.)[D\ oN LIJ I ° I \ \oD-€XI,STING TAXIWAY _ / z CIRCUIT-(TYP-), I w o \ \ / I \EXIS�_ING SIGN / SILT FENCE OUTLET (TYP.) — — \ TQ BE OEMOVED °� l SEE DETAIL ON SHEET EC3.2 rl TI s ° J EXISTING / \ \ \ � J EXISTING i° °°, ` --Go, p° o HANDHOLE (TYP.) \ \ HANDHOLE / I \ / l\ O H \ `— TO BE REMOVED / \ /H o EXISTING EXISTING4IGN —EXISTING DUCT / c t HANDH LE TO BEAEMOVED / ) - TO B- i�FEMOVED a Q T I TO BE EMOVED / o 1 T I FSEE LT FENCE OUTLET (TYP.) DETAIL ON SHEET EC3.2 ( EXISTING TAXIWAY / I \ Q � EXISTING TAXIWAY -I N 1 Q \ I I i EDGE LIGHT TO BE o/ I I EDGE LIGHT (TYP.) � I ~ � \ SILT FENCE OUTLET (TYP.) REMOVED (TYP.) Q \ \ \ '�l SEE DETAIL ON SHEET EC3.2 TI \ HTin s EXISTING RllDL1NAY 01 EXISTING RUNWAY I CIRCUIT (TYP.) _ H \ \ � \ � CIRCUIT (O BE I SILT FENCE OUTLET TYP. REMOVED TYP. / (TYP.)He \ SEE DETAIL ON SHEET EC3.2 \ \ \ ° \ EXISTING SIGN 5 \ EXISTING SIGN TO BE REMOVED / 1 / V 5F F <0D ♦ - / EXISTING SIGN SILT FENCE OUTLET (TYP.) 1 (TYP.) SF o-9 BE REMOVED SEE DETAIL ON SHEET EC3.2 SF ® EXISTING RUNWAY LODLOD—LOD—LOD—LOD—LOD— — I — — ° ^ ` S` LOO\ 4o, EDGE LIGHT (TYP.) /`Op 5` \ \ \ DD L°D 'fie OD— LDD—LDD LDD \�—L°= SF SF SF SF SF SF SF i \ SFLOD \ LOD LOD L OD LOD—LOD—�00 SILT FENCE OUTLET (TYP.) \ SF SF SF sF SF / SEE DETAIL ON SHEET EC3.2 - O I \ \ ♦ \ SILT FENCE OUTLET (TYP.) -- �` \ ----- ��— SEE DETAIL ON SHEET EC3.2 � I SAWCUT `U \ \ PAVEMENT EDGE \ I w w \ \ �� I = U) \ \ _ cn z \ w J \ \ FWNWAY 6-24 BASELINE RUNWAY 6\ 4 0 ^— ----- r—— — — — — — — — — — — ------------�— — — — — — — — — — — — — EXISTING RUNWAY / —js CIRCUIT (TYP.) / jS j5 —js 001 �0 O, OOl i�OOI �OOI iS jS / °o, �°o, �Do,� d Do, _DO, �Do,— js O O, is 00, OO, I 00, BOO , 00 ,, / Do, Do, °o, i�Do, �s is js / / T/ ` \ W / / EXISTING RUNWAY / � °D, Oo, O� OO,—OO,—OD,—Op,—OD, O DD, DO, 9Ol DD,_ O7 Doi—js �.1 J js po, ao, js js ds is is is / as I ° Z s/°°� EDGE LIGHT (TYP.) / / / =� _ — SILT FENCE OUTLET (TYP.) i SILT FENCE (TYP.) , / W s -- _ / SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 �\ °° / SEE DETAIL ON SHEET EC3.2 — \ m / \ / �\ / i SEE DETAIL ON SHEET EC3.2 // SILT FENCE OUTLET (TYP.) 1-1 H SEE DETAIL ON SHEET EC3.2 \ \ U o EXISTING HANDHOLE (TYP.) o (EXISTING RUNWAY \/ � / '/' — — \ \ \ I CIRCUIT (TYP.) 1 I / y / / / SILT FENCE OUTLET (TYP.) I H / o SEE DETAIL ON SHEET EC3.2 \ 1 I \ \ o / \, 1 , EXISTING DUCT (TYP.) EXISTING SIGN I (TYP.) /I" �:�� —/ �`—� I / ) �J lj 6-24 SILT FENCE (TYP.) r SEE DETAIL ON SHEET EC3.2 a ATCH LINE SEE RIGHT NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 i NIATCN I F.._ EROSION CONTROL LEGEND LOD � LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' E C cu 3 3 T � V 01 LL v LA c v 0 ci D` 10 V 01 01 D. D, v z u v v 0 `` Y — We3'Z)-F � Z c$ 2_5Z m FM �M & �i Z 4po- kA 0 3U) Z a_ V) 5 o x Eo r, z o z F_ < Q I— J ^ LL a J Ir Q 0 Q z Q p = LLJ z OQ ti it N Z L.L 0 UO W H Q 0 Lu mz z w a� U I C 00: Q m z J 0 U) m o 0 C� W U) 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC1.3 / J TAXIWAY A / — — _ — �\ /� / J — � � / J � / 1AX1 WAY A SILT FENCE OUTLET (TYP.) LOD LO LOD LOD LOD / SILT FENCE OUTLET (TYP.)— / SEE DETAIL ON SHEET EC3.2 ISEE DETAIL ON SHEET EC3.2 r,.^ EXISTING RUNWA'1 ---_ _\--_--------- \--- ----�\ I / / CIRCUIT (TYPO v/ / EXISTiNG HANDHOLE (TYP) 0 IN, \ 1 \ \ \\ \\\ \ N H H oI r \\— ( w i �I EXISTING DNCT SILT FENCE OUTLET (TYP.) — X SEE DETAIL ON SHEET EC3.2 —�� w F \ \ e \ \ EXISTING SIGN X \ SILT FENCE (TYP.) SILT FENCE OUTLET (TYP.) \(TYP.) / °°D EXIS�NCG-R WAY Q I T\ SILT FENCE OUTLET (TYP.) \ \ _ \ SILT FENCE OUTLET (TYP.) \ \ SEE DETAIL ON SHEET EC3.2 / LpD CIR.,CUVr P. I \ \ SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 - �� 5F I o SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 \ \ \ \ SEE DETAIL ON SHEET EC3.2 \ \ __ — pD—LOD / \ \ — / — i / ` m \ \\ ` �\ \ \ \ \ LOD SF— Q\ \ \ ` \ LODE LO� LODLOD SF LOD— LOD SF � FOD OD SF SF LOD— SF L LOD \ SF LOD L LOD D LOD LOD OD OD DO \ \ / LOD SF —SF \ \ \ \ LOD LOD LODE LO — LOD— LOD— LOD— LOD— LOD— LOD / I / LpD SF LODE LODE —LOD \ \ T LODE LOD SFSF SF SF SF SF / / Lp0 SF \ - SF SF LOD LOD LOD LODE SF —SF ` . S SF LOO— LODE LOD LOD LQD— LOD SF LOD L LOD SF SF — y EXISTING RUNWAY 0D_LOD ,L°° sc� EXISTING RALWAY EDGE LIGHT (�Y�) / / / / J —'F -- CIRCUIT(TI�P� -----\ _ ------ \� - \ I\ \ M wI \\ w \ w \ U) wI / z_ / J U Q RUNWAY 6-24 BASELINE N / / LLJ J~. La Z D F 2_5Z m 5 z�*j�c rccn o Z �Im �O 0U) a 0 �5 o x (o �H_ — - —-- -----------<= -----o ---------------------- — — — o z SILT FENCE OUTLET (TYP.) i� EXISTING RUNV1l� Y / I Q Q / SEE DETAIL ON SHEET EC3.2 EXISTING RUNWAY / / I d —� i CIRCUIT (TYP.) EDGE LIGHT( �)_ y� J jS SS js iS js iS / js iS 11 SS Ss js iS js 15 Ss 15 js LS 1S�j 15 iS fS �S jS il A' " SS jS / j5 SS js Ss ]5 \ 1�SS jS / 1S LS j5 iS w O aoF aoF—a/=—ao� —ao� ao� ��o� —ao� ao� ao� ao� ao� ao ao —ao� —ao� —ao� —7.a0� —ao� —ao� —ao� —ao�—a0,�ao� ao� ao� aoi aoi ao� ao� ao� i o� —ao� / -T� ao1-0M —GOI / 04 ao� —ao� —aol —aol —ao, —ao� ao' —001 i,� \ aoi aoi / o� a0� ao' ao' ao'—co� Q Q Q SILT FENCE OUTLET (TYP.) / J / / / J SILT FENCE OUTLET TYP. /' / / \ H _ / / Q z ( ) / , / SILT FENCE (TYP.) SEE DETAIL ON SHEET EC3.2,, / SEE DETAIL ON SHEET EC3.2 / / SILT FENCE OUTLET (TYP.) / SEE DETAIL ON SHEET EC3.2 / EXISTING / / SILT FENCE OUTLET TYP. / / 0 Q 0 SEE DETAIL ON SHEET EC3.2 / (TYP.) (TYP.)/ / / / — / / ( / — - / SEE DETAIL ON SHEET EC3.2 / / W U N U O W ir LLI Lo 2� QZ < LLI / / /i m0 z z W _ O _/—/ / i/ act � zzi z — — z l'loll\ \-- — \^------_—=__ -- = = __- ti .�/'� _ ____ _ __ /--—� �''__ — —_—_/ _ --__ — -- /_— —� �• ��- / �/ / / � I —_— i _ — � � � � �_—_— _� �� � � ��� �_— � lam_ _— / �� � �� � �—_—_—_— NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 EROSION CONTROL LEGEND � LOD � LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS — EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR — WR Checked WRP — WR Project No. 2102-2002 Sheet No. EC1.4 J --TAXIWAYA // �� �/ _ // • I LOD LOD LO LOD LOD ........ — / E STING SIGN — — — - - 7EXISTIN.GfAXIWAY— / -61ftC'CTIT (TYP.)- - / SILT FENCE OUTLET(TYP.) SEE DETAIL ON SHEET EC3.2 (SILT FENCE OUTLET(TYP.) --\— \\ ---_ — \ I \\ SEE DETAIL ON SHEETEC3.2 — ^-------------- I I EXISTING DUCT J / \ I — \ (TYP.) , I I\ N0�\ \ r ILLI \ I I Q _ _ oLL w EXISTING TAXIWAY I Q Q EXISTING RUNWAY — — — — - s — — EDGE LIGHT (TYP.) — — — — \ > \ \ SILT FENCE OUTLET(TYP.) � � D°/ /� Q `<°a \ \ EXISTING SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET(TYP.) — — — \ a \ HANDHOLE TYP. — — — — — SILT FENCE OUTLET(TYP.) `°°/SF / ° (TYP.) \ 1 SEE DETAIL ON SHEET EC3.2 — \ � \ \ SEE DETAIL ON SHEET EC3.2 � \ �°° 5F / LOD— LOD— LOD— LOD LOD LOD Le. LOD LOD LOD LOD LOD LOD LOD LOD— LOD— LOD— LOD— LOD LOD— LOD _ IF IF LOD IF LOD—SF LOD— LOD— LOD SF LbU LOD— LOD LOD— LOD— LOD LOD LOD 10°� — SF SF IF F SF SF SF IF IF SF IF IF SF IF IF LOD \ �O° — \ SF IF IF SF� LJ EXISTING RUNWAY SILT FENCE (TYP.) EXISTING RUNWAY OH T CIRCUIT (TYP.) SEE DETAIL ON SHEET EC3.2 \ EDGE LIGHT (TYP.) ------0 -- WIL�� I- \ T� U) w lz J I / v / y \ ------------ / / / / / / RUNWAY 6-24 H SILT FENCE OUTLET(TYP.) / I n SEE DETAIL ON SHEET EC3.2 0 LO=s°D�LOD, IF LODLOD— LOD— LOD LOD LO °MTrMOD— LOD— LOD 3FSF—°� _ F� IF IF \ \ \ \ \ / RUNWAY 6-24 BASELINE / / / / / / U W H - _ LLI LLI / Lu z_ J �b�weII-U) Z c$50z m is & Z rc U)4Fo-a y _ U ommmi 0 U) F 0 5 o x ET ' --- - —_ -- ---- - - ----------- --- ------ — —___ — SILT FENCE ON SHEETE --- � SEE DETAIL ON SHEET EC3.2 I SILT FENCE TYP. EXISTING RUNWAY — / / EXISTING RUNWAY / I z / — SEE DETAIL ON SHEET EC3.2 CIRCUIT (TYP.) EDGE LIGHT (TYP.) O Z a i ds s A, —As s s s ss �s is is ss is ss �s is / / ds72- as �s as �s — as is—ao�s—oo��s ao� ao�s ao� ao� ao� ao�—ao�—a—ao��ao�—ao�—ao�—ao� ao� ao� ao� ao� aea--ao� ao� ao� ao� ao�—ao�—ao�—ao�— o�— is is is ss ss�11 J_�is dS is is ss is As ds " � ao� am ao1 a�ao�-001�ecu �' / — Faa, ❑Ol a0l 001 a01=001 _ 00l 001 Go! aOF —aOF—a0,-00,—a0, a F —a01-001 —aal —aol aol — — — — — —— / / i — J SILT FENCE OULET (TYP.) / / / I a J J SILT FENCE OULET (TYP.) / SEE DETAIL ON SHEET EC3.2 / / Q Q SILT FENCE OULET (TYP.) / SILT FENCE OULET (TYP.)/ — /' SEE DETAIL ON SHEET EC3.2 / \ ' — — — / / Q Z SEE DETAIL ON SHEET EC3.2 -. SEE DETAIL ON SHEET EC3./ J —— — — — / — J Q O L Z EXISTING Z� 0 / SIGN (TYP.) e I � V N 0 LL / /-- WFS 0 ZWi (.0UO Z Z Q Qz pW EXISTING ��W 4�I U)U-U) \ pIN, —` — \� ��.—i--�--�—_ err ---_---_ -- -- — \/`..�1"_`\,fi r � ^ .� � � �\ � // � —\ \/— // // � —/ \ J W 100, \� ` �/ �,,—r--�..►-� ,—✓' �v���.�` .. �--• \ "'�� V ^ ��►�� .� `r \ / rrr'----....r — — — — _ —r J/ �• - /' —�� ^_--�• �� ...i �_ = -- � � �— -� .�. ^ "'� — '� J, - —�' '.i'. ► ^\ / � --= —ram= - �- �_ r _ -�� \ ^ , 1 N— / _�_ _ = _ = __=___ _- _- _ _ _----= = _ --� -/ �i�= _�\� --J/J 1/ / // /— _ _------------- --- --- ------------ ------------ —� NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 EROSION CONTROL LEGEND � LOD � LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC1 .5 -------------------------------------------------- TAXIWAY A \ \ ——\ IN, i \ °per N, I-- _- - - - - - - - - --------------------------------- ------------------- EXI.��TIN�CTAXIWAY ----- --- CIRCUIT(TW+— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ------ — ------ \ \\ \ \ — — — EXISTING TAXI�Y � , ,_ , f- EDGEbQHy(WP.) — — J, \ \ — — / \ ) ) I-------------- _--— — — — — — — — — — — — ----- JIV - - - - - - - - - - - - - - - - - ------------------------/ / I EXISTI�G I DUCT (TIP.) o / _ — — XIWA F _ — — / SILT FENCE OUTLET (TYP.) / 2 I SEE DETAIL ON SHEET EC3.2 / / SILT FENCE OUTLET (TYP.) - -� / _ — ` _ — — EXISTING / SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET (TYP.) SILT FENCE OUTLET (TYP.) — — — — SILT FENCE OUTLET (TYP.) SIGN (TYP.) / I SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 — /' SEE DETAIL ON SHEET EC3.2 LOD LOD— LODE LOD �— -- / IOD� LW LOD SF LODE— LODC .CLODS LOD LOD IF LOO NSF SF SF LOD—LOD LOD—LOD— _ — —�F _ — S IF IF LOD�LOD LODE LOD�LOD SF —SF— NSF LOD— ODD SF IF LOD— LOO —L6� COD LOD LOD LOD LOD—LOD—LOD LOD LOD IF SF— IF LOD—LOD——LOLO=SF NSF SF SF SF SF SF IF SF SF SF LOD SF LOD�SF IF —SF—SF—SF LOD�L00 LOD—LOD�SF / SF / I EXISTING RU WAY EXISTING RUNWAY / SILT FENCE (TYP.) — — CIRC'T (TYp I — — — _ EDGE LIGHT (T.) -- w PEI — w W U) ----- \ W z RUNWAY 6-24 BASELINE 2 \ RUNWAY 6-24 mow- -_ ------------ - _ I ------------------------------- -------------- _ -------- SILT FENCE (TYP.) �— ---------------- -----�----�\ EXISTING RUNWAY SEE DETAIL ON SHEET EC3.2 \ EXISTING RUNWAY \ IS, EDGE LIGHT (TYP.) CIRCUIT (TYP.) \ �\ - ss is Ls is is ds AS —As is Ls- AS —is-- — — _ is is �s js \ ` ao, Sao, —ao, —ao,—ao,—ao, —ao, ao, —ao, —ao, —ao, ao, ao, is Ls is ds s ds _ so, ao, ao, ao, ao, ao, ao, ,—ao, —ao, —ao, —ao, —ao, —ao, Sao, —ao, —ao, ao, ao, ao, ao, sao, Ls js ss is is Ls ds SILT FENCE OUTLET (TYP.) — _ — _ _ _ — — a_ — ao,-0°,—a°,—aO,—a°,,—a°,—�,�aa,� a°, aa,'S —col—cm a°, a°, ao, I SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET (TYP.) SILT FENCE OUTLET (TYP.) — — — — ` — SILT FENCE OUTLET (TYP.:271 1 SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 —°0 — — — — SEE DETAIL ON SHEET EC— — SILT FENCE OUTLET (TYP.) \ — SEE DETAIL ON SHEET EC3.2 \ \� \--------------------------------------------------------------------------------_----_-------.------ �— — — — — — 'o-/ /'- I� 1 / E ISTING I i SUPPLEMENTAL \ --`-►.�--��'�� �-^-� f'�`,�` •//�\�\-/� �11^ �^' ` / '/ �— —\\—�� _\ .-\ / \ \/ \ \'� '*-ANI f4Q CON \\ I \ -- .� /'� — `-► / /�_— _— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — NOTES: 1. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 2. FOR TYPICAL SILT FENCE AND SILT FENCE OUTLET EROSION AND SEDIMENT CONTROL DEVICES SEE SHEET EC3.2 EROSION CONTROL LEGEND LOD � LIMITS OF CONSTRUCTION SF SILT FENCE SILT FENCE OUTLET PROPOSED CONTOURS EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET (TYP.) / SEE DETAIL ON SHEET EC3.2 SILT FENCE (TYP.) _ \ \ SEE DETAIL ON SHEET EC3.2 STING;F41v< I I ELLIG1 I- T� YP.) \ \ \ \ \ — z W m rEXIS�IN 0\ _ \ )1 HANDI�10L (\TYP.)\ 1 O� \ \\ I f0 EXIS ING TAXIWAY °\ CIRC )IT (TYP.) SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 EXISTING RbNWAY THRESHOLAIGHT \ 1 (TYP.) \\ I\ I / r I I 11 � 'I I �5 O° 00 �5 J \Op'Lu U) SILT FENCE (TYP.) SEE DETAIL ON SHEET EC3.2 0 x I I J 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' WujZ Z W IX ZOO � Z�4po-m rc U)kA 0 0 I 0 a C U) O V) LLJ U Z z o z F Q Q LL a J IrQ Q O Q z Q p = LLJ z OQ ti it N z L.L 0 UO W ~ H mz Q W z U) I z C o � Q C3 I — m Z J 0 vJ m o 0 u LIJ C) 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 "=40' Drown RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC1 .6 2 EC2- ■ ■ \ II I I :' �....:.i, . '•: : \ � t - - ,IN / 1 594 3 \\\\\\\\�\\\ \ 1 \ �-/ \ 595.00 \ �_-✓f-- / -�-�// ` moo/ // / TT B \ ,� \ \\ LOD LOD 10D n n 001 I - _ 596.596.50 000 \ \�\� ✓ i- _'' '-\ f, / \ I\\ I /` ` //` 10 Ile Ar SHEET EC2.3 k oo� \ "1 1 ::y ..... 600.00 •s t? • hh h- \ h - - ^ /✓ \ -y _i- \ \� \ \ \\\ \ ^. I- / \\1 ,.•~ 600.50 I 610 SO p \\ 9.S \ :t: 595 50 / ��\ \ \ -77 610 • 0 �S 1599 110, \ \ h \�\ 02 2 / : r'. / l• ,: ,'. / SO cr 1 r •. O \ \\\\\ 1 1 \ I I596.504 \ \ \ pp i o \ 6o I - \ 950 00 \ . \ CD o\ `\ \ o ,-o,•• \ _ \ / 2 '" t�,.•' :t,' / 1'cS \ O \ \ \ :+h. ice• 1• v):0�'':•'_•``•' ```` .r' ':tn.. Cq \ ✓III II \\ \ 1 , p�`r s;. :\� i., ;� y .:c. '^.c0:r+'•:�•P I I II \ \ \ \ \ \\ \ r _ ° , \ \ \ �� 8. x.- '�',` '-- -I =, a.. ,ta"iF• •l•.'•' I }i:'.'« s:y, _ t� �.�:�c.: �I I I \ � \ \ \ \ / I -o\ \ o \ \ 5 \ s" • ' , ..59 . .�.:•� :.'. � �•�:�.'" 'f. .... o - � /( Ill / \\ \ \ \\\ \ \ 6 0 0 59 S / : ::s: /cif / i \ \ \ I O - o �oo/ � 6 �60- 5 -� 6.50 \ - 9' ' / :,�tx'`�� � ::.r' •.r..'° � - `��' •,,.::*. ''sr:,.:'1;.'P'�' // _\ •� / / � � - - \ \ � \ \ \ \ r- 596.50 5y6 �/ _ ' 604.00 ff 60 603.0 - - _ 600.to 00-599._5 .00 3.50� 0� 6016-Q0.50 O \ • •i " •' .. �.•:• • ao� _� 2.(,,, 32�• ,aoi ao� �_ ao� ..; .. _ �'+-,'':~�.':A�: t'• l a•.:,, ;.., s:: : �'• '' /� // \ \ OOl // �2. -- A. / \ \ \ \ o- • •ti. - 5 _ � o \ / C\ \ \- O f. .5 O I 1 `I 'I•. • S / I \ \ I . o • y/ i i t• • _ I I _ J \ F• `t •:•' SY \ -1 9 I _ - 1 •i 9 - \ :50 r1_ \ EROSION CONTROL NARRATIVE THE PROPOSED SITE IS LOCATED IN THE CITY OF BURLINGTON, NC. THE SCOPE OF WORK INCLUDES GRUBBING AND INSTALLATION OF EROSION CONTROL DEVICES. THE CONTRACTOR SHALL FAITHFULLY FOLLOW THE CONSTRUCTION SEQUENCE AND MAINTAIN ALL EROSION CONTROL MEASURES AND DEVICES ACCDORING TO DETAILS ON SHEET EC3.2. THE ENGINEER, OWNER, OR CITY OF BURLINGTON MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURE TO BE IMPLEMENTED DURING CONSTRUCTION IF WARRANTED. EROSION CONTROL CONSTRUCTION SEQUENCE - SCH II: PHASE 1 1. OBTAIN A LAND -DISTURBING ACTIVITY PERMIT FROM THE CITY OF BURLINGTON ENGINEERING DEPARTMENT. MAINTAIN A COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLANS ON THE PROJECT SITE AT ALL TIMES. 2. CALL ENGINEERING DEPARTMENT AT 336-222-5050 TO NOTIFY START DATE OF CONSTRUCTION SEQUENCE. 3. INSTALL THE FOLLOWING EROSION AND SEDIMENTATION CONTROL DEVICES FOR THE APPROVED PLAN IN THE FOLLOWING ORDER: 3.A. SILT FENCE, 3.B. INLET PROTECTION ON EXISTING STORM SYSTEM 4. SCHEDULE AN INSPECTION WITH THE CITY OF BURLINGTON ENGINEERING DEPARTMENT TO COMFIRM COMPLIANCE PRIOR TO BEGINNING ANY FURTHER LAND DISTURBANCE ACTIVITIES. 5. BEGIN APRON REHAB AND EXPANSION PER SCHEDULE II. 6. DEMO EXISTING INFRASTRUCTURE PER SCHEDULE II . EROSION CONTROL CONSTRUCTION SEQUENCE - SCH II: PHASE 2 7. BEGIN INSTALLATION OF PROPOSED STORM DRAINAGE NETWORK. INSTALL INLET PROTECTION TO PROPOSED STORMWATER INLETS AS INSTALLED. 8. INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES WEEKLY AND AFTER EACH RAINFALL EVENT. REMOVE ACCUMULATED SEDIMENT WHEN DEVICES REACH CAPACITY AND REPAIR ANY DAMAGES IMMEDIATELY (SEE BELOW): 8.A. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 6-INCHES DEEP AT THE FENCE. THE SILT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 8.B. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 9. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS FOR THE EROSION AND SEDIMENT CONTROL DEVICES AND COMPLETE THE FOLLOWED COMBINED SELF -INSPECT FORM FOUND ON THE DEMLR WEBSITE: https-.//deq.nc.gov/about/divisions/energy-mineral-land-resources/ erosion-sediment-control/forms TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ONSITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX. 10. STABILIZE SITE WITH VEGETATION AS AREAS ARE BROUGHT TO FINISHED GRADE. ALL GRADED AND BARE AREAS MUST BE STABILIZED WITHIN 14 CALENDAR DAYS OF REACHING FINISHED GRADE. 11. WHEN ALL AREAS HAVE BEEN BROUGHT TO FINISHED GRADE AND STABILIZED AS INDICATED ON THE PLANS, CALL FOR INSPECTION. 12. WHEN SITE IS APPROVED, REMOVE ALL TEMPORARY SEDIMENT AND EROSION CONTROL DEVICES AND STABILIZE ANY RESULTING DISTURBED AREAS. GENERAL NOTES - EROSION CONTROL: 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL STANDARDS AND PRACTICES PRESCRIBED BY THE CITY OF BURLINGTON. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL DEVICES SHOWN ON THE APPROVED PLAN ACCORDING TO DETAILS ON SHEET EC3.2. 3. ALL AREAS AND SLOPES DISTURBED DURING CONSTRUCTION AND EXPOSED SHALL BE STABILIZED WITH TEMPORARY SEEDING AND MULCHING WITHIN 14 CALENDAR DAYS, FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER IS TO BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS. 4. SLOPES SHALL BE NO STEEPER THAN 2:1, PREFERABLY FLATTER, FOR VEGETATIVE COVER. 5. THE CONTRACTOR SHALL FAITHFULLY MAINTAIN ALL SEDIMENTATION CONTROL DEVICES AND TAKE ANY PRECAUTIONARY MEASURES TO ENSURE THAT SILT DOES NOT ENTER ANY NATURAL STREAM CHANNEL LOCATED WITHIN THE SITE. DRAINAGE CHANNELS MUST BE CLEAN OF SEDIMENT AND STABILIZED BEFORE THE PROJECT IS RELEASED. 6. THE CONTRACTOR SHALL NOT DISTURB ANY AREA LOCATED WITHIN WETLAND AREA UNLESS SPECIFICALLY SHOWN ON THE PLAN. 7. RECEIVING WATERCOURSE: GUM CREEK IN THE CAPE FEAR RIVER BASIN. 8. THE SITE IS NOT WITHIN ANY 100-YEAR FLOOD LIMITS PER FIRM MAPS 3710885300K, 3710886300K, AND 3710886400K, EFFECTIVE DATE 11/17/17. 9. THE CONTRACTOR SHALL SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT OF CONSTRUCTION ACTIVITY (NCGO10000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. 10. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. CONTRACTOR SHALL REPAIR ALL EROSION CONTROL MEASURES WITHIN 24 HOURS OF THE RAINFALL EVENT. 11. CONTRACTOR SHALL TAKE EXTREME CAUTIONARY MEASURES TO REDUCE THE POSSIBILITY OF SEDIMENT TRAVELING OFF -SITE ONTO PUBLIC RIGHTS -OF -WAY. SHOULD ANY OF THE INSTALLED DEVICES NOT ADEQUATELY CONTAIN SEDIMENT FROM LEAVING THE PROPERTY, THE CONTRACTOR SHALL COORDINATE WITH THE OWNER (OR OWNER'S ASSIGNED REPRESENTATIVE), THE STORMWATER INSPECTOR, AND NCDENR TO INCORPORATE THE USE OF PAM DEVICES (ALSO KNOWN AS FLOCCULANTS). CONTRACTOR SHALL REFER TO SECTION 6.86 IN THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR CRITERIA OF FLOCCULANT USE, APPLICATION RATES, PERMITS, ETC. 12. NO SEDIMENT AND EROSION CONTROL DEVICES ARE TO BE REMOVED WITHOUT APPROVAL FROM THE STORMWATER INSPECTOR. 14. PIPE TRENCHES ARE NOT ALLOWED TO REMAIN OPEN. ANY TRENCHES OPEN AT THE END OF THE WORKING DAY SHALL BE BACKFILLED. ANY OPEN PIPES SHALL BE PROTECTED WITH PLYWOOD PRIOR TO BACKFILLING PER PIPE END PROTECTION DETAIL. Inspection and Monitoring Records for Activities Under Stormwater General Permit NCGO1000 and Self -Inspection Records for Land Disturbing Activities Per G.G. 113A-54.1 The Sedimentation Pollution Control Act was amended in 2006 to require that persons responsible for land -disturbing activities inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. The self -inspection program is separate from the weekly self -monitoring program of the NPDES Stormwater Permit for Construction Activities. The focus of the self -inspection report is the installation and maintenance of erosion and sedimentation control measures according to the approved plan. the inspections must be conducted after each phase of the project, and continued until permanent ground cover is established in accordance with NCGS 113a-54.1 and 15a NCAC 413.0131. 75 37.5 0 75 150 225 SCALE IN FEET 1 "= 75' EROSION CONTROL LEGEND LOD LIMITS OF CONSTRUCTION SF SILT FENCE III III I SILT FENCE OUTLET PROPOSED CONTOURS - EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA INLET PROTECTION _ TRIANGULAR SILT DIKE FILTER BASIN 56wkq N ri W�?�� i7j $Z � CJ Z zcc �WxZ 0=m= x lr_ do a N o158F-W �o F5 0 t7f S c I 0 0 Z 0 a m Q Z <0 0 W U UO zz Qo I z Z J Om C9 in Zm J ir D m z 0 z Q X w 0 z Q z 0 Q _J m Q w z O Q I LL-I J w U Cn 0 �U) F Z a_ U) 5 c x I- z .-. O LL Z O LIJ 0 LLJ Ld w V) = 0 Z Q Z O V) O D:f Ld 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1'-75' Drawn RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC2.0 .• J^� \ / / / / / / / / \ \\ \ \ L� \ ( \ / ` �/ / / \ -\ I \ \ -� \ \ \ \ / ` /\ / �'/ / / /i \ \ \ \ \.\\\\\\\ \ \\\ \ L—. \ \ %` I ' �\ ` \ \ / \ _ _ / / / / � //�/ / / /// / � / \ \ SILT FENCE OUTLET (TYP.) \\ \\ \\\ - - \ 1` \ \ \. '� < / / / / / / / / SEE DETAIL ON SHEET EC3.2 ' �\ \ \ I- \ y r ` // / // �// / / //SF _LoD \ \��\����\\\\\\\\�\\ \ \ \ \\ . / / / / / / / / /// /// / / _ / \ \ \\�\\\\\\\ \\\\\� , \ \ \ _ I \ i / / \ 1 _/-_/�_/� /�/ .'e/// �i� // _ / / / / ` \ �SILTFENCE(TYP.) \\\\ \ \\`�--�\ -. _ - / / ti / ( / I I SEE DETAIL ON SHEET EC3.2 \ \ \ \ _ I \ \�\\ \\\ \ l _ _ INLET PROTECTION - ACF SILT SACK ` ,� / " \ \ \ \ \\\ \ \ = k' . '` / \ - - - / -- \ ` I / J - - _ �� /i �, TYPE A OR APPROVED EQUIVALENT \ /'� \ l / � \\ �\� \\� �\\\\ \ \ \ - \ .. . 1:' I I \ \ \ \: \ I -� / / / �� �� _ — � i - \ / FOR INLETS LOCATED IN PAVEMENT. I \ -1 \ \ '\��� \\� \ -Z \\ \\ \ / i � / / � - / - - - / - \ / SEE DETAIL ON SHEET EC3.2 I I / \ \ \ \ \\\ �\ �� \ \ \\\\\ \ \ %`/_-/--„-\ -/ =-�_i /��/--- /// f-�� , , /� `� .. .. I \ / \ I \� \ `SEEDETAILONSHEETEC3.2 1 _ \ \ SILT FENCE OUTLET (TYP.) N \ \ SILT FENCE OUTLET TYP. - - - SILT FENCE TYP. / �' / \ \ -. l \ � N \ \ \ \ �� ( ) ( ) / - F 7 ) �,: .. .' : \ INLET PROTECTION (TYP.) \ \\\ \ / \ / / • . \ SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 - � / _ - \ / - J/ / % I \ . . \ \ / SEE DETAIL ON SHEET EC3.2 \ \ \ \ \ \\\ / \ I l/ —/ ^ i J� / \ / / �F \ LOD SF LOD SF LOD D V � - -- L=D ` LOD LOD OD • :' \ �.— . . : ' \ \ \ \ \ _ — \ \ \ �/ \ \ \ \ \/\ \ �� \ \ \ \ / I / . ✓ ,., . f \ \ 1 _ .. \ .. . o . I :%, is ° — \ — - / \ , _ \ q . '� / \ r � y. I : \' :• . \� :. INLET PROTECTION TYP. : • i . :. \ .. \ \ ( ) •. :: \• :' INLET PROTECTION TYP. . ( ) • ... • ..: o. SEE DETAIL ON SHEET EC3.2 :. :.: ' .::.: ' ': -\ : \ : '• I \ \ / ' � ;. ,� , .." ., .: \ SEE DETAIL ON SHEET EC3.2 I . __� \ I :� . \ �` \ .. :\• J . /. \ I �` . \ t ... �. :'� \ / 1 .::... . \ :. .. .. . .. .' _ < \ i i "• . I .. . . �' .. .. . . . .. / :. . r \ .. . \ y �- , . .. . \ . . . . \ 1 1 \• \ I \. p 1 . • , '\ ` ... .. \ . . i' \ ' \\. \ . 1 .' \: \ _ .. . \ \ F - n \. \ \ f , \ . /. .. . �:'. \ . �:. :. \_ \ � Z 1 SF J \ / \ X , \ o -- \—_ _ __ �— U ". ... . ,. a ti.. s o "V / \ / � p \\ / - � 1 / / i I I I , I / I /i p / 1 / COr '' \ •., \ /r . �'. / f. • ; r __ \ • \\ , I ` / \ \ \ \\ \II I\ ' / \"I, \ \ / I I \\ ---\\ \\ \ � %-� :�, j'. ` ..\ . .. \ �: H �. \ \ \ \ I ��\ \ � �■ •'m: \\ \ \ \ / \, -. • ..� -/ +. �. I -� •Y•.•^•• :.. ••i: \ \ \ / .. . ' . . \ \ \ \ \ I / -, / / \ '' \ \ \ \ / — \ / .. '. ' / `:. s:'-„° '' :::'~ . `. ti•:'�� \ \ I I — �- — :* :.�. ' • . i - ' .. - \ \ \ \ \ I J / / \ i INLET PROTECTION (TYP.) > / / :• '•• •.. I / \ .'' \ \ \ \ —\ \ -) / / / � SEE DETAIL ON SHEET EC3.2 / / / / _ _ / \ \ / / . . .. / / •:�t:. j' . \ — — ` `y, _ . .. • • \• �'\ • •. ' OOl OOl \ \ OOl — — _,_ :l.\ {�} a0l— \ OOl OOl Ol ` Dol \ \ • .. • ^^II'^` T . \ \ .\: ,., .. .. �� aoi ao� — - poi ao� ....\• \ —� o \ ' \.. ` — \ \o� — — \ . \ „ — ::: \ , — — :.i � . , �' . .. \.' . .. \ \ ,. — — . `• \. ' z ✓' v :�. 0 \:. �. . . '�. . . -.. - '.:' �: . .. . �: .. — i ,� `< . Y: . :/ ..* . :/ . :. /.'' . x �� \. 0 /. , i . ./ . \• INLET PROTECTION (TYP.) \ • . • \ \ \ •\ - . \ I SEE DETAIL ON SHEET EC3.21 `� .. , . , :�: :.•. •.. .•. '• • . I \ I \ �' '' .. �. ` - .\ _ \ �\ \' .. T .• 1 I . p 1 •.� �' •I t . : \ l 1 \-- . . \ \' . . .. \'. . . - . . ... �, \ 'y� .. \ . . /' . .. . ..... .. ... . . . . •: ... y . . :\ %' . .. .. .. . i .. \ \ 1 I . �• . . . . . 1 1 =J. / . o \ ' %' . . o �' / — \. I / I i / i ) / i •. . . ; . / I /: / \ ::..' :... .. .. . . }: �% / \ .. /. • I / . %' \ . 1: �. I\ / � • , / I / -- \ INLET PROTECTION (TYP.) � / INLET PROTECTION (TYP.) I o .. ' I I // / I/ / SEE DETAIL ON SHEET EC3.2 /' SEE DETAIL ON SHEET EC3.2 I INLET PROTECTION (TYP.) / I ( 1 / / \� \ / / \ f - - / \ \ \ I SEE DETAIL ON SHEET EC3.2 I � - \. \ \ NOTES: 1. PROPOSED CONTOURS SHOWN ON THIS SHEET ARE THE FINISHED GRADE CONTOURS AFTER COMPLETION OF ALL PAVING. 2. FOR TYPICAL PAVEMENT SECTION SEE SHEETS TS2.1 AND TS2.2. 3. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH FOR ALL DUCTS AND UNDER DRAINS UNDER THE APRON PRIOR TO PULVERIZING EXISTING PAVEMENT SECTION AND MIXING CEMENT FOR THE APRON EXPANSION. 4. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 5. SEE SHEET EC3.2 FOR TYPICAL EROSION AND SEDIMENT CONTROL DEVICES (I.E., SILT FENCE, SILT FENCE OUTLET, INLET PROTECTION, TRIANGULAR SILT DIKE, AND FILTER BASIN). EROSION CONTROL LEGEND � LOD � LIMITS OF CONSTRUCTION SF SILT FENCE I I I I 1 1 SILT FENCE OUTLET PROPOSED CONTOURS — EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA INLET PROTECTION TRIANGULAR SILT DIKE FILTER BASIN LEGEND EXISTING BITUMINOUS PAVEMENT PROPOSED RECLAMATION PAVEMENT PROPOSED PAVEMENT EXPANSION PROPOSED PAVEMENT OVERLAY EXISTING STORM DRAIN PIPE PROPOSED STORM DRAIN PIPE 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' f a) t C a) 1 o ro r u i LA .L c r a) C 0 I( a a u � r < , c S C , r� 06�J4�. 0� 8� W�Zaa -, Z ��~OO§F I. zda�U m W Z a] k9 0 � 0 rcy��c 0. Hmy tv oo�S�0 y �9isF- �o �N F~� �O W c 0 F < < 6 0 as s c I 0 c U z z o LIJ Q = IL 0- x ~ w Z a Q Q CL z J as Q Z Z� � O � O Q Q v LL_ W I— Z irF -i O O m U N UO Q QZ L J Z LIJ g O Ld Ld < o O Zzi � 0 � W c� Q (/) m 0 Z m = Q w J Z � O 0 L d V) = O U Of LIJ 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale I ws40i Drown RAR - WR Checked WRP - WR Project Na 2102-2002 EC2.1 IS, j SILT FENCE OUTLET (TYP.) \\\ \ \ - rLOD SEE DETAIL ON SHEET EC3.2br / \\ \ \ \ . . • \ • • / � / r r / /i / / / / - / aF � SILT FENCE (TYP.) r SEE DETAIL ON SHEET EC3.2 INLET PROTECTION - ACFSILT SACK TYPE A OR APPROVED EQUIVALENT 09 \ \ \ SILT FENCE OUTLET TYP. _ FOR INLETS LOCATED IN PAVEMENT. \ I 594•50- - INLET PROTECTION (TYP.) \ \ SEE DETAIL ON SHEET EC3.2 SEE DETAIL ON SHEET EC3.2 I / \ \ \ \ \ SEE DETAIL ON SHEET EC3.2 �,_o � \ \\595.00 \ SILT FENCE (TYP.) \ L- /2D_ SEE DETAIL ON SHEET EC3.2- 1 \ \ \ 595.50 SILT FENCE OUTLET (TYP.) - - -�' �/ )\ SEE DETAIL ON SHEET EC3.2 �� SF LOD SFSF LOD p LODE LOD _ LOD LOD ----------------- LOD 596.00 - _ - \ \ \ \ / / \ ) \ - 5� ! ✓� / \ ) cn INLET PROTECTION (TYP.) LOD \ - / /' ! . \ \ n SEE DETAIL ON SHEET EC3.2 / ) SF / \ \LOD Ioosop\ \ \ INLET PROTECTION ( ) / \•. \ \ \ U \ \ \ 5,96 \ \ I / \ SEE DETAIL ON SHEET EC3.2 �, •`'. \ 600.50� S99 SO Si9�9 595.50 / \ \ \, pp \ ,.. 59 \ \ 60 601.00 60 . \... 6)9 :\ 1 :. :\ / 6p / sot /.: �So ....... ..... . \ \ 8.0o ILo 9g�o v.r 1 \\ 1\ ,\ \ \ \ // ,\ \ �, \ \ goo \\ \ \\ \ 59R T \ \ r :�. LL ro LA 3 v% W1swj ~. WrZi� Z o$�z 0 m LAJ & Z 4po-M kA miff LA � N F �o 0 INLET PROTECTION (TYP.) SEE DETAIL ON SHEET EC3.2 \ s / I I o o \ Z / •` a' �\•••' �60 \ \o I o/ ��� 00 � ' /00 0 0 5gg 50 599 _ 598.00 _ \ \ o� 6 05 6 0� 596.50 \ GRAVEL AND RIPRAP FILTER BASIN O 0 0 597.50 00 5 596 \ (TYP.) SEE DETAIL ON SHEET EC3.2 / TRIANGULAR SILT DIKE (TYP.) - _ - TRIANGULAR SILT DIKE (TYP.) - - - - - - / p / - - \_ TRIANGULAR SILT DIKE (TYP.) _ _ - SEE DETAIL ON SHEET EC3.2 / _ - o I SEE DETAIL ON SHEET EC3.2 - - - - - - - - / SEE DETAILON SHEET EC3.2 _ o°j 19 ou�+.�� �� \ \ 600. �599. 599.00 - - - \ \ O 6p3 50` 603.00 - - - - _ - _ - 00 50 601.00600.50 I 5g8•50 aoi CIO]\ 6601.32�- oi col DOI aoi aoiT Doi ao� poi l -o \ aoi� 6 6 •�.: :. ��.' a01 Doi---------_-- - 99.6 GO 7 :. 7777777 'of 99. :. •. .. i : "• s NOTES: 1. PROPOSED CONTOURS SHOWN ON THIS SHEET ARE THE FINISHED GRADE CONTOURS AFTER COMPLETION OF ALL PAVING. 2. FOR TYPICAL PAVEMENT SECTION SEE SHEETS TS2.1 AND TS2.2. 3. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH FOR ALL DUCTS AND UNDER DRAINS UNDER THE APRON PRIOR TO PULVERIZING EXISTING PAVEMENT SECTION AND MIXING CEMENT FOR THE APRON EXPANSION. 4. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 5. SEE SHEET EC3.2 FOR TYPICAL EROSION AND SEDIMENT CONTROL DEVICES (I.E., SILT FENCE, SILT FENCE OUTLET, INLET PROTECTION, TRIANGULAR SILT DIKE, AND FILTER BASIN). EROSION CONTROL LEGEND LOD LIMITS OF CONSTRUCTION SF SILT FENCE III III I SILT FENCE OUTLET PROPOSED CONTOURS - EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA INLET PROTECTION TRIANGULAR SILT DIKE FILTER BASIN LEGEND EXISTING BITUMINOUS PAVEMENT PROPOSED RECLAMATION PAVEMENT PROPOSED PAVEMENT EXPANSION PROPOSED PAVEMENT OVERLAY EXISTING STORM DRAIN PIPE PROPOSED STORM DRAIN PIPE 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' t 0 N z 0 w v� (n z Q Q = � w x LLJ 0 CL o Q zIr J aZ Q 0- z o O z0 O_Q ~ 5 o Q L. L jr� ZO O F °° U r7 UO Q LLJ go w z0 I z (% 0 Q Ozi LLJ Im Q (� z J 0 IIX Z � m = QLIJ J Z C) 00 LJ V) = O w 100% DESIGN PLANS - NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 ws40' Drown RAR - WR Checked WRP - WR Project No. 2102-2002 Sheet No. EC2.2 EROSION CONTROL LEGEND LOD � LIMITS OF CONSTRUCTION SF SILT FENCE I I I I I I SILT FENCE OUTLET PROPOSED CONTOURS — EXISTING CONTOURS LIMITS OF FIELD SURVEY DATA; CONTOURS CREATED FROM NC QL2 LiDAR DATA INLET PROTECTION TRIANGULAR SILT DIKE FILTER BASIN tn SILT FENCE OUTLET (TYP.)\\\\\\\\\\\ SEE DETAIL ON SHEET EC3.2\�\ z� o 0 \ \\ 61 \\ \ SILT FENCE OUTLET (TYP.) \\ \ N���; \ SEE DETAIL ON SHEET EC3.2 i. • SILT FENCE OUTLET (TYP.) \ \ \ \ ' "'': +•. pop SEE DETAIL ON SHEET EC3.2 moo •.s . I 5� /SF D i�/ \ 1 yco \ \ . ..:.. . i _n I \ \ N ` I ' \06 N \ I moo° ' • / �� \ Ld U / 1 W \ : l:.� :' •"...�i: `: goo I \ co Ld LLJ Lj SILT FENCE (TYP.) z SEE DETAIL ON SHEET EC3.2 t: ::' '•:':: ••` \ J •• o •'•:"i ;.!•,/: SILT FENCE OUTLET (TYP.) •�`-, C� "_•; - •",>!,�'• :• •:. •:\ � ..•,: ; .«: •,: •: •. SEE DETAIL ON SHEET EC3.2 •. °�r— ' t►' / if : j •• a •s-. ' //� ////, / SILT FENCE OUTLET (TYP.) SEE DETAIL ON SHEET EC3.2 //// /^ // / 1 1 \ \ \I / 7*-- --- — a, i �/ J < PHASE 1 LEGEND EXISTING BITUMINOUS PAVEMENT PROPOSED RECLAMATION PAVEMENT PROPOSED PAVEMENT EXPANSION PROPOSED PAVEMENT OVERLAY — EXISTING CONTOUR EXISTING STORM DRAIN PIPE EXISTING TAXIWAY EDGE LIGHT EXISTING SIGN EXISTING TAXIWAY CIRCUIT EXISTING DUCT EXISTING HANDHOLE PROPOSED CONTOUR PROPOSED STORM DRAIN PIPE 40 20 0 40 80 120 SCALE IN FEET 1 "= 40' v N U w I— Ld Ld w Ld w z J U H Q NOTES: 1. PROPOSED CONTOURS SHOWN ON THIS SHEET ARE THE FINISHED GRADE CONTOURS AFTER COMPLETION OF ALL PAVING. 2. FOR TYPICAL PAVEMENT SECTION SEE SHEETS TS2.1 AND TS2.2. 3. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH FOR ALL DUCTS AND UNDER DRAINS UNDER THE APRON PRIOR TO PULVERIZING EXISTING PAVEMENT SECTION AND MIXING CEMENT FOR THE APRON EXPANSION. 4. FOR EXISTING AND PROPOSED DRAINAGE INFORMATION SEE SHEET G1.1. 5. SEE SHEET EC3.2 FOR TYPICAL EROSION AND SEDIMENT CONTROL DEVICES (I.E., SILT FENCE, SILT FENCE OUTLET, INLET PROTECTION, TRIANGULAR SILT DIKE, AND FILTER BASIN). \\\\ \\ \\ \ SILT FENCE OUTLET (TYP.) \\�\\�\ \\\\\\ \\\\\ � � — \ _. _• �\ � = _ — _ SEE DETAIL ON SHEET EC3.2 �\� l _596. \\\ \ \\ \ \ \\\\\ \ \ \ \\ \\ zz \�\\\ \ N\ \ SILT FENCE OUTLET (TYP.) \\ \ N���; \ SEE DETAIL ON SHEET EC3.2 \\ \� SILT FENCE OUTLET (TYP.) \ \ \ \ \ pop SEE DETAIL ON SHEET EC3.2 .50 I 5`` sL D y \\ \\ \\ I � � 106\ — � 597.00 T\ �ool •1. co I � / \ cn I � I • • CIA � SILT FENCE (TYP.) \ o \ o / SEE DETAIL ON SHEET EC3.2 SILT FENCE OUTLET (TYP.) / SEE DETAIL ON SHEET EC3.2 //// / SILT FENCE OUTLET (TYP.) / / ^ �N- —� / / SEE DETAIL ON SHEET EC3.2 �� yt Lo / /A // L \ Oo�Lo Lo I \ 1 \ \ \ \ oo \sJ(9 .r i PHASE 2 5 -AEfu LLJ La Z m LLJ � & �i z�4pc-M (A 0 �O im F s c I 0 8 H m O a Ir Q z Q0 OQ W U m� z z g0 z zi o� C3 zm J m 3U) Z a_ V) 5 c x o J Q z ~_ 0 0 ~ Q 0L.L. J z 0 m LL.I Q c w Ld Ld Ld (n � Z Q Q I Z 0 0 Ld U cn 100% DESIGN PLANS — NOT FOR CONSTRUCTION Date AUGUST 2022 Scale 1 ws40' Drown RAR — WR Checked WRP — WR Project No. 2102-2002 Sheet No. EC2.3