Loading...
HomeMy WebLinkAboutNCC230537_ESC Approval Submitted_20230228ROY COOPER Governor ELIZABETH S. B1SER Secretary DOUGLAS R. ANSEL Interim Director Buncombe County ATTN: Mr. Michael Mace 200 College Street, Suite 300 Asheville, NC 28801 NORTH CAROLINA Environmental Quality February 2, 2023 LETTER OF APPROVAL RE: Project Name: Asheville High School Track Replacement Acres Approved: 1.6 Project ID: BUNCO-2023-010 County: Buncombe City: Asheville Address: 419 McDowell Street River Basin: French Broad Stream Classification: C Submitted By: Roper Civil Engineering Date Initially Received by LQS: January 6, 2023 Date Revision Received by LQS: January 27, 2023 Plan Type: Institutional Dear Mr. Michael Mace, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any Iand disturbing activity. The eNOI form may be accessed at deq.nc.govJNCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 MeaTM c.aacuw, � Deovunan ui Envroiunmtet 9u�iry 828.296A500 Letter of Approval Buncombe County ATTN: Mr. Michael Mace February 2, 2023 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S1 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Laura Christiansen Engineer lI Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications Required for Approval ec: Mr. Matthew Roper, PE (matt@roperce.com) Mr. Ronnie Lunsford (ronald.lunsford@buncombecounty.org) cc: Regional Office file Letter of Approval Buncombe County ATTN: Mr. Michael Mace February 2, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Asheville High School Track Replacement Project ID: BUNCO-2023-010 County: Buncombe 1. Any changes to the Financial Responsibility/Ownership (FRO) form require the form to be resigned and notarized to maintain the integrity of the document. Please obtain a new signature and notarization for the revised FRO form and submit the revised document to this office for review. {G.S.113A-54.1}