HomeMy WebLinkAboutSW1221002_Plansheet CL301B3.P2 - Grading/Drainage Plan_20230223 °. 2139.22
RCP @ 5.00% 2129
N 2143.77 2139.47 I i I �► 2128. '
I I 1.7 >?, �2126- �\ LEGEND
N 2140.68 I I I 2127 ° o -
2144.01 I �'� / � � ' 6 � PROPERTY LINE
2139.67
IE = 2137.40 0 2139.17 D4 I �� �,�` �`L5��\ ��
SEE PLUMBING PLANS I `L I I ? \ ��p -2125 o \ �\ \ L BUILDING LINE
D5 2128.501 ► , , , , ;� �, o \ Gresham Smith
FOR CONTINUATION oDo. / 1 2139.88 (F) \
OF STORM LINE / I 2143.58 2140.81
1 2139.40 I N 7 GS-NC P.C.
2145.49v 2140.59 �,•� I N I •i -2 � �2 �� \ 12 • °\ I
� -2145- - EXISTING MAJOR CONTOUR
2145.58 / 2144.99 I 1 1 2140.09 I( °D I I I I N M �20 2 0� An Affiliate of Gresham Smith
/ 0 2140.07 I 1 I I I I I 1 2120 \. °
2139.57 II ( !N I I `V - - -2146- - - EXISTING MINOR CONTOUR
/ I v I N III N N 0 2118
/ W 1 1 I I I N N r2117.20 N �� 2123 2145 MAJOR CONTOUR
TW: 2141.23 ,2139.84 I � � N �z 2>> �
1 START WALL AT BUILDING FACE TW: 2145.14 I / FG (E): 2140.73 �F°c�� /�� X I }° I I I III N cV �� �Q * > >�j� 20 /
21�`^ I TW: 2146.00 FG (E): 2144.64 / / 2139.72 (F) I , z / 7 /
33 L.F. - 12" PVC 2.00% FG (E): 2145.58 FG 2140.31 FG (W): 2139.96 / / I I I 1 N N I= z / / 2� \A 2 2146 MINOR CONTOUR
@ (vv�: I N o / p �2 201 South College St.
- - - - - - -L74'F• FG 2140.41 END WALL / - - _ I 1 I 1 N N ^o // �0 2 RETAINING WALL
(� REFER TO AIRSIDE CIVIL PLANS FOR PROPOSED / 52 L.F. - 24 RCP @ 1.00/o I I �� o / ° Suite 1950
Ir 21 � / TW: 2144.86 GRADING AND SURROUNDING IMPROVEMENTS. I 1 III N `v o /
TW: 2145.99 p`L TW: 2141.00 N ^ / - - - - - - - Charlotte NC 28244
FG (E): 2144.36 COORDINATE ALL FINAL PROPOSED DRAWINGS i� 1 I I c�I I I N = • �z ?>>9///
FG (E): 2145.49 `L FG (W): 2140.29 / FG: 2139.88 (F) I I Q ,` ti704.944.7970
STORM PIPE
PRIOR TO CONSTRUCTION. D16 1 "'c� N I I N �• // cam �'
FG (W): 2140.38 - - - - - - - - - - - - // /� II RIM:2138.70 XI
"} 11 I I 1 z Z N
co
- - - - - - T - - - - - -
e� ry � I I III 21 D7 90 II // N � HEADWALL
- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1S - - - - - - - /
D21 I 220 L.F. -24" RCP @ 1.00% / / - - - - - - - - - - / 109 L.F. -24" RCP @ 9.96%
RIM:2140.15 =� - ` / ���� ��F°` �"�� D20 I / 1 11 ' I I 1 I /// DRY DETENTION POND 1 ST STORM MANHOLE
RIM:2138.26 I / I I 1 I I I I � rn ^' / I SEE SHEET CL313.P2
! / N CATCH BASIN
----f - ° - - FOR DETAILED GRADING �, \ ❑
\ 38 L.F. - 18 RCP @ 1.00/o _ I _ 1 N N� COMBINATION INLET
1 -2142' i/ //��F / / D17 /
STORM CLEANOUT RIM:2136.88 2j20 ?77 2j 2�� I �iEl
/ co � / � 9 78 >7) 16 1�6 N A4 A5
29 L.F. - 15" PVC @ 1.00% / 50 L.F. - 18" RCP @ 1.00%, / N �� �� 2 =__ STRUCTURE LABEL
- 2142 �� - /� - - - J N ����� - RIM:2139.00
- - 2141 - i cdU `�� N�
\� a 2136 - J �\ 2120 ?7?0 D1 - / _=I-_ \,Nw _ 2139.00\ SPOT ELEVATION Gresham
/ SEE PLUMBING PLANS r p °? D18 2j2 \
/ O 21 I �� 2139.00 (F) FLUSH ELEVATION Smith
FOR CONTINUATION - - RIM:2135.38 8
MATCH EXISTING F
OF STORM LINE c`� 2j23 2139.00 M.E.F.G.( GRADE E EVAT ION
`Z17� \
_ \ \ I 198 8p -TOPOFCURB
` -2134_ / F°o \ \ ` 198.30 -BOTTOM OF CURB
CURB ELEVATION
TW: 213950
. -TOPOFWALL WALL ELEVATION /
` \v FG(W): 213370.00 rATWALLRADE
?13 \ \ �� ` '2> \ FLOW ARROW
c, 6 \ h` � 33� �\ \ s heiville
H.P. HIGH POINT REG IONAL AIRPORT
L.P. LOW POINT
Asheville Regional
�Foc NOTE: Airport
1. CONTRACTOR TO COORDINATE Terminal
UNDERGROUND UTILITIES TO BE A MINIMUM OF
` I 3 INCHES CLEAR BELOW THE BASE OF THE
Modernization
- ' GRADE BEAMS WHEN PASSING UNDERNEATH.
2. NO UTILITY LINES SHALL PENETRATE THE 61 Terminal Drive Suite 1
FOOTING AT THE CENTRAL ENERGY PLANT Fletcher, North Carolina 28732
I I I EXCEPT FUEL LINES.
/Z' o I 3. CONTRACTOR TO COORDINATE ALL
/ 1 / _ N `�' I I I 02/16/2022
/ �/� ? I I I UNDERGROUND UTILITY ROUTINGS. UTILITIES
REFER TO AIRSIDE CIVIL PLANS FORSHALL II ' CLEAR FROM ALL FOUNDATIONS IN PLAN.
J 1 / WORK TO BE COMPLETED IN THIS AREA I II IE KEPT A MINIMUM OF 12 INCHES GS Project#: 43483.02
/
PROJECT I
BOUNDARY I '' i
SEAL :9,
11 =
- - - - - - - I I I I I 05314902/17/2&23
-.-•-•- - - - - - -'T�, -'-'-'-'-'-'-'- / / / I. I I POST-CONSTRUCTION DRY DETENTION POND qN' '�00��`�\
MAINTENANCE NOTES: DIII��H�����\\
II I I I I 1. THE DRAINAGE AREA WILL BE MANAGED
TO REDUCE THE SEDIMENT LOAD TO THE
/ /// I I II I I DRY POND.
1* / / / I I
p / / / I I I ' I 2 DETENTION BASIN EXTENDED IS ESTABLISHED,ED, THE
N ti��0 // (� // / I I II I I VEGETATION WILL BE WATERED TWICE NATHAN HUDGENS, PE
/ �I I I WEEKLY IF NEEDED UNTIL THE PLANTS NC 053149
&5
N / // \\ // / ' I II I B EO S) ESTABLISHED (COMMONLY SIX REVISION
r�"� \\� %/ II I I I 3. AFTER THE INITIAL FERTILIZATION TO NO. DATE DESCRIPTION
ESTABLISH VEGETATION IN THE DRY POND,
I j I I FERTILIZER WILL NOT BE APPLIED TO THE 1 02/16/22 ISSUE FOR CONSTRUCTIONry^�`8 II // / i I I I I I DRY POND. 2 03/09/22 ADDENDUM 02
II 4. THE VEGETATION IN AND AROUND THE
BASIN WILL BE MAINTAINED AT A HEIGHT 3 03/28/22 ADDENDUM 03
OF APPROXIMATELY SIX INCHES. 4 05/02/22 AGENCY COMMENTS
/ / / I I III I 5. AT LEAST ONCE ANNUALLY, A DAM SAFETY 5 06/28/22 ASI 005
EXPERT WILL INSPECT THE EMBANKMENT.
ANY PROBLEMS THAT ARE FOUND WILL BE 6 08/19/22 AGENCY COMMENTS
REPAIRED IMMEDIATELY. 7 11/02/22 AS1007
2 6. AFTER THE DRY POND IS ESTABLISHED, IT WILL BE INSPECTED QUARTERLY AND 8 02/17/23 AGENCY COMMENTS
o // // I I I I WITHIN 24 HOURS AFTER EVERY STORM
cv) EVENT GREATER THAN 1.0 INCHES.
RECORDS OF OPERATION AND
I
o / // // 11 / `yam I I I I I MAINTENANCE WILL BE KEPT IN A KNOWN
cv)00
II / / I I I I ` SET LOCATION AND WILL BE AVAILABLE
UPON REQUEST.
7. INSPECTION ACTIVITIES SHALL BE
PERFORMED AS REQUIRED IN THE NCDEQ
a) / / / / / I I I ENERGY, MINERAL, AND LAND RESOURCES
� / //� / / I I I VI I I STORMWATER DESIGN MANUAL.
CL
o
20' 0 20' 40'
'I I I I GRAPHIC SCALE GRADING &
co
00 KEYPLAN DRAINAGE PLAN
1*
I
�I Al ' A2 ' A3
CL301 B3 . P2
�0 - - - - -
i - - - - - i- - - - -
Q
���NG & DRAINAGE PLAN B1 B2 B3
O
CONSTRUCTION DOCUMENTS
I