Loading...
HomeMy WebLinkAbout20150465 Ver 2_More Info Received_20230125FUTURE (DASHED) POTENTIAL UNDERGROUND DETENTION / WATER RECLAMATION RECOMMENDED BYPASS OF RR ROW OFFSITE STORM WATER AROUND PERIMETER OF FUTURE AP MODULES PRELIMINARY ROUTE FOR PERIMETER UTILITY LOOP- WATER, ELECTRIC, FI BEROPTI C, TELECOM PREFERRED ROUTE FOR M60" STORM WATER PIPE BENEATH AP MODULE WASTE EcaoocH �-EXISTING STREAM IMPACTED BUFFER AREA (158,858 SF) z PREFERRED ROUTING TO BYPASS WESTERN RETAINING WALL AREA OF DRAINAGE MEASURES ALONG EXISTING STREAM BOTTOM PREFERRED RELEASE POINT AT NORTH TRIBUTARY WITH LEVEL SPREADER POTENTIAL UNDERGROUND DETENTION / WATER RECLAMATION, TYPICAL LEGEND UNDERGROUD DETENTION uwNrs i — UNDERGROUND STORMWATER PIPE NETWORK """' EXISTING STORMWATER PIPE """' EXISTING SECONDARY STORMWATER PIPE LEVEL SPREADER — PERIMETER UTILITY LOOP AP FILLING EXPANSION EXISTING BUILDING wawa STEWART novo nordisk® PRELIMINARY - DO NOT USE FOR CONSTRUCTION SCALE IDIOT NORTH NOVO NORDISK AP FILLING - WAREHOUSE EXPANSION USACE STORM WATER EXHIBIT LB Date DescrOon CONCEPTUAL STORMWATER PLAN EX