HomeMy WebLinkAboutNCC230467_Site Plan or Location Map_20230216PROJECT NARRATIVE
THE PROPOSED DELTA 100 KV PROJECT IS LOCATED IN DURHAM COUNTY, NORTH CAROLINA. THE PROJECT INVOLVES
ASSOCIATED LINE WORK REQUIRED TO RECONDUCTOR DUKE ENERGY'S EXISTING DELTA 100KV TRANSMISSION LINE
(LINE INDEX 114449 & 1 I1201) FROM IBM CORP RALEIGH TAP (STA 3656) TO GE AIRCRAFT ENGINES TAP (STA 1468). THE
PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY. THE PROPOSED LIMITS OF
DISTURBANCE ARE 14.65 ACRES. IN ORDER TO ACCOUNT FOR ALTERNATE CONSTRUCTION METHODS OR THE NEED TO
ACCESS OTHER TOWERS WITHIN THE DUKE ENERGY RIGHT-OF-WAY AND/OR ADJACENT ACCESS, AN ADDITIONAL
DISTURBANCE AREA OF 1.47 ACRES HAS BEEN INCLUDED FOR A TOTAL DISTURBANCE OF 16.12 ACRES. THE PRIOR USE
OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE.
PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL
MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. THE AREA WILL BE STABILIZED PRIOR TO
COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN
INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND
STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED
HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN MARCH
2023 AND BE COMPLETED IN OCTOBER 2023.
GENERAL NOTES
1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY LINE ENGINEER AND ARE FOR
REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION.
2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY
WAS OBTAINED FROM AUTOCAD CIVIL 3D SOFTWARE AND NC ONEMAP. ACTUAL FIELD CONDITIONS MAY VARY
FROM THOSE SHOWN.
3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE
START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR
SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE
REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE
CONTRACTOR.
4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
NOT DISTURB UTILITY POLES, GUY WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY.
5. THE PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. THE PROJECT IS SUBJECT TO STATE -REGULATED
BUFFER REQUIREMENTS.
6. SEE SHEET PEN-01 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE.
7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS
REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY.
8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING
AND NCDEQ PRIOR TO USE.
9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK
CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE.
10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER "CRANE" MATS. NO LATTICE OR
TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS.
11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE
WATER WITHOUT CONTAINMENT.
12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY.
13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT
INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION.
14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND COVER
SHALL BE USED FOR STABILIZATION.
15. A GAS LINE ENCUMBERS THE EXISTING 68-FOOT RIGHT OF WAY IN TWO KNOWN LOCATIONS IN THE PROJECT
CORRIDOR. AS THE PROJECT MAINLY INVOLVES RECONDUCTORING THIS SHOULD NOT BE AN ISSUE, BUT THE
CONTRACTOR WILL NEED TO VERIFY THE LOCATION AND DETERMINE THE LEVEL OF RISK AND COORDINATION
WITH THE GAS LINE COMPANY IF NEEDED.
MIGRATORY BIRD HOTLINE
STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA.
INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER
STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES
THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT
OCCUR DURING WORK ACTIVITIES.
CAROLINAS: 800.573.3853
SPILL REPORTING HOTLINE
IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE
THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS
SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD
ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO
REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES
AT:
CAROLINAS & MIDWEST: 800.527.3853
%-, ENERGY
CAROL'"�QS
DELTA 100KV TRANSMISSION LINE
CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) OR (1-800-632-4949) AT
LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE
EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT
PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CAROLINA ONE
CALL". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
B
P.DWG
12/15/2022
REV B IFP
BSS
DTB
BNC
A
P.DWG
1/12/2022
30% DESIGN -ACCESS SITE BASE
FLS
DTB
BA
REV
FILE NO.
DATE
REVISION
DRAWN
CHECKED
APPROVED
DURHAM COUNTY
NORTH CAROLINA
START:
LATITUDE:
LONGITUDE:
END:
LATITUDE:
LONGITUDE:
35°56'39.91"
-7 8° 52'02.03"
35° 55'04.89"
-7 8° 51 '07.47"
VICINITY MAP
SCALE: 1 " = 1500'
***CAUTION***
THE D TIL I TIES SHOWN ARE SHOWN FOR THE CON TR% C TOR S
CONVENIENCE ONLY THERE MA Y BD D THEN D SL I SOS
NOT SHOWN ON THESE PLANS, THE SUR VE YOB
ASSUMES NO BESPONSIBILITY FOR THE LOC% TIOKS
SHOWN AND IT SH% L L BE THE CON TR% C TOR 'S
RESPONSIBEI TY TO VERIFY THE L OC% SOBS OF ALL
D TIL I TIES WITHIN THE L IMI TS OR THE WORK. A L L
DAMAGE MADE TO EXISTING D TIL I TIES B Y THE
CON TRA C TOR SHALL BD THE SOLE RESP ONSIBX I T Y OR
THE CON TRA C TOR.
DDA TLVWP
NORTH & SOUTH CAROLINA STATE MAP
SHEET LIST:
TITLE SHEET
EROSION
&
SEDIMENT
CONTROL
NOTES
EROSION
&
SEDIMENT
CONTROL
NOTES
EROSION
&
SEDIMENT
CONTROL
NOTES
EROSION
&
SEDIMENT
CONTROL
SHEET LAYOUT
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
EROSION
&
SEDIMENT
CONTROL
PLAN
GRADING
PLAN
EROSION
&
SEDIMENT
CONTROL
DETAILS
EROSION
&
SEDIMENT
CONTROL
DETAILS
EROSION
&
SEDIMENT
CONTROL
DETAILS
EROSION
&
SEDIMENT
CONTROL
DETAILS
CONTACTS
OWNER: ENGINEER:
DUKE ENERGY CAROLINAS HDR ENGINEERING INC. OF THE
JEFF GOTO, P.E. CAROLINAS
526 SOUTH CHURCH ST. BRANDY N. CHAPMAN
CHARLOTTE, NC 28202 15 SOUTH MAIN ST.
PH: (704) 382-6383 SUITE 601
Jeff.Goto@duke-energy.com GREENVILLE, SC 29601
PH: (864) 631-0427
brandy.chapman@hdrinc.com
HDR Engineering Inc. DUKE
of the Carolinas E N E RGY®
440 S PC St 2-2 10°° CAROLINAS
Charlottee,, NC 28202-2075
704.338.6700
526 SOUTH CHURCH STREET
CHARLOTTE N C 28202
TELEPHONE NO. (704)382-2741
SHEET
PTL
SHEET
PEW
SHEET
PEN2
SHEET
PENS
SHEET
POM1
SHEET
PES 1
SHEET
PES2
SHEET
PES3
SHEET
INSET-1
SHEET
INSET-2
SHEET
INSETS
SHEET
INSET-4
SHEET
INSETS
SHEET
INSET-6
SHEET
GP—1
SHEET
PED1
SHEET
PED2
SHEET
PED3
SHEET
PED4
TITLE
RESPONSIBLE FOR MAINTENANCE:
ERIC SHOOK
DUKEENERGY
C&M SERVICES - CAROLINAS WEST
PH: (336) 971-4176
Eric.Shook@duke-energy.com
Q
— L —
0 1 8 =
• P�
Y N . CH `'Q 22/2a✓aoaa
DELTA TRANSMISSION LINE
EROSION & SEDIMENT CONTROL
PLAN
1114449 & 11201 °RRWING 10333863 SHEET
PTL