Loading...
HomeMy WebLinkAboutNCC230411_Certificate of Coverage_20230214Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2023-0411 Certificate of Coverage No. NCC230411 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Progress, LLC is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Brunswick Steam Electric Plant — Intake Canal Stabilization - EXPRESS 8470 River Road SE Southport Brunswick County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No. BRUNS-2023-074 This Certificate of Coverage shall become effective 2/14/2023. This Certificate of Coverage shall remain in effect until rescinded or expired. This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the annual administration and compliance fee. for Douglas R. Ansel, Interim Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission