Loading...
HomeMy WebLinkAboutSW3160702_4411 Carringdon Subdivision - BMP 2 and 3 Cert Inspection_20230210Chandler, Jeffrey A From: Eplin, Jerry W Sent: Friday, February 10, 2023 9:51 AM To: Chandler, Jeffrey A Subject: FW: [External] 4411 - Carringdon Subdivision - BMP #2 and #3 Certification- SW3160702 Attachments: 4411_Carringdon_BMP_2-3_Stormwater_Certification_012423.pdf; BMP Photos 2.9.23 Carringdon SubDivision SW3160702.pdf This is for Laserfiche, once it is ready to use From: Eplin, Jerry W Sent: Friday, February 10, 2023 9:45 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: Khan, Zahid <zahid.khan@ncdenr.gov> Subject: FW: [External] 4411 - Carringdon Subdivision - BMP #2 and #3 Certification-SW3160702 Jim: We received the attached BMP Certification for BMP2 and BMP3 for the referenced subdivision. Their letter indicates that BMP1 was previously certified, and BMP 4 is not ready to be certified. Shannon Leonard and I visited the site yesterday and we believe the certifications should not be accepted. 1) None of the basins have permanently stabilized walls. 2) Rip Rap in BMP1 is not installed well and is falling apart and into the basin. 3) Rills are beginning to form on BMP1 walls. 4) BMP1 outlet weirs are different than designed. The weirs provided have less surface area than the design. 5) BMP2 outlet weirs are different than designed. The weirs provided have more surface area than the design. 6) Forebays were not visible in BMP1 or BMP2, but they may have been submerged. My photographic log is attached. At the minimum, I would think we need proof that the weirs provided meet the retention and discharge requirements (or they should be changed to those as designed), and the basins need to be permanently stabilized. The builder is still on -site finishing the final few homes, and still actively using Basin 4. Please let me know if you need more from MRO. From: Khan, Zahid <z'ahi_dkh_an(ncdnnr:v_> Sent: Tuesday, January 24, 2023 6:09 PM To: Eplin, Jerry W < gLr .eglin@ncdenr. gy> Subject: FW: [External] 4411 - Carringdon Subdivision - BMP #2 and #3 Certification For your response. Thanks From: Todd Fisher <Todd.Fisher@bolton-menk.com> Sent: Tuesday, January 24, 2023 3:56 PM To: Khan, Zahid <z. hid_._kh_a_n(�ncd nr..goy> Cc: Fisher, Bonnie <Ui.sh_�_r@_IL nII I Cecaarrr>; Dwayne Moton <drnaataan( IMlllh.i IM S.caarrr>; Robert Hayes <Robert.Ii yes@Bolton-menk.com> .............................................. Subject: [External] 4411 - Carringdon Subdivision - BMP #2 and #3 Certification CAUTION. External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Sparn. Zahid: Construction certification for Stormwater Wet Detention Basin #2 and #3, as permitted under NCDEQ Stormwater Permit #SW3160702 for the Carringdon Subdivision in Weddington, NC, is attached for your file. R. Todd Fisher, P.E., LEED Green Associate Principal I Director of Civil Engineering ColeJenest & Stone Bolton & Menk, Inc. 200 South Tryon Street, Suite 1400 Charlotte, NC 28202 Phone: 704-376-1555 x3751 Cell: 704-577-6843 �pje eststone.cou