Loading...
HomeMy WebLinkAboutNCC216652_MODIFICATION Supporting Documents_20230201 (2)U / / �� - i ��D --- o C4- --333 32� -- ' i I �� i ------ ----- o w ------------ � - ------ _ i ' i - 5 - ----_ LO _ \ �� �� --- ----- - o �LOD____ j y � � � TREE PROTECTION � �° \ Q / �� - - - - - - ti o-LOD - - - _ _FENCE (TYP.) SEME / our 331.0 - -MCP&L EA 994)- i / Il�/- yRP 93(1 336� �p6 5951 PG ---------------- � ��3 W�M-LLT- O Y�016) - 8q3(6912 o / 28, _----�i - - - - i/����/ >70 TREE PROTECTION _ _ _ �� _ _- - 11, / 330 FENCE (TYP.) '�=w� �- 82°r4'S �W- - EROSION CONTROL LEGEND - - PROPERTY LINE TCE TEMPORARY CONSTRUCTION EASEMEN CL CLEARING LIMITS SF SILT FENCE TPF TREE PROTECTION FENCE > TD TEMPORARY DIVERSION DITCH > TD(CW) CLEAN WATER DIVERSION DITCH X SEDIMENT BASIN POROUS BAFFLES - ---_� - �_-- � v� ���__�i_-- /� In �� \ V� v 5' PUMP DISCHARGE HOSE o � 32 �8 ra-1 329- 330 _w- - �- _ w � ' - - - _ - yam_ _ -�_-� �_ / - / � - / / / / / � - � � / � -� � � V A � � o � � / EXISTING CONTOUR LIMITS OF DISTURBANCE (TYP.) G =W- _ - - - , 333 i _ _ _ - - - - __ _- _ I / ti / / TEMPORARY 3 F I i - �'W- _ _ _ - ' ��� - - - - _ _ - -_ l l / �> A �� / DIVERSION DITCH 805 PROPOSED CONTOUR SIGN / A V � / \ (TYP.) l i EASEMENT DRAINAGE AREA BOUNDARY -Vv �i__-- & Pi�asE�� _ _ _ - � _ I o � � � CE CONSTRUCTION ENTRANCE r_ - - % _W� � � / / / � � _r _ �- � / / / � � ® SILT FENCE OUTLET ARTWORK - - T - Gi. o , - / \ \ / _ / - \ wo V A / CONCRETE WASHOUT STATION / / _ _T - - r -I EASEMENT _ _ - -_ - - 34 V / CD o / �/ / ROCK CHECK DAM i �- j �- �� - TEMPORARY \v \I \I \ �(� // �- / / V / / s' SKIMMER DIVERSION DITCH \ / / (TYP.) ROCK CHECK TEMPORARY SLOPE DRAIN / / / / / / ro CO DAMN (TYP.) / / \ I / o DESIGNATED AREAS TO BE / " / i / / ��� _ �- STABILIZED WITHIN 7 DAYS / IT/ qqo�- SILT FENCE (TYP.) E. �L - - \ V //� /A �320 L TEMPORARY EROSION / / '� V A / / / / / / / TT \ CONTROL MATTING �34g45 0-330-- �// < </�\ v o / j - - - - / / /�' TOWN OF APEX CONSTRUCTION SEQUENCE TREE PROTECTION �) / / /� �� - - - _ -_� / / / A / V / �� A The following begins only after Construction Plans are approved, �� c - ( �a� A / O _ �- - _ \\\ _ \ \� r, signed by Town staff and copies are received. .0 FENCE (TYP.) / / - �� �� ( �� _ - - _ _ - - � / V A \ / / / 3 - _ - _ _ _ - - - _ / / A \ \ i Z - LIMITS OF DISTURBANCE (TYP.) 1. Through the Infrastructure Inspections Manager at (919) 249-3386, schedule a re -construction meeting with i N P 9 .- - % � / � � - - - - - _� 4, s � ) \ � f / 2 � � � � A I inspectors and other Town staff. s,5» 30�� s / / F- j V p�� - - N87°98'12,,W y 2. Fill out Tree/Protection Fencing Installation Permit Application (// // r / �� �� �� / �/ (obtain from Plannig Department). / Tv / / �- / / / / / / SEDIMENT \ / / 3. Have a surveyor flag property lines, easements, buffers, tree BASIN #3 TT/ \ �� - - protection areas, and flag the protection limits. 4. Contact an Apex Planning Department Zoning Compliance SKIMMER / Officer at (919) 249-3426 to request approval for tree // / �/ / / / / / / / / ✓ (TYP.) �S - protection fencing locations. �� / / / / 5. Install approved tree protection fencing, signs, and/or any x \ other protection measures that may be required. Call Plannin u� / / / \ / / / / / / X \w at 249 3426 for a final inspection of protection measures. g _n� l / / j TEMPORARY / / ( /� �/ / / \ Planning will forward approval to Water Resources, Erosion i E /) �� j /�� DIVERSION DITCH Control field staff. u �/ / / ' 5 a (TYP.) / ���j �� o 0 6. Submit the applicable S&E performance guarantee to the o / / / /� �� z Development Services Manager at 249-3394 in Development -0 / / a / N / ` / �_ /_! �� \ Services. An invoice can be requested from Water Resources �- V �� CONSTRUCTION ENTRANCE (TYP.) at (919) 362-8166. The erosion control Letter of Plan `3731Pi Approval will not be issued until the guarantee has been � o ) a ���- ��% / / - �_ _� �����/ �� EMERGENCY / � submitted. The guarantee will be returned once all Stormwater // / / SPILLWAY (TYP.) _ - Control Measures (SCMs) have been converted and accepted by the Town, all temporary erosion control measures have o � 4 been removed and the site is 100% permanently stabilized. o 7. Request a Letter of Plan Approval for sedimentation and o / 0 / ( CONCRETE WASHOUT (TYP.) �� / //�� _ j / / / erosion control measures from Water Resources staff at (919) � / tJ M 362-8166. ol U%Jti S"'-��® 8. Complete and submit an electronic Notice of Intent a-NOI l) / V form NCDEMLR requesting a Certificate of Coverage ) \, \\ _�� �, oa q 9 9 - /) � �� �� i / � ��\V� � / � � � '� (COC) under the NCG01 Construction Stormwater General Permit. Visit the following website: / \ �j/ �� �� �� /� �Q1 https: //deq.nc.gov/about/divisions/energy-mineral-land- o / // / � �� / / �, / -� SILT FENCE (TYP.) �/ resources energy-mineral-landpermits/ / O\� storm water- perm its/con struction-sw. CONSTRUCTION ENTRANCE (TYP.) �/ 3 /� /% / u, �\ A / / 9. Complete a Grading Permit Application and receive a Grading / / / / / Permit from the Building Inspections & Permitting Department �� / / J j as required by the North Carolina Building Code Appendix J / /) _ 1 �\ / \ / / �'� a for Grading. Both the Grading Permit and Certificate of Coverage from NCDEMLR must be submitted to the CONCRETE WASHOUT (TYP.) A I I Environmental Field Services Supervisor prior to the > f commencement of any land disturbance activity. / � � � � � � � i � ..� / � � / 10. Install gravel construction entrance, temporary diversions, silt o ) / �� / / TEMPORARY O / - A y fencing, sediment basins, bypass channels, and/or other DIVERSION DITCH / � � / / �/ �_ �� / measures as shown on the approved plans. Clear only as QT, / \ / / A, f j� ( (TYP.) / �� �'I necessary to install these devices. i 11. When completed, call Water Resources staff at (919) \ 362-8166 for an on -site inspection and to request a P Certificate of Compliance. Water Resources will also forward a / / ��� ✓/ - �� J VA\ /V / V copy to the Building Inspections &Permitting Department. E v / i A�� - I \7 � � � � / � / ) / �/� �� -� /// V\ � 1- I 12. Post Grading Permit prominently on site at all times. �(V5��, � 13. Begin clearing, grubbing, and rough grade of the site in 5' ETBACK FROM BUFFER �� �� �� �� /VA ��� \ V V I accordance with the approved grading plan. \ / SF 1 / /gF toile a sufficient amount of 14. Stockpile topsoil to cover 3 inches \ 30' T E BUFFER / / i / /� j/ ) A V �� I / / / �� \ �� L over landscaped areas at the end of the project. V - -7� 15. Install storm sewer, if applicable, and protect inlets with inlet // �\ ��37 V \ protection devices, sediment devices, and/or other approved o \ 28 / l/ \ \ _ )l \� measures as shown on lane. Maintain S&E measures as Q T_ _ l � i - - / / ' i // >A�\/ / l lll l I P sF F /�// �i / '3 v BAFFLE �29 s� i /i // /� /�l l� \ V needed. 16. After completion of an phase of grading or when TYP. \ � / / // / / _ V � ) P Y P 9 9 �� SEDIMENT (TYP.) �V ii / ��//��� \ / /�/// // y V I land -disturbing activities have temporarily ceased, establish 0-) 'U0 a) BASIN 1 / -� �33 �� �� (//A� �6 ��� \ �I / �/ / //// = //// / 1j groundcover on swales and ditches and graded slopes steeper / / / /� / /�/ \ A V A /� //���/ than 3:1 within 7 calendar days; slopes that are 3:1 or // / j \ // / flatter must establish groundcover within 14 calendar days. / / / PHASE 1 CONSTRUCTION SEQUENCE �- - 32S I \ / / = // 17. Stabilize site as areas are brought up to finished grade with - �� �� j // ��� l/��/�/ / \ A �/// 1. INSTALL TREE PROTECTION FENCE. CALL TROUTMAN TREE CONSERVATION INSPECTOR vegetation or paving. ° EMERGENCY FOR APPROVAL OF TREE PROTECTION FENCING. 18. Prior to plot approval, all disturbed areas both public and / // / private, must be properly stabilized. All temporary erosion \32 SPILLWAY TYP. / / \ ) / // / /o P P P Y P Y 4 (TYP.) / J // /// UPON APPROVAL BY WAKE COUNTY -LAND QUALITY SECTION, BEGIN CLEARING, control measures must be installed, be functioning properly o / S t \ \ �� / / \\ // / / /� \ /� 2. OBTAIN I LAND DISTURBING PERMIT FROM WAKE COUNTY -LAND QUALITY SECTION ANDg• and be maintained for the entire area contained within the -°1y \ 5' SETBACK / - / /// \ / / // // / / POST ORIGINAL PERMIT ON -SITE. GRADING, AND DEMOLITION OF SITE, MAINTAINING EROSION CONTROL MEASURES AS a i / / lat. / / / NECESSARY. EROSION CONTROL MEASURES SHALL BE RESTORED TO ORIGINAL 3 < FROM BUFFER- 3. /�/ \ /11/ / / / ( \ / / / %/� DIMENSIONS WHEN SEDIMENT ACCUMULATES TO 50% OF DESIGN DEPTH. 19. Flush and clean all stormwater system pipes. Clean and n o"v ` 2g -/ J / /� / 3. CONTRACTOR TO SCHEDULE PRE -CONSTRUCTION CONFERENCE ON -SITE WITH TOWN Q _� / / A� )) i \ / / / / / / / remove sediment from temporary sediment holding devices. ROCK CHECK BUFFER / �� ��/� )) �) \� //���1/� // / AND WAKE COUNTY -LAND QUALITY SECTION. CONTACT THE STORMWATER CONTROL P Y 9 ���// INSPECTOR. 9. INSPECT SITE ONCE A WEEK AND AFTER EVERY RAINFALL EVENT. Follow the SCM Construction Sequence found on the Grading _ A DAMN (TYP.) ///�///y / (/ // AV / ///// / and/or SCM Detail sheet on the Construction Plan set. - / / �� ���������( //&///%�/ // 4. CALL THE STORMWATER CONTROL INSPECTOR FOR INSPECTION. 20. Remove all temporary diversions, silt fencing, sediment basins, �a //// / ///// / / / 10. CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES EVERY etc. and provide adequate cover or pave an resulting bare P q P Y 9 �\ �I LIMITS OF DISTURBANCE (TYP.) /// 5. INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, INLET PROTECTION, DIVERSION SEVEN (7) CALENDAR DAYS AND AFTER EVERY RAINFALL EVENT. DAMAGED OR areas. All permanent erosion control devices should be \ \ '\ \ � \ � � / / � \\\\� \�\ _ _ / / {�j DITCHES, COIR MATTING, COMPOST SOCKS, AND SEDIMENT BASINS. DISTURBANCE INEFFECTIVE DEVICES SHALL BE REPLACED IMMEDIATELY. installed at this point. 11 \ �� ® _ , / \ \\\\ _ - / /�/ SHALL BE LIMITED TO THE INSTALLATION OF THESE DEVICES ONLY. s °4•°� �� �T9 / OUTLET ��VA�/ '� V 11. ALL DISTURBED AREA WHERE WORK HAS CEASED SHALL BE STABILIZED WITHIN o s oa �- CONSTRUCTION / -� _ �� / PROTECTION V ����� 6. DIVERSION DITCHES TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. FOURTEEN (14) CALENDAR DAYS. ENTRANCE (TYP.) - � NSF OUTLET (TYP.) (TYP.) �> 7. CALL WAKE COUNTY -LAND QUALITY SECTION INSPECTOR FOR INSPECTION OF EROSION 12. CALL STORMWATER CONTROL INSPECTOR FOR INSPECTION PRIOR TO TRANSITION TO E \� �� TD TD NPDES GROUND COVER REQUIREMENTS / ���' \ = - /// / CONTROL MEASURES. PHASE 2. o 0 o � 0 0 z � cn Q z � Ln n � � A Ci u u 0 U n a � � L Q n L � � o n E SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, SLOPES HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES IF SLOPES ARE 10' OR SLOPES STEEPER THAN 3:1 7 DAYS LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1. 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES SLOPES 3:1 OR FLATTER 14 DAYS GREATER THAN 50'IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE EXCEPT FOR SLOPES FLATTER THAN 4:1 PERIMETERS AND HQW ZONES. LIMIT OF DISTURBANCE: 18.16 ACRES - M o 1 ~ \- __T BAFFLE (TYP.) ��� \ SEDIMENT BASIN #2 k ' k k SKIMMER \ (TYP.) _� 3//__ o SF OUTLET (TYP.) NX 37 ; Skimmer Basin 1 DESIGN INFORMATION TOTAL DRAINAGEAREA 2.80 AC TOTAL DISTURBED AREA 2.80 AC TO 5 MIN RATIONAL C 0.34 DESIGN STORM INTENSITY 7.24 IN/HR PEAK FLOW 6.89 CFS DESIGN CALCULATIONS SURFACEAREA REQUIRED 2,240 SF SURFACEAREA PROVIDED 3,200 SF VOLUME REQUIRED 5,040 CF DEWATERING TIME 3.46 DAYS VOLUMEPROVIDED 5,695 CF EMBANKMENT WIDTH 5 FT EMERGENCY SPILLWAY LENGTH 8.0 FT EMERGENCY SPILLWAY CAPACITY 8.5 CFS SKIMMER SIZE 2.50 IN SKIMMER ORIFICE DIAMETER 1.25 IN SKIMMER OUTLET ELEVATION 1 323.501 FT BASIN GEOM ETRY AREA (SF) ELEV (FT) BOTTOM OF BASIN: 1356 324.0 PRIMARY SPILLWAY ELEVATION: 3200 326.5 TOP OF DAM: 4127 328.0 Skimmer Basin 2 DESIGN INFORMATION TOTAL DRAINAGE AREA 9.87 AC TOTAL DISTURBED AREA 9.87 AC Tc 5 MIN RATIONAL C 0.27 DESIGN STORM INTENSITY 7.24 IN/HR PEAK FLOW 19.44 CFS DESIGN CALCULATIONS SURFACE AREA REQUIRED 6,319 SF SURFACE AREA PROVIDED 3,200 SF VOLUME REQUIRED 17,771 CF DEWATERING TIME 3.46 DAYS VOLUME PROVIDED 5,695 CF EMBANKMENT WIDTH 5 FT EMERGENCY SPILLWAY LENGTH 2O.0 FT EMERGENCY SPILLWAY CAPACITY 21.2 CFS SKIMMER SIZE 2.50 IN SKIMMER ORIFICE DIAMETER 1.25 IN SKIMMER OUTLET ELEVATION 323.50 FT BASIN GEOMETRY AREA (SF) ELEV (FT) BOTTOM OF BASIN: 1356 324.0 PRIMARYSPILLWAYELEVATION: 3200 326.5 TOP OF DAM: 4127 328.0 Skimmer Basin 3 DESIGN INFORMATION TOTAL DRAINAGE AREA 4.03 AC TOTAL DISTURBED AREA 4.03 AC Tc 5 MIN RATIONAL C 0.28 DESIGN STORM INTENSITY 7.24 WHIR PEAK FLOW 8.17 CFS DESIGN CALCULATIONS SURFACE AREA REQUIRED 2,655 SF SURFACE AREA PROVIDED 3,200 SF VOLUME REQUIRED 7,254 CF DEWATERING TIME 3.46 DAYS VOLUME PROVIDED 5,695 CF EMBANKMENT WIDTH 5 FT EMERGENCY SPILLWAY LENGTH 8.0 FT EMERGENCY SPILLWAY CAPACITY 8.5 CFS SKIMMER SIZE 2.50 IN SKIMMER ORIFICE DIAMETER 1 1.251 IN SKIMMER OUTLET ELEVATION 1 323.501 FT BASIN GEOMETRY AREA (SF) ELEV (FT) BOTTOM OF BASIN: 1356 324.0 PRIMARYSPILLWAYELEVATION: 3200 326.5 TOP OF DAM: 4127 328.0 GRAPHIC SCALE IN FEET 0 25 50 100 THE SIGNATURES AFFIXED BELOW CERTIFY THAT THIS SHEET HAS BEEN REVIEWED AND APPROVED SOLELY PER THE CERTIFICATIONS SIGNED ON THE COVER SHEET OF THESE CONSTRUCTION PLANS. N/A NA 5­21 PM PUBLIC WORKS 2-oTRANSPORTATION WATER RESOURCES - STORMWATFR N/A PM F A. Veds wens01I24I20231106 BUILDING INSPECTIONS NIA PLANNING smiller 01 /24/2023 13344 PM �� Aprovede� WATER RESOURCES - UTILITY ENGINEERING PLANNING - TRANSPORTATION N/A rs ith 01/19/2023 6:61:51 PM N/A knee -h oll-33;as 23 PM ELECTRIC FIRE N / A APerzPunved incke 01/19/2023 1.22.16 PM WATER RESOURCES - SOIL & EROSION PARKS, RECREATION & CULTURAL CONTROL RESOURCES m N N N N N \ \ \ \ \ w o 0 0 0 z z z z z w w w w w 0 0 0 0 0 z O O O O O O w O O O O O IY CL CL CL CL CL a_ a_ a_ a_ a_ IUnI�t ter, 0 N z z o vi = N O w CDr H- w r- Mr Q J Q 9 O w � o � O 0 �-o z X a� C:) w Q O N zQ w = O zcnow ON J O H- � = w I� ei w H co J L J N> N W W o � z N 1-- O ■� @ w N *�,ti�k�ylYllllllff}�} w =� LAL ' 258 'f}�a 10R14,11 22 N w O U O N O O LLCD =i) O o O wO -- \ Un } m Q - C:) Q o m m o Q \ z z Y I O � w -1 c� C)Q C U w Q CL w S J 0 O U Z O V_ W Q z U J O J Z Q O W u C) _ 0 O C) WLL Q _ o � = W 0 < a Z^Z�2Q I..L a LU J w '� v / V v7 Q I- 0 O Z O SHEET NUMBER C4.0 No. REVISIONS DATE BY Kimley)))Horn © 2023 KIMLEY—HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600, RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY—HORN.COM KHA PROJECT 013804000 DATE 01/30/2023 SCALE AS SHOWN DESIGNED BY KEJ DRAWN BY KEJ CHECKED BY COB TMSA - HIGH SCHOOL NEW HILL OLIVE CHAPEL RD AND AMBERLIGHT RD APEX WAKE COUNTY NORTH CAROLINA LIMITS OF DISTURBANCE EXHIBIT PREPARED FOR LEGACY IMPACT CAPITAL SHEET NUMBER EX-1