Loading...
HomeMy WebLinkAboutNCC230274_ESC Approval Submitted_20230131On ROY COOPEP, Governor NORTH CAROLINA Environmental Quality August 26, 2020 LETTER OF APPROVAL Exchange Indian Trail Apartments, LLC Attention: Thomas Gunter, COO 3300 Northeast Expressway, Building 6 Atlanta, Georgia 30341 RE: Project Name: Exchange at Indian Trail Acres Approved: 22.17 Project ID: UNION-2020-064 County: Union City: Indian Trail Address: Plyer Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Exchange Indian Trait Apartments, LLC Date Received by LQS: August 20, 2020 Plan Type: Revised Dear Mr. Gunter: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially; DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .011 S(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Duality 1 Division of Energy, Mineral and Land Resources Mooresville Regional office 1 610 East Center Avenue, Suite 3011 Mooresville. North Carolina 28115 704.6631649 Letter of Approval Exchange Indian Trail Apartments, LLC August 26, 2020 Page 2 of 2 2. The NCGO1 permit and the COC, once it is received_ 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated Sin e y Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet Amicus Partners, PLLC Attention: Nicholas R. Parker, PE 30 Union Street South Concord, North Carolina 28025 Inspection Department Q&A About the New NCG01! Permit VVhydoconstruction sites have to dothis extra application step? DEK4LRisrequired bythe EPA toissue aspecific [O[toevery construction site that disturbs one acre or more. DEK4LR isworking to create a form that combines the E3'5Cplan approval and e-N0processes, but that will take more time. For now, DEMLR has created an efficient e-NO| process. If anUSCPlan isapproved before April 1,which permit applies? Projects with already approved E&S[Plans will automatically follow the new NCGOlpermit, but will not need bzfill out ane-N0orpay anannual permit fee. However, the permi11eesshould print the new permit and the two standard detail sheets and have them onsite, WiUQGMLR offer tools to he|ppemnittees comply with the new NCG01? Yes, DEK4LRxviU provide two sample plan sheets at that can beplaced into the E&SCplan set. The first covers the site stabilization and materials handling portions ofthe permit. The second sheet covers the inspection, record -keeping and reporting portions ofthe permit. How will the new e-NOIsubmittal and COCprocess work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the perm/tteetovisit tosubmit an e-NO|form to DE&4LR. The permit1ee may begin the construction activity after receipt of the [DC (within three days*). The permittee must print and retain a copy of the permit and the COC on site. Initially, the [O[wi|| be issued for free but on or around June 1, 2019, a $lUO annual general permit fee will be charged. Who is allowed tosubmit ane-NO|form? Submittal must be by a responsible corporate officer that owns or operates the activity, such asapresident, secretary, treasurer, or vice president oramanager that isauthorized inaccordance with |V.B.6ofthe NCS01permit. Additional signatory options are set forth in|VRGofthe permit, |t|spossible for consultant toprepare the e'NOisave )tasadraft, d and email it1othe responsible entity for gnature &submitta|. What happens tothe COCwhen the construction activity is complete'? When a project is complete, the permittees will contact DEMLR or the local delegated program toclose out the E&S[Plan. After DEK4LRorthe local E&SCprogram inform the permitteeofthe project close out via inspection report, the perrni1teewill visit tosubmit ane'NOT. Will there beagrace period for adherence tothe new process? DEMLR6oes not have the authority 10 grant agrace period from a federally mandated permit. Pennitteeswill beinformed ofthe new process via web site, E&S[ Plan approval letters and list seno. If construction activity disturbs one acre ormore (or ispart ofcommon plan ofdevelopment that disturbs one acre ormore) fails tosubmit an8'NO| after approval ofits E&SCPlan, this isaviolation offederal permitting requirements and the permitteecould besubject toapenalty assessment. How does the new NCGO1affect the delegated local E&SCPrograms? Local programs will continue to review and approve E&S[plans. However, they will nolonger send copies ofthe NCGO1with E&SCPlan approvals. DEK4LRwill provide sample language to use in local E&S[Plan approvals tm advise permittees that they must submit ane'ND|toDEMLR. Local programs are not required to check ifpermitteeshave submitted e- N0s to DEK4LR. However, ifthey wish todothis voluntarily, there will bea tool available on DEMLR'sweb site for them to view a list of construction projects that have submitted e-N0s. When local programs close out anE8GC Plan, the close-out letter will advise permitteesthat they must submit ane- NOT DEIVILRwill provide sample language. Local programs may approve E&S[ plans that meet state sediment laws and rules even ifthose plans are not compliant with all ofthe NCGO1 requirements. However, their permhteexwill berequired toadd two plan sheets (which will be provided by DEK4LR\totheir E&SCPlans toensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion Vfthe N[GOlpermit. *Cr24business hours for oproject approved under the DEMLRExpress review program.