Loading...
HomeMy WebLinkAbout660030_RFI response_20230103Smithfield Good food. RDtb11° PO Box 856 Warsaw, NC 28398 January 3, 2023 Ms. Christine Lawson Water Quality Permitting Section Animal Feeding Operations Program 1636 Mail Service Center Raleigh, NC 27699-1636 Re: Additional Information Request Application No. ADS660030 Farms 27-30 Washington County Dear Ms. Lawson: Smithfield Hog Production appreciates your review of our application for permit under the Digester General Permit. In response to your October 17, 2022 request for additional information; we are submitting the included responses to your questions. I have included your original questions in bold and our responses are below each question This package is being submitted for permit plan approval by NCDWR for the proposed covered lagoon digesters. The following items are included in this package: • Updated CAWMP o Updated Nutrient Management Plan o Updated Irrigation Plan o Odor Control Checklist o Insect Control Checklist o Mortality Management Checklist o Emergency Action Plan • 2022 Sludge Survey • Updated Engineering Drawings Thank you for taking the time to review this project. Please contact me at (910) 293-3434 or jolmstead@smithfield.com if you have any questions or need additional information. Sincerely, Jason E. Olmstead, P.E. Engineering Project Manager • Page 2 January 3, 2023 1. Freeboard — NC NRCS Standard 366 — Anaerobic Digester requires a minimum of 2 feet of freeboard in the covered digester. Please provide clarification that both digesters meet minimum freeboard requirements. "Provide a minimum of 2 feet of freeboard above the digester design water surface; if rainfall is included in determining the operating volume, only 1 foot of freeboard is required. The digester storage volume does not need to account for rainfall for completely covered digesters." Per the NRCS 366 Anerobic Digester standard rainfall was included in determining the operational volume of the digesters. The NOAA Atlas 14 30yr normal rainfall data for the area was used to determine the 25-year, 24-hour rainfall on the digester. With this data the operational volume for the digester designs at this site are based on 12-inches of structural freeboard plus 7-inches for the 25- year, 24-hour rainfall event to determine the 19-inches of freeboard for the digesters. This allows the covered lagoon digester at farm 8527 to operate with the existing freeboard. For proposed digester at farm 8529 this allows the top of dike and freeboard to be the same as the exiting lagoons. This allows equalization of the lagoons if necessary, during large storm events, which mitigates risk. 2. Stormwater Outlet — Please provide a typical detail for outlet for stormwater removed from digester covers. Please also indicate stormwater outlet location(s) for each digester. The stormwater removal outlet locations have been added to the site plan(s) and a detail of the outlet added to construction plan set. 3. Biogas Use as a Renewable Energy Resource — Please provide information for the intended onsite and/or offsite use of the biogas. Please include expected timeline regarding completion of digester system and utilization of gas as a renewable energy resource. The biogas produced at the site will be cleaned on -site to pipeline quality and trucked to a natural gas pipeline insertion point off -site to be used as renewable natural gas. The anticipated digester completion is Q2 2023 with utilization of the gas in Q4 2023. 4. Gas Generation Estimate — Please submit an estimate for the daily volume of biogas to be generated by the proposed Digester. The estimated total annual RNG generated at this facility is 52,840 dekatherms. The annual average daily RNG produced from each digester would be +/-72 dekatherms (50 scfm) 5. Emergency Flare — Please provide location/identification for the emergency flare(s). An emergency vent/flare connection location has been added to the site plans along with an updated detail. The plan is to us a mobile/moveable "candle stick" flare that will be kept on -site for use on an as needed basis for both digesters. 6. Slam Gate/Secondary Containment — Please indicate location of new slam gates/secondary containment associated with proposed digesters, if applicable. Per the site visit discussion, a secondary containment with valve has been added at the Farm 8529 digester adjacent to the level control station. 7. Influent/Effluent Sampling — Please indicate location for sampling of influent to and effluent from each digester. At Farm 8529 the influent sample(s) will be taken at the farm lift station(s) and the Effluent sample at the digester level control station. At Farm 8527 the influent sample(s) will be taken from the gravity pipeline clean -out nearest the digester and the Effluent sample at the digester level control station. • Page 3 January 3, 2023 8. Odor Control Checklist — The Odor Control Checklist was not included in the application. Please provide as a required component of the CAWMP. Please use the updated form, attached. See attached Swine Odor Control Checklist. 9. Insect Control Checklist — The Insect Control Checklist was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Insect Control Checklist 10. Mortality Management Checklist — The Mortality Management Checklist was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Mortality Management Checklist 11. Emergency Action Plan — The Emergency Action Plan was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Emergency Action Plan 12. Sludge Survey — Please provide a copy of the most recent sludge survey for the existing Primary Lagoon at Farm 27 (proposed Digester Cell 1). See attached sludge survey for 2022. It is planned that approximately 2-3 feet of sludge from the 8527 primary will be removed and transferred into the new digester at Farm 8529. After transfer a new sludge survey will be preformed for the 8527 primary. 13. Land application — Fields A, B, C, D, and E meet land application setback requirements; however, these fields are near the road/neighbors. Please provide any information regarding additional BMPs (example hose -drag vs travelling gun) in these areas used to improve protections and further reduce risk of off -site impacts. Land application BMP's: • Fields A & B: Land Application by Airway application • Fields C & D: Land Application by Airway application • Field E: Land Application by Airway application 14. Air Quality Permitting — Please provide general information regarding any Air Quality permits, and/or applicability determinations regarding this project. Please provide information about if applications have been filed, permits (if issued), and/or results of an applicability determination. A determination of non -applicability was issued by NCDAQ on February 22,2022. Applicability Determination No. 3758.