Loading...
HomeMy WebLinkAboutNCC230105_ESC Approval Submitted_20230113ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL Interim Director NORTH CAROLINA Environmental Quality January 4, 2023 LETTER OF APPROVAL WITH MODIFICATIONS City of Statesville Attention: Mark Taylor, Public Works Director P.O. Box 1111 Statesville, North Carolina 28687 RE: Project Name: Statesville Fire Station No. 1 Soil Borrow Site Project ID: IREDE-2023-008 Acres Approved: 1.5 acres County: Iredell City: Statesville Location: Amity Hill Road, Statesville, North Carolina River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: McGill Associates Date Received by LQS: December 28, 2022 Plan Type: Revised Dear Mr. Taylor: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications City of Statesville January 4, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, ZA%I/ Jerry W. Eplin, PE Assistant Regional Engineer Land Quality Section JWE/KL Enclosure: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: McGill Associates, P.A. Attention: Matthew D. Oetting, PE 1240 19a' Street Lane, NW Hickory, North Carolina 28601 North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications City of Statesville January 4, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Statesville Fire Station No. 1 Soil Borrow Site Project ID: IREDE-2023-008 County: Iredell Reviewed by: Jerry W. Eplin, PE Sheet C-101 shows at least one of the temporary diversion ditches running up hill. Add a note in the construction sequence that diversions shall have positive drainage to the sediment trap. Adjust diversions in the field to maintain positive drainage. 2. Additional silt fence outlets may be needed in low areas — install as needed (ex. southeast corner of the Limits of Disturbance (LOD). 3. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4. It is advisable to turn silt fence upslope at the outlet of the sediment trap. North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office i 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Fact Sheet on the New NCGO1 Permit The NC Construction General Permit (also known as was renewed omApril 42Q19.The updated permit does not significantly change the measures that are required tobeimplemented onconstruction sites. However, there are some organizational and technical updates to the permit as described below.Most notably, there banew process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. QEK8LRworked with mbroad team ofstakeholders tomake all ofthese updates. |fyou have questions, Anne e L � contactucasat nr(919)7O7-3639. Organizational Updates The new permit: • Repeats state requirements for E@8[ Plans and organizes them with federal construction activity requirements; * |sclearly organized bytopic; and m Has less text and more tables. Technical Updates The new permit: w Requires that the E&SCPlan meet 5VVPPPrequirements (p.2); wProvides alist ofitems that must be included inthe 3VVPPP,such asthe construction sequence, plans, calculations, etc. (p.24);` ^ Has updated language on bypasses and upsets that istailored toconstruction activities (p.1U); ~ Puts all thnefmmesfor inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p.11'l4);2 w Changes the inspection frequency (during business hours) toatleast once per 7calendar days and after every storm >1.8inch (previously 0.S inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take This list bbased onwebuheguidance bythe DEM0Sediment Program. The number ofcalendar days was selected tobeaoequivalent as possible with the previous permit. The intent istoprovide predictability tothe inspection schedule. COC: Certificate ofCoverage, proof ofcoverage under anNCGO1permit DEM0k: N[Division ofEnergy, Mineral, and Land Resources E&8C: Erosion & Sedimentation Control e-NO|: Notice ofIntent, application form for the NCGOlpermit e-MOT: Notice ofTermination, form for closing out the NC8U1permit SWpPP: 5tormwaterPollution Prevention Plan, required bythe N[G01 The NCG01 Process The new NCG01applies tapermits approved mnorafter April 12019. Pennittees will oolonger receive acopy ofthe 0OGO1permit inthe mail with their E@SCPlan approvals and beconsidered ascovered under the permit. Federal rules require that DEMLR receive an NO| on each construction project and issue each construction project its own [DC. Under the new N[GOIprocess, construction sites will continue to receive approval for E&5CPlans from either DEK4LRcvthe delegated local E@6Cprogram just like before, After receiving E&S[Plan approval, permbte*swill officially obtain coverage under the N[G01by completing ane-NO|(available at ), The e'N0will only take about 2Ominutes tnfill out and submit on'|inm. Initially, there will benocharge associated with applying for anN[GO1 permit but onoraround June 1,JO£\DEMLRwill begin charging a$1DU annual general permit fee asrequired per §143'215.3D. DEK4LRisworking oncreating asingle application form that will allow an applicant tosimultaneously apply for anE&S[permit and anNCGU1 [O[.That effort ispart ofalarger Permit Transformation project at DEMLK. Why dmconstruction sites have *o duthis extra application step? DEK4UKisrequired bythe EPA tuissue especific CO[toevery construction site that disturbs one acre or more. DEK8LR isworking tocreate aform that combines the E&SCplan approval and e-NO|processes, but that will take more time. For now, DEK4LRhas created onefficient e-NO|promess. If an E&SC Plan is approved before April 1,which permit applies? Projects with already approved E&5CPlans will automatically follow the new NOGO1permit, but will not need tofill out ane'00orpay anannual permit fee. However, the permitteeoshould print the new permit and the two standard detail sheets and have them on site. Will QEIV&Roffer tools to helppennittees comply with the new NCG017 Yes, DEh4LRwill provide two sample plan sheets at de �,goy/NCGQI that can beplaced into the E&S[plan set. The first covers the site stabilization and materials handling portions ofthe permit. The second sheet covers the inspection, record -keeping and reporting portions ofthe permit. Mow will the new e-NOVsubmittal and COC process work? Pennk1eeswill apply for E&S[Plan approvals from DEMLRorthe local E&SCprognym like before, The E&S[approva| letter will instruct the permittee to visit jftgncc,,ov NCGO1 tosubmit ene-N0form toDEMLR. The permittee may begin the construction activity after receipt of the COC (within three days*).The permittaemust print and retain acopy ofthe permit and the COCon site. Initially, the [O[mU| be issued for free but on oraround June 1,2019,a$10Oannual general permit fee will becharged, Who is allowed to submit ame4NOIform? Submittal must bebyoresponsible corporate officer that owns or operates the activity, such asapresident, secretary, treasurer, orvice president or a manager that is authorized in accordance with |V.13.6 of the NDG01permit. Additional signatory options are set forth in|V.8.6ofthe permit. |tiypossible for consultant toprepare the e'NO!,save hasadraft, and email btothe responsible entity for signature &submittal. What happens to the COC when the construction activity imcomplete? When aproject is complete, the pennitteexwill contact DEK8LRorthe local delegated program toclose out the E&SCPlan. After DEK8LRorthe local E&SCprogram inform the permdteeofthe project close out via inspection report, the permhteewill visit tosubmit ane'N0T. Will there be a grace period for adherence tothe new process? DEW9LRdoes not have the authority 10grant ograce period from a federally mandated permit. Permhteeswill beinformed ofthe new process via web site, E&5[Plan approval letters and list yena. If construction activity disturbs one acre ormore (or ispart ofcommon plan ufdevelopment that disturbs one acre ormore) fails tnsubmit ane'NO| after approval ofits E&8CPlan, this isaviolation offederal permitting requirements and the permi1teecould besubject toapenalty assessment. How does the new NCG01affect the delegated local E&SC Programs? Local programs will continue tnreview and approve E&5Cp|ens. However, they will nolonger send copies ofthe N[GO1with E&SCPlan approvals. DEN1LRwill provide sample language tn use in local E&5[P|an approvals to advise permitte*sthat they must submit ane'N0toDEMLR. Local programs are not required to check ifpennittees have submitted e- NDbtoDEK0LR.Hnwever, ifthey wish todmthis voluntarily, there will bea too] available onDEMLR'sweb site for them toview alist nfconstruction projects that have submitted e-NO|s. When local programs closeoutanE&S[ Plan, the close-out letter will advise permh1eesthat they must submit one' NOT. DEK4LRw/U| provide sample language. Local programs may approve E&6C plans that meet state sediment laws and rules even ifthose plans are not compliant with all ufthe N[GU1 requirements. However, their permh1eeswill berequired toadd two plan sheets (which will beprovided by OEK8LR)totheir E&SCPlans toensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCGO1 permit. *OrJ4business hours for oproject approved tinder the DEMLR Express eviewpnng/um.