Loading...
HomeMy WebLinkAboutNCC212598_Modification Confirmation Email_20230112Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Thursday, January 12, 2023 1:04 PM To: Nuwan.Wijesuriya@duke-energy.com Cc: Georgoulias, Bethany; Randy.Veltri@duke-energy.com; Nuwan.Wijesuriya@duke- energy.com; kcapps@dewberry.com Subject: Modification Confirmation This e-mail is to notify you that the modification information for COC No. NCC212598 for the project Folkstone- Jacksonville 115kV Transmission Line Rebuilt Part 2 that you submitted on 1/10/2023 has been added to the permit file records as of 1/12/2023. Modification Reason: Other Revision(s) to E&SC Plan Additional Details (if provided): The erosion & sediment control plan for this project has been modified due to an adjustment for the construction access. This resulted in the limits of disturbance increasing from 29.2 to 30.8 acres. You can find all Construction COC Permit files in our Document Reoository here. Questions? Please contact The NC Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.