Loading...
HomeMy WebLinkAboutNCC230046_Site Plan or Location Map_20230110Q� 71 0 in 0 X D p f 9gReFC�£ Rp SITE 2 FUTURE C' DEPOT 499 cr 0 FUTURE a N VICINITY MAP N.T.S. SITE DATA PARCEL IDENTIFICATION 0731-66-2438, 0731-76-6588 NUMBER (PIN) LATITUDE AND LONGITUDE 35.721105,-78.872209 ANNEXATION # 706 EXISTING ZONING PUD-CZ, CASE #20CZ01 CURRENT 2045 LAND USE MIXED USE, HIGH DENSITY RESIDENTIAL/OFFICE MAP DESIGNATION EMPLOYMENT/COMMERCIAL SERVICES; MEDIUM/HIGH DENSITY RESIDENTIAL; HIGH DENSITY RESIDENTIAL; OFFICE EMPLOYMENT/COMMERCIAL SERVICES SITE AREA 761,297 SF / 17.48 AC GROSS 45,719 SF / 1.05 AC R/W DEDICATION 715,578 SF / 16.43 AC NET PROPOSED USE 277 APARTMENT UNITS DENSITY MAXIMUM 850 APARTMENTS (OVERALL PUD) 50 SINGLE FAMILY 650TOWNHOME/SINGLE FAMILY COMBINED 650,000 SF NON-RESIDENTIAL PROPOSED 277 APARTMENTS (THIS PROJECT) BUILDING #1 (4-STORY) - 85 UNITS BUILDING #2 (4-STORY) - 85 UNITS BUILDING #3 (5-STORY) - 107 UNITS 583 TOWNHOMES (DEPOT499) REMAINING UP TO 573 APARTMENTS UP TO 50 SINGLE FAMILY UP TO 67 TOWNHOME/SINGLE FAMILY COMBINED UP TO 650,000 SF NON-RESIDENTIAL BUILDING HEIGHT MINIMUM SOUTH SALEM STREET: 4 STORIES; A MAXIMUM OF 25% OF BUILDINGS ALONG THIS FRONTAGE MAY BE 3 STORIES APEX BARBECUE ROAD: 4 STORIES; A MAXIMUM OF 25% OF BUILDINGS ALONG THIS FRONTAGE MAY BE 3 STORIES MAXIMUM SOUTH SALEM STREET: 6 STORIES OR 90' APEX BARBECUE ROAD: 6 STORIES OR 90'; THE FIRST ROW OF BUILDINGS ALONG THIS FRONTAGE SHALL NOT EXCEED 4 STORIES PROPOSED SOUTH SALEM STREET: 5 STORIES (53'-4") APEX BARBECUE ROAD: 4 STORIES (42'-8") SETBACKS FRONT 10, CORNER SIDE 10' REAR 10, BUILDING 30' MINIMUM SEPARATION BUILT -UPON AREA MAXIMUM 140.56 AC (70% OF GROSS PUD DEVELOPMENT (IMPERVIOUS SURFACE) AREA (200.8 AC)) (OVERALL PUD) PROPOSED 9.25 AC (THIS PROJECT) 40.8 AC (DEPOT 499) 50.05 AC TOTAL (18.48%) REMAINING UP TO 121.72 AC (60.62%) RESOURCE CONSERVATION REQUIRED 40.16 AC (20% OF GROSS PUD DEVELOPMENT AREA (SEE RCA TABLE SHEET AREA (200.8 AC)) C2.01) PROPOSED PROVIDED: 30.85 AC (2.29 AC WITHIN PROJECT) (OVERALL PUD) FUTURE: 9.31 AC MINIMUM TOTAL: 40.16 AC (20%) WATERSHED PROTECTION PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT OVERLAY FEMA FLOODPLAIN NONE (FIRM PANEL 3720073100J, EFFECTIVE 05/02/2006 ) GRADING TYPE MASS PERCENT PRE -DEVELOPMENT N/A DRAINAGE AREA HISTORIC STRUCTURES NONE PARKING REQUIRED 251 UNITS x 1.5/UNIT = 377 SPACES (1-2 BR) 26 UNITS x 1.8/UNIT = 47 SPACES (3 BR) 424 SPACES TOTAL MAXIMUM 424 REQ. SPACES + 64 (15%) = 488 SPACES PROPOSED 436 SURFACE SPACES (10 COMPACT) 25 GARAGE SPACES 20 ON -STREET SPACES 481 TOTAL SPACES NO SPACES PROPOSED BETWEEN ANY BUILDINGS AND PRIMARY STREET ACCESSIBLE PARKING REQUIRED 9 SPACES (2 VAN) PROPOSED 18 SPACES (8 VAN, 1 GARAGE, 1 EV) BICYCLE PARKING REQUIRED 277 UNITS x 1/30 UNITS = 9 SPACES (APT.) 277 UNITS x 1/30 UNITS = 9 SPACES (AMENITY) 18 SPACES TOTAL PROPOSED 22 SPACES ELECTRIC VEHICLE PARKING REQUIRED 427 REQ. SPACES x 3% = 13 SPACES PROPOSED 14SPACES ACCESSIBLE ELECTRIC REQUIRED 1 VAN SPACE VEHICLE PARKING PROPOSED 1 VAN SPACE AREA PER FLOOR 27,088 SF/FLOOR (APARTMENT BUILDINGS) AUTOMATIC FIRE SPRINKLER YES IN APARTMENT BUILDINGS, NO IN ACCESSORY BUILDINGS COMMUNITY AMENITIES REQUIRED 2AMENITIES PROPOSED 4 AMENITIES (#1-3 COURTYARDS, #4 CLUBHOUSE/POOLS) THE VILLAGE AIr DEPOT 499 APPROVED EXCEPTIONS The following items have been approved as exceptions for this drawing by the Town of Apex Department Director(s), and to the best of my knowledge and belief, this drawing conforms to the requirements established by the Directors) allowing deviation from the Standard Specifications and Standard Details of the Town of Apex. The signature below represents that the requesting Engineer has been granted a variance ONLY for the items listed. The developer/engineer/contractor is solely responsible for meeting all applicable requirements. Ust items below add number as needed APPROVED EXCEPTION DIRECTOR GRANTING EXCEPTION 1. 2. 3. By: Ryan Akers, PE Date: 01/12/2021 Recuesting Engineer GENERAL NOTES 1. LANDSCAPING PLANTED WITHIN PUBLIC RIGHT-OF-WAY SHALL BE PRIVATELY MAINTAINED BY THE HOA. 2. ON -STREET PARKING SPACES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE PRIVATELY MAINTAINED BY THE HOA. TRANSPORTATION CONDITIONS 1330 SOUTH SALEM STREET APEX, NORTH CAROLINA CONSTRUCTION DRAWINGS PROJECT NUMBER: HLE-21001 DATE: MARCH 11 2022 REVISED: SEPTEMBER 91 2022 DISTURBED AREA = 15.70 AC. PARKS AND RECREATION SITE DATA TABLE Reviewed by PRCR Advisory Commission Date: 02/26/2020 "PHASE 1" IN THE FOLLOWING CONDITIONS REPRESENTS IMPROVEMENTS REQUIRED PRIOR TO S. SALEM STREET AND SITE DRIVE 6 (RIGHT-IN/RIGHT-OUT ACCESS NEAREST APEX BARBECUE PLATTING NO MORE THAN 450 TOWNHOMES AND/OR SINGLE FAMILY HOMES, AND/OR ROAD) # of single-family detached units 0 x $3,446.98/ unit = 0 CERTIFICATE OF OCCUPANCY FOR NO MORE THAN 400 APARTMENT DWELLING UNITS, AND/OR • CONSTRUCT AN ADDITIONAL SOUTHBOUND THROUGH LANE ON S. SALEM STREET CERTIFICATE OF OCCUPANCY FOR NO MORE THAN 150,000 SQUARE FEET OF COMMERCIAL PROVIDING TWO SOUTHBOUND THROUGH LANES WITH A SHARED THROUGH -RIGHT LANE. # of Single-family attached units 0 x $2,321.54 / u nit = D DEVELOPMENT. IF A SCHOOL IS PURSUED ON PODS R-T, THE TRANSPORTATION COMMITMENTS • *FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, ALSO CONSTRUCT AN ON PUD PLAN SHEET C2.00 MAY BE MODIFIED BY THE TOWN COUNCIL AT SITE PLAN PURSUANT ADDITIONAL NORTHBOUND THROUGH LANE ON S. SALEM STREET PROVIDING TWO # of multi -family units 277 x $2,044.05 / unit $566,201.85 A MODIFIED TIA TO ADJUST OR REDUCE COMMENSURATE WITH REDUCED TRIP GENERATION NORTHBOUND THROUGH LANES. Total Fee -in -lieu of dedication $566,201.85 AND/OR MODIFIED MOVEMENTS. ADDITION OF A SCHOOL SITE IN PHASE 1 WILL REQUIRE AN UPDATED TIA TO REEVALUATE PHASE 1 IMPROVEMENTS WHICH MAY RESULT IN MODIFIED AND S. SALEM STREET AND APEX BARBECUE ROAD ADDITIONAL REQUIRED IMPROVEMENTS DURING THAT PHASE, SUBJECT TO APEX AND NCDOT • CONVERT THE EXISTING SOUTHBOUND RIGHT TURN LANE ON S. SALEM STREET TO A APPROVAL. THROUGH LANE IN ORDER TO PROVIDE TWO SOUTHBOUND THROUGH LANES CARRIED SOUTHWARD ACROSS THE SITE FRONTAGE. SHEET INDEX IMPROVEMENTS TO BE CONSTRUCTED IN PHASE 1 AS DEFINED ABOVE: • CONSTRUCT A 200-FOOT SOUTHBOUND RIGHT TURN LANE. • EXTEND THE NORTHBOUND LEFT TURN LANE ON S. SALEM STREET TO PROVIDE 300 FEET OF CO.00 APEX BARBECUE ROAD AND KELLY ROAD STORAGE (*OR FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, TERMINATE THE • CONSTRUCT A 200-FOOT WESTBOUND LEFT -TURN LANE ON APEX BARBECUE ROAD. ADDITIONAL NORTHBOUND THROUGH LANE AS A LEFT TURN LANE). C1.00 • CONSTRUCT 200-FOOT EASTBOUND LEFT -TURN LANE ON APEX BARBECUE ROAD. • EXTEND THE EASTBOUND LEFT TURN LANE ON APEX BARBECUE ROAD TO PROVIDE 375 FEET "PHASE OF STORAGE. C1.01 2" IN THE FOLLOWING CONDITIONS REPRESENTS IMPROVEMENTS REQUIRED PRIOR TO PLATTING NO MORE THAN 600 TOWNHOMES AND/OR SINGLE FAMILY HOMES, AND/OR APEX BARBECUE AND KELLY ROAD C2.00 CERTIFICATE OF OCCUPANCY FOR NO MORE THAN 600 APARTMENT DWELLING UNITS, AND/OR CONSTRUCT AOAD COND NORTHBOUND THROUGH LANE ON KELLY ROAD THAT STARTS 800 CERTIFICATE OF OCCUPANCY FOR NO MORE THAN 300,000 SQUARE FEET OF COMMERCIAL FEET SOUTH OF THE INTERSECTION AND CONTINUES FOR APPROXIMATELY 1,000 FEET C2.01 DEVELOPMENT. NORTH, DROPPING OFF WITH A 45:1 MERGE TAPER BEYOND THE INTERSECTION OF GRAND KELLY WAY. C2.02-2.03 IMPROVEMENTS TO BE CONSTRUCTED IN PHASE 2 AS DEFINED ABOVE: • WIDEN THE SOUTHBOUND APPROACH OF KELLY ROAD TO PROVIDE A TWO-WAY LEFT TURN LANE APEX ROAD TO IND LANE. C2.04-C2.05 S. SALEM STREET AND SOUTHBOUND NC-540 RAMPS (SIGNALIZED) UCT A 200B OOT SOUTHBOUND RIGHTRBECUE • CONSTRUM TURN LANE ON KELLY ROAD. • EXTEND THE SOUTHBOUND RIGHT TURN LANE ON THE RAMP TO PROVIDE 375 FEET OF C3.00 STORAGE AND PLACE IT UNDER SIGNALIZED CONTROL RATHER THAN FREE -FLOW. IMPROVEMENTS REQUIRED WITH CONSTRUCTION OF SITE DRIVES: • CONSTRUCT AN ADDITIONAL WESTBOUND THROUGH LANE ON S. SALEM STREET PRIOR TO C3.01-3.02 THE INTERCHANGE, EXTENDING THROUGH THE INTERSECTION OF NC-540 NORTHBOUND S. SALEM STREET AND SITE DRIVE 7 (FULL MOVEMENT ACCESS NEAREST NC 540) RAMPS ACROSS THE BRIDGE AND THROUGH THE INTERSECTION OF NC-540 SOUTHBOUND • WITH CONSTRUCTION OF SITE DRIVE 7, DEVELOPER SHALL: PROVIDE A 150-FOOT C4.00 RAMPS IN ORDER TO PROVIDE TWO CONTIGUOUS WESTBOUND THROUGH LANES (SEE EASTBOUND LEFT TURN LANE ON THE DRIVEWAY. ALTERNATIVE BELOW)*. e CONSTRUCT A 250-FOOT NORTHBOUND LEFT TURN LANE ON S. SALEM STREET. C4.01-4.02 • CONSTRUCT A 100-FOOT SOUTHBOUND RIGHT TURN LANE TO LATER BE CONVERTED TO A S. SALEM STREET AND NORTHBOUND NC-540 RAMPS (SIGNALIZED) THROUGH LANE IF SITE DRIVE 7 IS CONSTRUCTED PRIOR TO PHASE 2. C5.00-05.03 • CONSTRUCT TWO CONTIGUOUS WESTBOUND THROUGH LANES CARRIED FROM THE SITE FRONTAGE ACROSS THE BRIDGE AND THROUGH THE INTERSECTION OF SOUTHBOUND S. SALEM STREET AND SITE DRIVE 4 (BETWEEN SITE DRIVE 7 AND SITE DRIVE 1) C6.00 NC-540 RAMPS (SEE ALTERNATIVE BELOW)*. • WITH CONSTRUCTION OF SITE DRIVE 4, DEVELOPER SHALL: PROVIDE A MINIMUM OF 600 FEET OF SEPARATION BETWEEN SITE DRIVE 4 AND BOTH OF THE ADJACENT INTERSECTIONS, C6.01-6.02 *ALTERNATIVE RECOMMENDATIONS FOR NC 540 INTERCHANGE RAMPS, PHASE 2 SITE DRIVE 7 AND SITE DRIVE 1, IN ORDER TO CONSTRUCT NORTHBOUND LEFT -OVER ACCESS • *DEVELOPER SHALL CONSTRUCT AN ADDITIONAL WESTBOUND THROUGH LANE ON S. WITH 150 FEET OF STORAGE AT SITE DRIVE 4. OTHERWISE, SITE DRIVE 4 SHALL BE C6.O3 SALEM STREET AT SOUTHBOUND NC-540 RAMPS STARTING IMMEDIATELY WEST OF THE CONSTRUCTED AS A RIGHT-IN/RIGHT-OUT ACCESS. BRIDGE FOR A MINIMUM OF 200 FEET AND CONSTRUCT A 200-FOOT WESTBOUND RIGHT • CONSTRUCT A 100-FOOT SOUTHBOUND RIGHT TURN LANE TO LATER BE CONVERTED TO A C6.O4-6.05 TURN LANE ON S. SALEM STREET. THROUGH LANE IF SITE DRIVE 4 IS CONSTRUCTED PRIOR TO PHASE 2. • *DEVELOPER SHALL CONSTRUCT AN ADDITIONAL 150-FOOT SOUTHBOUND LEFT TURN LANE C6.06-6.07 ON THE NORTHBOUND NC-540 EXIT RAMP, AND BEGIN AN ADDITIONAL S. SALEM STREET AND SITE DRIVE 1 MAIN ACCESS FOR TOWNHOMES & COMMERCIAL ( EASTBOUND/NORTHBOUND RECEIVING THROUGH LANE ON S. SALEM STREET, CARRYING BUILDINGS) C8.00-8.02 THAT ADDITIONAL (SECOND) THROUGH LANE ACROSS THE DEVELOPMENT FRONTAGE AND • WITH CONSTRUCTION OF SITE DRIVE 1, DEVELOPER SHALL: PROVIDE A 150-FOOT TERMINATING IN A LEFT TURN LANE AT APEX BARBECUE ROAD. EASTBOUND LEFT TURN LANE ON THE DRIVEWAY. C8.03 • *DEVELOPER SHALL TERMINATE THE ADDITIONAL WESTBOUND/SOUTHBOUND THROUGH CONSTRUCT 200-FOOT NORTHBOUND LEFT TURN LANE ON S. SALEM STREET. l.0 LANE ON S. SALEM STREET AS A RIGHT TURN LANE AT THE NC 540 NORTHBOUND RAMPS. • CONSTRUCT A 100-FOOT SOUTHBOUND RIGHT TURN LANE ON S. SALEM STREET. C8.0 /I -8.05 S. SALEM STREET AND SITE DRIVE 7 (FULL MOVEMENT ACCESS NEAREST NC 540) S. SALEM STREET AND SITE DRIVE 3 (LIMITED -MOVEMENT ACCESS FOR COMMERCIAL BUILDINGS C8.06 V • CONSTRUCT AN ADDITIONAL SOUTHBOUND THROUGH LANE ON S. SALEM STREET NORTH OF SITE DRIVE 1) PROVIDING TWO SOUTHBOUND THROUGH LANES WITH A SHARED THROUGH -RIGHT LANE. • WITH CONSTRUCTION OF SITE DRIVE 3, DEVELOPER SHALL: CONSTRUCT SITE DRIVE 3 AS A C8.07 • *FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, ALSO CONSTRUCT AN RIGHT-IN/RIGHT-OUT, LEFT -OVER ACCESS. ADDITIONAL NORTHBOUND THROUGH LANE ON S. SALEM STREET PROVIDING TWO • CONSTRUCT A 150-FOOT NORTHBOUND LEFT TURN LANE ON S. SALEM STREET. C9, F 1 NORTHBOUND THROUGH LANES. • CONSTRUCT A 100-FOOT SOUTHBOUND RIGHT TURN LANE TO LATER BE CONVERTED TO A • INSTALL A TRAFFIC SIGNAL ONCE WARRANTED AND PERMITTED BY NCDOT. IF NOT THROUGH LANE IF SITE DRIVE 3 IS CONSTRUCTED PRIOR TO PHASE 2. C9. F2-C9. F4 WARRANTED, DEVELOPER SHALL PAY A FEE IN LIEU FOR ESTIMATED DESIGN AND CONSTRUCTION COST OF A TRAFFIC SIGNAL. IF NOT PERMITTED BY NCDOT UPON S. SALEM STREET AND SITE DRIVE 6 (RIGHT-IN/RIGHT-OUT ACCESS NEAREST APEX BARBECUE C9, F5 BUILD -OUT OF PHASE 2, DEVELOPER SHALL BE RELEASED FROM THE REQUIREMENTS TO ROAD) INSTALL A TRAFFIC SIGNAL. • WITH CONSTRUCTION OF SITE DRIVE 6, DEVELOPER SHALL: PROVIDE RIGHT-IN/RIGHT-OUT L5.00 ACCESS WITH A MINIMUM OFFSET OF 250 FEET FROM APEX BARBECUE ROAD. S. SALEM STREET AND SITE DRIVE 4 (BETWEEN SITE DRIVE 7 AND SITE DRIVE 1) • CONSTRUCT A 100-FOOT SOUTH BOUND RIGHT TURN LANE TO LATER BE CONVERTED TO A L5.01-5.02 • CONSTRUCT AN ADDITIONAL SOUTH BOUND THROUGH LANE ON S. SALEM STREET THROUGH LANE IF SITE DRIVE 6 IS CONSTRUCTED PRIOR TO PHASE 2. PROVIDING TWO SOUTHBOUND THROUGH LANES WITH A SHARED THROUGH -RIGHT LANE. L5.03 • *FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, ALSO CONSTRUCT AN APEX BARBECUE ROAD AND SITE DRIVE 5 (RIGHT-IN/RIGHT-OUT ACCESS NEAREST S. SALEM ADDITIONAL NORTHBOUND THROUGH LANE ON S. SALEM STREET PROVIDING TWO STREET) S L2.0 NORTHBOUND THROUGH LANES. • WITH CONSTRUCTION OF SITE DRIVE 5, DEVELOPER SHALL: PROVIDE RIGHT-IN/RIGHT-OUT ACCESS WITH A MINIMUM OFFSET OF 250 FEET FROM S. SALEM STREET. A1.201-A1.206 S. SALEM STREET AND SITE DRIVE 1 (MAIN ACCESS FOR TOWNHOMES & COMMERCIAL • CONSTRUCT A 100-FOOT EASTBOUND RIGHT TURN LANE ON APEX BARBECUE ROAD. BUILDINGS) A2.201 • CONSTRUCT AN ADDITIONAL SOUTH BOUND THROUGH LANE ON S. SALEM STREET, APEX BARBECUE ROAD AND SITE DRIVE 2 / ST. MARY MAGDALENE CONVERTING THE RIGHT TURN LANE TO A THROUGH -RIGHT LANE. • WITH CONSTRUCTION OF SITE DRIVE 2, DEVELOPER SHALL: PROVIDE A FULL MOVEMENT A3.110 • *FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, ALSO CONSTRUCT AN INTERSECTION ALIGNED WITH THE ST. MARY MAGDALENE DRIVEWAY. ADDITIONAL NORTHBOUND THROUGH LANE ON S. SALEM STREET PROVIDING TWO • PROVIDE A 150-FOOT NORTHBOUND LEFT TURN LANE ON THE DRIVEWAY. A4.11O NORTHBOUND THROUGH LANES. • INSTALL A TRAFFIC SIGNAL ONCE WARRANTED AND PERMITTED BY NCDOT. IF NOT • CONSTRUCT 100-FOOT WESTBOUND LEFT TURN LANE ON APEX BARBECUE ROAD. • CONSTRUCT A 100-FOOT EASTBOUND RIGHT TURN LANE ON APEX BARBECUE ROAD. A5.110 WARRANTED IN PHASE 2, DEVELOPER SHALL PAY A FEE IN LIEU FOR ESTIMATED DESIGN AND CONSTRUCTION COST OF A TRAFFIC SIGNAL. IF NOT PERMITTED BY NCDOT UPON APEX BARBECUE ROAD AND SCOTTS RIDGE TRAIL / WOODALL CREST DRIVE BUILD -OUT OF PHASE 2, DEVELOPER SHALL BE RELEASED FROM THE REQUIREMENT TO • UPON OPENING ACCESS TO ASPEN RIVER LANE, DEVELOPER SHALL: INSTALL A DOUBLE INSTALL A TRAFFIC SIGNAL. YELLOW CENTERLINE AND EDGE LINE PAVEMENT MARKINGS PER THE TOWN OF APEX MAJOR COLLECTOR STREET TYPICAL SECTION ALONG ASPEN RIVER LANE AND WOODALL S. SALEM STREET AND SITE DRIVE 3 (LIMITED -MOVEMENT ACCESS FOR COMMERCIAL BUILDINGS CREST DRIVE TO APEX BARBECUE ROAD. NORTH OF SITE DRIVE 1) • DEVELOPER SHALL INSTALL A TRAFFIC SIGNAL ONCE WARRANTED AND PERMITTED BY • CONSTRUCT AN ADDITIONAL SOUTHBOUND THROUGH LANE ON S. SALEM STREET NCDOT. IF NOT WARRANTED IN PHASE 2, DEVELOPER SHALL PAY A FEE IN LIEU FOR PROVIDING TWO SOUTHBOUND THROUGH LANES WITH A SHARED THROUGH -RIGHT LANE. ESTIMATED DESIGN AND CONSTRUCTION COST OF A TRAFFIC SIGNAL. IF NOT PERMITTED BY • *FOR ALTERNATIVE NC 540 INTERCHANGE IMPROVEMENTS, ALSO CONSTRUCT AN NCDOT UPON BUILD -OUT OF PHASE 2, DEVELOPER SHALL BE RELEASED FROM THE ADDITIONAL NORTHBOUND THROUGH LANE ON S. SALEM STREET PROVIDING TWO REQUIREMENT TO INSTALL A TRAFFIC SIGNAL. NORTHBOUND THROUGH LANES. ELECTRIC TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Electric Department, and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Construction Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. Approved By: rsmith 10/21/2022 4:14:27 PM FIRE DEPARTMENTTOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Fire Department, and to the best of my knowledge and belief, conforms to the requirements established within the Town's Standard Specifications, Fire Protection Ordinances, and the North Carolina International Fire Code. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. Approved khuegerich 10/19/2022 1:31:35 PM By: PARKS, RECREATION, AND CULTURAL RESOURCES TOWN OF APEX CERTIFICATION These plans have been reviewed by the Town of Apex, and to the best of my knowledge and belief, conform to representations made by the developer to myself and the Parks, Recreation, and Cultural Resource Advisory Commission consistent with the projects requirements for public Parks and Recreation, either in total or in part, as outlined in the Town of Apex Unified Development Ordinance and Town of Apex Code of Ordinances. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. Approved By: PLANNING/ZONING TOWN OF APEX CERTIFICATION This construction drawing has been reviewed by the Town of Apex Planning Department, and to the best of my knowledge and belief, conforms to the Subdivision or Site Plan that was approved by the Town of Apex Town Council or Technical Review Committee, as appropriate, and meets the standards of the Town of Apex Unified Development Ordinance. This signature does not constitute a variance from any requirements of the originally approved Subdivision or Site Plan cited above, or any federal, state, or local code, law, specification, rule, guideline, or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. Approved By: Iloftin 10/24/2022 2:58:31 PM BUILDING INSPECTIONS & PERMITS TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Building Inspections & Permits Department, and to the best of my knowledge and belief, conforms to the requirements established within the Town's Code of Ordinances and the North Carolina State Building Codes. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specfcation, rule or ordinance. It Is the sole responsibility of the owner/developer, PROJECTNOTES or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. EXISTING CONDITIONS ppro2e:d STAGING & DEMOLITION PLAN By: A202v3732 AM OVERALL SITE LAYOUT OVERALL PUD RESOURCE CONSERVATION AREA SITE LAYOUT - AREAS "A"-"13" SIGNAGE AND PAVEMENT MARKING PLAN - AREA "A"-'13" OVERALL GRADING PLAN GRADING PLAN - AREAS "A"-"13" OVERALL UTILITY PLAN UTILITY PLAN - AREAS "A"-"13" PLAN AND PROFILES OVERALL EROSION CONTROL PLAN STAGE 1 EROSION CONTROL PLAN STAGE 1 - AREAS "A"-"13" OVERALL EROSION CONTROL PLAN STAGE 2 EROSION CONTROL PLAN STAGE 2 - AREAS "A"-"13" EROSION DETAILS SITE DETAILS STORM DRAINAGE DETAILS WATER DETAILS SANITARY SEWER DETAILS UTILITY TRENCHES DETAILS STORMWATER CONTROL MEASURE "F" PLAN VIEW STORMWATER CONTROL MEASURE "F" DETAILS STORMWATER CONTROL MEASURE "F" LANDSCAPE PLAN OVERALL LANDSCAPE PLAN STANDARD SPECIFICATIONS & STANDARD DETAILS LANDSCAPE PLAN - AREAS "A"-" B'1 I I VERSION: MARCH 23, 2021 LANDSCAPE NOTES & DETAILS LIGHTING PLAN BUILDING ELEVATIONS BUILDING ELEVATIONS BUILDING ELEVATIONS BUILDING ELEVATIONS BUILDING ELEVATIONS PUBLIC INFRASTRUCTURE TABLE WATER LINES 2,020 LF (S"j SEWER LINES 1,516 LF (8") CURB AND GUTTER 2,450 LF STORM DRAIN 1,650 LF SIDEWALK 2,450 LF GREENWAYS N/A NEW STREETS 959 LF - 11' LANE (DOUBLE) 769 LF - 10.S' LANE {PARKING LOT) 256 LF - 15' LANE (DOUBLE) NEW ALLEYS N/A PUBLIC WORKS & TRANSPORTATION TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Public Works & Transportation Department, and to the best of my knowledge and belief, provides an acceptable transportation system with consideration for the elements contained within the Transportation Plan conforming to the requirements established in the Standard Specifications & Standard Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: Approved rdalton 10/24/2022 11:17:31 AM WATER RESOURCES SOIL EROSION & SEDIMENTATION CONTROL TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex, and to the best of my knowledge and belief, conforms to the requirements established in the Soil Erosion and Sedimentation Control Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. This signature does not constitute plan approval, only plan requirements. A separate letter of plan approval will be mailed to the financially responsible person at a later date according to the construction sequence. Approved By rpatterson 10/19/2022 10:40:58 AM WATER RESOURCES STORMWATER ENGINEERING TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Water Resources Stormwater &Utility Engineering Division and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Standard Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from an requirements contained in an g Y q y federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. This signature serves as the stormwater permit for this project. Approved By: rpatterson 10/19/2022 10:41:06 AM IF - WATER RESOURCES UTILITY ENGINEERING TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Water Resources Department, and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Standard Details of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. Approved By: jdillon 10/21/2022 12:40:30 PM ARCHITECTURAL CONDITIONS 1. VINYL SIDING IS NOT PERMITTED; HOWEVER, VINYL WINDOWS, DECORATIVE ELEMENTS AND TRIM ARE PERMITTED. 2. ALL SINGLE-FAMILY HOMES SHALL HAVE A CRAWL SPACE OR HAVE A RAISED SLAB FOUNDATION WHICH AT A MINIMUM RISES AT LEAST 12 INCHES FROM AVERAGE GRADE ACROSS THE FRONT OF THE HOUSE TO THE FINISHED FLOOR LEVEL AT THE FRONT DOOR. 3. ALL TOWNHOMES SHALL HAVE A CRAWL SPACE OR HAVE A RAISED SLAB FOUNDATION WHICH AT A MINIMUM RISES AT LEAST 6 INCHES FROM AVERAGE GRADE ACROSS THE FRONT OF THE HOUSE TO THE FINISHED FLOOR LEVEL AT THE FRONT DOOR. 4. FRONT -FACING GARAGE DOORS SHALL HAVE WINDOWS, DECORATIVE DETAILS OR CARRIAGE -STYLE ADORNMENTS ON THEM. 5. THE GARAGE CANNOT PROTRUDE MORE THAN 1 FOOT OUT FROM THE FRONT FACADE OR FRONT PORCH, MEASURED FROM ROOF OF PORCH. 6. ON SINGLE-FAMILY HOMES, THE ROOF SHALL BE PITCHED AT 5:12 OR GREATER (NOT TO INCLUDE PORCHES, BAY WINDOWS, ETC.). 7. ON TOWNHOMES, ROOF LINE CANNOT BE A SINGLE MASS; IT MUST BE BROKEN UP EITHER HORIZONTALLY AND/OR VERTICALLY BETWEEN, AT MINIMUM, EVERY OTHER UNIT. 8. HOUSE ENTRANCES FOR UNITS WITH FRONT -FACING SINGLE -CAR GARAGES MUST HAVE A COVERED PORCH/STOOP AREA LEADING TO THE FRONT DOOR. 9. REAR AND SIDE ELEVATIONS OF UNITS THAT HAVE RIGHT-OF-WAY FRONTAGE SHALL HAVE TRIM AROUND THE WINDOWS. 10. FOUR OF THE FOLLOWING DECORATIVE ELEMENTS SHALL BE USED ON EACH BUILDING: DECORATIVE SHAKE, BOARD AND BATTEN SIDING, DECORATIVE PORCH RAILS AND POSTS, SHUTTERS, DECORATIVE FUNCTIONAL FOUNDATION AND ROOF VENTS, RECESSED WINDOWS, DECORATIVE WINDOWS, DECORATIVE BRICK OR STONE, DECORATIVE GABLES, DECORATIVE CORNICES, OR METAL ROOFING. 11. A VARIED COLOR PALETTE SHALL BE UTILIZED ON SINGLE FAMILY AND TOWNHOME UNITS THROUGHOUT THE SUBDIVISION AND SHALL INCLUDE SIDING, TRIM, SHUTTER, AND ACCENT COLORS COMPLEMENTING THE SIDING COLORS. Fri_�r�_��_virr•Ia►r■:mu.�I►�e�y_��.�►�e�•�yarar•�•�r:�a��y:rare:rani>tl►rra:��•�:zK•�:uaz.�:�•� 13. RECESSES AND PROJECTIONS SHALL BE PROVIDED FOR AT LEAST 50% OF EACH FACADE ON EACH APARTMENT BUILDING. 14. A SOLAR PV SYSTEM SHALL BE INSTALLED ON AT LEAST 15% OF THE SINGLE-FAMILY HOMES WITHIN THE DEVELOPMENT. ALL SOLAR INSTALLATION REQUIRED BY THIS CONDITION SHALL BE COMPLETED OR UNDER CONSTRUCTION PRIOR TO 90% OF THE BUILDING PERMITS BEING ISSUED FOR THE APPROVED NUMBER OF SINGLE-FAMILY LOTS. THE LOTS ON WHICH THESE HOMES ARE LOCATED SHALL BE IDENTIFIED ON THE MASTER SUBDIVISION PLAT, WHICH MAYBE AMENDED. 15. SOLAR CONDUIT WILL BE PROVIDED ON ALL SINGLE-FAMILY HOMES TO ACCOMMODATE THE FUTURE INSTALLATION OF SOLAR PANELS. Apex Staff Approval This plan has been reviewed by Town of Apex staff and to the best of our knowledge and belief, meets the town of Apex Unified Development Ordinance and does not increase any existing non- conformity. This signature does not constitute a variance from any requirements of an originally approved subdivision or site plan, or any federal, state or local code, law, specification, rule, guideline, or ordinance, such as but not limited to grading and building permits. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this plan meets all the aforementioned requirements. Planning Staff Date Conditions (if applicable): I/we hereby certify that I/we have read and fully understand the conditions listed above: Applicant Signature Date FINAL DRAWING - RELEASED FOR CONSTRUCTION I !!i The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CONTACT RYAN AKERS akers@mcadamsco.com PHONE: 919. 361. 5000 CLIENT HALLE BUILDING GROUP 56 HUNTER STREET APEX, NC 27502 PHONE: 919. 387. 1885 I Halle BUILDING GROUP PROJECT DIRECTORY OWNERS HARP-BARR LLC MEMPHIS & MADDOX LLC 1216 SOUTH SALEM STREET APEX, NC 27502 POE, WILLIAM DOUGLAS POE, JEAN S 1216 SOUTH SALEM STREET APEX, NC 27502 -`0-cN CARD - '•�� SEAL �� • - R;an F arkg49483 = s�� zc�;,�� r°fit' e REVISIONS NO. DATE CONSTRUCTION DRAWINGS FOR: THE VILLAGE AT DEPOT 499 APEX, NORTH CAROLINA PROJECT NUMBER: HLE-21001