Loading...
HomeMy WebLinkAboutNCC230035_ESC Approval Submitted (2)_20230109Letts- of Appr~ival with Modifications L.ag.le Properties. LLC December 30.2p7D Page ; of 3 MODIMAT IONS REQUMV FOR APPROVAL Project Name: 252 Eaton Road. Mocksville~ NC i'roject fl]: DAVIE-2023-013 County: Davie !%tuclirjications �eirSu:�nt tc� :� iicahlc E�rtlt Earr�lI t=enffW Statutes sndlor fit ulations: 1. This site may not be used as a mine in violation of G.S. 7449(7)(fj. If the entire purpose of this project is to provide fill dirt to other sites (one or multiple], pleu-se contact our Minim, Pnigrarn to discuss applicable permitting requirements. �. Any off -site borrow and waste required for this project must come from a site with an approved erasion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Write Management. 1rmshidchris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Divi.%on of Solid Waste Management or per Division of Solid Waste Management Or Division of Water Resources rules and regulations. [l SA NCAC413 .0110j 3. Stockpiles should to surrounded with silt fencing and stabilized_ They should not be located within 50 feet of any storm drain, basin. or stream unless no altcmativc is few4b1e. [G.S. 143-215.11 4. Additional measures may be required - The applicant is responsible for the con"I of sediment on site. If the approvird erosion and sedimentation control measures prove insufficient, the applicant must take those Additional steps necessary to stop sediment from [caving this Site, [13A NCAC 4B .01151 5. The NC GO 1 has a $100 yearly Fev and OUT Office often receives closure inspection rcquc4ts days prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection repon by DF.MELR prior to filing the Notice of Termination (NUT) to tcrminfttc NC'Ci01 covemSe. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures. including basins. requires prior approval. Dlten, a full growing season is necessary between initial secding;mulching and ra noval of measure. Please plan your construction accsordingly to avoid contacting our office prematurely fora closure inspectitm. Also br advised you may be asked for reprcsentative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sotions 1 SA NCAC 04A.0101 through USA NC AC 04E.0504 [Goal Permit NCG oi0000 NPDES for f'cnmmction Activities