Loading...
HomeMy WebLinkAboutNCC230037_Site Plan or Location Map_20230106OPTIONAL CONTRACTOR STAGING AREA "C �\ M N I y zz SOIL AND AGGREGATE BASE CONTRACFOR A_1 A LOCATION STAGING STOCKPILES H CONCRETE WASHOUT LOCATION ' RUNWAY 5L-23R REMOVED PCC STOCKPILE CONTRACTORS HAUL ROUTE 0 1q11w TAXIWAY B3 z if ifs { /l w x < r' a 400r, c X � 1+i TAXIWAY B2 1 TAXI WAJ O_ .0. &1 O Ire 1\_ NI ILI _ �a ��, s- .� -'.• V. a ^lY. ..•il M r. M � � - — TAXIWAY lip fill - a.• �1�i r►wits_ -' 1 NOTES: 1. THE TAXIWAY E RECONSTRUCTION PROJECT WILL REPLACE THE TAXIWAY E CONCRETE PAVEMENT IN THE SAME LOCATION. THIS PROJECT WILL ALSO ADD 20' WIDE BITUMINOUS SHOULDER PAVEMENT ADJACENT TO TAXIWAY E AND GRADE THE TAXIWAY E SAFETY AREA TO TIE INTO THE EXISTING DRAINAGE SWALES. 2. RALEIGH-DURHAM INTERNATIONAL AIRPORT IS WITHIN THE LIMITS OF THE NEUSE RIVER BASIN. 3. STORMWATER RUNOFF FROM THE SITE APPEARS TO FLOW TO THE BRIER CREEK RESERVOIR. 4. ALL SEDIMENT LADEN RUNOFF WILL BE CONTROLLED VIA SILT FENCE AND/OR INLET PROTECTION MEASURES. 5. SEDIMENT LADEN RUNOFF FROM CONTRACTOR'S STAGING AREA AND PROJECT STOCKPILES WILL BE CONTROLLED VIA SILT FENCE. LEGEND: LIMITS OF DISTURBANCE (12 ACRES) _ r RALEIGH-DURHAM INTERNATIONAL AIRPORT 200 0 200 400 RDU .jacobs APRIL 2022 TAXIWAY E RECONSTRUCTION �T PROJECT LOCATION AND OVERVIEW EXHIBIT 1 "=200'