HomeMy WebLinkAboutSW3220805_Design Calculations_20221230 (2)STORMWATER BMP CALCULATIONS VILLAGE AT GRANITE QUARRY - PHASE 1 Granite Quarry, Rowan County, North Carolina Prepared for. LGI HOMES Contact: Jeff Webb 3037 Sherman Drive Lancaster, SC P. 844-566-4300 Prepared by.- DPR Associates, Inc. 420 Hawthorne Lane Charlotte, NC 28204 P. 704-332-1204 F. 704-332-1210 www.dprassociates.net DPR Project No.: 17031 November 27, 2017 February 26, 2018 March 30, 2018 June 25, 2018 September 11, 2018 October 11, 2018 DPR Associates, Inc. �CI rR��i �5 S' &//r/rrr�y _ SEAL 030523 AGI NC NGVF..� 4 °� 1 1 C'i�11011ill11111���� 10-11-2012 TABLE OF CONTENTS NARRATIVE II. BMP SUMMARY III. BMP EXHIBITS AND CALCULATIONS - Vicinity Map and Aerial Photo - Pre -Development Drainage Map - Post -Development Drainage Map - Pre -Development TOC Map - TOC Calculations - Run -Off Curve Number - Soils Map IV. BMP DESIGN AND CALCULATIONS V. BMP HYDROGRAGH ANALYSIS - Hydrograph Summary Report - Hydrograph Pond Report - Hydrograph Report VI. APPENDIX �. NARRATIVE VILLAGE AT GRANITE QUARRY - PHASE 1 BMP STORMWATER DESIGN NARRATIVE DPR No. 17031 November 20, 2017 Revised 12-21-17 Revised 3-30-18 Revised 6-25-18 Revised 9-11-18 Revised 10-11-18 The enclosed package shows the results of the stormwater BMP design calculations for Phase 1 of Village at Granite Community. The development is in Granite Quarry, Rowan County, North Carolina, at 3040 Faith Road. The net site area is approximately +/-108 acres and the existing conditions consist of covered buildings with pavement, open space and woods. This project's proposed development will be a 118-lot single-family residential homes. Phase 1 has 5 proposed BMP facilities for the site, one wet pond, one dry detention pond and three sand filters. All were designed per the most recent NCDENR Stormwater design manual. Topographic maps and field observations were used to delineate the watershed basins and hydraulic path feeding into the study conveyance system. With this information, hydraulic lengths, time of concentrations (TOC), and basin slopes were determined for the pre -developed conditions. TOC of 5 minutes was used for all post - developed conditions. The total impervious areas of the development were calculated. The composite curve numbers (CN) were calculated based on the hydrologic soil types and groups from the U.S. Department of Agriculture, SCS method for the pre -developed and post -developed conditions. Surface areas of BMPs 1-4 were sized to handle the first -inch of rainfall based on total impervious area of the watershed. The BMP facilities are designed to treat the 1"-Inch of rainfall water quality volume using the Schueler simple method and to provide for channel protection using the 1-year, 24-hr storm. Modeling results indicate that 2-year and 10-year (24-hr storm events, using SCS Method) release peak flow rates for the post -development detention routed conditions are less than that of pre -developed conditions. The proposed dry detention pond near Faith Road, BMP #6 is designed for detention purposes only. We have made the commitment that the future multi -family and future commercial developments will treat the water quality/detention during that permit process. Refer to the detailed maps, calculations, results, and details as shown in this package and in the civil engineering subdivision plans. T: PROJECTSI2017 PROJECTSI17031 The Village At Granite - LGhCALCSIBMPIPhase V 17031-Ph 1 BMP Narrative.doc Page 1 of 4 Table 1: DRAINAGE AREAS: Basin No. Drainage Area Pre -Developed (+/- Ac.) Drainage Area Post -Developed (+/- Ac.) Phase 1 BMP #1 5.5 5.0 Phase 1 BMP #2 9.5 9.0 Phase 1 BMP #3 16.0 22.0 Phase 1 BMP #4 5.0 4.0 Phase 1 Temp. BMP #5 2.5 ----- *Phase 1 Undetained Areas to Crane Creek 4.3 4.2 Total 42.8 44.2 Phase 1 BMP #6 5.5 6.0 *Phase 1 BMP#6 Undetained Areas to Faith Road 0.3 0.8 Total 5.8 6.8 TABLE 2: PRE -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Phase 1 BMP #1 1.670 3.289 8.897 Phase 1 BMP #2 7.971 12.240 25.190 Phase 1 BMP #3 8.685 14.040 30.470 Phase 1 BMP #4 1.415 3.036 8.691 Phase 1 Temp. BMP #5 2.098 3.221 6.628 *Phase 1 Undetained Areas to Crane Creek 1.675 3.607 10.010 Total 23.514 39.433 89.886 Phase 1 BMP #6 3.340 5.969 14.400 *Phase 1 BMP#6 Undetained Areas to Faith Road 0.231 0.391 0.892 Total 3.571 6.360 15.292 1 - Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Total BMP #1- #5 21.839 35.826 79.876 *Phase 1 Undetained Areas to Crane Creek 1.675 3.607 10.010 Total 23.514 39.433 89.886 Phase 1 BMP #6 3.340 5.969 14.400 *Phase 1 BMP#6 Undetained Areas to Faith Road 0.231 0.391 0.892 Total 3.571 6.360 15.292 T: PROJECTSI2017 PROJECTSI17031 The Village At Granite - LGhCALCSIBMPIPhase I07031-Ph 1 BMP Narrative.doc Page 2 of 4 TABLE 3: POST -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Phase 1 BMP #1 11.410 15.410 26.390 Phase 1 BMP #2 22.590 29.950 49.890 Phase 1 BMP #3 50.190 67.800 116.130 Phase 1 BMP #4 7.892 10.870 19.460 *Phase 1 Undetained Areas to Crane Creek 4.137 6.600 14.120 Total 96.219 130.62 225.99 Phase 1 BMP #6 7.978 12.190 24.780 *Phase 1 BMP#6 Undetained Areas to Faith Road 1.724 2.395 4.285 Total 9.702 14.585 29.065 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Total BMP #1- #4 92.082 124.03 211.87 *Phase 1 Undetained Areas to Crane Creek 4.137 6.600 14.120 Total 96.219 130.63 225.99 Phase 1 BMP #6 7.978 12.190 24.780 *Phase 1 BMP#6 Undetained Areas to Faith Road 1.724 2.395 4.285 Total 9.702 14.585 29.065 T: PROJECTSI2017 PROJECTSI17031 The Village At Granite - LGhCALCSIBMPIPhase 107031-Ph 1 BMP Narrative.doc Page 3 of 4 TABLE 4: ROUTED -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Phase 1 BMP #1 0.197 0.270 4.819 Phase 1 BMP #2 0.255 0.503 15.790 Phase 1 BMP #3 0.411 1.423 29.100 Phase 1 BMP #4 0.163 0.241 6.694 *Phase 1 Undetained Areas to Crane Creek 4.137 6.600 14.120 Total 5.163 9.037 70.520 Phase 1 BMP #6 0.067 0.187 4.919 *Phase 1 BMP#6 Undetained Areas to Faith Road 1.724 2.395 4.285 Total 1.791 2.582 9.204 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) Total of BMP #1-#4 1.026 2.437 56.400 *Phase 1 Undetained Areas to Crane Creek 4.137 6.600 14.120 Total 5.163 9.037 70.520 Phase 1 BMP #6 0.067 0.187 4.919 *Phase 1 BMP#6 Undetained Areas to Faith Road 1.724 2.395 4.285 Total 1.791 2.582 9.204 *Undetained areas include areas that are disturbed during construction but covered with grass in the final condition (5.Oac) and BUA (0.30ac) T: PROJECTSI2017 PROJECTSI17031 The Village At Granite - LGhCALCSIBMPIPhase 107031-Ph 1 BMP Narrative.doc Page 4 of 4 III. BMP EXHIBITS AND CALCULATIONS - Vicinity Map and Arial Photo - Pre -Development Drainage Map - Post -Development Drainage Map - Pre -Development TOC Map - TOC Calculations - Run -Off Curve Number - Impervious Calculation - Soils Map Pmlent Manager HVN Dre n,By LGIRJ Clan By HVN Date 11/27/2017 Pmlent Number 17031 ---------------- PORNO PRE _Zil- , AREA AT F4ITH ROI D SIJNED HATCHED A3ACREA) _ - il,, ,PREDA 11G.9ACr --------------- PRE EA-a95AC TOTAL UNDETAINED AREA ` TO CRANE.:REEK PREDA DAC (GRAY SHADED AREAL \ \ PREDA 5AG; ------------------ �� �! BVPnss cHQrrNEL z \ 1 1 / PREDA=t11.0�1G PRE -DEVELOPMENT STORMWATER DRAINAGE AREAS PLAN POST -DEVELOPMENT STORMWATER DRAINAGE AREAS PLAN No. Date (MIDI) By ❑ ,,lPjo 1 2123/2018 RJILG REVISIONS PER FIRST REVIEW COMMENTS 2 3130/2018 RJILG REVISIONS PER SECOND REVIEW COMMENTS 3 6125/2018 RJILG REVISIONS PER THIRD REVIEW COMMENTS 4 9111/2018 RJ REVISIONS PER FOURTH REVIEW COMMENTS / LE( EXISTING 10 CONTOUR PROPOSED RIGHT OF %VAY - - - -,-,- I DO YR. FLOODLINE STORM DRAINAGE AREAS PLAN (based on 1979 FEMA maps) EXISTING STREAM OLOTNUMSER PROPOSED STORM DR41NAGE AREA PRE-DE/ELOPMENT DRAINAGE AREA — 1OST-0E1-11MENT URAINAGE AREA NOTE-. PA O LOCATIONS ARE APPROXIMATE AND ARE SHOWN ON THIS PLAN FOR DRAINAGE 0 100 200 300 CALCULATION ONLY. I. °N aR'' STORMWATER DRAINAGE AREA PLAN nsNOTED a`op1�oCIAR O��s., _a°a�P.E °�� landscape architecture O,QF s5/pry 9'"=: € p _ civil engineering Gso . z�, _ planning Xvo x2'F4'G NtEP� A bo, Y' INc �ae��- DPR Associates, Inc.. 420 H,,thorr,e Lane. charlone, NC 28204 q ""!gSSOCIAS ES:.e°� Ph.- 704. 332. 1204 . fax 704. 332. 1210 .—..OPr... d tear 1 VILLAGE AT GRANITE - PHASE 1 GRANITE QUARRY, NORTH CAROLINA 11TER°" Tl enR<LINAz LGI / HOMES SOUTHEAST Sheet Number L-18 SHEET IS OF 21 TOTAL Project: Village at Granite Impervious Calculation Prepared by: RJ DPR Job #: 17031 Phase 1 Checked by: HVN Location: Granite Quarry, NC Date: Proposed 50' Wide Single Family Lots 3,210 sf x 9 lots......................................................................................... 28,890 sq ft = 0.66 ac (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 3,210 sf x 9 lots......................................................................................... 28,890 sq ft = 0.66 ac (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 4,060 sf x 1.75 lots.................................................................................... (avg house pad 50' x 65' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) Total Proposed Lots Winding Creek Road, B/C-B/C (approx. 26' x 770 If) ...................................... Sidewalk (approx. 5' x 7701f x 2)........................................................... Driveway within R/W (20 x 6' x 18 If)........................................................... Emergency Fire Access (20' x 100 If) .......................................................... Total Proposed Streets: 7,105 sq ft = 0.16 ac 1 64,885 sg ft = 1.49 ac 20,020 sq ft = 0.46 ac 7,700 sq ft = 0.18 ac 2,160 sq ft = 0.05 ac 2,000 sq ft = 0.05 ac 31,880 sg ft = 0.73 ac iotai impervIOUS Area..............................................................................I `Jb,/bb sq TT = L.LL ac TotalNet Site Area =............................................................................................................... 107.90 ac Phase1 Site Area =............................................................................................................... 41.54 ac BMP1 Watershed Area =............................................................................................................ 5.00 ac Imperv. Area (Ac ) Proprosed Lots 1.49 Prop. Amenity Area + Misc. Site Features 0.00 Proposed Streets 0.73 Future Muilti-Famly 0.00 2.22 Total Imp. Area % of Imp. Area of % of Imp. Area of % of Imp. Area of Site Area Phase 1 Site Area BMP 1 WS Area 1.38% 3.59% 29.790/, 0.00% 0.00% 0.00% 0.68% 1.76% 14.64% 0.00% 0.00% 0.00% USED 48% IN I T:IPROJECTS12017 PROJECTS117031 The Village At Granite - LGftQft6.S232d81i8se 1117031-PHI-Impervious.xls Sheet 1 of 1 Project: Village at Granite Impervious Calculation Prepared by: RJ DPR Job #: 17031 Phase 1 Checked by: HVN Location: Granite Quarry, NC Date: Proposed 50' Wide Single Family Lots 3,210 sf x 6 lots............................................................................... 19,260 sq ft = 0.44 ac (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 3,210 sf x 0.25 lots............................................................................... 0,803 sq ft = 0.02 ac (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 4,060 sf x 20.5 lots............................................................................... (avg house pad 50' x 65' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) Total Proposed Lots 83,230 sq ft = 1.91 ac 1 103,293 sg ft = 2.37 ac Winding Creek Road, B/C-B/C (approx. 26' x 772 If) ....................................... 20,072 sq ft = 0.46 ac Village Commons Drive, B/C-B/C (approx. 26' x 488 If) ................................... 12,688 sq ft = 0.29 ac Sidewalk (approx. 5' x 1,260 If x 2)........................................................... 12,600 sq ft = 0.29 ac Driveway within R/W (23 x 6' x 18 If)........................................................... 2,484 sq ft = 0.06 ac Emergency Fire Access (20' x 260 If) .......................................................... 5,200 sq ft = 0.12 ac Total Proposed Streets: 53,044 sq ft = 1.22 ac iotai impervious Area..............................................................................I l5e,JJf sq rt = s.5a ac TotalNet Site Area=............................................................................................................... 107.90 ac Phase1 Site Area =............................................................................................................... 41.54 ac BMP2 Watershed Area =............................................................................................................ 8.50 ac Imperv. Area % of Imp. Area of (Ac) Site Area Proprosed Lots 2.37 2.20% Prop. Amenity Area + 0.00 0.00% Misc. Site Features Proposed Streets 1.22 1.13% Future Muilti-Famly 0.00 0.00% Total Imp. Area 3.59 3.33% % of Imp. Area of % of Imp. Area of Phase 1 Site Area BMP 2 WS Area 5.71 % 27.90% 0.00% 0.00% 2.93% 14.33% 0.00% 0.00% 8.64% 42.22% USED 48% IN DESIGN T:IPROJECTS12017 PROJECTS117031 The Village At Granite - LGftQft6.S232d81i8se 1117031-PHI-Impervious.xls Sheet 1 of 1 Project: Village at Granite Impervious Calculation Prepared by: RJ DPR Job #: 17031 Phase 1 Checked by: HVN Location: Granite Quarry, NC Date: 10 sf x 19.25 lots............................................................... (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 10 sf x 16.75 lots............................................................... (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 60 sf x 22.25 lots............................................................................... (avg house pad 50' x 65' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) Total Proposed Lots -�--- ....._........ _........................ Play Ground Equipment, Metal Gazebo Pavilion On -Street Parking (approx. 1,015 sq ft) Limestone Terrace, B/C-B/C (approx. 36' x 650 If) ............. Winding Creek Road, B/C-B/C (approx. 26' x 150 If)........... Village Commons Drive, B/C-B/C (approx. 26' x 940 If)....... Standing Oak Drive, B/C-B/C (approx. 26' x 650 If) ............. Trailwood Court, B/C-B/C (approx. 26' x 200 If + 4,931 sq ft) Ramses Rock Run, B/C-B/C (approx. 6,885 sq ft).............. Sidewalk (approx. 5' x 3,481 If x 2).................................. Driveway within R/W (10 x 4' x 18 If) ............................... Driveway within R/W (50 x 6' x 18 If) ............................... Emergency Fire Access (20' x 225 If) .............................. Total Proposed Streets: BUA = 50% Inpervious of 3.5 ac Total Net Site Area=... Phase 1 Site Area = .... BMP 3 Watershed Area 61,793 sq It = 1.42 ac 53,768 sq ft = 1.23 ac 90,335 sq ft = 2.07 ac 205,895 sq ft = 4.73 ac 10,000 sq ft = 0.23 ac 20.000 sa ft = 0.46 ac 23,400 sq ft = 0.54 ac 3,900 sq ft = 0.09 ac 24,440 sq ft = 0.56 ac 16,900 sq ft = 0.39 ac 10,131 sq ft = 0.23 ac 6,885 sq ft = 0.16 ac 34,810 sq ft = 0.80 ac 720 sq ft = 0.02 ac 5,832 sq ft = 0.13 ac 4,500 sq ft = 0.10 ac 131,518 sq ft = 3.02 ac Impervious Area Summa Imperv. Area % of Imp. Area of % of Imp. Area of % of Imp. Area of (Ac) Site Area Phase 1 Site Area BMP 3 WS Area Proprosed Lots 4.73 4.38% 11.38% 21.01 % Prop. Amenity Area + 0.69 0.64% 1.66% 3.06% Misc. Site Features Proposed Streets 3.02 2.80% 7.27% 13.42% Future Muilti-Famly 1.75 1.62% 4.21% 7.78% BMP 3 PWS 0.37 0.34% 0.90% 1.65% Total Imp. Area 10.56 9.78% 25.41% 46.92% i.fo ac 0.37 ac 10.56 ac 107.90 ac 41.54 ac 22.50 ac USED 48% IN DESIGN T.IPROJECTST017 PROJECTSU7031 The Village At Granite - LGIICALCSfflMLhPi 120,TS31-PHI-Impervious.xls Sheet 1 of 1 Project: Village at Granite Impervious Calculation Prepared by: RJ DPR Job #: 17031 Phase 1 Checked by: HVN Location: Granite Quarry, NC Date: Proposed 50' Wide Single Family Lots 3,210 sf x 7.75 lots............................................................................... 24,878 sq ft = 0.57 ac (avg house pad 40' x 60' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 4,060 sf x 5.5 lots............................................................................... (avg house pad 50' x 65' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) Total Proposed Lots Standing Oak Drive, B/C-B/C (approx. 26' x 285 If) ........................................ Sidewalk (approx. 5' x 285 If x 2)........................................................... Driveway within R/W (9 x 6' x 18 If)............................................................. Total Proposed Streets: 22,330 sq ft = 0.51 ac 1 47.208 sa ft = 1.08 ac 7,410 sq ft = 0.17 ac 2,850 sq ft = 0.07 ac 972 sq ft = 0.02 ac 11.232 sa ft = 0.26 ac i otai impervious Hrea..............................................................................I ots,44u sq TT = TotalNet Site Area=............................................................................................................... Phase1 Site Area =............................................................................................................... BMP4 Watershed Area =.......................................................................................................... Impervious Area Sum ma Imperv. Area % of Imp. Area of % of Imp. Area of % of Imp. Area of (Ac) Site Area Phase 1 Site Area BMP 4 WS Area Proprosed Lots 1.08 1.00% 2.61 % 27.09% Prop. Amenity Area + 0.00 0.00% 0.00% 0.00% Misc. Site Features Proposed Streets 0.26 0.24% 0.62% 6.45% Future Muilti-Famly 0.00 0.00% 0.00% 0.00% Total Imp. Area 1.34 1.24% 3.23% 33.54% 1..54 ac 107.90 ac 41.54 ac 4.00 ac USED 48% IN DESIGN T:IPROJECTS12017 PROJECTS117031 The Village At Granite - LGftQft6.S232d81i8se 1117031-PHI-Impervious.xls Sheet 1 of 1 Project: Village at Granite Impervious Calculation Prepared by: RJ DPR Job #: 17031 Phase 1 Checked by: HVN Location: Granite Quarry, NC Date: Existing Streets: Faith Road............................................................................................. 30.492 sa ft = 0.70 ac Faith Road, B/C-B/C................................................................................ 11,700 sq ft = 0.27 ac Limestone Terrace, B/C-B/C..................................................................... 18,600 sq ft = 0.43 ac Sidewalk (approx. 5' x 370 If x 2)........................................................... 3,700 sq ft = 0.08 ac Emergency Access#1.............................................................................. 8,000 sq ft = 0.18 ac Total Proposed Streets:F 42,000 sq ft = 0.96 ac Otal ImpervlOUs Area..............................................................................I /L,4UZ sq Tt = 1.titi ac TotalNet Site Area=............................................................................................................... 107.90 ac Phase1 Site Area =............................................................................................................... 41.54 ac BMP6 Watershed Area =............................................................................................................ 5.00 ac Imperv. Area % of Imp. Area of % of Imp. Area of % of Imp. Area of (Ac) Site Area Phase 1 Site Area BMP 6 WS Area Existing Streets 0.70 0.65% 1.69% 14.00% Proposed Streets 0.96 0.89% 2.32% 19.28% Total Imp. Area 1.66 1.54% 4.01% 33.28% T:IPROJECTS12017 PROJECTS117031 The Village At Granite - LGftQft6.SEffM81hi8se 1117031-PHI-Impervious.xls Sheet 1 of 1 547900 350 36' 38" N 35o 36' 12" N Hydrologic Soil Group —Rowan County, North Carolina (17031-Soils) 548000 548100 5482M 5483M 548400 548000 548100 54MM 548300 kD Map Scale: 1:3,890 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 50 100 200 300 A Feet 0 0 1y0 300 E00 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 54M 35o 36' 38" N 35o 36' 12" N 548500 9/21/2017 Pagel of 4 Hydrologic Soil Group —Rowan County, North Carolina (17031-Soils) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D ■ B S B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Rowan County, North Carolina Survey Area Data: Version 13, Sep 20, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2015—Mar 15, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 9/21/2017 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Rowan County, North Carolina Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Rowan County, North Carolina (NC159) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CcB Cecil sandy loam, 2 to 8 B 2.5 5.7% percent slopes CeB2 Cecil sandy clay loam, 2 B 10.1 23.0% to 8 percent slopes, moderately eroded ChA Chewacla loam, 0 to 2 B/D 0.4 0.8% percent slopes, frequently flooded VnB2 Vance sandy clay loam, C 19.2 43.7% 2 to 8 percent slopes, moderately eroded VnC2 Vance sandy clay loam, C 11.8 26.8% 8 to 15 percent slopes, moderately eroded Totals for Area of Interest 43.9 100.0% USDA Natural Resources Web Soil Survey 9/21/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Rowan County, North Carolina frL11611Q OMP Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 9/21/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 Existing Condition Watershed BMP # 1 Total Drain. Area (Ac.) 5.50 Site Soil Type Soil Group Percentage of Basin CeB2 B 1.0 ac 18.2% VnB2, VnC2 C 4.0 ac 72.7% 5.0 ac 90.9% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.50 9.1% 55 10.0 66 0.0 70 50.9 60.9 5.5 Open Space - Grass and Shurbs 5.00 90.9% 61 11.1 71 0.0 74 53.8 64.9 59.0 (Good Cond.) Impervious 0.00 0.0% 98 17.8 98 0.0 98 71.3 89.1 0.0 64.5 Total 5.5 100% Proposed Development Watershed BMP # 1 Total Drain. Area (Ac.) 5.00 Site Soil Type Soil Group Percentage of Basin CeB2 B 1.0 ac 20.0% VnB2, VnC2 C 4.0 ac 80.0% 5.0 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 11.0 66 0.0 70 56.0 67.0 0.0 Open Space - Grass and Shurbs 2.60 52.0% 61 12.2 71 0.0 74 59.2 71.4 37.1 (Good Cond.) Impervious 2.40 48.0% 98 19.6 98 0.0 98 78.4 98.0 47.0 84.2 Total 5.0 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 6 313012018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 Existing Condition Watershed BMP # 2 Total Drain. Area (Ac.) 9.50 Site Soil Type Soil Group Percentage of Basin VnB2, VnC2 C 9.5 ac 100.0% 9.5 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 4.00 42.1% 55 0.0 66 0.0 70 70.0 70.0 29.5 Open Space - Grass and Shurbs 5.00 52.6% 61 0.0 71 0.0 74 74.0 74.0 38.9 (Good Cond.) Impervious 0.50 5.3% 98 0.0 98 0.0 98 98.0 98.0 5.2 73.6 Total 9.5 100% Proposed Development Watershed BMP # Total Drain. Area (Ac.) 9.00 Site Soil Type Soil Group VnB2, VnC2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total C Percentage of Basin 9.0 ac 100.0% 9.0 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 0.0 66 0.0 70 70.0 70.0 0.0 4.68 52.0% 61 0.0 71 0.0 74 74.0 74.0 38.5 4.32 48.0% 98 0.0 98 0.0 98 98.0 98.0 47.0 85.5 9.0 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 612212018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 n Total Drain. Area (Ac.) Site Soil Type CcB, CeB2 ChA VnB2, VnC2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious e Soil Group Percentage of Basin B 3.0 ac 18.8% B/D 1.0 ac 6.3% C 12.0 ac 75.0% 16.0 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 1.40 8.8% 55 10.3 66 4.1 70 52.5 66.9 5.9 13.40 83.8% 61 11.4 71 4.4 74 55.5 71.4 59.8 1.10 6.9% 98 18.4 98 6.1 98 73.5 98.0 6.7 72.4 15.9 99% Proposed Development Watershed BMP # Total Drain. Area (Ac.) 22.00 Site Soil Type Soil Group CcB, CeB2 B ChA B/D VnB2, VnC2 C Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total Percentage of Basin 3.9 ac 17.7% 0.3 ac 1.4% 17.8 ac 80.9% 22.0 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 9.8 66 0.9 70 56.6 67.3 0.0 11.44 52.0% 61 10.8 71 1.0 74 59.9 71.7 37.3 10.56 48.0% 98 17.4 98 1.3 98 79.3 98.0 47.0 84.3 22.0 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 612212018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 n Watershe Total Drain. Area (Ac.) 5.00 Site Soil Type Soil Group Percentage of Basin CcB, CeB2 B 2.6 ac 52.0% ChA B/D 0.4 ac 8.0% VnB2, VnC2 C 2.0 ac 40.0% 5.0 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 3.50 70.0% 55 28.6 66 5.3 70 28.0 61.9 43.3 Open Space - Grass and Shurbs 1.50 30.0% 61 31.7 71 5.7 74 29.6 67.0 20.1 (Good Cond.) Impervious 0.00 0.0% 98 51.0 98 7.8 98 39.2 98.0 0.0 63.4 Total 5.0 100% Proposed Development Watershed BMP # 4 Total Drain. Area (Ac.) 4.00 Site Soil Type Soil Group Percentage of Basin CcB, CeB2 B 2.5 ac 62.5% ChA B/D 0.3 ac 7.5% VnB2, VnC2 C 1.2 ac 30.0% 4.0 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 34.4 66 5.0 70 21.0 60.3 0.0 Open Space - Grass and Shurbs 2.08 52.0% 61 38.1 71 5.3 74 22.2 65.7 34.1 (Good Cond.) Impervious 1.92 48.0% 98 61.3 98 7.4 98 29.4 98.0 47.0 81.2 Total 4.0 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 4 of 6 313012018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 .xisting Condition Total Drain. Area (Ac.) Site Soil Type CcB, CeB2 ChA VnB2, VnC2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total rshe 2.50 Soil Group Percentage of Basin B 0.0 ac 0.0% B/D 0.0 ac 0.0% C 2.5 ac 100.0% 2.5 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group 8 Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 0.0 66 0.0 70 70.0 70.0 0.0 2.50 100.0% 61 0.0 71 0.0 74 74.0 74.0 74.0 0.00 0.0% 98 0.0 98 0.0 98 98.0 98.0 0.0 74.0 2.5 100% T FROJECTS12017 PROJECTS117031 The Village At Granite - LGIICALCSWPIPhase 1117031-PH1-Runoff CN.xls Sheet. 5 of 6 313012018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 n Undetain Area to Crane Cree Total Drain. Area (Ac.) Site Soil Type CeB2 ChA VnB2, VnC2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious 4.30 Soil Group B B/D C Percentaae of Basin 3.0 ac 69.8% 0.0 ac 0.0% 1.3 ac 30.2% 4.3 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 3.00 69.8% 55 38.4 66 0.0 70 21.2 59.5 41.5 1.20 27.9% 61 42.6 71 0.0 74 22.4 64.9 18.1 0.10 2.3% 98 68.4 98 0.0 98 29.6 98.0 2.3 61.9 4.3 100% Proposed Development Undetain Area to Crane Creek Total Drain. Area (Ac.) 4.20 Site Soil Type Soil Group Percentage of Basin CeB2 B 0.7 ac 16.7% ChA B/D 2.6 ac 61.9% VnB2, VnC2 C 0.9 ac 21.4% 4.2 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 9.2 66 40.9 70 15.0 65.0 0.0 Open Space - Grass and Shurbs 4.20 100.0% 61 10.2 71 44.0 74 15.9 70.0 70.0 (Good Cond.) Impervious 0.00 0.0% 98 16.3 98 60.7 98 21.0 98.0 0.0 70.0 Total 4.2 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 911112018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 n Watershe Total Drain. Area (Ac.) 5.50 Site Soil Type Soil Group Percentage of Basin CeB2 B 4.3 ac 78.2% ChA B/D 0.0 ac 0.0% VnB2, VnC2 C 1.2 ac 21.8% 5.5 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.0% 55 43.0 66 0.0 70 15.3 58.3 0.0 Open Space - Grass and Shurbs 5.00 90.9% 61 47.7 71 0.0 74 16.1 63.8 58.0 (Good Cond.) Impervious 0.50 9.1% 98 76.6 98 0.0 98 21.4 98.0 8.9 66.9 Total 5.5 100% Proposed Development Watershed BMP # 6 Total Drain. Area (Ac.) 6.00 Site Soil Type Soil Group Percentage of Basin CeB2 B 4.8 ac 80.0% ChA B/D 0.0 ac 0.0% VnB2, VnC2 C 1.2 ac 20.0% 6.0 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 44.0 66 0.0 70 14.0 58.0 0.0 Open Space - Grass and Shurbs 4.40 73.3% 61 48.8 71 0.0 74 14.8 63.6 46.6 (Good Cond.) Impervious 1.60 26.7% 98 78.4 98 0.0 98 19.6 98.0 26.1 72.8 Total 6.0 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 911112018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 Proposed Development Watershed BMP # Total Drain. Area (Ac.) 3.20 Site Soil Type Soil Group CeB2 B ChA B/D VnB2, VnC2 C Hvdroloaic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total (Sheet Flow ONLY) Percentaae of Basin 2.6 ac 81.3% 0.0 ac 0.0% 0.6 ac 18.8% 3.2 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group 8 Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 44.7 66 0.0 70 13.1 57.8 0.0 3.20 100.0% 61 49.6 71 0.0 74 13.9 63.4 63.4 0.00 0.0% 98 79.6 98 0.0 98 18.4 98.0 0.0 63.4 3.2 100% T FROJECTS12017 PROJECTS117031 The Village At Granite - LGIICALCS0MPIPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 911112018 Project: Village at Granite DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: MB Location: Granite Quarry, NC Date: 11-17-17 n Undetain Area Total Drain. Area (Ac.) Site Soil Type CeB2 ChA VnB2, VnC2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious 0.30 Soil Group B B/D C Percentage of Basin 0.15 ac 50.0% 0.00 ac 0.0% 0.15 ac 50.0% 0.30 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 27.5 66 0.0 70 35.0 62.5 0.0 0.29 96.7% 61 30.5 71 0.0 74 37.0 67.5 65.3 0.01 3.3% 98 49.0 98 0.0 98 49.0 98.0 3.3 68.5 0.3 100% Proposed Development Undetain Area BMP #6 Total Drain. Area (Ac.) 0.80 Site Soil Type Soil Group Percentage of Basin CeB2 B 0.3 ac 37.5% ChA B/D 0.0 ac 0.0% VnB2, VnC2 C 0.5 ac 62.5% 0.8 ac 100.0% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 20.6 66 0.0 70 43.8 64.4 0.0 Open Space - Grass and Shurbs 0.50 62.5% 61 22.9 71 0.0 74 46.3 69.1 43.2 (Good Cond.) Impervious 0.30 37.5% 98 36.8 98 0.0 98 61.3 98.0 36.8 80.0 Total 0.8 100% T IPROJECTS12017 PROJECTSU7031 The Village At Granite - LGIICALCSIBMPPhase 1117031-PH1-Runoff CN.xls Sheet. 1 of 1 911112018 i?;\��►--'' i``•� ' 6/ 1�` i,��/ / / / / 635LF OF SHALLOW ' I I•�� / a / / / 1 / CONCENTRATED FLOW 150LF OF SHEET FLOW \ //f / / //,�i 1 I / I S ^ / 1 1 \\ \ \\� BMP #4V 7 ��/ �I/ / 43�_—��— 54).\ \ PORTjaw•oE _ ♦ \\\ i I \t_,// i / r-�II \ \ t \\ `\\\\\\ 130LF OF SHALLOW \ \ \\\I BMP #5 u I I CONCENTRATED FLOW (754)- *I'.. f / 150LF OF SHEET FLOW ,� ; \\�0\\ \ l\ ���� \ \ \``\---/BMW —A(752) --- � ^ \\\ \ \\\IIII/)/ \ \ \ \III 1/ \\ `1,180LFOFSHALLOW ! - \\\\`Ihllt/ 1 1 / / • ��� \ \ \ I11i / / / r ► I 1 1 /''`'',L_ ` POP N F`\ CONCENTRATED FLOW .(73s) ,/ —f* hill BMP #3 ---/ --_—/ /PRE Af 6.OA�� / 1 S� \\ !/� I I \ ......1yy 1/,,. / _� (740) —_ I /� / �••:•: ...::..:•:•.t. J I I'co 44) — -----\ \ h N6\ i j / l/ ,'� ,-- / t Ian--\\ / / / /�♦ / I \) I \ \\ / ' /' /' /// /// Ijll\`\ t, / loyal ♦y/ \ \ /1 kcal\ —^_— /'<0, �� ry \\ \ �� \ \ , l < N 150LF OF SHEET FLOW _ \2 \ \ \. 1--- --' / ` ` / / BMP #2 1 56i �� 758 �aseDA=5.5jE; 6p� BMP #6 \ \ / / ) 148LF OF CHANNEL FLOW AC J \ o r i� Co / / / ice_ - 235LF OF \' � ii11� 1 �?���, / / / / ss) -�� T�s - \I - ' CHANNEL FLOW \\ `\ `� r, I I\i 1 l , r�►_ /_ / �� r I 315LF OF - \\ \ \ \ '/� _��� \ `\`�\\\\ \\ : •'• • • !` I \ 1 \ \\\\\ , 1 11 II I I f/ _ 4) J % ) I I I 1 CHANNEL FLOW \� `�� \\ \ \\ \ 1\ �\ \\1\ I i I i i `\ / (2 \\ — — 10OLF OF \) 1 1 1 TOTAL SITE_--'—t�\\\\\ 1 I 11NEDAREA ` 1 SHEET FLOW --_\ 11 \ 430LF OF SHALLOW 1 I 150LF OF SHEET FLOW — I 1 / ,) \ 1 1 :.:'::::: I ♦ i \\`\� \\\ i \ \\ \ — — / ��1 % 1 \\ 1 1\ III/ / / / CONCENTRATED FLOW \� � \ `\ \ \ Il \ 1 ` DAPY59�/ \ \ 1\I It` III BMP #1 74 , -, ( 470LF OF SHALLOW -- - _ — </ / • \ _' , —(74 \ _ , of CONCENTRATED FLOW (734 X. ItNO I / BY/ASS 1 I I 11 \ \\ \ \\ 1 0 1 / / A 1 PRE "A="Y.0AC landscape architecture civil engineering planning DPR Associates, Inc. ■ 420 Hawthorne Lane ■ Charlotte, NC 28204 phone 704.332. 1204 ■ fax 704.332. 1210 ■ www.dprassociates.net TIME OF CONCENTRATION MAP VILLAGE AT GRANITE QUARRY - PHASE 1 GRANITE QUARRY, NORTH CAROLINA FOR LGI HOMES SOUTHEAST 18 U W 0 o- d Scale: 1 "= 250' Date: 11-17-17 Dwg. No: s 6-22-18 Job #: 17031 BD-1 D- � w 0 250 ass By: RIJ 00 Project: Village at Granite DPR ASSOCIATES Prepared by:RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by:HN Location: Granite Quarry, NC BMP 1 Date: 11-17-17 Sheet: 1 of 4 HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 150 Slope (%) = 2.0 P-2yr (in.) = 3.12 T(t) (min.) = 20.0 SHALLOW CONCENTRATED FLOW: Surface Description unpaved Flow Length (ft) = 470 Water Course Slope (%) = 6.00 Average Velocity (fps) = 3.95 T(t) (min.) = 2.0 T(t) Sum of Travel Time (min)= 22.0 Time = 22 (min.) Hydraulic Length = 620 ft Basin Slope = 5.0 POST DEVELOPMENT - TIME OF CONCENTRATION Time = 5 (min.) TIPROJECTS12017 PROJECTS07031 The Village At GraniRGtta1bMA?-=Sx4RPhase 107031-TOC Sheet: 1 of 1 Project: Village at Granite DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC BMp 2 Date: 11-17-17 Page: 2 of 4 HEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ Slope (%) = P-2yr (in.) = T(t) (min.) = SHALLOW CONCENTRATED FLOW: Surface Description Flow Length (ft) = Water Course Slope Average Velocity (fps) _ T(t) (min.) = NEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = grass 0.24 150 4.0 3.12 15.1 unpaved 430 7.00 4.27 1.7 4.00 0.618 235 2 0.048 3.19 1.2 Bottom Width (ft) _ Side Slope (X:1) _ Depth (ft) = t) Sum of Travel Time (min)= 18.1 Time = 18 (min.) Hydraulic Length = 815 ft Basin Slope = 5.0 POST DEVELOPMENT - TIME OF CONCENTRATION Time = 5 (min.) 2 2 TIPROJECTS12017 PROJECTS07031 The Village At GraniRGtta1bMA?-=Sx4RPhase 107031-TOC Sheet: 1 of 1 Project: Village at Granite DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC BMP 3 Date: 11-17-17 Sheet: 3 of 4 HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 150 Slope (%) = 2.0 P-2yr (in.) = 3.12 T(t) (min.) = 20.0 SHALLOW CONCENTRATED FLOW: Surface Description unpaved Flow Length (ft) = 1180 Water Course Slope (%) = 3.50 Average Velocity (fps) = 3.02 T(t) (min.) = 6.5 T(t) Sum of Travel Time (min)= 26.5 Time = 27 (min.) Hydraulic Length = 1330 ft Basin Slope = 3.3 POST DEVELOPMENT - TIME OF CONCENTRATION Time = 5 (min.) TIPROJECTS12017 PROJECTS07031 The Village At GraniRGtta1bMA?-=Sx4RPhase 107031-TOC Sheet: 1 of 1 Project: Village at Granite DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC BMP 4 Date:10-17-17 Sheet: 4 of 4 HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 150 Slope (%) = 6.7 P-2yr (in.) = 3.12 T(t) (min.) = 12.3 SHALLOW CONCENTRATED FLOW: Surface Description unpaved Flow Length (ft) = 635 Water Course Slope (%) = 5.00 Average Velocity (fps) = 3.61 T(t) (min.) = 2.9 T(t) Sum of Travel Time (min)= 15.3 Time = 15 (min.) Hydraulic Length = 785 ft Basin Slope = 5.3 POST DEVELOPMENT - TIME OF CONCENTRATION Time = 5 (min.) TIPROJECTS12017 PROJECTS07031 The Village At Granit@l01t&AG14QMMdRPhase 107031-T0C.xIs Sheet: 1 of 1 Project: Sample DPR ASSOCIATES Prepared by:XXX DPR Job No.: 00000.0 BMp Checked by:XXX Location: Mecklenburg Co. (Charlotte-Meck. Storm Water Design Manual) Date:X-XX-XX HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 150 Slope (%) = 3.0 P-2yr (in.) = 3.12 T(t) (min.) = 17.0 SHALLOW CONCENTRATED FLOW: Surface Description unpaved Flow Length (ft) = 130 Water Course Slope (%) = 3.00 Average Velocity (fps) = 2.79 T(t) (min.) = 0.8 T(t) Sum of Travel Time (min)= 17.8 Time = 18 (min.) Hydraulic Length = 280 ft Basin Slope = 3.0 TIPROJECTS12017 PROJECTS07031 The Village At Granit@l01t&AG14QMMdRPhase 107031-T0C.xIs Sheet: 1 of 1 Project: Village at Granite DPR ASSOCIATES DPR Job No.: 17031 TIME OF CONCENTRATION Location: Granite Quarry, NC HEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ Slope (%) = P-2yr (in.) = T(t) (min.) = NEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = NEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = grass 0.24 100 5.5 3.12 9.6 4.00 0.618 315 3.2 0.048 4.03 1.3 4.00 0.618 148 3.3 0.048 4.09 0.6 Bottom Width (ft) _ Side Slope (X:1) _ Depth (ft) = Bottom Width (ft) _ Side Slope (X:1) _ Depth (ft) = t) Sum of Travel Time (min)= 11.5 Time = 11.5 (min.) Hydraulic Length = 563 ft Basin Slope = 3.0 Time = 5 (min.) Prepared by: RJ Checked by: HN Date: 4-18-18 2 2 2 2 TIPROJECTS12017 PROJECTS07031 The Village At Granit@lolt&A91AdQ,9MdRPhase 107031-PHI-TOC.xIs Sheet: 1 of 1 IV. BMP DESIGN AND CALCULATIONS Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-1 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 10-17-17 Sheet: 1 of 3 Revised: 12-21-17 DESIGN CRITERIA PER NCDENR STORMWATER DESIGN MANUAL DATED JAN 2017 " BMP -SAND FILTER -WATER QUALITY CONTROL ONLY 1 1 " Total Drainage Area (A): 5.00 ac " Total Impervious Area "I" USED = 48.0% (for Design) 1 2.40 Jac (See attached Impervious Calcs) " Total Water Quality Volume To Treat (First 1" of Rainfall): WQv = (P/12) (A) (RV) (43560) = 8,748 cf (Simple Method, Schueler) P: Water Quality Design Storm, 1st Inch of Rainfall 1 inch A: Drainage Area (Impervious Area Only) 5.00 ac. Rv: 0.05 + 0.009 (I) = 0.482 1: % of Impervious Area 48.0% *Total Storm Water Volume Control 1-yr. 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 24,564 cf (SCS Method) P: Design Storm, 1-yr 24-hr Storm Rainfall depth 2.80 inch A: Drainage Area 5.00 ac. S = 1,000/CN-10 = 1.90 inch CN: Curve Number 84 " Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 34,526 cf (SCS Method) P: Design Storm, 10-yr 24-hr Storm Rainfall depth 3.46 inch A: Drainage Area 5.00 ac. S = 1000/CN-10 = 1.90 inch CN: Curve Number 84 "Sedimentation Chamber Volume Min. Required: Vol -Pre = (0.2)(WQv) = 1,750 cf " Sedimentation Chamber Volume Provided: 1 9,200 1cf " Filtration Media Surface Area Required: Af=((WQv) (DO]/ ((k) (Hf + Df) (Tf)] = 949 sf (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Water quality volume 8,748 cf Df.- Filter bed depth (2'.5 for Optimal Efficiency) 2.5 ft k: Permeability coefficient of filter media 3.50 ft/day (1.75" per hour, or 3.5' per day) Hf.- Average height of water above filter bed, (half of pond depth, 1' max) 0.60 ft Tf = Design filter bed drain time in days, (2 days beyond center 6-hr storm) 2.125 days Depth of Pond Water (24" Max.)= 24 inch " Filtration Media Surface Area Provided: 1,000 sf BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage fts c c FEMA 100 Year Flood Elevation @ 727.8' (Flood Insurance Study dated 6-16-2009) SHWTE and groundwater @ 733.86' per Summit Geo Report letter dated 11-14-17 729.5 Bottom of Stone - Provide liner per geo recommendation 730.5 Top of Stone/Bottom of Sand 733.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 733.0 7,000 0 0 Bottom of Pond 734.0 8,100 7,550 7,550 736.0 10,500 18,600 26,150 738.0 12,700 23,200 49,350 Top of Embankment Static Water Quality Elevation @ 734.16 ft Static Channel Protection Elevation @ 1 735.83 Ift printed 101912018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPPhase 107031-PHI-BMP Sandfilterxls page 1 of 3 Project: Village at Granite Job No.:17031 Location: Granite Quarry, NC Sheet: 2 of 3 BMP-SAND x , DPR ASSOCIATES, INC SAND FILTER-1 DESIGN Qo = WQv/Tf= (Af)(k)(Hf+Df)/Df= (Darcy's Law) k: Permeability coefficient of filter media Af.- Surface area, sf Hf.- Average height of water above filter bed Df.- Depth of soil filter bed Q o @ Top of Media Q o @ Median of WQv storage Q o @ Top of WQv storage 0.0692 cfs 3.50 ft/day 949 sf 2.00 ft 2.5 ft 733.0 = 0.0000 cfs 733.6 = 0.0506 cfs 734.2 = 0.0620 cfs Tf = WQv / Qo 35.13 hrs Q: Draw down rate thru sand filter 0.0692 cfs Use [2]-17 If of 6" PVC or Sch 40, Use 2 of I w/3/8"perforations spaced 3"on center, 4 rows w/90-deg apart 17 LF of 6 inch # of Perforation = (# pipes)(4 rows/ft) (Linear feet/per pipe -2') (4 holes/row) = (2 pipes)(4)(171f)(4) 20 holes Capacity of one hole (3/8") = CA(2gh)1(0.5) (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) of 3/8" hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 0.1566 cfs Total Capacity w/ 50% lost to clogging 0.0783 cfs Underdrain Pipe Capacity= 1.49/n(A)(A/P)1(2/3) (S)10.5 (Manning Eq) 0.395 cfs n= pipe coefficient 0.013 A= Area (sf) of 6" dia pipe 0.1963 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 0.1974 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter. OK (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 12,282 cf Average Surface Area 4,340 sf Prepared By: RJ Checked By: HN Date: 10-17-17 Revised: 12-21-17 Area of Outlet Orifice (sf), a =(2)(A)h1(1/2))/(c)(t)(2g)A(1/2)) NCDENR, Orifice Equation) a = 0.023 where: A= ResevoirArea, sf 4,340 Max. Orifice Diameter (inch), d = 2.06 h= Falling Head, ft 2.75 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 2.0 t= Time ( 36 hrs), sec. 129,600 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) d= Orifice Diameter (inch) Qo = WQv / Tf 0.1137 cfs (Darcy's Law) CPv: 1-yr Storm Volume 24,564 cf Tf.- 2 days beyond center of 24hr-storm, 60 hours 216,000 sec printed 101912018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPIPhase 107031-PHI-BMP Sandfilterxls page 2 of 3 Project: Village at Granite DPR ASSOCIATES, INC Job No.: 17031 SAND FILTER-1 DESIGN Location: Granite Quarry, NC Sheet: 3 of 3 BMP - SAND FILTER Anti -Seep Collar Sizing Outlet Pipe Size (I.D.) = 18 in Outlet Pipe Size (O.D.) = 1.92 ft L, Length of Outlet Pipe = 40 If Min. Flow Length = 46.0 ft Total Lengh of Collar offset = 6.0 ft Number of anti -seep collars 2 Offset per collar 3.0 ft Min. Outside dimension of each collar 4.92 ft Designed collars 2 at 5.0' x 5.0' Prepared By: RJ Checked By: HN Date: 10-17-17 Revised: 12-21-17 Min. Flow Length = 115% of outlet pipe printed 10192018 T.IPROJECTS12017 PROJECTS117031 The Village At Grande - LGIICALCSIBMPIPhase 1117031-PHI-BMP Sandfidecxls page 3 of 3 Pond Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 1 - PH1 BMP 1 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 733.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 733.00 7,000 0 0 1.00 734.00 8,100 7,550 7,550 3.00 736.00 10,500 18,600 26,150 5.00 738.00 12,700 23,200 49,350 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 18.00 3.00 0.00 0.00 Span (in) = 18.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 728.35 734.10 0.00 0.00 Length (ft) = 66.00 0.50 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 ' ' 0.00 3.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 13.30 10.00 0.00 0.00 Crest El. (ft) = 736.00 737.00 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 6.00 9.00 Stage / Discharge Elev (ft) 738.00 737.00 736.00 735.00 734.00 733.00 12.00 15.00 18.00 21.00 24.00 27.00 Discharge (cfs) Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-2 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 11-17-17 Sheet: 1 of 3 Revised: 12-21-17 DESIGN CRITERIA PER NCDENR STORMWATER DESIGN MANUAL DATED JAN 2017 " BMP -SAND FILTER -WATER QUALITY CONTROL ONLY 2 " Total Drainage Area (A): 9.00 ac " Total Impervious Area "I" USED = 48.0% (for Design) 4.32 ac (See attached Impervious Calcs) " Total Water Quality Volume To Treat (First 1" of Rainfall): WQv = (P/12) (A) (RV) (43560) = 15,747 cf (Simple Method, Schueler) P: Water Quality Design Storm, 1st Inch of Rainfall 1 inch A: Drainage Area (Impervious Area Only) 9.00 ac. Rv: 0.05 + 0.009 (I) = 0.482 1: % of Impervious Area 48.0% *Total Storm Water Volume Control 1-yr. 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 48,760 cf (SCS Method) P: Design Storm, 1-yr 24-hr Storm Rainfall depth 2.8 inch A: Drainage Area 9.00 ac. S = 1,000/CN-10 = 1.63 inch CN: Curve Number 86 " Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 67,398 cf (SCS Method) P: Design Storm, 10-yr 24-hr Storm Rainfall depth 3.46 inch A: Drainage Area 9.00 ac. S = 1000/CN-10 = 1.63 inch CN: Curve Number 86 "Sedimentation Chamber Volume Min. Required: Vol -Pre = (0.2)(WQv) = 3,149 cf " Sedimentation Chamber Volume Provided: 13,000 cf " Filtration Media Surface Area Required: Af=((WQv) (Df)]/ ((k) (Hf + Df) (Tf)] = 1,616 sf (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Water quality volume 15,747 cf Df.- Filter bed depth (2'.5 for Optimal Efficiency) 2.5 ft k: Permeability coefficient of filter media 3.50 ft/day (1.75" per hour, or 3.5' per day) Hf.- Average height of water above filter bed, (half of pond depth, I'max) 0.78 ft Tf = Design filter bed drain time in days, (2 days beyond center 6-hr storm) 2.125 days Depth of Pond Water (24" Max.)= 24 inch " Filtration Media Surface Area Provided: 2,000 sf BMP Storage Volume Provided: Elevation Surface Area Incremental Storage Total Storage fts c c FEMA 100 Year Flood Elevation @ 725.0' (Flood Insurance Study dated 6-16-2009) SHWTE and groundwater @ 719.73' per Summit Geo Report letter dated 11-14-17 724.5 Bottom of Stone 725.5 Top of Stone/Bottom of Sand 728.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 728.0 5,300 0 0 Bottom of Pond 730.0 13,500 18,800 18,800 732.0 17,100 30,600 49,400 734.0 20,900 38,000 87,400 Top of Embankment Static Water Quality Elevation @ 729.68 ft Static Channel Protection Elevation @ 731.96 ft printed 811312018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPPhase 107031-PHI-BMP Sandfilterxls page 1 of 3 Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-2 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 11-17-17 Sheet: 2 of 3 Revised: 12-21-17 BMP - SAND FILTER R \A/..L...- Il.-..... Il....... G1..... O..L.. Tl..-.. C.....J G:IL...- �I...J:.. Qo = WQv/Tf= (Af)(k)(Hf+Df)/Df= 0.1178 cfs (Darcy's Law) k: Permeability coefficient of filter media 3.50 ft/day Af.- Surface area, sf 1,616 sf Hf.- Average height of water above filter bed 2.00 ft Df.- Depth of soil filter bed 2.5 ft Q o @ Top of Media 728.0 = 0.0000 cfs Q o @ Median of WQv storage 728.8 = 0.0506 cfs Q o @ Top of WQv storage 729.7 = 0.0620 cfs 'ime Drawdown from Inundation to Saturation surface Tf=WQv/Qo 37.12 hrs iizinn Under Drain Pipes Q: Draw down rate thru sand filter 0.1178 cfs Use [2]-17 If of 6" PVC or Sch 40, Use 2 of w/ 3/8" perforations spaced 3" on center, 4 rows w/ 90-deg apart 17 LF of 6 inch # of Perforation = (# pipes)(4 rows/ft) (Linear feet/per pipe -2') (4 holes/row) = (2 pipes)(4)(171f)(4) 20 holes Capacity of one hole (3/8") = CA(2gh)1(0.5) (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) of 3/8" hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 0.1566 cfs Total Capacity w/ 50% lost to clogging 0.0783 cfs Underdrain Pipe Capacity= 1.49/n(A)(A/P)1(2/3) (S)10.5 (Manning Eq) 0.395 cfs n= pipe coefficient 0.013 A= Area (sf) of 6" dia pipe 0.1963 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 0.1974 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter. OK (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). Storm Volume, Less 50% Remain Beyond 36th Hour 24,380 cf Average Surface Area 14,512 sf Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)A(1/2)) a = 0.058 Max. Orifice Diameter (inch), d = 3.28 Orifice Diameter (inch) Used, d = 2.5 Qo = WQv /Tf (Darcy's Law) CPv: 1-yr Storm Volume Tf.- 2 days beyond center of 24hr-storm. 60 hours Orifice A= ResevoirArea, sf 14,512 h= Falling Head, ft 1.58 c= Discharge Coefficient 0.6 t= Time ( 36 hrs), sec. 129,600 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) d= Orifice Diameter (inch) 0.2257 cfs 48,760 cf 216.000 sec printed 811312018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPPhase 107031-PHI-BMP Sandfilterxls page 2 of 3 Project: Village at Granite DPR ASSOCIATES, INC Job No.: 17031 SAND FILTER-2 DESIGN Location: Granite Quarry, NC Sheet: 3 of 3 Outlet Pipe Size (I.D.) = 36 Outlet Pipe Size (O.D.) = 3.67 L, Length of Outlet Pipe = 38 Min. Flow Length = 43.7 Total Lengh of Collar offset = 5.7 Number of anti -seep collars 2 Offset per collar 2.9 Min. Outside dimension of each collar 6.52 Designed collars 2 at 6.5' x 6.5' Prepared By: RJ Checked By: HN Date: 11-17-17 Revised: 12-21-17 Min. Flow Length = 115% of outlet pipe printed 811312018 T.IPROJECTS12017 PROJECTS117031 The Village At Grande - LGIICALCSIBMPIPhase 1117031-PHI-BMP Sandfidecxls page 3 of 3 Pond Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 2 - PH1 BMP 2 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 728.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 728.00 5,300 0 0 2.00 730.00 13,500 18,800 18,800 4.00 732.00 17,100 30,600 49,400 6.00 734.00 20,900 38,000 87,400 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 3.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 724.33 729.80 0.00 0.00 Length (ft) = 32.00 0.50 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 6.00 6X0I01 4.00 3.00 2.00 1.00 0.00 ' 1' 0.00 10.00 20.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 17.00 0.00 0.00 0.00 Crest El. (ft) = 731.80 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 30.00 40.00 50.00 60.00 70.00 Elev (ft) 734.00 111111036191I91 732.00 731.00 730.00 729.00 728.00 80.00 90.00 100.00 Discharge (cfs) Project: Village at Granite - Phasel DPR ASSOCIATES Prepared By: RJ Job No.: 17031 BMP WETPOND #3 DESIGN Checked By: HN Location: Granite Quarry, INC Date: 10-17-17 Sheet: 1 of 2 Revised: 2-26-18, RJ DESIGN CRITERIA PER NCDENR STORMWATER DESIGN MANUAL DATED JAN 2017 " BMP WET DETENTION POND 3 " Total Drainage Area (A): 22.00 ac * Total Impervious Area "I" USED = 48.0% (for Design) 10.56 ac (See attached Impervious Calcs) " Total Water Quality Volume To Treat (First 1" of Rainfall): WQv = (P/12) (A) (Rv) (43, 560) = 38,493 cf (Simple Method, Schueler) P. Water Quality Design Storm, lstl-Inch of Rainfall 1 inch A: Drainage Area 22.00 ac. Rv., 0.05 + 0.009 (1) = 0.482 I. % of Impervious Area 48.0% • Main Pool: Pool Average Depth (H)= 6.5 ft Surface Area to Drainage Area Ratio (SA/DA)= (NCDENR Table 1) 1.04 Required Surface Area (SA)= 9,967 sf Provided Surface Area (SA) @ Perm. W.S. Elev.= 18,000 sf Required Pool Volume (V= SA'H)= 64,782 cf Provided Pool Volume (V) @ Perm. W.S. Elev.= 74,500 cf • Forebay: Required Forebay Volume (20% of Pool Volume)= 12,956 cf Provided Forbay Volume @ Perm. W.S. Elev.= cf • Estimated Storm Water Volume 1-yr, 24-hr Post-Dev: 108,082 cf Qv = (P-0.2S)^2/ (P+0.8S) ` A ` (43,560/12) _ (SCS Method) P. Design Storm, 1-yr 24-hr Storm Rainfall depth inch A: Drainage Area 22.00 ac. S = 1000/CN-10 = 1.90 inch CN: Curve Number 84 • Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)^2/ (P+0.8S) ' A' (43,560/12) = 151,915 cf (SCS Method) P. Design Storm, 10-yr24-hrStorm Rainfall depth 3.46 inch A: Drainage Area 22.00 ac. S = 1000/CN-10 = 1.90 inch CN: Curve Number 84 BMP Pond Storage Volume Provided: Stage Surface Area Incremental Storage Total Storage (ft) (sf) (cf) (cf) Notes FEMA 100 Year Flood Elevation @ 724.14' DPR Flood Study dated 6-1-2018 SHWTE and groundwater @ 722.28' per Summit Geo Report letter dated 11-14-17 716.0 2,000 0 0 Bottom of Pond 718.0 11,300 13,300 13,300 720.0 13,200 24,500 37,800 722.0 15,200 28,400 66,200 722.5 (Perm. W.S.) 18,000 8,300 74,500 Top of Perm. Pool 722.5 (Perm. W.S.) 18,000 0 0 Bottom of Temp. Pool 723.0 21,400 9,850 9,850 724.0 23,500 22,450 32,300 724.5 24,600 12,025 44,325 726.0 27,900 39,375 83,700 728.0 32,400 60,300 144,000 729.0 34,800 33,600 177,600 730.0 36,800 35,800 213,400 Top of Embankment Static Water Quality Elevation @ 724.26 ft Static Channel Protection Elevation @ 726.81 ft T IPROJECTS12017 PROJECTS117031 The Village At Grande-1-GIICAI-CSIBMPIPhase 1117031-PHI-BMP Wet Pond.xls printed 101912018 Project: Village at Granite - Phasel DPR ASSOCIATES Prepared By: RJ Job No.: 17031 BMP WETPOND #3 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 10-17-17 Sheet: 2 of 2 Revised: 2-26-18, RJ * BMP POND 3 Orifice Calculations For Detawering Time Between 24 hrs to 120 hrs WQv 38,493 cf Average Surface Area 21,871 sf Area of Outlet Orifice (sf), a =(2)(A)h^(l /2))/(c)(t)(2g)^(1 /2)) (NCDENR, Orifice Equation) a = 0.084 where: A=ResevoirArea, sf 21,871 Min. Orifice Diameter (inch), d = 3.93 h= Falling Head, ft 1.76 c= Discharge Coefficient 0.5 Orifice Diameter (inch) Used, d = 3.0 t= Time (48 Hrs), sec. 172,800 g=Accelleration, ff/sq.sec 32.2 a= Orifice Area (so d= Orifice Diameter (inch) Emergency Drain Orifice Calculations For Permanent Pond Within 24 hrs Permanent Pool Volume 74,500 cf Average Surface Area 11,462 sf Area of Outlet Orifice (sf), a =(2)(A)h^(l /2))/(c)(t)(2g)^(1 /2)) (NCDENR, Orifice Equation) a = 0.169 where: A= ResevoirArea, sf 11,462 Min. Orifice Diameter (inch), d = 5.58 h= Falling Head, ft 6.50 c= Discharge Coefficient 0.5 Orifice Diameter (inch) Used, d = 5.0 t= Time (24 Hrs), sec. 86,400 g=Accelleration, /Isec 32.2 a= Orifice Area (so d= Orifice Diameter (inch) Anti -Seep Collar Sizing Outlet Pipe Size (I.D.) = 36 in Outlet Pipe Size (O.D.) = 3.67 ft L, Length of Outlet Pipe = 96 If Min. Flow Length = 110.4 ft Min. Flow Length = 115% of outlet pipe length Total Lengh of Collar offset = 14.4 ft Number of anti -seep collars 2 Offset per collar 7.2 ft Min. Outside dimension ofeach collar 10.87 ft Designed collars 2 at 10' x 10' T.IPROJECTS12017 PROJECTS117031 The Village At Grande - LGIICALCSIBMPIPhase 1117031-PHI-BMP Wet Pond.xls printed 101912018 Pond Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 3 - PH1 BMP 3 - WET POND Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 722.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 722.50 18,000 0 0 0.50 723.00 21,400 9,850 9,850 1.50 724.00 23,500 22,450 32,300 2.00 724.50 24,600 12,025 44,325 3.50 726.00 27,900 39,375 83,700 5.50 728.00 32,400 60,300 144,000 6.50 729.00 34,800 33,600 177,600 7.50 730.00 36,800 35,800 213,400 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 3.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 719.45 722.50 0.00 0.00 Length (ft) = 90.00 0.50 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 8.00 6.00 4.00 2.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 17.00 10.00 0.00 0.00 Crest El. (ft) = 726.50 728.00 0.00 0.00 Weir Coeff. = 2.60 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 723.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 9.00 18.00 27.00 36.00 45.00 54.00 63.00 72.00 81.00 Total Q Elev (ft) 730.50 728.50 726.50 724.50 1 722.50 90.00 Discharge (cfs) Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-4 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 11-17-17 Sheet: 1 of 3 Revised 12-21-17 DESIGN CRITERIA PER NCDENR STORMWATER DESIGN MANUAL DATED JAN 2017 " BMP -SAND FILTER -WATER QUALITY CONTROL ONLY 4 " Total Drainage Area (A): 4.00 ac " Total Impervious Area "I" USED = 48.0% (for Design) 1.92 ac (See attached Impervious Calcs) " Total Water Quality Volume To Treat (First 1" of Rainfall): WQv = (P/12) (A) (RV) (43560) = 6,999 cf (Simple Method, Schueler) P: Water Quality Design Storm, 1st Inch of Rainfall 1 inch A: Drainage Area (Impervious Area Only) 4.00 ac. Rv: 0.05 + 0.009 (I) = 0.482 1: % of Impervious Area 48.0% *Total Storm Water Volume Control 1-yr. 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 16,868 cf (SCS Method) P: Design Storm, 1-yr 24-hr Storm Rainfall depth 2.8 inch A: Drainage Area 4.00 ac. S = 1,000/CN-10 = 2.35 inch CN: Curve Number 81 " Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 24,339 cf (SCS Method) P: Design Storm, 10-yr 24-hr Storm Rainfall depth 3.46 inch A: Drainage Area 4.00 ac. S = 1000/CN-10 = 2.35 inch CN: Curve Number 81 "Sedimentation Chamber Volume Min. Required: Vol -Pre = (0.2)(WQv) = 1 1,400 cf " Sedimentation Chamber Volume Provided: 3,200 cf " Filtration Media Surface Area Required: Af=((WQv) (Df)]/ ((k) (Hf + Df) (Tf)] = 684 sf (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Water quality volume 6,999 cf Df.- Filter bed depth (2'.5 for Optimal Efficiency) 2.5 ft k: Permeability coefficient of filter media 3.50 ft/day (1.75" per hour, or 3.5' per day) Hf.- Average height of water above filter bed, (half of pond depth, I'max) 0.94 ft Tf = Design filter bed drain time in days, (2 days beyond center 6-hr storm) 2.125 days Depth of Pond Water (24" Max.)= 24 inch " Filtration Media Surface Area Provided: 700 sf BMP Storacie Volume Provided: Elevation Surface Area Incremental Storage Total Storage fts c c FEMA 100 Year Flood Elevation @ 723.37' (DPR Flood Study dated 6-1-2018) SHWTE and groundwater @ 708.71' per Summit Geo Report letter dated 11-14-17 720.5 Bottom of Stone 721.5 Top of Stone/Bottom of Sand 724.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 724.0 3,600 0 0 Bottom of Pond 726.0 5,600 9,200 9,200 728.0 7,800 13,400 22,600 730.0 10,300 18,100 40,700 Top of Embankment Static Water Quality Elevation @ 725.52 ft Static Channel Protection Elevation @ 727.14 ft printed 811312018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPPhase 107031-PHI-BMP Sandfilterxls page 1 of 3 Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-4 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 11-17-17 Sheet: 2 of 3 Revised 12-21-17 BMP - SAND FILTER R \A/..L...- Il.-..... Il....... G1..... O..L.. Tl..-.. C.....J G:IL...- �I...J:.. Qo = WQv/Tf= (Af)(k)(Hf+Df)/Df= 0.0499 cfs (Darcy's Law) k: Permeability coefficient of filter media 3.50 ft/day Af.- Surface area, sf 684 sf Hf.- Average height of water above filter bed 2.00 ft Df.- Depth of soil filter bed 2.5 ft Q o @ Top of Media 724.0 = 0.0000 cfs Q o @ Median of WQv storage 724.8 = 0.0506 cfs Q o @ Top of WQv storage 725.5 = 0.0620 cfs 'ime Drawdown from Inundation to Saturation surface Tf = WQv / Qo 38.99 h rs ;izina Under Drain Pipes Q: Draw down rate thru sand filter 0.0499 cfs Use [2]-17 If of 6" PVC or Sch 40, Use 2 of w/3/8"perforations spaced 3"on center, 4 rows w/90-deg apart 17 LF of 6 inch # of Perforation = (# pipes)(4 rows/ft) (Linear feet/per pipe -2') (4 holes/row) = (2 pip es) (4)(17If) (4) 20 holes Capacity of one hole (3/8") = CA(2gh)1(0.5) (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) of 3/8" hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 0.1566 cfs Total Capacity w/ 50% lost to clogging 0.0783 cfs Underdrain Pipe Capacity= 1.49/n(A)(A/P)1(2/3) (S)10.5 (Manning Eq) 0.395 cfs n= pipe coefficient 0.013 A= Area (sf) of 6" dia pipe 0.1963 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 0.1974 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter. OK (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 8,434 cf Average Surface Area 5,549 sf Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)A(1/2)) a = 0.021 NCDENR, Orifice E uatio, where: A= ResevoirArea, sf 5,549 Max. Orifice Diameter (inch), d = 1.98 h= Falling Head, ft 1.42 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 2.5 t= Time ( 36 hrs), sec. 129,600 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) d= Orifice Diameter (inch) Qo = WQv / Tf 0.0781 cfs (Darcy's Law) CPv: 1-yr Storm Volume 16,868 cf Tf.- 2 days beyond center of 24hr-storm, 60 hours 216,000 sec printed 811312018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPIPhase 107031-PHI-BMP Sandfilterxls page 2 of 3 Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-4 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 11-17-17 Sheet: 3 of 3 Revised 12-21-17 * BMP - SAND FILTER Anti -Seep Collar Sizing Outlet Pipe Size (I.D.) = 24 in Outlet Pipe Size (O.D.) = 2.50 ft L, Length of Outlet Pipe = 40 If Min. Flow Length = 46.0 ft Min. Flow Length = 115% of outlet pipe Total Lengh of Collar offset = 6.0 ft Number of anti -seep collars 2 Offset per collar 3.0 ft Min. Outside dimension of each collar 5.50 ft Designed collars 2 at 5.5' x 5.5' printed 811312018 T.IPROJECTS12017 PROJECTS117031 The Village At Grande - LGIICALCSIBMPIPhase 1117031-PHI-BMP Sandfidecxls page 3 of 3 Pond Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 4 - PH1 BMP 4 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 724.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 724.00 3,600 0 0 2.00 726.00 5,600 9,200 9,200 4.00 728.00 7,800 13,400 22,600 6.00 730.00 10,300 18,100 40,700 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 24.00 3.00 0.00 0.00 Span (in) = 24.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 720.40 725.60 0.00 0.00 Length (ft) = 40.00 0.50 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 6.00 6X0I01 4.00 3.00 2.00 1.00 0.00 I I 0.00 4.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 13.30 0.00 0.00 0.00 Crest El. (ft) = 727.20 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 730.00 729.00 728.00 727.00 726.00 725.00 I 724.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 44.00 48.00 Discharge (cfs) Project: Village at Granite DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 SAND FILTER-1 DESIGN Checked By: HN Location: Granite Quarry, NC Date: 10-17-17 Sheet: 1 of 2 Revised: 12-21-17 DESIGN CRITERIA PER NCDENR STORMWA TER DESIGN MANUAL DATED JAN 2017 "BMP-DRYPOND 6 " Total Drainage Area: 6.00 ac *Total Storm Water Volume Control 1-vr. 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 16,053 cf (SCS Method) P: Design Storm, 1-yr 24-hr Storm Rainfall depth 2.80 inch A: Drainage Area 6.00 ac. S = 1,0001CN-10 = 3.70 inch CN: Curve Number 73 Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) " A " (43560/12) = 25,109 cf (SCS Method) P: Design Storm, 10-yr 24-hr Storm Rainfall depth 3.46 inch A: Drainage Area 6.00 ac. S = 1000/CN-10 = 3.70 inch CN: Curve Number 73 BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage fts c c 753.0 3,100 0 0 Bottom of Pond 754.0 9,600 6,350 6,350 756.0 12,700 22,300 28,650 758.0 16,100 28,800 57,450 758.5 17,000 8,275 65,725 Top of Embankment Static Channel Protection Elevation @ 755.13 ft Orifice Calcs For Channel Protection Dewaterina Time 2 days (48 hrs) Beyond Center of 24-hr Storm (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 8,027 cf Average Surface Area 3,768 sf Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)1(1/2)) NCDENR, Orifice Equation) a = 0.017 where: A= ResevoirArea, sf 3,768 Max. Orifice Diameter (inch), d = 1.79 h= Falling Head, ft 2.06 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 1.8 t= Time ( 36 hrs), sec. 129,600 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (sf) d= Orifice Diameter (inch) printed 101912018 T:IPROJECTSI2017 PROJECTS07031 The Village At Granite - LGACALCSOMPPhase 107031-PHI-BMP Dry Detention.xls page 1 of 2 Project: Village at Granite DPR ASSOCIATES, INC Job No.: 17031 SAND FILTER-1 DESIGN Location: Granite Quarry, NC Sheet: 2 of 2 BMP - SAND FILTER Anti -Seep Collar Sizing Outlet Pipe Size (I.D.) = 24 in Outlet Pipe Size (O.D.) = 2.50 ft L, Length of Outlet Pipe = 53 If Min. Flow Length = 61.0 ft Total Lengh of Collar offset = 8.0 ft Number of anti -seep collars 2 Offset per collar 4.0 ft Min. Outside dimension of each collar 6.48 ft Designed collars 2 at 6.5' x 6.5' Prepared By: RJ Checked By: HN Date: 10-17-17 Revised: 12-21-17 Min. Flow Length = 115% of outlet pipe printed 10192018 T.IPROJECTS12017 PROJECTS117031 The Village At Grande - LGIICALCSIBMPIPhase 1117031-PHI-BMP Dry Detention.xls page 2 of 2 Pond Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Pond No. 1 - PH1 BMP 6 - DRY DETENTION Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 753.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 753.00 3,100 0 0 1.00 754.00 9,600 6,350 6,350 3.00 756.00 12,700 22,300 28,650 5.00 758.00 16,100 28,800 57,450 5.50 758.50 17,000 8,275 65,725 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 1.80 0.00 0.00 Crest Len (ft) = 13.30 0.00 0.00 0.00 Span (in) = 24.00 1.80 0.00 0.00 Crest El. (ft) = 755.20 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 753.00 754.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 53.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.56 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 753.50 Stage (ft) 6.00 6'110101 4.00 3.00 2.00 1.00 0.00 ' ' 0.00 3.00 Total Q 6.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 759.00 757.00 756.00 755.00 754.00 753.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Discharge (cfs) DPR ASSOCIATES, INC BMP OUTLET STRUCTURE BOUYANCY CALCULATION OUTLET STRUCTURE BOUYANCYCALCULATION NC DOT #840.N BMP Number BMP #1 BMP #2 BMP BMP #4 BMP #6 Structure Number 1400 2-200 3-40 44-200 5-106 WEIGHT OF DISPLACED WATER BY STRUCTURE Volume of riser: Outlet Pipe Diameter (in) = 18 36 36 24 24 Outside Length (ft) = 5.00 5.50 5.50 5.00 5.00 Outside Width (ft) = 3.67 5.00 5.00 3.67 3.67 Wall Thickness (ft) = 0.50 0.50 0.50 0.50 0.50 Weir Elev (ft) = 736.00 736.00 731.80 726.50 755.20 I nvert Out (ft) = 728.36 728.35 724.33 719.45 753.00 Height of Weir to Invert Out (ft) = 7.64 7.65 7.47 7.05 2.20 Riser Volume (cu.ft) = 140.07 210.37 205.42 129.25 40.33 Length (ft) = 6.00 6.50 6.50 6.00 6.00 Width (ft) = 4.67 6.00 6.00 4.67 4.67 Height (ft) = 0.67 0.67 0.67 0.67 0.67 Base Volume (cu.ft) = 18.67 26.00 26.00 18.67 18.67 Total Volume of Structure: 158.73 236.38 231.43 147.92 59.00 Weight of Water (lbs/cu.ft) = 62.4 62.4 ' 62.4 62.4 62.4 Weight of Water Displaced (Ibs) 9,905 14,750 14,441 9,230 3,682 Volume of Base (cu ft) = 18.67 26.00 26.00 18.67 18.67 Volume of riser: Outside Area (sf) = 18.33 27.50 27.50 18.33 18.33 Inside Area (sf) = 10.67 18.00 18.00 10.67 10.67 Net Area (sf) = 7.67 9.50 9.50 7.67 7.67 Height of Riser to Weir (ft) = 7.64 7.65 7.47 7.05 2.20 Volume of Riser (cu ft) = 58.57 72.67 70.96 54.05 16.87 Area Loss for outlet pipe opening (sf): 1.77 7.07 M 7.07 Mini 3.14 3.14 Volume Loss for outlet pipe opening (cu.ft): -0.88 -3.53 -3.53 -1.57 -1.57 Net Volume of Riser (sf) = 57.69 69.14 67.43 52.48 15.30 Volume of Posts (cu.ft): Weir Height (in) = 6.00 6.00 6.00 6.00 6.00 Volume of Posts (cu.ft) = 0.89 0.89 0.89 0.89 0.89 Volume of Top Slab (cu.ft): Length (ft) = 5.00 5.50 5.50 5.00 5.00 Width (ft) = 3.67 5.00 5.00 3.67 3.67 Thickness (in) = 6.00 6.00 6.00 6.00 6.00 Volume of Top slab (cu.ft) = 9.17 13.75 13.75 9.17 9.17 Volume Loss for Opening for Frame/Cover (cu ft) = 1.83 1.83 1.83 1.83 1.83 Volume of Top slab (cu.ft) = 7.33 11.92 11.92 7.33 7.33 Weight of Concrete in Structure (Ibs) = 13,533 17,272 16,998 12,699 6,750 Weight of Ring and Cover (Ibs) = 230 230 230 fi 230 230 Total Weight Structure (Ibs) = 13,763 17,502 17,228 12,929 6,980 Length (ft) = 6.00 6.50 6.50 6.00 6.00 Width (ft) = 4.67 6.00 6.00 4.67 4.67 Height (ft) = 0.00 0.00 0.00 0.00 0.00 Anchor Block Volume (cu.ft) = 0.0 0.0 0.0 0.0 0.0 Weight of Water (lbs/cu.ft) = 62.4 62.4 62.4 62.4 62.4 Weiaht of Water Displaced by Anchor Block (Ibs) 0 0 0 0 0 Weight of Anchor Block (Ibs) 0 0 0 0 0 Not Required Not Required Not Required Not Required Not Required Weight of Water Displaced (Ibs) = 9,905 14,750 14,441 9,230 3,682 Total Weight Structure (Ibs) = 13,763 17,502 17,228 12,929 6,980 Bouyancy (Ibs) = 3,858 2,752 2,787 3,699 3,298 Safety Factor = 1.39 1.19 1.19 1.40 1.90 Includes anchor block, if needed T.IPRQIECTS12017 PRQIECTSI17031 The Village At Granite - LGIICALCSIBMPIPhase 1117031-PH1 BMP Anchor Block.xls printed 10/102018 V. BMP HYDROGRAGH ANALYSIS - Hydrograph Summary Report - Hydrograph Pond Report - Hydrograph Report Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.670 2 730 8,486 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 7.971 2 726 27,035 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 8.685 2 732 40,180 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 1.415 2 726 6,232 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 2.098 2 726 7,114 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 1.675 2 718 4,662 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 10.37 2 732 47,295 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 11.41 2 716 23,029 ------ ------ ------ PH1 POST - BMP 1 11 SCS Runoff 22.59 2 716 45,713 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 50.19 2 716 101,326 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 7.892 2 718 15,814 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 4.137 2 718 8,662 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 0.197 2 1060 15,252 10 734.92 16,122 PH1 ROUTED - BMP 1 17 Reservoir 0.255 2 1222 28,763 11 731.09 35,490 PH1 ROUTED - BMP 2 18 Reservoir 0.411 2 1442 86,336 12 726.02 84,243 PH1 ROUTED - BMP 3 19 Reservoir 0.163 2 996 8,440 13 726.20 10,559 PH1 ROUTED - BMP 4 20 SCS Runoff 4.137 2 718 8,662 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 1 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 2.00 1.00 M PH1 PRE - BMP 1 Hyd. No. 1 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Tuesday, 10 / 16 / 2018 = 1.670 cfs = 730 min = 8,486 cuft = 65 = 0 ft = 22.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 8.00 WE 4.00 2.00 0.00 0 120 240 360 — Hyd No. 2 PH1 PRE - BMP 2 Hyd. No. 2 -- 1 Year 480 600 720 840 Tuesday, 10 / 16 / 2018 = 7.971 cfs = 726 min = 27,035 cuft = 74 = 0 ft = 18.00 min = Type II = 484 Q (cfs) 8.00 . �� 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 16.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 10.00 More 4.00 2.00 M PH1 PRE - BMP 3 Hyd. No. 3 -- 1 Year 120 240 360 480 600 720 840 Hyd No. 3 Tuesday, 10 / 16 / 2018 = 8.685 cfs = 732 min = 40,180 cuft = 72 = 0 ft = 27.00 min = Type II = 484 Q (cfs) 10.00 MIX ItM 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 2.00 1.00 M PH1 PRE - BMP 4 Hyd. No. 4 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Tuesday, 10 / 16 / 2018 = 1.415 cfs = 726 min = 6,232 cuft = 63 = 0 ft = 15.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge = 2.098 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 7,114 cuft Drainage area = 2.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 5 Q (Cfs) Hyd. No. 5 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.300 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 2.00 1.00 M PH1 PRE - UNDET. Hyd. No. 6 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 6 Tuesday, 10 / 16 / 2018 = 1.675 cfs = 718 min = 4,662 cuft = 61.9 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE-BMP3&5 Hydrograph type = Combine Peak discharge = 10.37 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 47,295 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac Q (cfs) 12.00 10.00 m .M 4.00 2.00 PH1 PRE - BMP 3 & 5 Hyd. No. 8 -- 1 Year 0.00 ' ' 0 120 240 360 480 600 Hyd No. 8 Hyd No. 3 720 Q (cfs) 12.00 10.00 M M 4.00 2.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 11.41 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 23,029 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 M .M 4.00 2.00 PH1 POST - BMP 1 Hyd. No. 10 -- 1 Year Q (cfs) 12.00 10.00 M M 4.00 2.00 0.00 ' — ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 22.59 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 45,713 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 24.00 20.00 16.00 12.00 M 4.00 PH1 POST - BMP 2 Hyd. No. 11 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 M M 0.00 1 1 1 1'- ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 11 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 50.19 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 101,326 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - BMP 3 Q (Cfs) Hyd. No. 12 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 12 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 8.00 WE 4.00 2.00 0.00 0 120 240 360 — Hyd No. 13 PH1 POST - BMP 4 Hyd. No. 13 -- 1 Year 480 600 720 840 Tuesday, 10 / 16 / 2018 = 7.892 cfs = 718 min = 15,814 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 8.00 . �� 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 14 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 4.137 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,662 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 14 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 0.197 cfs Storm frequency = 1 yrs Time to peak = 1060 min Time interval = 2 min Hyd. volume = 15,252 cuft Inflow hyd. No. = 10-PH1 POST - BMP 1 Max. Elevation = 734.92 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 16,122 cuft Storage Indication method used. PH1 ROUTED - BMP 1 Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 16 Hyd No. 10 0 Total storage used = 16,122 cult Pond Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 1 - PH1 BMP 1 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 733.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 733.00 7,000 0 0 1.00 734.00 8,100 7,550 7,550 3.00 736.00 10,500 18,600 26,150 5.00 738.00 12,700 23,200 49,350 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 18.00 3.00 0.00 0.00 Span (in) = 18.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 728.35 734.10 0.00 0.00 Length (ft) = 66.00 0.50 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 ' ' 0.00 3.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 13.30 10.00 0.00 0.00 Crest El. (ft) = 736.00 737.00 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 6.00 9.00 Stage / Discharge Elev (ft) 738.00 737.00 736.00 735.00 734.00 733.00 12.00 15.00 18.00 21.00 24.00 27.00 Discharge (cfs) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 0.255 cfs Storm frequency = 1 yrs Time to peak = 1222 min Time interval = 2 min Hyd. volume = 28,763 cuft Inflow hyd. No. = 11 -PH1 POST - BMP 2 Max. Elevation = 731.09 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 35,490 cuft Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 ' 0 480 Hyd No. 17 PH1 ROUTED - BMP 2 Hyd. No. 17 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 0.00 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 11 0 Total storage used = 35,490 cult Pond Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 2 - PH1 BMP 2 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 728.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 728.00 5,300 0 0 2.00 730.00 13,500 18,800 18,800 4.00 732.00 17,100 30,600 49,400 6.00 734.00 20,900 38,000 87,400 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 3.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 724.33 729.80 0.00 0.00 Length (ft) = 32.00 0.50 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 6.00 6X0I01 4.00 3.00 2.00 1.00 0.00 ' 1' 0.00 10.00 20.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 17.00 0.00 0.00 0.00 Crest El. (ft) = 731.80 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 30.00 40.00 50.00 60.00 70.00 Elev (ft) 734.00 111111036191I91 732.00 731.00 730.00 729.00 728.00 80.00 90.00 100.00 Discharge (cfs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 0.411 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 86,336 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 726.02 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 84,243 cuft Storage Indication method used. PH1 ROUTED - BMP 3 Q (cfs) Hyd. No. 18 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 18 Hyd No. 12 Total storage used = 84,243 cuft Pond Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 3 - PH1 BMP 3 - WET POND Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 722.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 722.50 18,000 0 0 0.50 723.00 21,400 9,850 9,850 1.50 724.00 23,500 22,450 32,300 2.00 724.50 24,600 12,025 44,325 3.50 726.00 27,900 39,375 83,700 5.50 728.00 32,400 60,300 144,000 6.50 729.00 34,800 33,600 177,600 7.50 730.00 36,800 35,800 213,400 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 3.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 719.45 722.50 0.00 0.00 Length (ft) = 90.00 0.50 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 8.00 6.00 4.00 2.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 17.00 10.00 0.00 0.00 Crest El. (ft) = 726.50 728.00 0.00 0.00 Weir Coeff. = 2.60 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 723.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 9.00 18.00 27.00 36.00 45.00 54.00 63.00 72.00 81.00 Total Q Elev (ft) 730.50 728.50 726.50 724.50 1 722.50 90.00 Discharge (cfs) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 0.163 cfs Storm frequency = 1 yrs Time to peak = 996 min Time interval = 2 min Hyd. volume = 8,440 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 726.20 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 10,559 cuft Storage Indication method used Q (cfs) 8.00 WE 4.00 2.00 PH1 ROUTED - BMP 4 Hyd. No. 19 -- 1 Year 240 480 720 960 1200 1440 1680 1920 2160 2400 Hyd No. 19 Hyd No. 13 Total storage used = 10,559 cuft Q (cfs) 8.00 WE 4.00 2.00 0.00 2640 Time (min) Pond Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Pond No. 4 - PH1 BMP 4 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 724.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 724.00 3,600 0 0 2.00 726.00 5,600 9,200 9,200 4.00 728.00 7,800 13,400 22,600 6.00 730.00 10,300 18,100 40,700 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 24.00 3.00 0.00 0.00 Span (in) = 24.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 720.40 725.60 0.00 0.00 Length (ft) = 40.00 0.50 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 6.00 6X0I01 4.00 3.00 2.00 1.00 0.00 I I 0.00 4.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 13.30 0.00 0.00 0.00 Crest El. (ft) = 727.20 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 730.00 729.00 728.00 727.00 726.00 725.00 I 724.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 44.00 48.00 Discharge (cfs) Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 20 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 4.137 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,662 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 20 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 Time (min) 23 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.289 2 728 14,021 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 12.24 2 726 39,928 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 14.04 2 732 60,589 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 3.036 2 724 10,653 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 3.221 2 726 10,507 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 3.607 2 718 8,135 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 16.64 2 730 71,097 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 15.41 2 716 31,209 ------ ------ ------ PH1 POST- BMP 1 11 SCS Runoff 29.95 2 716 61,026 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 67.80 2 716 137,320 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 10.87 2 716 21,942 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 6.600 2 718 13,362 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 0.270 2 1024 23,369 10 735.53 21,804 PH1 ROUTED - BMP 1 17 Reservoir 0.503 2 1028 44,071 11 731.81 46,448 PH1 ROUTED - BMP 2 18 Reservoir 1.423 2 948 118,514 12 726.54 99,985 PH1 ROUTED - BMP 3 19 Reservoir 0.241 2 950 14,568 13 726.77 14,326 PH1 ROUTED - BMP 4 20 SCS Runoff 6.600 2 718 13,362 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 2 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 3.289 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 14,021 cuft Drainage area = 5.500 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 1 Q (Cfs) Hyd. No. 1 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 12.24 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 39,928 cuft Drainage area = 9.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 00 . We M 2.00 M PH1 PRE - BMP 2 Hyd. No. 2 -- 2 Year Q (cfs) 14.00 12.00 10.00 ItM MIX 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 14.04 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 60,589 cuft Drainage area = 16.000 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 3 Q (Cfs) Hyd. No. 3 -- 2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 3.036 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 10,653 cuft Drainage area = 5.000 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 4 Q (Cfs) Hyd. No. 4 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge = 3.221 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 10,507 cuft Drainage area = 2.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 5 Q (Cfs) Hyd. No. 5 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 3.607 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,135 cuft Drainage area = 4.300 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - UNDET. Q (Cfs) Hyd. No. 6 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE-BMP3&5 Hydrograph type = Combine Peak discharge = 16.64 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 71,097 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac Q (cfs) 18.00 15.00 12.00 •M .M 3.00 PH1 PRE - BMP 3 & 5 Hyd. No. 8 -- 2 Year Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 ' J ' ---7 -------- I I I- ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 3 Hyd No. 5 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 15.41 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 31,209 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •M .M 3.00 a�ais PH1 POST - BMP 1 Hyd. No. 10 -- 2 Year Q (cfs) 18.00 15.00 12.00 M M 3.00 �S 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 10 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 29.95 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 61,026 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 30.00 25.00 15.00 10.00 5.00 PH1 POST - BMP 2 Hyd. No. 11 -- 2 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 11 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 67.80 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 137,320 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 70.00 -1 •• 50.00 F• •• 30.00 20.00 10.00 Q (cfs) 70.00 •• •It 50.00 E• •� 30.00 20.00 10.00 0.00 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 12 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 10.87 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 21,942 cuft Drainage area = 4.000 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 12.00 10.00 WE WE M 2.00 M PH1 POST - BMP 4 Hyd. No. 13 -- 2 Year Q (cfs) 12.00 10.00 M. . �� 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 14 PH1 POST -UNDET. Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.200 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.38 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 7.00 5.00 3.00 2.00 1.00 P11-111 POST - UNDET. Hyd. No. 14 -- 2 Year 0.00 ' ' 0 120 240 360 480 600 Hyd No. 14 Tuesday, 10 / 16 / 2018 = 6.600 cfs = 718 min = 13,362 cuft = 70 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 ' ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 0.270 cfs Storm frequency = 2 yrs Time to peak = 1024 min Time interval = 2 min Hyd. volume = 23,369 cuft Inflow hyd. No. = 10-PH1 POST - BMP 1 Max. Elevation = 735.53 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 21,804 cuft Storage Indication method used. Q (cfs) 18.00 15.00 12.00 .M 3.00 a�ais PH1 ROUTED - BMP 1 Hyd. No. 16 -- 2 Year Q (cfs) 18.00 15.00 12.00 3.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 16 Hyd No. 10 0 Total storage used = 21,804 cult 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 0.503 cfs Storm frequency = 2 yrs Time to peak = 1028 min Time interval = 2 min Hyd. volume = 44,071 cuft Inflow hyd. No. = 11 - PH1 POST - BMP 2 Max. Elevation = 731.81 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 46,448 cuft Storage Indication method used. PH1 ROUTED - BMP 2 Q (cfs) Hyd. No. 17 -- 2 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) — Hyd No. 17 Hyd No. 11 Total storage used = 46,448 cuft 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 1.423 cfs Storm frequency = 2 yrs Time to peak = 948 min Time interval = 2 min Hyd. volume = 118,514 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 726.54 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 99,985 cuft Storage Indication method used. PH1 ROUTED - BMP 3 Q (cfs) Hyd. No. 18 -- 2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 18 Hyd No. 12 Total storage used = 99,985 cuft Hydrograph Report 39 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 0.241 cfs Storm frequency = 2 yrs Time to peak = 950 min Time interval = 2 min Hyd. volume = 14,568 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 726.77 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 14,326 cuft Storage Indication method used PH1 ROUTED - BMP 4 Q (cfs) Hyd. No. 19 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 19 Hyd No. 13 0 Total storage used = 14,326 cult Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 20 PH1 POST -UNDET. Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.200 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.38 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 7.00 5.00 3.00 2.00 1.00 P11-111 POST - UNDET. Hyd. No. 20 -- 2 Year 0.00 ' ' 0 120 240 360 480 600 Hyd No. 20 Tuesday, 10 / 16 / 2018 = 6.600 cfs = 718 min = 13,362 cuft = 70 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 ' ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) 41 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 8.897 2 728 32,525 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 25.19 2 724 79,337 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 30.47 2 732 124,085 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 8.691 2 724 25,809 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 6.628 2 724 20,878 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 10.01 2 718 20,229 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 36.02 2 730 144,963 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 26.39 2 716 54,404 ------ ------ ------ PH1 POST - BMP 1 11 SCS Runoff 49.89 2 716 103,903 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 116.13 2 716 239,380 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 19.46 2 716 39,677 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 14.12 2 718 28,260 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 4.816 2 726 46,497 10 736.22 28,637 PH1 ROUTED - BMP 1 17 Reservoir 15.79 2 724 86,947 11 732.23 53,551 PH1 ROUTED - BMP 2 18 Reservoir 29.10 2 724 220,285 12 727.25 121,287 PH1 ROUTED - BMP 3 19 Reservoir 6.694 2 724 32,303 13 727.48 19,027 PH1 ROUTED - BMP 4 20 SCS Runoff 14.12 2 718 28,260 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 10 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.92 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 10.00 More 4.00 2.00 M PH1 PRE - BMP 1 Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 1 Tuesday, 10 / 16 / 2018 = 8.897 cfs = 728 min = 32,525 cuft = 65 = 0 ft = 22.00 min = Type II = 484 Q (cfs) 10.00 MIX ItM 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 25.19 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 79,337 cuft Drainage area = 9.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 : M M PH1 PRE - BMP 2 Hyd. No. 2 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 30.47 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 124,085 cuft Drainage area = 16.000 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 1 1 1 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.92 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 10.00 More 4.00 2.00 M PH1 PRE - BMP 4 Hyd. No. 4 -- 10 Year 120 240 360 480 600 Hyd No. 4 Tuesday, 10 / 16 / 2018 = 8.691 cfs = 724 min = 25,809 cuft = 63 = 0 ft = 15.00 min = Type II = 484 Q (cfs) 10.00 MIX ItM 4.00 2.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge = 6.628 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 20,878 cuft Drainage area = 2.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 7.00 N. us• 5.00 3.00 2.00 1.00 Q (cfs) 7.00 . •• 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 10.01 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 20,229 cuft Drainage area = 4.300 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 12.00 10.00 M M o 2.00 M PH1 PRE - UNDET. Hyd. No. 6 -- 10 Year Q (cfs) 12.00 10.00 M. . �� 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE -BMP3&5 Hydrograph type = Combine Peak discharge = 36.02 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 144,963 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac PH1 PRE-BMP3&5 Q (Cfs) Hyd. No. 8 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 3 Hyd No. 5 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 26.39 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 54,404 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 i e PH1 POST - BMP 1 Hyd. No. 10 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 10 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 49.89 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 103,903 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 50.00 30.00 20.00 10.00 e PH1 POST - BMP 2 Hyd. No. 11 -- 10 Year Q (cfs) 50.00 we I11 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 11 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 116.13 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 239,380 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 120.00 100.00 20.00 PH1 POST - BMP 3 Hyd. No. 12 -- 10 Year Q (Cfs) 120.00 100.00 40.00 20.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 12 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 19.46 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 39,677 cuft Drainage area = 4.000 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el 3.00 PH1 POST - BMP 4 Hyd. No. 13 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 • OI 3.00 0.00 1 1 1-' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 13 Time (min) Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 14 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 14.12 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 28,260 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 14 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 4.816 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 46,497 cuft Inflow hyd. No. = 10 - PH1 POST - BMP 1 Max. Elevation = 736.22 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 28,637 cuft Storage Indication method used. Q (cfs) 28.00 24.00 16.00 12.00 010111111 i KI PH1 ROUTED - BMP 1 Hyd. No. 16 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) — Hyd No. 16 — Hyd No. 10 Total storage used = 28,637 cuft Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 15.79 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 86,947 cuft Inflow hyd. No. = 11 - PH1 POST - BMP 2 Max. Elevation = 732.23 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 53,551 cuft Storage Indication method used PH1 ROUTED - BMP 2 Q (cfs) Hyd. No. 17 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) — Hyd No. 17 Hyd No. 11 Total storage used = 53,551 cuft 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 29.10 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 220,285 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 727.25 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 121,287 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 0.00 ' 0 360 720 Hyd No. 18 PH1 ROUTED - BMP 3 Hyd. No. 18 -- 10 Year 1080 1440 Hyd No. 12 Q (cfs) 120.00 100.00 40.00 20.00 0.00 1800 2160 2520 2880 3240 3600 3960 Time (min) 0 Total storage used = 121,287 cult 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 6.694 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 32,303 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 727.48 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 19,027 cuft Storage Indication method used. PH1 ROUTED - BMP 4 Q (cfs) Hyd. No. 19 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 1 1 1 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 19 Hyd No. 13 Total storage used = 19,027 cuft Hydrograph Report 58 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 20 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 14.12 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 28,260 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 20 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 Time (min) 59 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 12.72 2 728 45,286 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 33.52 2 724 104,919 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 41.13 2 730 165,806 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 12.57 2 724 36,428 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 8.820 2 724 27,610 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 14.38 2 718 28,780 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 48.56 2 730 193,416 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 32.96 2 716 68,703 ------ ------ ------ PH1 POST - BMP 1 11 SCS Runoff 61.72 2 716 130,110 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 145.03 2 716 302,294 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 24.68 2 716 50,763 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 18.96 2 718 38,176 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 17.64 2 722 60,786 10 736.54 32,308 PH1 ROUTED - BMP 1 17 Reservoir 36.92 2 722 113,154 11 732.57 59,738 PH1 ROUTED - BMP 2 18 Reservoir 66.87 2 722 283,076 12 727.89 140,362 PH1 ROUTED - BMP 3 19 Reservoir 18.35 2 720 43,389 13 727.75 20,892 PH1 ROUTED - BMP 4 20 SCS Runoff 18.96 2 718 38,176 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 25 Year Tuesday, 10 / 16 / 2018 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 12.72 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 45,286 cuft Drainage area = 5.500 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 00 . We M 2.00 M PH1 PRE - BMP 1 Hyd. No. 1 -- 25 Year Q (cfs) 14.00 12.00 10.00 ItM MIX 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 33.52 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 104,919 cuft Drainage area = 9.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 62 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 41.13 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 165,806 cuft Drainage area = 16.000 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 3 Q (Cfs) Hyd. No. 3 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 12.57 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 36,428 cuft Drainage area = 5.000 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 00 . ee M 2.00 M PH1 PRE - BMP 4 Hyd. No. 4 -- 25 Year Q (cfs) 14.00 12.00 10.00 ItM . 1M 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 64 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.83 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 10.00 More 4.00 2.00 M PH1 PRE - BMP 5 Hyd. No. 5 -- 25 Year 120 240 360 480 600 Hyd No. 5 Tuesday, 10 / 16 / 2018 = 8.820 cfs = 724 min = 27,610 cuft = 74 = 0 ft = 18.00 min = Type II = 484 Q (cfs) 10.00 MIX ItM 4.00 2.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 65 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 14.38 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 28,780 cuft Drainage area = 4.300 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - UNDET. Q (Cfs) Hyd. No. 6 -- 25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 66 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE -BMP3&5 Hydrograph type = Combine Peak discharge = 48.56 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 193,416 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac PH1 PRE-BMP3&5 Q (Cfs) Hyd. No. 8 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 3 Hyd No. 5 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 32.96 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 68,703 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 e PH1 POST - BMP 1 Hyd. No. 10 -- 25 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 ' ' 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 10 Time (min) 68 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 61.72 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 130,110 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - BMP 2 Q (cfs) Hyd. No. 11 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) 69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 145.03 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 302,294 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 160.00 140.00 120.00 100.00 20.00 PH1 POST - BMP 3 Hyd. No. 12 -- 25 Year Q (Cfs) 160.00 140.00 120.00 100.00 20.00 0.00 ' r ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 12 Time (min) 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 24.68 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 50,763 cuft Drainage area = 4.000 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 PH1 POST - BMP 4 Hyd. No. 13 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 13 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 14 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 18.96 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,176 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 P11-111 POST - UNDET. Hyd. No. 14 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 17.64 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 60,786 cuft Inflow hyd. No. = 10 - PH1 POST - BMP 1 Max. Elevation = 736.54 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 32,308 cuft Storage Indication method used. PH1 ROUTED - BMP 1 Q (cfs) Hyd. No. 16 -- 25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 16 Hyd No. 10 Total storage used = 32,308 cuft 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 36.92 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 113,154 cuft Inflow hyd. No. = 11 - PH1 POST - BMP 2 Max. Elevation = 732.57 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 59,738 cuft Storage Indication method used. Q (cfs) 70.00 -1 •• 50.00 F• •• 30.00 20.00 10.00 Q (cfs) 70.00 •• •It 50.00 55• •� 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 17 Hyd No. 11 Total storage used = 59,738 cuft 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 66.87 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 283,076 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 727.89 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 140,362 cuft Storage Indication method used. Q (Cfs) 160.00 140.00 120.00 100.00 20.00 Q (Cfs) 160.00 140.00 120.00 100.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 18 Hyd No. 12 Total storage used = 140,362 Cuft 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 18.35 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 43,389 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 727.75 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 20,892 cuft Storage Indication method used. Q (cfs) PH1 ROUTED - BMP 4 Hyd. No. 19 -- 25 Year Q (cfs) 28.00 24.00 Lo.VV 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 0 00 4.00 n nn 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 19 Hyd No. 13 Total storage used = 20,892 cuft 76 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 20 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 18.96 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,176 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 P11-111 POST - UNDET. Hyd. No. 20 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 Time (min) 77 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 15.96 2 728 56,217 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 40.38 2 724 126,255 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 50.07 2 730 200,789 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 15.94 2 722 45,587 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 10.63 2 724 33,225 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 18.09 2 718 36,186 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 58.96 2 730 234,014 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 38.23 2 716 80,366 ------ ------ ------ PH1 POST - BMP 1 11 SCS Runoff 71.18 2 716 151,412 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 168.22 2 716 353,612 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 28.89 2 716 59,859 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 23.04 2 716 46,538 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 22.53 2 722 72,448 10 736.78 34,991 PH1 ROUTED - BMP 1 17 Reservoir 52.77 2 720 134,455 11 732.75 63,599 PH1 ROUTED - BMP 2 18 Reservoir 76.57 2 722 334,310 12 728.42 157,866 PH1 ROUTED - BMP 3 19 Reservoir 24.93 2 720 52,485 13 727.90 21,743 PH1 ROUTED - BMP 4 20 SCS Runoff 23.04 2 716 46,538 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 50 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 78 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.56 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 18.00 15.00 12.00 WE 3.00 M PH1 PRE - BMP 1 Hyd. No. 1 -- 50 Year 120 240 360 480 600 Hyd No. 1 Tuesday, 10 / 16 / 2018 = 15.96 cfs = 728 min = 56,217 cuft = 65 = 0 ft = 22.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 •M . �� CM 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 79 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 40.38 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 126,255 cuft Drainage area = 9.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 2 Q (Cfs) Hyd. No. 2 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 80 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 50.07 cfs Storm frequency = 50 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 200,789 cuft Drainage area = 16.000 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 3 Q (Cfs) Hyd. No. 3 -- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 81 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.56 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 18.00 15.00 12.00 WE 3.00 M PH1 PRE - BMP 4 Hyd. No. 4 -- 50 Year 120 240 360 480 600 Hyd No. 4 Tuesday, 10 / 16 / 2018 = 15.94 cfs = 722 min = 45,587 cuft = 63 = 0 ft = 15.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 •M . �� CM 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 82 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.56 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 12.00 10.00 M M o 2.00 M PH1 PRE - BMP 5 Hyd. No. 5 -- 50 Year 120 240 360 480 600 Hyd No. 5 Tuesday, 10 / 16 / 2018 = 10.63 cfs = 724 min = 33,225 cuft = 74 = 0 ft = 18.00 min = Type II = 484 Q (cfs) 12.00 10.00 M. . �� 4.00 2.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 18.09 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 36,186 cuft Drainage area = 4.300 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 PH1 PRE - UNDET. Hyd. No. 6 -- 50 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE -BMP3&5 Hydrograph type = Combine Peak discharge = 58.96 cfs Storm frequency = 50 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 234,014 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac PH1 PRE-BMP3&5 Q (Cfs) Hyd. No. 8 -- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 Hyd No. 3 Hyd No. 5 85 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 38.23 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 80,366 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 40.00 30.00 10.00 e PH1 POST - BMP 1 Hyd. No. 10 -- 50 Year 120 240 360 480 600 720 840 Hyd No. 10 Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 Time (min) 86 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 71.18 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 151,412 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 80.00 70.00 50.00 30.00 20.00 10.00 e PH1 POST - BMP 2 Hyd. No. 11 -- 50 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 168.22 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 353,612 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 Q (Cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 12 Time (min) 88 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 28.89 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 59,859 cuft Drainage area = 4.000 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - BMP 4 Q (Cfs) Hyd. No. 13 -- 50 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 13 Time (min) Hydrograph Report 89 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 14 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 23.04 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 46,538 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 14 -- 50 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) Hydrograph Report 90 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 22.53 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 72,448 cuft Inflow hyd. No. = 10 - PH1 POST - BMP 1 Max. Elevation = 736.78 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 34,991 cuft Storage Indication method used Q (cfs) 40.00 30.00 10.00 e PH1 ROUTED - BMP 1 Hyd. No. 16 -- 50 Year 240 480 720 960 1200 1440 1680 1920 Hyd No. 16 Hyd No. 10 Total storage used = 34,991 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 2160 Time (min) 91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 52.77 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 134,455 cuft Inflow hyd. No. = 11 - PH1 POST - BMP 2 Max. Elevation = 732.75 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 63,599 cuft Storage Indication method used. Q (cfs) 80.00 70.00 50.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 17 Hyd No. 11 Total storage used = 63,599 cuft 92 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 76.57 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 334,310 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 728.42 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 157,866 cuft Storage Indication method used. Q (Cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 PH1 ROUTED - BMP 3 Hyd. No. 18 -- 50 Year Q (Cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 0.00 X�- 0.0 / 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 Hyd No. 12 Total storage used = 157,866 Cuft Time (mi Hydrograph Report 93 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 24.93 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 52,485 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 727.90 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 21,743 cuft Storage Indication method used PH1 ROUTED - BMP 4 Q (cfs) Hyd. No. 19 -- 50 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 19 Hyd No. 13 0 Total storage used = 21,743 cult Hydrograph Report 94 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 20 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 23.04 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 46,538 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 P11-111 POST - UNDET. Q (Cfs) Hyd. No. 20 -- 50 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 Time (min) 95 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 19.44 2 726 67,958 ------ ------ ------ PH1 PRE -BMP 1 2 SCS Runoff 47.56 2 724 148,752 ------ ------ ------ PH1 PRE - BMP 2 3 SCS Runoff 59.46 2 730 237,812 ------ ------ ------ PH1 PRE - BMP 3 4 SCS Runoff 19.58 2 722 55,473 ------ ------ ------ PH1 PRE - BMP 4 5 SCS Runoff 12.52 2 724 39,145 ------ ------ ------ PH1 PRE - BMP 5 6 SCS Runoff 22.06 2 718 44,202 ------ ------ ------ PH1 PRE -UNDET. 8 Combine 69.88 2 730 276,958 3, 5, ------ ------ PH1 PRE - BMP 3 & 5 10 SCS Runoff 43.64 2 716 92,480 ------ ------ ------ PH1 POST - BMP 1 11 SCS Runoff 80.87 2 716 173,484 ------ ------ ------ PH1 POST - BMP 2 12 SCS Runoff 192.01 2 716 406,911 ------ ------ ------ PH1 POST - BMP 3 13 SCS Runoff 33.23 2 716 69,344 ------ ------ ------ PH1 POST - BMP 4 14 SCS Runoff 27.39 2 716 55,422 ------ ------ ------ PH1 POST - UNDET. 16 Reservoir 23.61 2 722 84,561 10 737.10 38,778 PH1 ROUTED - BMP 1 17 Reservoir 65.77 2 720 156,527 11 732.91 66,472 PH1 ROUTED - BMP 2 18 Reservoir 82.27 2 722 387,534 12 729.01 177,332 PH1 ROUTED - BMP 3 19 Reservoir 30.72 2 718 61,970 13 727.99 22,441 PH1 ROUTED - BMP 4 20 SCS Runoff 27.39 2 716 55,422 ------ ------ ------ PH1 POST - UNDET. 17031-PH1-BMP Hydraflow.gpw Return Period: 100 Year Tuesday, 10 / 16 / 2018 96 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 1 PH1 PRE -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 19.44 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 67,958 cuft Drainage area = 5.500 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 PH1 PRE - BMP 1 Hyd. No. 1 -- 100 Year ti Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 97 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 PH1 PRE - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 47.56 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 148,752 cuft Drainage area = 9.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 2 Q (Cfs) Hyd. No. 2 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 98 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 3 PH1 PRE - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 59.46 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 237,812 cuft Drainage area = 16.000 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 3 Q (Cfs) Hyd. No. 3 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 99 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 4 PH1 PRE - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 19.58 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 55,473 cuft Drainage area = 5.000 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 PH1 PRE - BMP 4 Hyd. No. 4 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) 100 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 5 PH1 PRE - BMP 5 Hydrograph type = SCS Runoff Peak discharge = 12.52 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 39,145 cuft Drainage area = 2.500 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 00 . We M 2.00 M PH1 PRE - BMP 5 Hyd. No. 5 -- 100 Year Q (cfs) 14.00 12.00 10.00 ItM MIX 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 101 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 PH1 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 22.06 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 44,202 cuft Drainage area = 4.300 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - UNDET. Q (Cfs) Hyd. No. 6 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 102 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 8 PH1 PRE -BMP3&5 Hydrograph type = Combine Peak discharge = 69.88 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 276,958 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 18.500 ac Q (Cfs) 70.00 •• •• 50.00 F• •• 30.00 20.00 10.00 Q (cfs) 70.00 •1 ••, 50.00 E• •� 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 Hyd No. 3 Hyd No. 5 103 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 10 PH1 POST -BMP 1 Hydrograph type = SCS Runoff Peak discharge = 43.64 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 92,480 cuft Drainage area = 5.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 50.00 30.00 20.00 10.00 e 120 240 Hyd No. 10 PH1 POST - BMP 1 Hyd. No. 10 -- 100 Year 360 480 600 720 840 Q (cfs) 50.00 we I11 30.00 20.00 10.00 0.00 960 1080 1200 Time (min) 104 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 11 PH1 POST - BMP 2 Hydrograph type = SCS Runoff Peak discharge = 80.87 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 173,484 cuft Drainage area = 9.000 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - BMP 2 Q (Cfs) Hyd. No. 11 -- 100 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 11 Time (min) 105 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 12 PH1 POST - BMP 3 Hydrograph type = SCS Runoff Peak discharge = 192.01 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 406,911 cuft Drainage area = 22.000 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - BMP 3 Q (Cfs) Hyd. No. 12 -- 100 Year Q (Cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 12 Time (min) 106 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 13 PH1 POST - BMP 4 Hydrograph type = SCS Runoff Peak discharge = 33.23 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 69,344 cuft Drainage area = 4.000 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 13 Time (min) 107 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 14 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 27.39 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 55,422 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 : M M P11-111 POST - UNDET. Hyd. No. 14 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 14 Time (min) Hydrograph Report 108 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 16 PH1 ROUTED - BMP 1 Hydrograph type = Reservoir Peak discharge = 23.61 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 84,561 cuft Inflow hyd. No. = 10 - PH1 POST - BMP 1 Max. Elevation = 737.10 ft Reservoir name = PH1 BMP 1 - SANDFILTER Max. Storage = 38,778 cuft Storage Indication method used Q (cfs) 50.00 30.00 20.00 10.00 e 240 Hyd No. 16 PH1 ROUTED - BMP 1 Hyd. No. 16 -- 100 Year 480 720 Hyd No. 10 960 1200 1440 1680 Total storage used = 38,778 cuft Q (cfs) 50.00 MW I11 30.00 20.00 10.00 0.00 1920 Time (min) 109 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 17 PH1 ROUTED - BMP 2 Hydrograph type = Reservoir Peak discharge = 65.77 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 156,527 cuft Inflow hyd. No. = 11 - PH1 POST - BMP 2 Max. Elevation = 732.91 ft Reservoir name = PH1 BMP 2 - SANDFILTER Max. Storage = 66,472 cuft Storage Indication method used. Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 PH1 ROUTED - BMP 2 Hyd. No. 17 -- 100 Year 1 1 �I •1 I •11 1 1 •01 1of Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 110 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 18 PH1 ROUTED - BMP 3 Hydrograph type = Reservoir Peak discharge = 82.27 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 387,534 cuft Inflow hyd. No. = 12 - PH1 POST - BMP 3 Max. Elevation = 729.01 ft Reservoir name = PH1 BMP 3 -WET POND Max. Storage = 177,332 cuft Storage Indication method used. Q (Cfs) 210.00 180.00 150.00 120.00 •• •• 30.00 Q (Cfs) 210.00 180.00 150.00 120.00 •• •e, 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 18 Hyd No. 12 Total storage used = 177,332 Cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 19 PH1 ROUTED - BMP 4 Hydrograph type = Reservoir Peak discharge = 30.72 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 61,970 cuft Inflow hyd. No. = 13 - PH1 POST - BMP 4 Max. Elevation = 727.99 ft Reservoir name = PH1 BMP 4 - SANDFILTER Max. Storage = 22,441 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 19 Hyd No. 13 Total storage used = 22,441 cuft 112 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 20 PH1 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 27.39 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 55,422 cuft Drainage area = 4.200 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 P11-111 POST - UNDET. Hyd. No. 20 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1 1 1 1 '- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 20 Time (min) BMP #6 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.340 1 722 9,856 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 0.231 1 720 594 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 3.561 1 722 10,450 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 7.978 1 718 16,555 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 1.724 1 716 3,000 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 9.295 1 718 19,556 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 0.067 1 1444 6,937 5 754.70 14,194 PH1 ROUTED - BMP 6 10 SCS Runoff 1.724 1 716 3,000 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 1.724 1 716 9,937 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 1 Year Monday, 10 / 15 / 2018 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 3.340 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 9,856 cuft Drainage area = 5.500 ac Curve number = 66.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.50 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 6 Q (Cfs) Hyd. No. 1 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 0.231 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 594 cuft Drainage area = 0.300 ac Curve number = 68.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 3.561 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 10,450 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac PH1 PRE TOTAL Q (Cfs) Hyd. No. 3 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 1 Hyd No. 2 Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 6.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 8.00 WE 4.00 2.00 0.00 0 120 240 360 — Hyd No. 5 PH1 POST - BMP 6 Hyd. No. 5 -- 1 Year 480 600 720 840 Monday, 10 / 15 / 2018 = 7.978 cfs = 718 min = 16,555 cuft = 73 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 8.00 . �� 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 0.00 0 120 240 Hyd No. 6 PH1 POST - UNDET. FAITH Hyd. No. 6 -- 1 Year Monday, 10 / 15 / 2018 = 1.724 cfs = 716 min = 3,000 cuft = 80 = 0 ft = 2.00 min = Type II = 484 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 2.00 1.00 — 0.00 1440 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 9.295 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 19,556 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac Q (Cfs) 10.00 ee 4.00 2.00 PH1 POST TOTAL Hyd. No. 7 -- 1 Year 120 240 360 480 600 720 Hyd No. 7 Hyd No. 5 Q (cfs) 10.00 MIX ItX 4.00 2.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hydrograph Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 0.067 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 6,937 cuft Inflow hyd. No. = 5 - PH1 POST - BMP 6 Max. Elevation = 754.70 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 14,194 cuft Storage Indication method used Q (cfs) 8.00 WE 4.00 2.00 PH1 ROUTED - BMP 6 Hyd. No. 9 -- 1 Year 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 9 - Hyd No. 5 Total storage used = 14,194 cuft Q (cfs) 8.00 we] 4.00 2.00 0.00 3000 Time (min) Pond Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Pond No. 1 - PH1 BMP 6 - DRY DETENTION Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 753.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 753.00 3,100 0 0 1.00 754.00 9,600 6,350 6,350 3.00 756.00 12,700 22,300 28,650 5.00 758.00 16,100 28,800 57,450 5.50 758.50 17,000 8,275 65,725 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 1.80 0.00 0.00 Crest Len (ft) = 13.30 0.00 0.00 0.00 Span (in) = 24.00 1.80 0.00 0.00 Crest El. (ft) = 755.20 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 753.00 754.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 53.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.56 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 753.50 Stage (ft) 6.00 6'110101 4.00 3.00 2.00 1.00 0.00 ' ' 0.00 3.00 Total Q 6.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 759.00 757.00 756.00 755.00 754.00 753.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Discharge (cfs) Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.800 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 0.00 0 120 240 Hyd No. 10 PH1 POST - UNDET. FAITH Hyd. No. 10 -- 1 Year Monday, 10 / 15 / 2018 = 1.724 cfs = 716 min = 3,000 cuft = 80 = 0 ft = 2.00 min = Type II = 484 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 2.00 1.00 — 0.00 1440 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 1.724 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 9,937 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac Q (Cfs) 2.00 1.00 PH1 POST TOTAL Hyd. No. 11 -- 1 Year 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 11 — Hyd No. 9 Hyd No. 10 Q (Cfs) 2.00 1.00 0.00 3000 Time (min) 12 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.969 1 721 15,825 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 0.391 1 720 934 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 6.352 1 721 16,758 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 12.19 1 718 24,700 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 2.395 1 716 4,197 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 14.02 1 717 28,898 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 0.187 1 1184 11,513 5 755.20 19,784 PH1 ROUTED - BMP 6 10 SCS Runoff 2.395 1 716 4,197 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 2.395 1 716 15,711 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 2 Year Monday, 10 / 15 / 2018 Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 5.969 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 15,825 cuft Drainage area = 5.500 ac Curve number = 66.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.50 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 6 Q (Cfs) Hyd. No. 1 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 0.391 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 934 cuft Drainage area = 0.300 ac Curve number = 68.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 6.352 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 16,758 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac Q (cfs) 7.00 5.00 3.00 2.00 1.00 PH1 PRE TOTAL Hyd. No. 3 -- 2 Year Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 1 1 1 1 1 1 Y I D I I I M 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 12.19 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 24,700 cuft Drainage area = 6.000 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 OR . ee M 2.00 PH1 POST - BMP 6 Hyd. No. 5 -- 2 Year Q (cfs) 14.00 12.00 10.00 MIX MIX 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 2.395 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 4,197 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 6 PH1 POST - UNDET. FAITH Hyd. No. 6 -- 2 Year 360 480 600 720 840 960 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 14.02 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 28,898 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac PH1 POST TOTAL Q (Cfs) Hyd. No. 7 -- 2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 Hyd No. 5 Hyd No. 6 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 0.187 cfs Storm frequency = 2 yrs Time to peak = 1184 min Time interval = 1 min Hyd. volume = 11,513 cuft Inflow hyd. No. = 5 - PH1 POST - BMP 6 Max. Elevation = 755.20 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 19,784 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 00 . ee W 2.00 300 600 Hyd No. 9 PH1 ROUTED - BMP 6 Hyd. No. 9 -- 2 Year Q (cfs) 14.00 12.00 10.00 N. s@ H. us@ 4.00 2.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Total storage used = 19,784 cuft 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 2.395 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 4,197 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 3.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 10 PH1 POST - UNDET. FAITH Hyd. No. 10 -- 2 Year 360 480 600 720 840 960 1080 1200 Q (cfs) 3.00 2.00 1.00 — 0.00 1320 Time (min) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 2.395 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 15,711 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac Q (Cfs) 3.00 2.00 1.00 e PH1 POST TOTAL Hyd. No. 11 -- 2 Year Q (Cfs) 3.00 2.00 1.00 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 11 — Hyd No. 9 Hyd No. 10 22 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 14.40 1 721 35,361 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 0.892 1 720 2,027 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 15.27 1 721 37,387 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 24.78 1 718 49,816 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 4.285 1 715 7,686 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 28.27 1 717 57,502 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 4.919 1 727 36,609 5 755.42 22,225 PH1 ROUTED - BMP 6 10 SCS Runoff 4.285 1 715 7,686 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 5.446 1 727 44,295 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 10 Year Monday, 10 / 15 / 2018 Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 14.40 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 35,361 cuft Drainage area = 5.500 ac Curve number = 66.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.50 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 PRE - BMP 6 Q (Cfs) Hyd. No. 1 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 0.892 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 2,027 cuft Drainage area = 0.300 ac Curve number = 68.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 I :1 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 10 Year Q (cfs) 1.00 0.90 1 :I 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 15.27 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 37,387 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac Q (Cfs) 18.00 15.00 12.00 WE 3.00 M 120 240 360 480 600 Hyd No. 3 Hyd No. 1 PH1 PRE TOTAL Hyd. No. 3 -- 10 Year Q (cfs) 18.00 15.00 12.00 •M . �� CM 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 24.78 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 49,816 cuft Drainage area = 6.000 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 : M M PH1 POST - BMP 6 Hyd. No. 5 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 4.285 cfs Storm frequency = 10 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 7,686 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 Hyd No. 6 PH1 POST - UNDET. FAITH Hyd. No. 6 -- 10 Year 240 360 480 600 720 840 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 Time (min) Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 28.27 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 57,502 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac PH1 POST TOTAL Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 5 Hyd No. 6 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 4.919 cfs Storm frequency = 10 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 36,609 cuft Inflow hyd. No. = 5 - PH1 POST - BMP 6 Max. Elevation = 755.42 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 22,225 cuft Storage Indication method used. Q (cfs) 28.00 24.00 16.00 12.00 i e PH1 ROUTED - BMP 6 Hyd. No. 9 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 9 — Hyd No. 5 Total storage used = 22,225 cuft 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 4.285 cfs Storm frequency = 10 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 7,686 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 4.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 10 PH1 POST - UNDET. FAITH Hyd. No. 10 -- 10 Year 360 480 600 720 840 960 Q (cfs) 5.00 4.00 3.00 2.00 1.00 T- . 0.00 1080 1200 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 5.446 cfs Storm frequency = 10 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 44,295 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 300 Hyd No. 11 PH1 POST TOTAL Hyd. No. 11 -- 10 Year 600 900 1200 Hyd No. 9 1500 1800 2100 2400 2700 Hyd No. 10 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 1 0.00 3000 Time (min) 32 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 20.01 1 721 48,644 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 1.221 1 720 2,761 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 21.19 1 720 51,405 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 32.76 1 718 66,217 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 5.446 1 715 9,878 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 37.29 1 717 76,095 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 15.76 1 723 53,003 5 755.79 26,311 PH1 ROUTED - BMP 6 10 SCS Runoff 5.446 1 715 9,878 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 16.54 1 723 62,881 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 25 Year Monday, 10 / 15 / 2018 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 20.01 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 48,644 cuft Drainage area = 5.500 ac Curve number = 66.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.50 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 • el am 3.00 PH1 PRE - BMP 6 Hyd. No. 1 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.300 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.83 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Monday, 10 / 15 / 2018 = 1.221 cfs = 720 m i n = 2,761 cuft = 68.5 = 0 ft = 10.00 m i n = Type II = 484 Q (cfs) 2.00 1.00 -' ' 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 21.19 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 51,405 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac PH1 PRE TOTAL Q (Cfs) Hyd. No. 3 -- 25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 1 Hyd No. 2 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 32.76 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 66,217 cuft Drainage area = 6.000 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 5.446 cfs Storm frequency = 25 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 9,878 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - UNDET. FAITH Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 37.29 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 76,095 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac PH1 POST TOTAL Q (Cfs) Hyd. No. 7 -- 25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 — Hyd No. 5 Hyd No. 6 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 15.76 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 53,003 cuft Inflow hyd. No. = 5 - PH1 POST - BMP 6 Max. Elevation = 755.79 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 26,311 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 Hyd No. 5 Total storage used = 26,311 cuft 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 5.446 cfs Storm frequency = 25 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 9,878 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 5.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - UNDET. FAITH Q (cfs) Hyd. No. 10 -- 25 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 10 Time (min) Hydrograph Report 41 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 16.54 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 62,881 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac Q (Cfs) 18.00 15.00 12.00 WE 3.00 M PH1 POST TOTAL Hyd. No. 11 -- 25 Year 120 240 360 480 600 720 Hyd No. 11 Hyd No. 9 Q (cfs) 18.00 15.00 12.00 •M . �� CM 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 42 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 24.74 1 720 59,951 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 1.496 1 719 3,384 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 26.24 1 720 63,335 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 39.31 1 718 79,932 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 6.383 1 715 11,680 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 44.70 1 717 91,612 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 19.56 1 723 66,713 5 756.11 30,287 PH1 ROUTED - BMP 6 10 SCS Runoff 6.383 1 715 11,680 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 21.43 1 720 78,393 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 50 Year Monday, 10 / 15 / 2018 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 24.74 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 59,951 cuft Drainage area = 5.500 ac Curve number = 66.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.50 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 16.00 12.00 : M M PH1 PRE - BMP 6 Hyd. No. 1 -- 50 Year .001 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.300 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.56 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 50 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Monday, 10 / 15 / 2018 = 1.496 cfs = 719 min = 3,384 cuft = 68.5 = 0 ft = 10.00 m i n = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 26.24 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 63,335 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac Q (Cfs) 28.00 24.00 16.00 12.00 : M M PH1 PRE TOTAL Hyd. No. 3 -- 50 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 1 Hyd No. 2 Hydrograph Report 46 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 6.000 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.56 in Distribution Storm duration = 24 hrs Shape factor Q (Cfs) 40.00 30.00 10.00 0.00 1 ' 1 0 120 240 — Hyd No. 5 PH1 POST - BMP 6 Hyd. No. 5 -- 50 Year 360 480 600 720 840 960 Monday, 10 / 15 / 2018 = 39.31 cfs = 718 min = 79,932 cuft = 73 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 1440 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 6.383 cfs Storm frequency = 50 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 11,680 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - UNDET. FAITH Q (cfs) Hyd. No. 6 -- 50 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 44.70 cfs Storm frequency = 50 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 91,612 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac PH1 POST TOTAL Q (Cfs) Hyd. No. 7 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 7 Hyd No. 5 Hyd No. 6 Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 19.56 cfs Storm frequency = 50 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 66,713 cuft Inflow hyd. No. = 5 - PH1 POST - BMP 6 Max. Elevation = 756.11 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 30,287 cuft Storage Indication method used PH1 ROUTED - BMP 6 Q (cfs) Hyd. No. 9 -- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 — Hyd No. 5 Total storage used = 30,287 cuft 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 6.383 cfs Storm frequency = 50 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 11,680 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 6.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH1 POST - UNDET. FAITH Q (cfs) Hyd. No. 10 -- 50 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 10 Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 21.43 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 78,393 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac PH1 POST TOTAL Q (Cfs) Hyd. No. 11 -- 50 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 11 — Hyd No. 9 Hyd No. 10 52 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 29.79 1 720 72,045 ------ ------ ------ PH1 PRE -BMP 6 2 SCS Runoff 1.788 1 719 4,047 ------ ------ ------ PH1 PRE - UNDET. FAITH 3 Combine 31.57 1 720 76,092 1,2 ------ ------ PH1 PRE TOTAL 5 SCS Runoff 46.14 1 718 94,420 ------ ------ ------ PH1 POST- BMP 6 6 SCS Runoff 7.348 1 715 13,562 ------ ------ ------ PH1 POST- UNDET. FAITH 7 Combine 52.42 1 717 107,982 5,6 ------ ------ PH1 POST TOTAL 9 Reservoir 22.20 1 723 81,196 5 756.44 34,922 PH1 ROUTED - BMP 6 10 SCS Runoff 7.348 1 715 13,562 ------ ------ ------ PH1 POST- UNDET. FAITH 11 Combine 25.05 1 718 94,758 9, 10 ------ ------ PH1 POST TOTAL 17031-PH1-BMP Hydraflow BMP 6.gpw Return Period: 100 Year Monday, 10 / 15 / 2018 Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PH1 PRE - BMP 6 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 5.500 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.31 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 30.00 25.00 15.00 10.00 5.00 PH1 PRE - BMP 6 Hyd. No. 1 -- 100 Year 0.00 ' ' 0 120 240 360 480 600 Hyd No. 1 Monday, 10 / 15 / 2018 = 29.79 cfs = 720 min = 72,045 cuft = 66.9 = 0 ft = 11.50 m i n = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 ' ' ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 PH1 PRE - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.300 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.31 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 PH1 PRE - UNDET. FAITH Hyd. No. 2 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Monday, 10 / 15 / 2018 = 1.788 cfs = 719 min = 4,047 cuft = 68.5 = 0 ft = 10.00 m i n = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 3 PH 1 PRE TOTAL Hydrograph type = Combine Peak discharge = 31.57 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 76,092 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 5.800 ac Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 1 1 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 1 Hyd No. 2 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 5 PH1 POST - BMP 6 Hydrograph type = SCS Runoff Peak discharge = 46.14 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 94,420 cuft Drainage area = 6.000 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 50.00 30.00 20.00 10.00 0.00 1 ' 1 0 120 240 — Hyd No. 5 PH1 POST - BMP 6 Hyd. No. 5 -- 100 Year 360 480 600 720 840 Q (cfs) 50.00 we I11 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 Time (min) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 6 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 7.348 cfs Storm frequency = 100 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 13,562 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 8.00 .M 4.00 2.00 e PH1 POST - UNDET. FAITH Hyd. No. 6 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 6 Q (cfs) 8.00 m 4.00 2.00 T- 4 0.00 1080 1200 Time (min) Hydrograph Report 58 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 7 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 52.42 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 107,982 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 6.800 ac PH1 POST TOTAL Q (Cfs) Hyd. No. 7 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 7 Hyd No. 5 Hyd No. 6 Hydrograph Report 59 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 9 PH1 ROUTED - BMP 6 Hydrograph type = Reservoir Peak discharge = 22.20 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 81,196 cuft Inflow hyd. No. = 5-PH1 POST - BMP 6 Max. Elevation = 756.44 ft Reservoir name = PH1 BMP 6 - DRY DETENTIOMax. Storage = 34,922 cuft Storage Indication method used PH1 ROUTED - BMP 6 Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 — Hyd No. 5 Total storage used = 34,922 cuft 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 10 PH1 POST - UNDET. FAITH Hydrograph type = SCS Runoff Peak discharge = 7.348 cfs Storm frequency = 100 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 13,562 cuft Drainage area = 0.800 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 2.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 8.00 .M 4.00 2.00 e 120 240 Hyd No. 10 PH1 POST - UNDET. FAITH Hyd. No. 10 -- 100 Year 360 480 600 720 840 960 Q (cfs) 8.00 m 4.00 2.00 T- 4 0.00 1080 1200 Time (min) Hydrograph Report 61 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 10 / 15 / 2018 Hyd. No. 11 PH 1 POST TOTAL Hydrograph type = Combine Peak discharge = 25.05 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 94,758 cuft Inflow hyds. = 9, 10 Contrib. drain. area = 0.800 ac Q (Cfs) 28.00 24.00 16.00 12.00 : M M PH1 POST TOTAL Hyd. No. 11 -- 100 Year \Z44 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 11 — Hyd No. 9 Hyd No. 10 VI. APPENDIX - WA* �rt a bur `{ South Yadkin Rover ( oolemee vwr if -I V �ql op EEDMOf E R Q Cr V5� RARY RD 10,PO T Q Yadkin l River Fri li bury i. o a+dki (Salisbury vwr. .i. � HEEN -1 11! LEGEND C.' - ' RIDGE RD,, Class _ �R I�ILD EFL '. + w- I I� r' r— 1111 -III ` N Hif I D it � T � � WS_ Ill IN E F0/%CRA-WFC) • +� yy - F ITI ALAF EA ' RILL S F0RD ' MUNICIPAL LIMITSy- VA '_� IN ��-� � - ETJ GOO .Rowan Roads Y ? � LAKE F � �I FT _ DE INTERSTATE fff V i7 y�'� '1 - tp Nl� 'o `',RD 4 [ -A`" Q �.. {- ,� - L ��� - NORTH AR LINA HIGHWAY r - U2 c N1FF RAMPS STATE f 1AINTAIN ED R AD .� C o �� _ T F Bark reeklloarn eek w-II __.+ ;.. ' -� Cr X x1. r UNITED STATES HIGHWAY BRADS, ,� ,, IT, Al L ND %4 e 4 RD � ;� Q r' , ' TAD L .. F _ 0 p - �t " ,' Sp)'INGS RD CHURCH RD _ Branch e ri RFF-N. NOS .�No A. ' D qQ oaBrP ��ti _I E x p Tu kerto n Reservoir ,. ri h Buffaloreek iI' an " — c ' �, t-1 1 - �.� 111fB-III { �' . RD toddle creeks Qku wB-II .' ot4 �' Ids 3 r creek ke 1=i E , I -; + RD TO c R s Moir 1J11 IIB-IV IV + i Dutch Buffalo Creek D ' \C -11I Milesr ` � 1 2ouVEIR RD Creaked b - olu mbus Hawks 412000 _97 3t .. 9/20/2017 Precipitation Frequency Data Server 1) NOAA Atlas 14, V olume 2, Version 3 Location name: Salisbury , North Carolina, USA F!`" Latitude: 35.5603°, Longitude:-80.459° Elevation: 805.12 ft- 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches )1 Duration Average recurrence interval (years) 1 ������ 2 5 10 25 50 100 200 500 1000 � 0.391 0.462 0.539 0.592 0.652 0.691 0.726 0.756 0.788 0.809 5-min (0.360-0.424) (0.426-0.503) (0.496-0.586) (0.543-0.642) (0.595-0.706) (0.628-0.749) (0.657-0.787) (0.680-0.820) (0.702-0.856) (0.715-0.880) 0.624 0.739 0.863 0.947 1.04 1.10 1.15 1.20 1.25 1.27 1 0-min (0.576-0.678) (0.682-0.805) (0.794-0.938) (0.869-1.03) (0.948-1.12) 1 (1.00-1.19) 11 (1.04-1.25) 1 (1.08-1.30) 1 (1.11-1.35) 11 (1.13-1.39) 0.780 0.930 1.09 1.20 1.32 1.39 1.46 1.51 1.57 1.60 15-min (0.720-0.847) (0.857-1.01) (1.00-1.19) 11 (1.10-1.30) 1 (1.20-1.43) 1 (1.27-1.51) 11 (1.32-1.58) 1 (1.36-1.64) 1 (1.40-1.71) 11 (1.41-1.74) 1.07 1.28 1.55 1.74 1.95 2.10 2.24 2.35 2.50 2.59 30-min (0.986-1.16) 1 (1.18-1.40) 11 (1.43-1.69) 11 (1.59-1.88) 1 (1.78-2.11) 1 (1.91-2.27) 11 (2.02-2.42) 1 (2.12-2.55) 1 (2.23-2.71) 11 (2.29-2.82) 1.33 1.61 1.99 2.26 2.60 2.85 3.08 3.30 3.58 3.78 60-min (1.23-1.45) 1 (1.49-1.75) 11 (1.83-2.16) 11 (2.07-2.45) 1 (2.37-2.81) 1 (2.59-3.08) 11 (2.78-3.33) 1 (2.97-3.58) 1 (3.19-3.89) 11 (3.34-4.11) 1.54 1.87 2.32 2.66 3.09 3.42 3.74 4.04 4.44 4.73 2-hr (1.42-1.68) 1 (1.71-2.04) 11 (2.13-2.53) 11 (2.43-2.90) 1 (2.81-3.37) 1 (3.09-3.72) 11 (3.36-4.07) 1 (3.60-4.41) 1 (3.91-4.85) 11 (4.13-5.1 7) 1.65 1.99 2.48 2.85 3.35 3.73 4.11 4.48 4.99 5.37 3-hr (1.51-1.80) 1 (1.83-2.17) 11 (2.27-2.71) 11 (2.61-3.10) 1 (3.04-3.64) 1 (3.37-4.05) 11 (3.68-4.45) 1 (3.99-4.87) 1 (4.38-5.42) 11 (4.67-5.85) 1.99 2.40 3.00 3.46 4.08 4.56 5.05 5.55 6.21 6.73 6-hr (1.83-2.18) 1 (2.21-2.63) 11 (2.75-3.28) 11 (3.16-3.77) 1 (3.70-4.43) 1 (4.12-4.95) 11 (4.52-5.48) 1 (4.91-6.02) 1 (5.43-6.75) 11 (5.81-7.31) 2.36 F 2.84 7 3.56 F 4.13 F 4.91 F 5.53 7 7 6.17 F 6.82 F 7.73 7 8.44 12-hr (217-2.57) 1 (2.62-3.11) 11 (3.27-3.89) 11 (3.78-4.51) 1 (4.46-5.33) 1 (4.98-5.99) 11 (5.51-6.67) 1 (6.03-7.37) 1 (6.71-8.33) 11 (7.22-9.10) 2.80 F 3.38 7 4.24 F 4.92 F 5.83 F 6.56 7 7 7.31 F 8.07 F 9.11 7 9.93 24-hr (2.61-3.01) 1 (3.15-3.64) 11 (3.95-4.56) 11 (4.57-5.29) 1 (5.41-6.27) 1 (6.07-7.05) 11 (6.74-7.85) 1 (7.42-8.67) 1 (8.34-9.81) 11 (9.06-10.7) 3.26 3.93 4.89 5.65 6.67 7.47 8.29 9.13 10.3 11.2 2-da (3.04-3.50) (3.67-4.22) (4.56-5.25) (5.26-6.05) (6.19-7.13) (6.92-8.00) (7.66-8.88) (8.41-9.79) (9.42-11.0) (10.2-12.0) 3.47 4.17 5.17 5.95 7.01 7.85 8.71 9.59 10.8 11.7 3-da (3.24-3.71) (3.90-4.47) (4.82-5.53) (5.54-6.36) (6.51-7.50) (7.28-8.40) (8.05-9.32) (8.83-10.3) (9.90-11.6) (10.7-12.6) 3.68 4.41 5.44 6.25 7.35 8.23 9.12 10.0 11.3 12.3 4-da (3.44-3.93) 1 (4.13-4.71) 11 (5.08-5.81) 11 (5.83-6.67) 1 (6.83-7.86) 1 (7.63-8.80) 11 (8.44-9.76) 1 (9.26-10.7) 1 (10.4-12.1) 11 (11.2-13.2) 4.23 5.05 6.15 7.01 8.20 9.15 10.1 11.1 12.4 13.5 7-da (3.99-4.51) 1 (4.76-5.38) 11 (5.78-6.54) 11 (6.59-7.46) 1 (7.68-8.72) 1 (8.54-9.73) 11 (9.41-10.8) 1 (10.3-11.8) 1 (11.5-13.3) 11 (12.4-14.4) 4.84 5.75 6.91 7.82 9.03 9.99 11.0 11.9 13.3 14.3 10-da (4.57-5.13) 1 (5.43-6.09) 11 (6.52-7.32) 11 (7.37-8.28) 1 (8.49-9.57) 1 (9.38-10.6) 11 (10.3-11.6) 1 (11.1-12.7) 1 (12.3-14.1) 11 (13.2-15.2) 6.50 7.67 9.06 10.2 11.6 12.8 13.9 15.1 16.7 17.9 20-da (6.18-6.84) 1 (7.29-8.07) 11 (8.60-9.52) 11 (9.62-10.7) 1 (11.0-12.2) 1 (12.1-13.4) 11 (13.1-14.7) 1 (14.2-15.9) 1 (15.6-17.6) 11 (16.7-19.0) 8.02 9.44 11.0 12.1 13.7 14.9 16.1 17.2 18.8 20.0 30-da (7.65-8.42) (8.99-9.89) (10.4-11.5) (11.6-12.7) (13.0-14.3) (14.1-15.6) (15.2-16.9) (16.3-18.1) (17.7-19.8) (18.7-21.1) 10.1 11.8 13.5 14.8 16.5 17.8 19.0 20.2 21.8 23.0 45-da (g 69-10.6) (11.3-12.3) (12.9-14.1) (14.2-15.4) (15.7-17.2) (16.9-18.5) (18.1-19.8) (19.2-21.1) (20.6-22.8) (21.7-24.1) 12.0 14.0 15.9 17.3 19.1 20.4 21.7 23.0 24.6 25.8 60-da (11.6-12.5) (13.5-14.6) (15.2-16.5) (16.6-17.9) (18.3-19.8) (19.5-21.2) (20.7-22.6) ]LE 1.9-23.9) E 4-25.7) E 5-27.0) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.5603&Ion=-80.4590&data=depth&units=english&series=pds 1 /4 9/20/2017 Precipitation Frequency Data Server 1) NOAA Atlas 14, V olume 2, Version 3 Location name: Salisbury , North Carolina, USA F!`" Latitude: 35.5603°, Longitude:-80.459° Elevation: 805.12 ft- 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches /hour)1 Duration Average recurrence interval (years) 1 ������ 2 5 10 25 50 100 200 500 1000 � 4.69 5.54 6.47 7.10 7.82 8.29 8.71 9.07 9.46 9.71 5-min (4.32-5.09) (5.11-6.04) (5.95-7.03) (6.52-7.70) (7.14-8.47) (7.54-8.99) (7.88-9.44) (8.16-9.84) (8.42-10.3) (8.58-10.6) 3.74 F 4.43 F 5.18 7 F 5.68 F 6.23 F 6.61 7 7 6.92 F 7.19 F 7.48 7 7.64 10-min (3.46-4.07) (4.09-4.83) (4.76-5.63) (5.21-6.16) (5.69-6.74) (6.01-7.15) (6.26-7.50) (6.47-7.80) (6.67-8.12) (6.76-8.32) 3.12 F 3.72 7 4.36 F 4.79 F 5.26 F 5.58 7 7 5.84 F 6.05 F 6.27 7 6.40 15-min (2 88-3.39) (3.43-4.04) (4.02-4.75) (4.40-5.20) (4.81-5.70) (5.07-6.04) (5.28-6.32) (5.44-6.56) (5.59-6.82) (5.66-6.96) 2.14 F 2.57 7 3.10 F 3.47 F 3.90 F 4.20 7 7 4.47 F 4.71 F 4.99 7 5.18 30-min (1.97-2.32) (2.37-2.79) (2.85-3.37) (3.19-3.76) (3.56-4.22) (3.82-4.55) (4.04-4.84) (4.24-5.11) (4.45-5.43) (4.58-5.63) 1.33 1.61 1.99 2.26 2.60 2.85 3.08 3.30 3.58 3.78 60-min (1.23-1.45) 1 (1.49-1.75) 11 (1.83-2.16) 11 (2.07-2.45) 1 (2.37-2.81) 1 (2.59-3.08) 11 (2.78-3.33) 1 (2.97-3.58) 1 (3.19-3.89) 11 (3.34-4.11) 0.772 0.934 1.16 1.33 1.55 1.71 1.87 2.02 2.22 2.36 2-hr (0.708-0.842) (0.856-1.02) (1.06-1.27) 11 (1.21-1.45) 1 (1.41-1.68) 1 (1.54-1.86) 11 (1.68-2.03) 1 (1.80-2.20) 1 (1.96-2.42) 11 (2.07-2.59) 0.548 0.661 0.826 0.950 1.11 1.24 1.37 1.49 1.66 1.79 3-hr (0.503-0.598) (0.608-0.723) (0.757-0.901) (0.868-1.03) 1 (1.01-1.21) 1 (1.12-1.35) 11 (1.23-1.48) 1 (1.33-1.62) 1 (1.46-1.81) 11 (1.55-1.95) 0.333 0.401 0.501 0.578 0.681 0.762 0.844 0.926 1.04 1.12 6-hr (0.306-0.364) (0.369-0.439) (0.459-0.547) (0.528-0.630) (0.618-0.740) (0.687-0.827) (0.755-0.915) (0.821-1.00) (0.907-1.13) (0.970-1.22) 0.196 0.236 0.296 0.343 0.407 0.459 0.512 0.566 0.641 0.700 12-hr (0.180-0.213) (0.217-0.258) (0.272-0.323) (0.314-0.374) (0.370-0.442) (0.413-0.497) (0.457-0.553) (0.500-0.611) (0.557-0.691) (0.599-0.755) 0.117 0.141 0.177 0.205 0.243 0.273 0.304 0.336 0.380 0.414 24-hr (0. 109-0. 126) (0.131-0.152) (0.165-0.190) (0.191-0.220) (0.225-0.261) (0.253-0.294) (0.281-0.327) (0.309-0.361) (0.348-0.409) (0.378-0.446) 0.068 0.082 0.102 0.118 0.139 0.156 77_0._17_3�F_0_190 0.214 0.233 2-da (0.063-0.073) (0.076-0.088) (0.095-0.109) (0.110-0.126) (0.129-0.149) (0.144-0.167) (0.160-0.185) (0.175-0.204) (0.196-0.230) (0.213-0.250) 0.048 0.058 0.072 0.083 0.097 0.109 0.121 0.133 0.150 0.163 3-da (0.045-0.052) (0.054-0.062) (0.067-0.077) (0.077-0.088) (0.090-0.104) (0.101-0.117) (0.112-0.129) (0.123-0.143) (0.137-0.161) (0.149-0.175) 0.038 0.046 0.057 0.065 0.077 0.086 0.095 0.105 0.118 0.128 4-da (0.036-0.041) (0.043-0.049) (0.053-0.061) (0.061-0.070) (0.071-0.082) (0.079-0.092) (0.088-0.102) (0.096-0.112) (0.108-0.126) (0.117-0.137) 0.025 0.030 0.037 0.042 0.049 0.054 0.060 0.066 0.074 0.080 7-da (0.024-0.027) (0.028-0.032) (0.034-0.039) (0.039-0.044) (0.046-0.052) (0.051-0.058) (0.056-0.064) (0.061-0.070) (0.068-0.079) (0.074-0.086) 0.020 0.024 0.029 0.033 0.038 0.042 0.046 0.050 0.055 0.060 10-da (0.019-0.021) (0.023-0.025) (0.027-0.030) (0.031-0.034) (0.035-0.040) (0.039-0.044) (0.043-0.048) (0.046-0.053) (0.051-0.059) (0.055-0.063) 0.014 0.016 0.019 0.021 0.024 0.027 0.029 0.031 0.035 0.037 20-da (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.025) (0.025-0.028) (0.027-0.031) (0.030-0.033) (0.033-0.037) (0.035-0.040) 0.011 0.013 0.015 0.017 0.019 0.021 0.022 0.024 0.026 0.028 30-da (0.011-0.012) (0.012-0.014) (0.014-0.016) (0.016-0.018) (0.018-0.020) (0.020-0.022) (0.021-0.023) (0.023-0.025) (0.025-0.027) (0.026-0.029) 0.009 0.011 0.013 0.014 0.015 0.016 0.018 0.019 0.020 0.021 45-da (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.022) 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 60-da (0.008 0.009) (0.009 0.010) (0.011 0.011) (0.012-0.012) (0.013-0.014) (0.014-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.5603&Ion=-80.4590&data=intensity&units=english&series=pds 1 /4 9/20/2017 Precipitation Frequency Data Server PF graphical PDS-based depth -duration -frequency {DDF) curves Latitude_ 35.5603 Longitude: -80.4590' 30 25 t 20 a-1 CL d+ a 15 49 .a 1� CL S '� •rt � '� '� t t t L L N N +V N +V +0 r4 N r4 Ap i i y"� O O ■i N Y'V fY1 � P+ O O O Y'S O rl r-I f+'] 1D rl N h7 V �D Duration 3D 25 c L 20 CL 15 a 10 a 5 W1 T I T I T I I I ..... ..._. i. i - ii -r. i. 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMTY Wed Sep 20 21:54-01 2017 Back to Top Maps & aerials Small scale terrain Average recurrence ml erva I {years} — 1 2 5 — 10 — 25 50 100 200 Soo 1000 ❑v rall9n - 5--min — 2-day — f QLmin 3-cfay 15-min — 4-day — 30-,min — 7-say — 60-min — 10-day — 2fir — 20-day — 3-�1r — 30-aay — "r — 4"ay — 12--,r — 6"By 24-#)r https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.5603&Ion=-80.4590&data=depth&units=engIish&series=pds 2/4 07MIM1111r� Precipitation Frequency Data Server Large scale terrain *- tBristol • Winston-Salem Durham * . rham I' Greensboro • . ' I.-Itr-�1ik-:I,eII Raleig * Asheville N 0 R Tail R 0 L I N A 'Charlotte Fayetteville. + 'Greenvil — 100km mi R 0 L I N A kNilrni Large scale map IpB. Winston-Shlem Greensboro U rham Raleig Asheville North _ iCarolina arlotte Greenville Lumbee Shc :i 100km mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.5603&Ion=-80.4590&data=depth&units=english&series=pds 3/4 OINIM1>rr11 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(cDnoaa.aov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.5603&Ion=-80.4590&data=depth&units=english&series=pds 4/4