HomeMy WebLinkAboutNCC224169_Site Plan or Location Map_20221222VICINITY MAP
NOT TO SCALE
LEGEND:
R/W - RIGHT OF WAY
PROPERTY LINE
ADJACENT PROPERTY LINE
RIGHT-OF-WAY
270 MAJOR CONTOUR
278 MINOR CONTOUR
— sF — sF — SILT FENCE LINE
— roc— roc— LIMITS OF CONSTRUCTION
OINLET PROTECTION
GROUND STABILIZATION CHART
SITE AREA
STABILIZATION
STABILIZATION TIME
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITHCES
7 DAYS
NONE
AND SLOPES
HIGH QUALITY
WATER (HQW)
7 DAYS
NONE
ZONES
IF SLOPES ARE 10' OR
SLOPES STEEPER
7 DAYS
LESS IN LENGTH AND ARE
THAN 3:1
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR
7—DAYS FOR SLOPES
FLATTER
14 DAYS
GREATER THAN 50 FEET
IN LENGTH
NONE
ALL OTHER AREAS
(EXCEPT FOR
WITH SLOPES FLATTER
14 DAYS
PERIMETERS AND
THAN 4:1
HQW ZONES)
CONSTRUCTION SEQUENCE
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND
HOLD PRE CONSTRUCTION CONFERENCE.
2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY -
-
SILT FENCE WHERE SPECIFIED. /
3. CLEAR AND GRUB THE SITE AS NEEDED.
4. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED -
AREAS. -
5. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO
REMOVE ALL TEMPORARY MEASURES. -/
6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED
AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND
ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. -
7. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL
STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST Gj
N /F
J.F. JOHNSON FAMILY, LLC
DB 7899, PG 536
PB 122, PG 117
/
/
/
/
//- pG
v
/ pG
/
/
/
/ J
�0�� ip/G
1p0
h
BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF - -/
TERMINATION (NOT). THE NOT IS AVAILABLE AT: -
HTTPS://EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION.
PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT -- -/ 00'� L) \
MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE / // vs� \
OF TERMINATION PROCESS.
� J \
-
-
/ 15" DRIVEWAY PIPE TO BE INSTALLED \ JZ)T
PER THE EXISTING DITCH LINE JO
/ (TYP)
-
- J
•rJ' >
-
-
-
- - !O
/ / O
-
- <O\
-
/
\00
34,901 SF
(0.80 AC)
ro
�S
1p
x
<\00
<\'O
N /F
o�
-
X O\
/ �Zp JO n
\ Co
ors JO O\
\ �
ors JO
'1011
'1 j6I 0^ J
O)
TEMPORARY J
SILT FENCE/ s+o)
ors O)
N /F
\ JOHN E. HARDIN
DB 4714, PG 811
PB 134, PG 191
EROSION CONTROL NOTES
1. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT
FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE.
THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO
MAINTAIN A PROPER BARRIER.
2. TEMPORARY EROSION CONTROL FACILITIES AND/OR
PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF
AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED
BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE
OR AT THE EARLIEST POSSIBLE POINT DURING
CONSTRUCTION.
3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES
SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR
0j SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL.
4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ
OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY
LAND DISTURBING ACTIVITIES. 910-433-3300
5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE
DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS.
REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING
OCCURS.
6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET
FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE
CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS,
STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS,
OR OTHER MEANS. CONTROL EROSION FROM ALL
STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES.
TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES
MUST BE NO LESS THAN FIVE FEET FROM THE
DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT
MORE THAN 24 HOURS.
7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL
DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE
AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION
AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND
REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION
CONTROL DEVICES IMMEDIATELY.
8. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL
DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE
FINAL STABILIZATION AND PERMANENT VEGETATION HAS
BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ
APPROVE THE ACTION PRIOR TO REMOVAL.
9. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION
ACTIVITY.
10. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL
TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION
ACTIVITIES.
11. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE
ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES
PERFORMING WORK ON THIS PROJECT.
12. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN
ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
13. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED
SLOPES AND FILLS SHALL BE NO GREATER THAN THE
�\�E sO��r/ ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
OTHER ADEQUATE EROSION CONTROL DEVICES OR
a N STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL,
WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY
PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED
WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES
OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR
PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION
MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN
0 90 CALENDAR DAYS FOLLOWING COMPLETION OF
CONSTRUCTION OR DEVELOPMENT.
m 14. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION
o CONTROL MEASURES SHOWN AND ANY ADDITIONAL
z
MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING
o THE COURSE OF CONSTRUCTION.
15. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT
0ARISE ON SITE IS SHAUN HARRELL. CONTACT
R. AUTRY FAMILY, LLC z (910)-263-2945.
N /F
RIDDLE FARMS LLC
DB 9668, PG 276
PB 147, PG 112
DB 10032, PG 58
/
/ s
�•
*TOTAL DISTURBED AREA:
2.4 AC
N44.48'52"E F
/ 15.91' i96'
NOTIFICATION OF COMBINED SELF -MONITORING AND
SELF -INSPECTION FORM:
/
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN
/
2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR
LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH
PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN IS BEING
FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE
INSPECTIONS TOOK EFFECT OCTOBER 1, 2010.
tx
TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS
\
AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR
/ p,
DEVELOPED A COMBINED FORM. THE SELF -INSPECTION
\
PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING
PROGRAM OF THE NPDES STORMWATER PERMIT FOR
j
CONSTRUCTION ACTIVITIES. THE FOCUS OF THE
®
\�•
SELF -INSPECTION REPORT IS THE INSTALLATION AND
`srn
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL
\F
MEASURES ACCORDING TO THE APPROVED PLAN. THE
GRAPHIC SCALE
INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF
/
N/F
THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND
30 o is 30 60
Know what's below. /
BRENDA C. BRISSON
O��
COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT:
DB 512, PG 884
HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION
Call before you dig. /
\F
IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM,
/
\
PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910)
433-3300.
( IN FEET )
1 inch = 30 ft.
THE CONTRACTOR MUST
CONTACT
NORTH CAROLINA ONE
CALL CENTER AT 1-800-632-4949 A MINIMUM OF
72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE
EXISTING UTILITIES LOCATED
120
4Dsite
solutions
civil engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777 license number I C-2354
wwwAD site solutions.com
IICAR9 �%
40': 0Fsss /0 ••• `9 i
,•4� SEA �� •;
0274
�'� 1 1111g0xv
U 4 -23 -.2.2
REVISIONS
PROJECT NAME
RUFUS
JOHNSON
ROAD
LOTS 4-7
EROSION
CONTROL PLAN
CLIENT
HARRELL
BUILDERS OF NC
LLC
PO Box 451
Raeford, North Carolina 28376
Phone: (910) 263-2945
PROJECT INFORMATION
DESIGNED BY:
BRETT
DRAWN BY:
BRETT
CHECKED BY:
SCOTT
PROJECT NUMBER:
1927
DRAWING SCALE
HORIZONTAL: 1 "=30'
DATE RELEASED
JUNE 23, 2022
SHEET NUMBER
C-3mO