Loading...
HomeMy WebLinkAboutNCC224155_Site Plan or Location Map_20221222VICINITY MAP NOT TO SCALE LEGEND: R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY 270 MAJOR CONTOUR 278 MINOR CONTOUR — SF — SF — SILT FENCE LINE — LO— roc— LIMITS OF CONSTRUCTION 0INLET PROTECTION CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY SILT FENCE WHERE SPECIFIED. 3. CLEAR AND GRUB THE SITE AS NEEDED. 4. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 5. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 7. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. EROSION CONTROL NOTES 1. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. N /F BRANTLEY ALLEN TURNER & CINDY TURNER DB 11522, PG 491 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7—DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) I — . ---r . _ NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: --F-- \ HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, i PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) / \ \ 433-3300. \ 8. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL 10 / /\ \ DEVICES STA FTER THE ION PROTECTED ND AREANENT HASVEGUNDERGONE TION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ r\ 27 / 25,E / / I APPROVE THE ACTION PRIOR TO REMOVAL. I 9. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION L \ ACTIVITY. 10. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL A TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 11. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES / PERFORMING WORK ON THIS PROJECT. 12. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE / / \ 24 I / \ / \ \ CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY I RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE / \ _ 64— �IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. �1 113. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED 12, SLOPES AND FILLS SHALL BE NO GREATER THAN THE 28 / 'sR\ <O ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY ' PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED G \ / 23,E I / \ 0, WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES <O n OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR I 00. / \ \ PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION < MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN G o0 13 001 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. C, 1 01 00 14. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION \ / 22 CONTROL MEASURES SHOWN AND ANY ADDITIONAL I r 22, / \ MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING 00 THE COURSE OF CONSTRUCTION. G <O 15 THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS GREG CAULDER. CONTACT 14 (919)-802-4959. 701 � � / �°c \ NO J°� k 60 n � I\ r o 31 \ \ / � N /F 5� T� �6 \ \ \ / / 00, ERAN CE CCCANADY& soANADY ��-� DB 4707, PG 25 U, I IF\ 18 i P B 51, PG 48 00 z o 17 m / r z ------ / SURVEY NOTE: INFORMATION USED FOR THIS SITE WAS PROVIDED BY HASTY N/F ® \ LAND SURVEYING, PLLC, 102 SHANNON ROAD, RED SPRINGS, NC \ I ERNEST T CANADY & 28377, 910-843-4510. \ / \ JANICE C CANADY \ - / I� THE SURVEY CAN BE FOUND AT CUMBERLAND COUNTY DB 2381, PG 611 GRAPHIC SCALE REGISTER OF DEEDS IN PLAT BOOK 148, PAGE 29 RECORDED r 100 0 50 100 200 Know what's below. MARCH 16, 2022. I I 111!!" Call before you dig. ` / 1 I_ ( IN FEET ) / 1 inch = 100 ft. I I \ � J THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 701 X / / r\20; / *TOTAL DISTURBED AREA: / 7.1 AC / r 19 -\ 400 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com .•••• ••. •% `9 i • 4� SEA • 0274 COT T 1 v-12-2,2 REVISIONS PROJECT NAME HALL'S FARM SUBDIVISION LOTS 13=1 61 29 &30 OVERALL EROSION CONTROL PLAN CLIENT GMC CONSTRUCTION OF NC, INC 9820 US Hwy 301 North Lumberton, North Carolina 28360 Phone: (910) 802-4959 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1950 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED OCTOBER 12, 2022 SHEET NUMBER C-1 00