HomeMy WebLinkAboutNCS000348_BIMS Inspection Report_20220601Compliance Inspection Report Permit: NCS000348 Effective: 04/01/20 Expiration: 03/31/25 Owner: CPI USA North Carolina LLC SOC: Effective: Expiration: Facility: Southport Power Plant County: Brunswick 1281 Power House Dr SE Region: Wilmington Aka Cogentrix Dr Southport NC 28461 Contact Person: Rick Houser Title: EHS Coordinator Phone: 910-457-4527 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/01/2022 Primary Inspector: Brian P Lambe Secondary Inspector(s): Entry Time 10:OOAM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 11:30AM Phone: Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC Inspection Date: 06/01/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: An inspection was conducted to evaluate the close out procedures for the permit. The site is currently being demolished. There is an erosion control plan BRUNS-2022-086 and NCGO10000 certificate of coverage NCC221387. The industrial stormwater permit can be rescinded upon site conditions that will not contribute to stormwater pollution. 1. The industrial process has ceased. 2. Stockpiles of coal, wood chips, and TDF are removed, leaving residual cleanup. The site will be excavated to a three foot depth to reach native soils. Less excavation can achieve the desired removal of remnant material. 3. The plant is mostly removed and they are in the process of removing all the metal and concrete from the site. 4. Wastewater components should be in compliance with NC DWR. 5. Groundwater and soil samples should be reviewed by Sue Robbins from DWM. The site can resume Representative Outfall Status for Outfall 005 to represent all other outfalls. If a sample exceeds the benchmark, you may need to sample all outfalls to identify where the source of the problem is. The drainage areas of the site are in flux neccesitating the ROS. The state post construction permit can be rescinded by removal of all Built Upon Area (BUA) on the site. There is not a form for this process. You will need to write a letter explaining how a permit is not needed. The owners should understand that any future actions on this site will need to go through permitting without benefit of the former BUA. Page 2 of 3 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC Inspection Date: 06/01/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? Comment: The ROS can be reinstated for the samplinc outfalls. ■❑❑❑ The Outfall 005 is now reDresentative for all Page 3 of 3