Loading...
HomeMy WebLinkAboutNCS000589_Annual Report_20220405 (2)DUKE ENERGY, PROGRESS April 14, 2022 RECEIVED AIPR 0 5 2022 CertMed Mall M 70192280 0001 43973341 (2 copies) Annette Lucas OEMLR-Stormwater Program NCDEMLR- Stormwater Permitting Program 1612 Mail Service Center Raleigh, NC 27699-1612 Subject: Annual Non-stormwater Discharge Evaluation and Certification Dear Ms. Lucas: W. H. Weatherspoon Plant 491 Power Plant Rd Lumberton, NC 28359 Mating Address. Kent Tyndall L V Sutton Energy Complex 801 Sutton Steam Plant Rd Wilmington, NC 28401 910.341-4775 t 910.34"790 As required by Part II, Section A. (1.)(e.) of Duke Energy Progress, LLC's W. H. Weatherspoon NPDES Stormwater Permit NCS000589, Duke hereby submits this certification of stormwater outfalls for the presence of non-stormwater discharges. The following permitted stormwater outtalis have been evaluated by visual observation for the presence of non-stormwater discharges: • Outfall SW-1: Runoff from an area draining the access road; • Outfall SW-2: Runoff from areas draining the access road, ditches along an abandoned railroad, an admin building, and a vegetative area adjacent to the power plant; • Outtall SW-3: Runoff from areas draining the western edge of the access road and a picnic area adjacent to the power plant Please note Section B (page 6 of 17) of our permit state: Outfalls SW-2 and SW-3 are influenced by groundwater. Should discharge characteristics or influences change such that discharges contain contaminated groundwater orother waters not authorized by this permit, the permiffee will be required to obtain or modify a wastewater permit to cover these discharges or rind an alternative to direct discharge. If there are any questions, please contact either: • Mr. Kent Tyndall, Environmental Professional for the W. H. Weatherspoon Plant; phone (910) 341-4775 or e-mail Kent.Tvndall®duke-energy.com; or • Ms. Elizabeth Glenn, Environmental Specialist in our Permitting & Compliance Group, phone (864) 642-8833 or email Elizabeth.Glenn@duke-energv.com. I certify, under penalty or law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submittedbased on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, We, accurate, and complete. I am aware that there are significant penalties for submitting false Information. Including the possibility of fines and imprisonment for knowing violations. Sincerely, Antonio Price, PE Station Manager Ms. Annette Lucas Annual Non-stormwater Discharge Evaluation and Certification Dated: Ap6114. 2022 Page 2 Non-Stormwater Discharge Assessment W. H. Weatherspoon Plant NPDES Stormwater Permit 9 NCS000589 8/10/2021 SW-1 No discharge N/A K Tyndall 8/10/2021 SW-2 Influenced by Identified In K Tyndall Groundwater. permit. 8/1012021 SW-3 No discharge Identified in K Tyndall permit. Section B (page 6 of 17) of our permit state 'Outfalls SW-2 and SW-3 are influenced by groundwater' IR/2022 SW-1 No discharge N/A K Tyndall 11`12022 SW-2 Influenced by Identified in K Tyndall 1/7/2022 SW-3 No discharge Identified in K Tyndall permit. Section B (page 6 of 17) of our permit state 'Outfalis SW-2 and SW-3 are influenced by groundwater'.