HomeMy WebLinkAboutNCC224031_Site Plan or Location Map_20221207PORT CITY COMMUNITY CHURCH
LELAND CAMPUS
DEVELOPER
PORT CITY COMMUNITY CHURCH
250 VISION DRIVE
WILMINGTON, NC 28403
ARCHITECT
EQUIP STUDIO
245 N MAIN STREET, SUITE 200
GREENVILLE, SC 29601
CIVIL ENGINEER / LAND PLANNER
CLD ENGINEERING, PLLC
P.O. BOX 1172
WILMINGTON, NC 28402
SURVEYOR
ESP ASSOCIATES, INC.
211 RACINE DRIVE, SUITE # 101
WILMINGTON, NC 28403
GEOTECHNICAL CONSULTANT
ECS SOUTHEAST, LLP
6714 NETHERLANDS DRIVE
WILMINGTON, NC 28405
ENVIRONMENTAL CONSULTANT
SOUTHERN ENVIRONMENTAL GROUP, INC.
5315 COLLEGE ROAD
WILMINGTON, NC 28412
TRAFFIC CONSULTANT
DAVENPORT
5917 OLEANDER DRIVE, SUITE 206
WILMINGTON, NC 28403
REVIEW AGENCY
APPROVAL DATE
PERMIT NUMBER
DUKE ENERGY TRANSMISSION LINE ENCROACHMENT
14 JUL 2022
N/A
N ih Brunswick Hlgh Scnoo
01tl'F. yellevtlle RdL 0" kett vine R�\\
Hope- House or Prayer Eternally
1 t Love F th( Ily Mnistn
PortCltyc tyC"uchLel—
' ex Ste ns B2Ck 11.1
15
1 f d M , R tl ntia
,A/V
x' Female Sh p rs P T. •in
VICINITY MAP
NOT TO SCALE
CONTENTS
SHEET NAME
COVER PORT CITY COMMUNITY CHURCH LELAND CAMPUS
GI-1 GENERAL NOTES AND SHEET INDEX
GI-2 NCDEQ NCGO1 INFORMATION
CG-1 DEMOLITION PLAN
CG-2 EROSION CONTROL PLAN
CG—Di EROSON CONTROL DETAILS
CG—D2 EROSION CONTROL DETAILS
CP-1 GRADING AND PAVING PLAN
CP-2 GRADNG AND PAVING PLAN
SW —Di WET DETENTION BASIN DETAILS
SW—D2 WET DETENTION BASIN DETAILS
C—Di CONSTRUCTION DETAILS
C—D2 CONSTRUCTION DETAILS
CU-1 PROPOSED UTILITY PLAN
CU—D1 GENERAL UTILITY DETAILS
CU—D2 GENERAL UTILITY DETAILS
CU—D3 GENERAL UTILITY DETAILS
DEP-1 DUKE ENERGY ENCROACHMENT
NOT PROVIDED IN THIS SET (INCLUDING BUT NOT LIMITED TO):
• PLANNING/LANDSCAPING/LIGHTING
• ARCHITECTURAL/MEP
• TRAFFIC/DRIVEWAY PLANS
• SITE ELECTRICAL
ISSUED FOR AGENCY REVIEW
NOT FOR CONSTRUCTION
BEFORE YOU BIG, CALL
North 8�
Carolinaw
RC81I.Org
CLD Engineering, PLLC
QM En9ineenn11-g ndpon, AmXiile -
Land Planning ICgrebuNon Management
NCSLLS Finn License P-0309
P.O.Box N Phone:910.25 SN
Wlairgron, NC 28402 Fax: 91P25d-0502
xxw.tltlem3.mm
U
L
W
z
U Q
0- n
Em z
O
E U v
o�
J O
U U
^^O
11
�o
F
U
0
pe
DEVELOPER
PORT CITY COMMUNITY
CHURCH (PC3)
250 VISION DRIVE
WILMINGTON, NC 28403
APPROVED: JRC PROJECT: Q1-03
CHECKElp, JBP SCALE: NTS
DESIGNED: JRC RELEASE: IFAR-NFC
SHEET
COVER