Loading...
HomeMy WebLinkAboutNCC224031_Site Plan or Location Map_20221207PORT CITY COMMUNITY CHURCH LELAND CAMPUS DEVELOPER PORT CITY COMMUNITY CHURCH 250 VISION DRIVE WILMINGTON, NC 28403 ARCHITECT EQUIP STUDIO 245 N MAIN STREET, SUITE 200 GREENVILLE, SC 29601 CIVIL ENGINEER / LAND PLANNER CLD ENGINEERING, PLLC P.O. BOX 1172 WILMINGTON, NC 28402 SURVEYOR ESP ASSOCIATES, INC. 211 RACINE DRIVE, SUITE # 101 WILMINGTON, NC 28403 GEOTECHNICAL CONSULTANT ECS SOUTHEAST, LLP 6714 NETHERLANDS DRIVE WILMINGTON, NC 28405 ENVIRONMENTAL CONSULTANT SOUTHERN ENVIRONMENTAL GROUP, INC. 5315 COLLEGE ROAD WILMINGTON, NC 28412 TRAFFIC CONSULTANT DAVENPORT 5917 OLEANDER DRIVE, SUITE 206 WILMINGTON, NC 28403 REVIEW AGENCY APPROVAL DATE PERMIT NUMBER DUKE ENERGY TRANSMISSION LINE ENCROACHMENT 14 JUL 2022 N/A N ih Brunswick Hlgh Scnoo 01tl'F. yellevtlle RdL 0" kett vine R�\\ Hope- House or Prayer Eternally 1 t Love F th( Ily Mnistn PortCltyc tyC"uchLel— ' ex Ste ns B2Ck 11.1 15 1 f d M , R tl ntia ,A/V x' Female Sh p rs P T. •in VICINITY MAP NOT TO SCALE CONTENTS SHEET NAME COVER PORT CITY COMMUNITY CHURCH LELAND CAMPUS GI-1 GENERAL NOTES AND SHEET INDEX GI-2 NCDEQ NCGO1 INFORMATION CG-1 DEMOLITION PLAN CG-2 EROSION CONTROL PLAN CG—Di EROSON CONTROL DETAILS CG—D2 EROSION CONTROL DETAILS CP-1 GRADING AND PAVING PLAN CP-2 GRADNG AND PAVING PLAN SW —Di WET DETENTION BASIN DETAILS SW—D2 WET DETENTION BASIN DETAILS C—Di CONSTRUCTION DETAILS C—D2 CONSTRUCTION DETAILS CU-1 PROPOSED UTILITY PLAN CU—D1 GENERAL UTILITY DETAILS CU—D2 GENERAL UTILITY DETAILS CU—D3 GENERAL UTILITY DETAILS DEP-1 DUKE ENERGY ENCROACHMENT NOT PROVIDED IN THIS SET (INCLUDING BUT NOT LIMITED TO): • PLANNING/LANDSCAPING/LIGHTING • ARCHITECTURAL/MEP • TRAFFIC/DRIVEWAY PLANS • SITE ELECTRICAL ISSUED FOR AGENCY REVIEW NOT FOR CONSTRUCTION BEFORE YOU BIG, CALL North 8� Carolinaw RC81I.Org CLD Engineering, PLLC QM En9ineenn11-g ndpon, AmXiile - Land Planning ICgrebuNon Management NCSLLS Finn License P-0309 P.O.Box N Phone:910.25 SN Wlairgron, NC 28402 Fax: 91P25d-0502 xxw.tltlem3.mm U L W z U Q 0- n Em z O E U v o� J O U U ^^O 11 �o F U 0 pe DEVELOPER PORT CITY COMMUNITY CHURCH (PC3) 250 VISION DRIVE WILMINGTON, NC 28403 APPROVED: JRC PROJECT: Q1-03 CHECKElp, JBP SCALE: NTS DESIGNED: JRC RELEASE: IFAR-NFC SHEET COVER